Sunnyside Intermediate School - New School Construction State and local contract opportunity
Solicitation number
SSD22004-NC_NEWIS
Issued by
New Castle County, Delaware

About this file

This document is a comprehensive technical specification for the Sunnyside Intermediate School New Construction Project in Smyrna, Delaware, involving the Smyrna School District and prepared by Fearn-Clendaniel Architects. The specification focuses specifically on the plumbing, HVAC, and fire protection systems for the new school, detailing technical requirements for piping, valves, equipment, materials, installation methods, testing procedures, and quality standards. The document covers multiple technical sections including common work results, piping systems, equipment specifications, insulation, fixtures, and vibration controls, with extensive requirements for materials, installation, testing, and documentation.

The specification emphasizes compliance with numerous national and local codes and standards, including ASHRAE, NFPA, ASME, and Delaware state regulations. Key technical requirements include detailed specifications for pipe materials, valve types, expansion joints, supports, and installation methods, with specific attention to potential issues like thermal expansion, corrosion prevention, and system performance. The documentation also mandates comprehensive testing, cleaning, and documentation procedures, including detailed requirements for system flushing, chemical treatment, and maintenance. Specific focus is placed on energy efficiency, lead-free materials, and system integration, with requirements for professional certification, manufacturer warranties, and thorough commissioning and training processes.

View the file

Other files for this state and local contract opportunity

Other files attached to Sunnyside Intermediate School - New School Construction, newest first.
File Type Posted
SSD22004-NC_NEWIS-specs1.pdf PDF
SSD22004-NC_NEWIS-specs4.pdf PDF
SSD22004-NC_NEWIS-specs2.pdf PDF
SSD22004-NC_NEWIS-rfp.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SMYRNA SCHOOL DISTRICT

BID No SSD22004-NC_NEWIS

SPECIFICATIONS FOR

SUNNYSIDE INTERMEDIATE

SCHOOL

New School

IN

70 GRACEVILLE DRIVE

SMYRNA, DELAWARE 19977

ARCHITECT’S PROJECT No 22019

Volume 3

PREPARED BY:

Fearn-Clendaniel Architects, Inc.

ISSUED FOR BIDDING/CONSTRUCTION

April 2025

12-20-2024 12-20-2024

Smyrna School District Sunnyside Intermediate School – New School

Smyrna, Delaware #SSD22004-NC_NEWIS

Fearn-Clendaniel Architects, Inc. COMMON WORK RESULTS FOR FIRE PROTECTION

22019 21 05 00 – 1 of 24

DIVISION 21 SECTION 21 05 00

COMMON WORK RESULTS FOR FIRE PROTECTION

TABLE OF CONTENTS

PART 1. GENERAL

1.1. SUMMARY

1.2. PERMITS AND FEES

1.3. EXAMINATION OF SITE

1.4. CONTRACTOR QUALIFICATION

1.5. MATERIALS AND EQUIPMENT

1.6. FIRE SAFE MATERIALS

1.7. REFERENCED STANDARDS, CODES AND SPECIFICATIONS

1.8. SUBMITTALS, REVIEW AND ACCEPTANCE

1.9. SHOP DRAWINGS

1.10. SUPERVISION AND COORDINATION

1.11. CUTTING AND PATCHING

1.12. PENETRATION OF WATERPROOF CONSTRUCTION

1.13. CONCRETE AND MASONRY WORK

1.14. CONNECTIONS AND ALTERATIONS TO EXISTING WORK

1.15. DEMOLITION

1.16. EXCAVATION AND BACKFILLING

1.17. DRIVE GUARDS

1.18. VIBRATION ISOLATION

1.19. ALTERNATES

1.20. DEFINITIONS

1.21. FUTURE ADDITIONS

PART 2. ELECTRICAL REQUIREMENTS

2.1. GENERAL MOTOR AND ELECTRICAL REQUIREMENTS

2.2. MOTORS AND CONTROLS

2.3. MOTOR INSTALLATION

2.4. WIRING DIAGRAMS

2.5. ENCLOSURES

PART 3. EXECUTION

3.1. EQUIPMENT INSTALLATION - COMMON REQUIREMENTS

3.2. SUPPORTS, HANGERS AND FOUNDATIONS

3.3. DEMONSTRATION AND TRAINING VIDEO RECORDINGS

3.4. PROVISIONS FOR ACCESS

3.5. PAINTING AND FINISHES

3.6. CLEANING OF SYSTEMS

3.7. COLOR SELECTION

3.8. PROTECTION OF WORK

3.9. OPERATION OF EQUIPMENT

3.10. IDENTIFICATIONS, FLOW DIAGRAMS, ELECTRICAL DIAGRAMS AND OPERATING

INSTRUCTIONS

3.11. WALL AND FLOOR PENETRATION

3.12. RECORD DRAWINGS

3.13. WARRANTY

3.14. LUBRICATION

Sunnyside Intermediate School – New School Smyrna School District

#SSD22004-NC_NEWIS Smyrna, Delaware

COMMON WORK RESULTS FOR FIRE PROTECTION Fearn-Clendaniel Architects, Inc.

21 05 00 – 2 of 24 22019

3.15. OPERATION AND MAINTENANCE MANUALS

3.16. INSTALLATION AND COORDINATION DRAWINGS

3.17. PIPING SYSTEMS TESTING

3.18. OUTAGES

END OF SECTION

22019 21 05 00 – 3 of 24

SECTION 21 05 00 - COMMON WORK RESULTS FOR FIRE PROTECTION

PART 1. GENERAL

1.1. SUMMARY

A. All work under Division 21 is subject to the Division 01, General Conditions and Special

Requirements for the entire contract.

B. Provide all labor, materials, equipment, and services necessary for and incidental to the complete installation and operation of all mechanical work.

C. Unless otherwise specified, all submissions shall be made to, and acceptances and approvals made by the Architect.

D. Contract Drawings are generally diagrammatic and all offsets, fittings, transitions and accessories are not necessarily shown. Furnish and install all such items as may be required to fit the work to the conditions encountered. Arrange piping, equipment, and other work generally as shown on the contract drawings, providing proper clearance and access.

Where departures are proposed because of field conditions or other causes, prepare and submit detailed shop drawings for approval in accordance with Submittals specified below.

The right is reserved to make reasonable changes in location of equipment, and piping up to the time of rough-in or fabrication.

E. Conform to the requirements of all rules, regulations and codes of local, state and federal authorities having jurisdiction.

F. Coordinate the work under Division 21 with the work of all other construction trades.

G. Be responsible for all construction means, methods, techniques, procedures, and phasing sequences used in the work. Furnish all tools, equipment and materials necessary to properly perform the work in first class, substantial, and workmanlike manner, in accordance with the full intent and meaning of the contract documents.

1.2. PERMITS AND FEES

A. Obtain all permits and pay taxes, fees and other costs in connection with the work. File necessary plans, prepare documents, give proper notices and obtain necessary approvals.

Deliver inspection and approval certificates to Owner prior to final acceptance of the work.

B. Permits and fees shall comply with the Division 01, General Requirements of the specification.

1.3. EXAMINATION OF SITE

A. Examine the site, determine all conditions and circumstances under which the work must be done, and make all necessary allowances for same. No additional cost to the Owner will be permitted for Contractors failure to do so.

B. Examine and verify specific conditions described in individual specifications sections.

21 05 00 – 4 of 24 22019

C. Verify that utility services are available, of the correct characteristics, and in the correct locations.

1.4. CONTRACTOR QUALIFICATION

A. Any Contractor or Subcontractor performing work under Division 21 shall be fully qualified and acceptable to the Architect and Owner. Submit the following evidence when requested:

1. A list of not less than five comparable projects which the Contractor completed.

2. Letter of reference from not less than three registered professional engineers, general contractors or building owners.

3. Local and/or State License, where required.

4. Membership in trade or professional organizations where required.

B. A Contractor is any individual, partnership, or corporation, performing work by contract or subcontract on this project.

C. Acceptance of a Contractor or Subcontractor will not relieve the Contractor or subcontractor of any contractual requirements or his responsibility to supervise and coordinate the work, of various trades.

1.5. MATERIALS AND EQUIPMENT

A. Materials and equipment installed as a permanent part of the project shall be new, unless otherwise indicated or specified, and of the specified type and quality.

B. Where material or equipment is identified by proprietary name, model number and/or manufacturer, furnish named item, or its equal, subject to approval by Engineer.

Substituted items shall be equal or better in quality and performance and must be suitable for available space, required arrangement, and application. Submit all data necessary to determine suitability of substituted items, for approval.

C. The suitability of named item only has been verified. Where more than one item is named, only the first named item has been verified as suitable. Substituted items, including items other than first named shall be equal or better in quality and performance to that of specified items, and must be suitable for available space, required arrangement and application.

Contractor, by providing other than the first named manufacturer, assumes responsibility for all necessary adjustments and modifications necessary for a satisfactory installation.

Adjustments and modifications shall include but not be limited to electrical, structural, support, and architectural work.

D. Substitution will not be permitted for specified items of material or equipment where noted.

E. All items of equipment furnished shall have a service record of at least five (5) years.

1.6. FIRE SAFE MATERIALS

A. Unless otherwise indicated, materials and equipment shall conform to UL, NFPA and

ASTM standards for fire safety with smoke and fire hazard rating not exceeding flame spread of 25 and smoke developed of 50.

22019 21 05 00 – 5 of 24

1.7. REFERENCED STANDARDS, CODES AND SPECIFICATIONS

A. Specifications, Codes and Standards listed below are included as part of this specification, latest edition.

B. ASTM - American Society for Testing and Materials

C. FM - Factory Mutual

D. IBC - International Building Code

E. IEEE - Institute of Electrical and Electronics Engineers

F. MSSP - Manufacturers Standards Society of the Valve and Fittings

Industry

G. NEC - National Electrical Code

H. NEMA - National Electrical Manufacturers Association

I. NFPA - National Fire Protection Association

J. UL - Underwriters' Laboratories

K. State of Delaware Fire Protection Requirements.

L. All equipment materials, piping and installation shall comply with the codes and standards listed in the enforceable edition of the Applicable National Fire Protection Association

Pamphlets.

M. Fire Protection Systems design, equipment and installation shall comply with the Delaware

State Fire Prevention Regulations, latest edition including all Annexes and Addendums.

1.8. SUBMITTALS, REVIEW AND ACCEPTANCE

A. Equipment, materials, installation, workmanship and arrangement of work are subject to review and acceptance. No substitution will be permitted after acceptance of equipment or materials except where such substitution is considered by the Architect to be in best interest of Owner.

B. After acceptance of Material and Equipment List, submit six (6) copies or more as required under General Conditions of complete descriptive data for all items. Data shall consist of specifications, data sheets, samples, capacity ratings, performance curves, operating characteristics, catalog cuts, dimensional drawings, wiring diagrams, installation instructions, and any other information necessary to indicate complete compliance with

Contract Documents. Edit submittal data specifically for application to this project.

C. Thoroughly review and stamp all submittals to indicate compliance with contract requirements prior to submission. Coordinate installation requirements and any electrical requirements for equipment submitted. Contractor shall be responsible for correctness of all submittals.

21 05 00 – 6 of 24 22019

D. Submittals will be reviewed for general compliance with design concept in accordance with contract documents, but dimensions, quantities, or other details will not be verified.

E. Identify submittals, indicating intended application, location and service of submitted items. Refer to specification sections or paragraphs and drawings where applicable.

Clearly indicate exact type, model number, style, size and special features of proposed item. Submittals of a general nature will not be acceptable. For substituted items, clearly list on the first page of the submittal all differences between the specified item and the proposed item. The contractor shall be responsible for corrective action and maintaining the specification requirements if differences have not been clearly indicated in the submittal.

F. Submit actual operating conditions or characteristics for all equipment where required capacities are indicated. Factory order forms showing only required capacities will not be acceptable. Call attention, in writing, to deviation from contract requirements.

G. Acceptance will not constitute waiver of contract requirements unless deviations are specifically indicated and clearly noted. Use only final or corrected submittals and data prior to fabrication and/or installation.

H. For any submittal requiring more than two (2) reviews by the Engineer (including those caused by a change in subcontractor or supplier) the Owner will withhold contractor's funds by a change order to the contract to cover the cost of additional reviews. One review is counted for each action including rejection or return of any reason.

I. For resubmissions, the Contractor must address in writing all of the Engineer’s comments on the original submission to verify compliance.

1.9. SHOP DRAWINGS

A. Prepare and submit shop drawings for all mechanical equipment, specially fabricated items, modifications to standard items, specially designed systems where detailed design is not shown on the contract drawings, or where the proposed installation differs from that shown on contract drawings.

B. Submit data and shop drawings including but not limited to the list below, in addition to provisions of the paragraph above. Identify all shop drawings by the name of the item and system and the applicable specification paragraph number and drawing number.

C. Every submittal including, but not limited to the list below, shall be forwarded with its own transmittal as a separate, distinct shop drawing. Grouping of items/systems that are not related shall be unacceptable.

D. Items and Systems

1. Access Doors/Panels including layout and location

2. Alarm Check Valves

3. Backflow Preventers

4. Blind Flange

5. Coordinated Drawings

6. Drip Pans

22019 21 05 00 – 7 of 24

7. Exterior Equipment/Piping Supports

8. Fire Protection System including Hydraulic Calculations, Equipment and Devices

9. Fire Pump and Accessories

10. Fire Pump Controller and automatic transfer switch

11. Fire Stopping - Methods and Materials

12. Flowmeter and Primary Elements (Flow Fittings)

13. Gongs

14. Hose Valve Cabinets and Hose Valves

15. Identification System

16. Jockey Pump/controllers

17. Material and Equipment List

18. Operations and Maintenance Manuals

19. Pipe Materials Including Itemized Schedule

20. Preliminary and Final Pipe Pressure Tests

21. Pressure Gauges

22. Pressure Relief Valves

23. Pump Pressure Switches

24. Pumps

25. Sprinkler Heads

26. Standpipes

27. Strainers

28. Test Certificates

29. Valves

30. Vibration Isolation Materials

31. Weatherproof Assembly Components

32. Wiring Diagrams, Flow Diagrams and Operating Instructions

33. Zone Valve Assemblies

E. Contractor, additionally, shall submit for review any other shop drawings as required by the Architect. No item shall be delivered to the site, or installed, until the Contractor has received a submittal from the Engineer marked Reviewed or Comments Noted. After the proposed materials have been reviewed, no substitution will be permitted except where approved by the Architect.

F. For any shop drawing requiring more than two (2) reviews by the Engineer (including those caused by a change in subcontractor or supplier) the Owner will withhold contractor's funds by a change order to the contract to cover the cost of additional reviews. One review is counted for each action including rejection or return of any reason.

1.10. SUPERVISION AND COORDINATION

A. Provide complete supervision, direction, scheduling, and coordination of all work under the Contract, including that of subcontractors.

B. Coordinate rough-in of all work and installation of sleeves, anchors, and supports for piping, equipment, and other work performed under Division 21.

C. Arrange for pipe spaces, chases, slots, and openings in building structure during progress of construction to allow for fire protection installations.

D. Coordinate electrical work required under Division 21 with that under Division 26.

21 05 00 – 8 of 24 22019

Coordinate all work under Division 21 with work under all other Divisions.

E. Supply services of an experienced (10 years minimum) and competent Project Manager to be in constant charge of work at site.

F. Where a discrepancy exists within the specifications or drawings or between the specifications and drawings, the more stringent (or costly) requirement shall apply until clarification can be obtained from the Engineer. Failure to clarify such discrepancies with the Engineer will not relieve the Contractor of the responsibility of conforming to the requirements of the Contract.

G. Failure of contractor to obtain a full and complete set of contract documents (either before or after bidding) will not relieve the contractor of the responsibility of complying with the intent of the contract documents.

H. Coordinate installation of large equipment requiring positioning before closing in building.

1.11. CUTTING AND PATCHING

A. Accomplish all cutting and patching necessary for the installation of work under Division

21. Damage resulting from this work to other work already in place, shall be repaired at

Contractor's expense. Where cutting is required, perform work in neat and workmanlike manner. Restore disturbed work to match and blend with existing construction and finish, using materials compatible with the original. Use mechanics skilled in the particular trades required.

B. Do not cut structural members without approval from the Architect or Structural Engineer.

1.12. PENETRATION OF WATERPROOF CONSTRUCTION

A. Coordinate the work to minimize penetration of waterproof construction, including roofs, exterior walls, and interior waterproof construction. Where such penetrations are necessary, furnish and install all necessary curbs, sleeves, flashings, fittings and caulking to make penetrations absolutely watertight.

B. Where pipes penetrate roofs, flash pipe with Stoneman Stormtite, Pate or approved equal, roof flashing assemblies with skirt and caulked counter flashing sleeve.

C. Furnish and install pitch pockets or weather tight curb assemblies where required.

D. Furnish and install curbs, specifically designed for application to the particular roof construction, and install in accordance with the manufacturer's instructions. The

Contractor shall be responsible for sleeve sizes and locations. All roof penetrations shall be installed in accordance with manufacturer’s instructions, the National Roofing

Contractors Association, SMACNA, and as required by other divisions of these specifications.

1.13. CONCRETE AND MASONRY WORK

A. Furnish and install concrete and masonry work for equipment foundations, supports, pads, and other items required under Division 21. Perform work in accordance with

22019 21 05 00 – 9 of 24 requirements of other applicable Divisions of these specifications.

B. Concrete shall test not less than 3,000 psi compressive strength after 28 days.

C. Grout shall be non-shrink, high strength mortar, free of iron of chlorides and suitable for use in contact with all metals, without caps or other protective finishes. Apply in accordance with manufacturer's instructions and standard grouting practices.

1.14. CONNECTIONS AND ALTERATIONS TO EXISTING WORK

A. Unless otherwise noted on the drawings, where existing fire protection work is removed, pipes, valves, etc., shall be removed, including hangers, to a point below finished floors or behind finished walls and capped. Such point shall be far enough behind finished surfaces to allow for installation of normal thickness of required finish material.

B. Where work specified in Division 21 connects to existing equipment and piping, etc., Contractor shall perform all necessary alterations, cuttings, fittings, etc., of existing work as may be necessary to make satisfactory connections between new and existing work, and to leave completed work in a finished and workmanlike condition.

C. Where the work specified under Division 21, or under other Divisions, requires relocation of existing equipment, piping, etc., Contractor shall perform all work and make necessary changes to existing work as may be required to leave completed work in a finished and workmanlike condition.

D. Where the relocation of existing equipment is required for access or the installation of new equipment, the contractor shall temporarily remove and/or relocate and re-install as required to leave the existing and new work in a finished and workman like condition.

1.15. DEMOLITION

A. Unless otherwise noted all existing equipment, piping, etc., shall remain.

B. Where existing equipment is indicated to be removed, all associated piping, conduit, power, controls, insulation, hangers, supports and housekeeping pads, etc. Patch, paint and repair walls/roof/floor to match existing and/or new finishes.

C. Provide necessary piping, valves, temporary feeds, etc., as required. Drain and refill piping systems as often as necessary to accommodate phasing and to minimize time lengths of outages.

D. The Contractor shall be responsible for visiting the site and determining the existing conditions in which the work is to be performed.

E. Where any abandoned pipes in existing floors, walls, pipe tunnels, ceilings, etc., conflict with new work, remove abandoned pipes as necessary to accommodate new work.

F. The location of all existing equipment, piping, etc., indicated is approximate only and shall be checked and verified. Install all new fire protection work to connect to or clear existing work as applicable.

21 05 00 – 10 of 24 22019

G. Maintain egress at all times. Coordinate egress requirements with the State Fire Marshal, the Owner and the authorities having jurisdiction.

H. Make provisions and include in bid all costs associated with confined entry/space requirements in and all other applicable OSHA regulations.

I. Where required to maintain the existing systems in operation, temporarily backfeed existing systems from new equipment. Contractor shall temporarily extend existing piping systems to new piping systems with the appropriate shut-off valves and tamper switches.

J. At completion of project all temporary piping, valves, controls, etc., shall be removed in their entirely.

K. Existing piping, equipment, materials, etc., not required for re-use or re-installation in this project, shall be removed from the project site.

L. Deliver to the Owner, on the premises where directed, existing equipment and materials which are removed and which are desired by the Owner or are indicated to remain the property of the Owner.

M. All other materials and equipment which are removed shall become property of the

Contractor and shall be promptly removed, from the premises, and disposed of by the

Contractor, in an approved manner.

N. Where piping is removed, remove all pipe hangers which were supporting the removed piping. Patch the remaining penetration voids with like materials and paint to match existing construction.

O. Before demolition begins, and in the presence of the Owners representative, test and note all deficiencies in all existing systems affected by demolition but not completely removed by demolition. Provide a copy of the list of system deficiencies to the Owner and the

Engineer. Videotape existing conditions in each space prior to beginning demolition work.

P. The Owner shall have the first right of refusal for all devices and equipment removed by the Contractor.

Q. All devices and equipment designated by the Owner to remain the property of the Owner shall be moved and stored by the Contractor at a location on site as designated by the

Owner. It shall be the Contractor’s responsibility to store all devices and equipment in a safe manner to prevent damage while stored.

R. All existing equipment refused by the Owner shall become the property of the Contractor and shall be removed from the site by the Contractor in a timely manner and disposed of in a legal manner.

S. Work Abandoned in Place: cut and remove underground pipe a minimum of 2 inches beyond face of adjacent construction. Cap and patch surface to match existing finish.

T. Temporary Disconnection: Remove, store, clean, reinstall, reconnect, and make operational equipment indicated for relocation.

22019 21 05 00 – 11 of 24

U. Terminate services and utilities in accordance with local laws, ordinances, rules and regulations.

1.16. EXCAVATION AND BACKFILLING

A. General

1. Perform all necessary excavation, or installation of work under Division 21, in whatever materials or conditions encountered, using suitable methods and equipment.

2. Accurately establish required lines and grades and properly locate the work.

3. Determine the locations of all existing utilities before commencing the work.

B. Excavation: (Refer also to other portions of the specifications)

1. Excavate only the required elevations. If excavation is carried below the foundation lines or other required limits, backfill the excess with concrete.

2. Keep banks of trenches as nearly vertical as possible, and provide sheeting and/or shoring as required for protection of work and safety of personnel. Follow local, State, OSHA Guidelines.

3. Keep excavations dry. Protect excavations from freezing.

C. Backfilling: (Refer also to other portions of the specifications)

1. Backfill excavations to the required elevations and restore surfaces to their original or required conditions.

2. Backfill shall be similar material, free from objectionable matter such as rubbish, roots, stumps, brush, rocks and other sharp objects. Unless otherwise indicated, suitable material from the excavation may be used for backfill.

3. Carefully place and mechanically tamp backfill in layers not exceeding 12 inches loose thickness. Compact to 95 percent minimum.

4. Do not backfill against frozen material. Do not use frozen material for backfill.

1.17. DRIVE GUARDS

A. Provide safety guards on all exposed belt drives, motor couplings, and other rotating machinery. Provide fully enclosed guards where machinery is exposed from more than one direction.

B. When available, guards shall be factory fabricated and furnished with the equipment.

Otherwise fabricate guards of heavy gauge steel, rigidly braced, removable, and finish to match equipment served. Provide openings for tachometers. Guards shall meet local, State and O.S.H.A. requirements.

1.18. VIBRATION ISOLATION

A. Furnish and install vibration isolators, flexible connections, supports, anchors and/or foundations required to prevent transmission of vibration from equipment, or piping to building structure. See Division 23 Section, “Vibration Control for HVAC Plumbing and

Fire Protection Equipment”.

21 05 00 – 12 of 24 22019

1.19. ALTERNATES

A. Refer to Division 01 Section, “Alternates” for description of work under this section affected by alternates

1.20. DEFINITIONS

A. Approve - to permit use of material, equipment or methods conditional upon compliance with contract documents requirements.

B. Furnish and install or provide means to supply, erect, install, and connect to complete for readiness for regular operation, the particular work referred to.

C. Contractor means the mechanical contractor and any of his subcontractors, vendors, suppliers, or fabricators.

D. Piping includes pipe, all fittings, valves, hangers, insulation, identification, and other accessories relative to such piping.

E. Concealed means hidden from sight in chases, formed spaces, shafts, hung ceilings, embedded in construction.

F. Exposed means not installed underground or concealed as defined above.

G. Invert Elevation means the elevation of the inside bottom of pipe.

H. Finished Spaces: Spaces other than mechanical and electrical equipment rooms, furred spaces, pipe and duct shafts, unheated spaces immediately below roof, spaces above ceiling, unexcavated spaces, crawl spaces, and tunnels.

I. Review - limited observation or checking to ascertain general conformance with design concept of the work and with information given in contract documents. Such action does not constitute a waiver or alteration of the contract requirements.

J. Building Line: Exterior wall of building.

1.21. FUTURE ADDITIONS

A. Where future additions are indicated, size, calculate, and install all piping to account for future additions. Furnish and install control valve with tamper switch in ceiling adjacent to future additions. Provide cap at the end of the piping. Arrange so that in the future the cap can be removed and control valve opened to serve future additions without draining system.

PART 2. ELECTRICAL REQUIREMENTS

2.1. GENERAL MOTOR AND ELECTRICAL REQUIREMENTS

A. Furnish and install control and interlock wiring for the equipment furnished. In general, power wiring and motor starting equipment will be provided under Division 26. Carefully review the contract documents to coordinate the electrical work under Division 21 with the

22019 21 05 00 – 13 of 24 work under Division 26. Where the electrical requirements of the equipment furnished differ from the provisions made under Division 26, make the necessary allowances under

Division 21. Where no electrical provisions are made under Division 26, include all necessary electrical work under Division 21.

B. All electrical work performed under Division 21 shall conform to the applicable requirements of Division 26 and conforming to the National Electrical Code. All wiring, conduit, etc., installed in ceiling plenums must be plenum rated per NFPA and the IBC.

C. Provide wiring diagrams with electrical characteristics and connection requirements.

D. Test Reports: Indicate test results verifying nominal efficiency and power factor for three phase motors larger than five (5) horsepower.

E. Protect motors stored on site from weather and moisture by maintaining factory covers and suitable weatherproof covering. For extended outdoor storage, remove motors from equipment and store separately.

F. All motors shall be furnished with visible nameplate indicating motor horsepower, voltage, phase, cycles, RPM, full load amps, locked rotor amps, frame size, manufacturer’s name and model number, service factor, power factor and efficiency.

G. Nominal efficiency and power factor shall be as scheduled at full load and rated voltage when tested in accordance with IEEE 112.

H. Brake horsepower load requirement at specified duty shall not exceed 85 percent of nameplate horsepower times NEMA service factor for motors with 1.0 and 1.15 service factors.

I. All single phase motors shall be provided with thermal protection: Internal protection shall automatically open power supply circuit to motor when winding temperature exceeds a safe value calibrated to temperature ratings of motor insulation. Thermal protection device shall automatically reset when motor temperature returns to normal range, unless otherwise indicated.

J. Where equipment under this Division is specified with integral disconnecting means, the same shall be a single disconnecting means for disconnecting all ungrounded main power supply conductors that is capable of being locked in the open (“off”) position in accordance with the National Electrical Code and the local electrical inspector.

2.2. MOTORS AND CONTROLS

A. Motors and controls shall conform to the latest requirements of IEEE, NEMA, NFPA-70 and shall be UL listed. Motor sizes are specified with the driven equipment. Motor starting and control equipment is specified either with the motor which is controlled or in an electrical specification section. The Contractor is advised to consult all specification sections to determine responsibility for motors and controls.

B. Motors shall be designed, built and tested in accordance with the latest revision of NEMA

Standard MG l.

21 05 00 – 14 of 24 22019

C. Motors shall be suitable for use under the conditions and with the equipment to which applied, and designed for operation on the electrical systems specified or indicated.

1. Motor capacities shall be such that the horsepower rating and the rated full-load current will not be exceeded while operating under the specified operating conditions. Under no condition shall the motor current exceed that indicated on the nameplates.

2. Motor sizes noted in the individual equipment specifications are minimum requirements only. It is the responsibility of the equipment manufacturers and of the Contractor to furnish motors, electrical circuits and equipment of ample capacity to operate the equipment without overloading, exceeding the rated full-load current, or overheating at full-load capacity under the most severe operating service of this equipment. Motors shall have sufficient torque to accelerate the total WR2 of the driven equipment to operating speed.

3. Motors shall be continuous duty type and shall operate quietly at all speeds and loads.

4. Motors shall be designed for operation on 60 hertz power service. Unless otherwise specified or shown, motors less than ½ horsepower shall be single phase, and motors ½ horsepower and larger shall be 3 phase unless otherwise noted.

5. Motors shall be mounted so that the motor can be removed without removing the entire driven unit.

D. Single phase motors, smaller than 1/20 horsepower shall be ball or sleeve bearing; drip-proof, totally enclosed or explosion proof, as specified; 120 volts; permanent-split capacitor or shaded pole type. These motors shall not be used for general power purposes, and shall only be provided as built-in components. When approved by the Engineer, deviations from the specifications will be permitted as follows:

1. Open motors may be installed as part of an assembly where enclosure within a cabinet provides protection against moisture.

2. Motors used in conjunction with low voltage control systems may have a voltage rating less than 115 volts.

E. Single phase motors, greater than 1/20 horsepower and less than ½ horsepower shall be ball bearing; drip-proof, totally enclosed or explosion proof, as specified, with Class A or

B insulation, as standard with the motor manufacturer; 115 or 120/208/240 volts as required; capacitor start-induction run, permanent split capacitor, or repulsion start-induction run type with minimum efficiency of 70 percent and a minimum full load power of 77 percent.

F. Except as otherwise specified in the various specification sections, 3 phase motors 60 horsepower and smaller shall be NEMA design B squirrel cage induction type meeting the requirements of this paragraph. Motors shall be drip-proof, totally enclosed or explosion proof, as specified or indicated. Insulation shall be Class B or F, at 40 degrees C ambient temperature. Drip-proof motors shall have a 1.15 service factor and totally enclosed and explosion proof motors shall have a service factor of 1.00 or higher. Motors specified for operation at 480, 240, and 208 volts shall be name-plated 460, 230, 200 volts, respectively.

Efficiencies and percent power factor at full load for three phase motors shall be not less than the values listed below for premium efficiency motors:

22019 21 05 00 – 15 of 24

MOTOR NAMEPLATE MINIMUM PERCENT

EFFICIENCY AT

NOMINAL SPEED AND

RATED LOAD

MINIMUM PERCENT

POWER FACTOR

1HP and above to 85.5 percent 84 percent

1-½ HP 86.5 percent 85 percent

2HP 86.5 percent 85 percent

3HP 89.5 percent 86 percent

5HP 89.5 percent 87 percent

7½ HP 91 percent 86 percent

10HP 91.7 percent 85 percent

15HP 93.0 percent 85 percent

20HP 93.0 percent 86 percent

25HP 93.6 percent 85 percent

50HP and above 94.5 percent 88 percent

G. Three phase motors ½ HP or greater shall be the Duty Master XE by Reliance Electric

Company, Super-E Premium Efficiency of Baldor Motor and Drives, E-plus Efficient

Standard Duty Motor of the Electric Motor Division of Gould, Inc., the MAC II High

Efficiency motor of Westinghouse Electric Corp., the equivalent product of General

Electric, or approved equal.

H. Motor frames shall be NEMA Standard T-Frames of steel, aluminum, or cast iron with end brackets of cast-iron or aluminum with steel inserts.

2.3. MOTOR INSTALLATION

A. Install in accordance with manufacturer’s instructions.

B. Install securely on firm foundation. Mount ball bearing motors to support shaft regardless of shaft position.

C. Check line voltage and phase and ensure agreement with nameplate. Check that proper thermal overloads have been installed prior to operating motors.

2.4. WIRING DIAGRAMS

A. The Contractor is responsible for obtaining and submitting wiring diagrams for all major

21 05 00 – 16 of 24 22019 items of equipment.

B. Wiring diagrams shall be provided with shop drawings for all equipment requiring electric power.

2.5. ENCLOSURES

A. Electrical enclosures including factory provided enclosures, field provided and installed enclosures, and automatic temperature control system enclosures shall be as follows:

1. Dry Interior Locations: NEMA 1.

2. Damp/Wet Locations, Including Exterior Locations: NEMA 3R.

3. Corrosive Locations, Including Chemical Storage Rooms and Similar Space =

NEMA 4X.

PART 3. EXECUTION

3.1. EQUIPMENT INSTALLATION - COMMON REQUIREMENTS

A. Install equipment to provide maximum possible headroom, if mounting heights are not indicated.

B. Install equipment according to approved submittal data. Portions of the work are shown only in diagrammatic form. Refer conflicts to Architect.

C. Install equipment level and plumb, parallel and perpendicular to other building systems and components in exposed interior spaces, unless otherwise indicated.

D. Install fire protection equipment to facilitate service, maintenance, and repair or replacement of components. Connect equipment for ease of disconnecting, with minimum interference to other installations. Extend grease fittings to accessible locations.

E. Install equipment giving right of way to piping installed at required slope.

F. Install flexible connectors on equipment side of shutoff valves, horizontally and parallel to equipment shafts if possible.

G. Do not install equipment or piping over electrical gear, electrical panels, motor controllers, and similar electrical equipment. Install equipment and piping to maintain clear space above and in front of all electrical components per the National Electric Code.

3.2. SUPPORTS, HANGERS AND FOUNDATIONS

A. Provide supports, hangers, braces, attachments and foundations required for the work.

Support and set the work in a thoroughly substantial and workmanlike manner without placing strains on materials, equipment, or building structure, submit shop drawings for approval. Coordinate all work with the requirements of the structural division.

B. Supports, hangers, braces, and attachments shall be standard manufactured items or fabricated structural steel shapes. All interior hangers shall be galvanized or steel with rust inhibiting paint. For un-insulated copper piping provide copper hanger to prevent contact

22019 21 05 00 – 17 of 24 of dissimilar metals. All exterior hangers shall be stainless steel including hangers, rods, nuts, washers, bolts, etc.

C. Concrete housekeeping pads and foundations shall be not less than 4 inches high and shall extend a minimum of 6 inches beyond equipment bases. Provide wire-mesh reinforcement;

chamfer exposed edges and corners; and finish exposed surfaces smooth.

3.3. DEMONSTRATION AND TRAINING VIDEO RECORDINGS

A. General: Record demonstration and training video recordings. Record each training module separately.

1. At beginning of each training module, record each chart containing learning objective and lesson outline.

B. Video Recording Format: Provide high-quality color video recordings with menu navigation in format acceptable to Engineer

C. Recording: Mount camera on tripod before starting recording, unless otherwise necessary to show area of demonstration and training. Display continuous running time.

D. Narration: Describe scenes on video recording by audio narration by microphone while video recording is recorded. Include description of items being viewed.

E. Transcript: Provide a transcript of the narration. Display images and running time captured from videotape opposite the corresponding narration segment.

3.4. PROVISIONS FOR ACCESS

A. The contractor shall provide access panels and doors for all concealed equipment, valves, strainers, controls, control devices, and other devices requiring maintenance, service, adjustment, balancing or manual operation.

B. Where access doors are necessary, furnish and install manufactured painted steel door assemblies consisting of hinged door, key locks, and frame designed for the particular wall or ceiling construction. Properly locate each door. Door sizes shall be a minimum of 12 inches x 12 inches for hand access, 18 inches x 18 inches for shoulder access and 20 inches x 30 inches for full body access where required. Review locations and sizes with Architect prior to fabrication. Provide U.L. approved and labeled access doors where installed in fire rated walls or ceilings. Doors shall be Milcor Metal Access Doors as manufactured by

Inland-Ryerson, Mifab, or approved equal.

1. Acoustical or Cement Plaster: Style B

2. Hard Finish Plaster: Style K or L

3. Masonry or Dry Wall: Style M

C. Where access is by means of liftout ceiling tiles or panels, mark each ceiling grid using small color-coded and numbered tabs. Provide a chart or index for identification. Place markers within ceiling grid not on ceiling tiles.

D. Access panels, doors, etc. described herein shall be furnished under the section of

21 05 00 – 18 of 24 22019 specifications providing the particular service and to be turned over to the pertinent trade for installation. Coordinate installation with installing contractor. All access doors shall be painted in baked enamel finish to match ceiling or wall finish.

E. Submit shop drawings indicating the proposed location of all access panels/doors. Access doors in finished spaces shall be coordinated with air devices, lighting and sprinklers to provide a neat and symmetrical appearance.

F. Where access doors are installed in wet locations (i.e. shower rooms, toilet rooms, kitchens, dishwasher rooms, can wash rooms, natatoriums, and similar spaces, etc.) provide aluminum access doors/frames.

3.5. PAINTING AND FINISHES

A. Provide protective finishes on all materials and equipment. Use coated or corrosion-resistant materials, hardware and fittings throughout the work. Paint bare, untreated ferrous surfaces with rust-inhibiting paint. All exterior components including supports, hangers, nuts, bolts, washers, vibration isolators, etc. shall be stainless steel.

B. Clean surfaces prior to application of insulation, adhesives, coatings, paint, or other finishes.

C. Provide factory-applied finishes where specified. Unless otherwise indicated factory-applied paints shall be baked enamel with proper pretreatment.

D. Protect all finishes and restore any finishes damaged as a result of work under Division 21 to their original condition.

E. The preceding requirements apply to all work, whether exposed or concealed.

F. Remove all construction marking and writing from exposed equipment, piping and building surfaces. Do not paint manufacturer's labels or tags.

G. All exposed piping, equipment, etc. shall be painted. Colors shall be as stated in this division or as selected by the Architect in Division 09 and conform to ANSI Standards.

H. All exposed piping, equipment, etc. in finished spaces shall be painted. Colors shall be as selected by the Architect and conform to ANSI Standards.

I. Refer to Division 09 for additional painting requirements.

J. Paint perimeter of all housekeeping pads safety yellow.

3.6. CLEANING OF SYSTEMS

A. Thoroughly clean systems after satisfactory completion of pressure tests and before permanently connecting equipment, and other accessory items. Blow out and flush piping until interior surfaces are free of foreign matter.

B. Flush piping to remove cutting oil, excess pipe joint compound, solder slag and other foreign materials. Do not use system pumps until after cleaning and flushing has been

22019 21 05 00 – 19 of 24 accomplished to the satisfaction of the Engineer. Employ chemical cleaners, including a non-foaming detergent, not harmful to system components. After cleaning operation, final flushing and refilling, the residual alkalinity shall not exceed 300 parts per million. Submit a certificate of completion to Engineer stating the name of service company used.

C. Pay for labor and materials required to locate and remove obstructions from systems that are clogged with construction refuse after acceptance. Replace and repair work disturbed during removal of obstructions.

D. Leave systems clean, and in complete running order.

3.7. COLOR SELECTION

A. Color of finishes shall be as selected by the Architect.

B. Submit color of factory-finished equipment for acceptance prior to ordering.

3.8. PROTECTION OF WORK

A. Protect work, material and equipment from weather and construction operations before and after installation. Properly store and handle all materials and equipment.

B. Cover temporary openings in piping and equipment to prevent the entrance of water, dirt, debris, or other foreign matter. Deliver pipes and tubes with factory applied end caps.

C. Cover or otherwise protect all finishes.

D. Replace damaged materials, devices, finishes and equipment.

E. Protect stored pipes and tubes from moisture and dirt. Elevate above grade. Do not exceed structural capacity of floor, where stored inside.

3.9. OPERATION OF EQUIPMENT

A. Clean all systems and equipment prior to initial operation for testing, or other purposes.

Lubricate, adjust, and test all equipment in accordance with manufacturer's instructions.

Do not operate equipment unless all proper safety devices or controls are operational.

Provide all maintenance and service for equipment that is authorized for operation during construction.

B. Where specified, or otherwise required, provide the services of the manufacturer's factory-trained servicemen or technicians to start up the equipment. Where factory start-up of equipment is not specified, provide field start-up by qualified technician.

C. Submit factory start-up sheets or field start-ups sheets for all equipment.

3.10. IDENTIFICATIONS, FLOW DIAGRAMS, ELECTRICAL DIAGRAMS AND OPERATING

INSTRUCTIONS

A. Contractor shall submit for approval working fire protection drawings of each piping system installed in the building. Diagrams shall indicate the location and the identification

21 05 00 – 20 of 24 22019 number of each valve in the particular system. Following approval by all authorities, the diagrams shall be framed, mounted under safety glass and hung in each Mechanical Room where directed. Contractor shall deliver the tracing or sepia from which the diagrams were reproduced to the Owner.

B. All valves shall be plainly tagged. For any bypass valves, install sign indicating valve position as “Normally Open” or “Normally Closed” as required.

C. All items of equipment, including motor starters, fire pump controllers, jockey pump controllers, and disconnects shall be furnished with white on black plastic permanent identification cards. Lettering shall be a minimum of ¼ inch high. Identification plates shall be secured, affixed to each piece of equipment, starters, disconnects, panels by screw or adhesive (tuff bond #TB2 or as approved equal). Equipment identification and room name or area served shall be on each label.

D. Provide six (6) hard copies and one (1) electronic copy of operating and maintenance instructions for all principal items of equipment furnished. This material shall be bound as a volume of the Operation and Maintenance Booklet as hereinafter specified.

E. All piping installed under this contract shall be stenciled with direction of flow arrows and with stenciled letters naming each pipe and service. Refer to Division 21 Section, “Fire

Suppression System Piping, Fittings, Valves, Etc”. Color code all direction of flow arrows and labels. In finished spaces omit labeling and direction of flow arrows. Paint in color as selected by Architect.

F. Submit list of wording, symbols, letter size, and color coding for fire protection identification. Submit samples of equipment identification cards, piping labels, and valve tags to Engineer for review prior to installation.

G. Provide at least eight (8) hours of straight time instruction to the operating personnel. Time of instruction shall be designated by the Owner.

H. Contractor shall demonstrate Sequences of Operation of all fire protection equipment in presence of Owner’s representative, and Fire Marshal.

3.11. WALL AND FLOOR PENETRATION

A. All penetrations of partitions, ceilings, roofs and floors by piping or conduit under Division

21 shall be sleeved, sealed, and caulked airtight for sound and air transfer control.

B. All penetration of fire rated assemblies shall be sleeved, sealed, caulked and protected to maintain the rating of the wall, roof, or floor. Fire Marshal approved U.L. assemblies shall be utilized. See Division 07 Section, “Fire Protection, HVAC and Plumbing Protection

Firestopping”.

C. Where piping extends through exterior walls or below grade, provide waterproof pipe penetration seals, as specified in another division of these specifications.

D. Provide pipe escutcheons for sleeved pipes in finished areas.

E. Piping sleeves:

22019 21 05 00 – 21 of 24

1. Galvanized steel pipe, standard weight where pipes are exposed and roofs and concrete and masonry walls. On exterior walls provide anchor flange welded to perimeter.

2. Twenty-two (22) gauge galvanized steel elsewhere.

F. Extend all floor sleeves through floor at least 2-inches above finished floor, caulk sleeve the entire depth and furnish and install floor plate.

G. Sleeves for penetrations in kitchen and food service areas shall finish .375 inches above floor or flush with wall surfaces and be neatly pointed up to fit snuggly against floor or wall material.

3.12. RECORD DRAWINGS

A. Upon completion of the mechanical installations, the Contractor shall deliver to the

Architect one complete set of prints of the fire protection drawings which shall be legibly marked in red pencil to show all changes and departures of the installation as compared with the original design. They shall be suitable for use in preparation of Record Drawings.

B. Contractor shall incorporate all sketches, addendums, value engineering, change orders, etc., into record drawings prior to delivering to Architect.

3.13. WARRANTY

A. Contractor's attention is directed to warranty obligations contained in the GENERAL

CONDITIONS.

B. The above shall not in any way void or abrogate equipment manufacturer's guarantee or warranty. Certificates of equipment manufacturer’s warranties shall be included in the operations and maintenance manuals.

C. The contractor guarantees for a two (2) year period from the time of final acceptance by the Owner.

1. That the work contains no faulty or imperfect material or equipment or any imperfect, careless, or unskilled workmanship.

2. That all work, equipment, machines, devices, etc. shall be adequate for the use to which they are intended, and shall operate with ordinary care and attention in a satisfactory and efficient manner.

3. That the contractor will re-execute, correct, repair, or remove and replace with proper work, without cost to the Owner, any work found to be deficient. The contractor shall also make good all damages caused to their work or materials in the process of complying with this section.

4. That the entire work shall be water-tight and leak-proof.

3.14. LUBRICATION

A. All bearings, motors, and all equipment requiring lubrication shall be provided with accessible fittings for same. Before turning over the equipment to the Owner, the

Contractor shall fully lubricate each item of equipment, shall provide one year's supply of lubricant for each, and shall provide Owner with complete written lubricating instructions, 21 05 00 – 22 of 24 22019…