SQSS_001177326.pdf
PDF 168 KB Posted
- Attached to
- 1620‐00‐117‐7326 (25‐R‐0426)
- Solicitation number
- SPRHA125R0426
- Issued by
-
Defense Logistics Agency Aviation
About this file
This Source Qualification Statement (SQS) details requirements for a Shimmy Damper (NSN 1620-00-117-7326, P/N 3-43902-7) for the T-38 aircraft. The document establishes strict pre-contract award qualification requirements to ensure manufacturers can produce a high-quality, structurally sound component critical to aircraft mission capability and crew safety. Key qualification criteria include submission of a pre-contract award qualification article that undergoes comprehensive testing for dimensional accuracy, material composition, processing, form, fit, and function, with potential destruction of the test article and an estimated government testing cost of $1,500.
The qualification process allows potential offerors to either submit a qualification article or apply for a waiver based on previous manufacturing experience. The design control authority at OO-ALC will evaluate waiver requests within 30 days, with no guarantee of qualification. Testing of the qualification article will not exceed 30 days, and successful qualification does not guarantee contract award. The document emphasizes the critical nature of the component, highlighting that improper manufacturing of this high-strength steel forging could potentially degrade aircraft mission capabilities or risk aircraft and crew safety.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPRHA1-25-R-0426-0001 CUI.pdf | ||
| SPRHA1-25-R-0426 CUI.pdf | ||
| PackagingSOW.pdf | ||
| CDRLFAT.pdf | ||
| EDL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOURCE QUALIFICATION STATEMENT
(PL 98-525, Section 2319)
SECTION A. ITEM IDENTIFICATION
1. STOCK NUMBER (NSN): 1620-00-117-7326
2. PART NUMBER (P/N): 3-43902-7
3. NOUN: Shimmy Damper
4. APPLICATION: T-38
SECTION B.
JUSTIFICATION FOR ESTABLISHING A QUALIFICATION REQUIREMENT AND REASON WHY
QUALIFICATION REQUIREMENT MUST BE DEMONSTRATED PRIOR TO ANY CONTRACT
AWARD
1. The manufacture, tolerances, material availability and interpretation of engineering data along with the special skills associated with forging, machining and processing of high strength steel forgings can result in product structural or durability degradations if not properly applied.
2. The bidder's ability to interpret the engineering drawings, specifications and the execution of the qualification requirements specified herein are necessary to verify the structural integrity as well as form, fit, and function of the item being procured.
3. Failure to procure these items from a fully qualified source can degrade the mission capability of the respective aircraft and/or cause the loss of aircraft and crew.
4. Completion of the specified pre-contract award qualification requirements will assure the government that the offeror is capable of producing the item in compliance with the applicable technical specification/data and within the schedule and economic constraints of the government’s contracts. There are sufficient technical and schedule risks, which can only be minimized by a completion of the requirements prior to contract award.
SOURCE QUALIFICATION REQUIREMENTS
(PL 98-525, SECTION 2319)
STOCK NR (NSN) 1620-00-117-7326 PART NUMBER (P/N) 3-43902-7
NOUN: Shimmy Damper AIRCRAFT: T-38
SECTION C
QUALIFICATION REQUIREMENTS THAT MUST BE SATISFIED TO BECOME A QUALIFIED
SOURCE:
1. Because of the need for uninterrupted item support to military aircraft systems while keeping with the requirements of PL 98-525, the current acquisition need not and generally will not be delayed to provide an offeror an opportunity to qualify. Normal acquisition practices at OO-ALC should preclude the denial of opportunity to any interested offeror.
2. The offeror must provide a pre-contract award qualification article, which meets the requirements of the engineering drawings, material specifications, and process specifications. However, successful completion of the qualification testing does not guarantee any contract award. If the offeror is deemed qualified and awarded the contract, a post-contract award first article exhibit may be required to verify production capability.
3. The qualification article will be subjected to form, fit, and function verification as well as required testing to assure compliance with data list and other applicable procurement criteria. The qualification article shall demonstrate full compatibility and comparability with existing parts.
4. The required materials will be procured from a qualified source and shall meet the requirements of their respective specifications. The offeror will assure that the supplier has accomplished this and shall submit certified documentation of accomplishment of the above requirements to the purchaser along with the pre-contract award qualification article.
5. The required forgings shall be procured from the qualified forging source using the original certified forging procedures and dies. Forging material and lot qualifications shall be accomplished as required in the specified forging drawing, P/N 3-43902-7 and specification SAE-AMS-A-22771. The offeror shall assure that this is or has been accomplished by the forging source and will submit certified documentation of accomplishment of the above requirements to the government along with the pre-contract award qualification article.
6. The qualification article once submitted will become subject to such testing as deemed necessary by the U.S. Government to prove that the article meets all dimensional, processing and functional requirements.
Such testing may result in the destruction of the article. Following completion of necessary testing and evaluation, the article no matter what its condition shall be returned to the contractor or disposed of at his discretion and direction whether it was found acceptable or not.
7. Form verification: The U.S. Government's Quality Verification Center (QVC) will be used to insure compliance with the dimensional requirements of the article. Material and processing compliance will also be verified as required.
8. Fit/function verification: Existing components and government test stands and fixtures will be utilized to verify physical interface and functional performance of articles.
9. Testing for material and process compliance.
(a) Material analysis (e) Finish
(b) Heat treat (f) Grain flow
(c) Grinding (g) Other
(d) Plating
(PL 98-525, SECTION 2319)
NOUN: Shimmy Damper AIRCRAFT: T-38
10. Remarks:
a. Organic verification capabilities exist at OO-ALC.
b. Testing requirements outside organic capabilities will be contracted out.
11. The estimated cost of government testing and evaluation is $1500
12. Maximum time for testing of the qualification article will not exceed 30 days from receipt at testing agency.
SECTION D
QUALIFICATION WAIVER REQUIREMENTS.
1. An offerer who has had previous experience in the manufacture and qualification of items, which can be correlated with this product, may apply to the design control authority at OO-ALC for a waiver of the above stated qualification requirements.
a. The qualification waiver criteria utilized by the design control authority to perform a qualification analysis are available upon request. The qualification waiver criteria may be used as a guide in preparing the offerer's written input to the design control authority.
b. The burden of proof for written inputs is on the offerer. The design control authority will not pursue authenticity verification of claims made by the offerer of product manufacturing experience with other Government or non-Government agencies. Unsubstantiated claims will not be considered in the waiver analysis process.
c. This waiver will be granted if and only if the design control authority (417 SCMS/GUEB) can establish the qualifications of the offerer through the evaluation of written inputs from the offerer or from previous knowledge of the offerer's capabilities or from previous experience with the offerer on similar item acquisitions.
If there is any doubt about the offerer's capability, the offerer will be required to submit a pre-qualification article. There is no guarantee of qualification by similarity. 417 SCMS/GUEB reserves the right to require a pre-qualification article of all offerers.
2. The current acquisition need not and will not be delayed in order to provide an offerer with an opportunity to meet the requirements for qualification waiver.
3. Maximum time for approval of qualification by similarity will not exceed 30 days.
(PL98-525, SECTION 2319)
NOUN Shimmy Damper APPLICATION T-38
SECTION E
MASTER SIGNATURE BLOCK:
_______________________________________ ___28FEB2025______
Matthew Vadnais Engineer, 417 SCMS/GUEA Date
_______________________________________ ____28FEB2025______
Brad Martin Engineering Lead, 417 SCMS/GUEA Date
SECTION D
| 2025-02-28T08:35:12-0700 | |
| VADNAIS.MATTHEW.LAVON.1612531273 |
| 2025-03-04T07:59:08-0700 | |
| MARTIN.BRAD.H.1256609564 |