FA_-_AFMC_260.pdf

PDF 91 KB Posted

Attached to
Gun Housings
Solicitation number
SPRWA1-19-R-0052
Issued by

About this file

First Article Form 260

View the file

Other files

File Type Posted
SPRWA119R0052_Amended.pdf PDF
19-R-0052_Attachments.pdf PDF
SPRWA1-19-R-0052.pdf PDF
CDRLs_A001-_A004.pdf PDF
Pricing_Matrix_19-R-0052.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST ARTICLE REQUIREMENTS 1. DATE

12 DEC 2018(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)

2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER

05606 / 205F120

4. NSN

1005010267132

5. FIRST ARTICLE QUANTITY

THE FIRST ARTICLE IS 2 UNIT(S) OF LOT / ITEM 001

AND WILL BE: PART OF PRODUCTION QUANTITY X IN ADDITION TO PRODUCTION QUANTITY

6. ARTICLES

WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD

7. LONG LEAD TIME ITEMS

X REQUIRED NOT REQUIRED

(See FAR 52.209-3 OR -4, alternate II)

8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)

X REQUIRED NOT REQUIRED

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."

9. TEST / INSPECTION REQUIREMENTS

A. X

X

CONTRACTOR TESTING

GOVERNMENT TESTING

Performance or other characteristics which the First Articles must meet are

Performance or other characteristics which the First Articles must meet are Material/Process Certification, Dimensional Inspection, and Form, Fit, and Function

B. The detailed technical requirements for First Article approval tests are contained in

Drawing number 205F120 Revision AT and all subdrawings FFF Instruction Memo

(Cite Spec and Para number)

C. X TEST PLAN REQUIRED

Number of days for government approval / disapproval 30 days.

D. Contractor's notification to ACO and

782cbsg.armamentfat@robins.af.mil

(Requesting Activity) of test time and location due 30 days prior to start of testing.

E. X TEST REPORT REQUIRED

(1) Forwarded to

IAW DD Form 1423 Block 14

(2) Government written notice of approval / disapproval due 30 days after receipt of contractor's report.

F. FIRST ARTICLE DELIVERY

(1) Due within 365 calendar days from date contract.

(2) Notify 30 calendar days prior to shipment.

(3) Delivered to government at

Code: FD2060 Spec Hndlg Unit, FAT

Test Unit 455 Byron Street

Robins AFB, GA 31098-1887

Mark For: First Article Test

(Set Forth Consignee and Address)

(4) Government written notice of approval / disapproval within 180 days after receipt of first article package.

G. Estimated cost of government testing / inspection evaluation.

$67,121.3700

Page 1 of 2AFMC IMT 260, 20020830, V-3 Version 10Generated by PRPS using Jasper Reports on 23 Jan 2019

FIRST ARTICLE REQUIREMENTS 1. DATE

12 DEC 2018(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)

10. DISPOSITION OF FIRST ARTICLES

X Approved First Articles will be forwarded to the manufacturer

X 1 (insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor

X will be retained by WR-ALC pending disposition instructions from the contractor.

First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.

X Disapproved First Articles

X will be returned to the contractor will be retained by pending disposition instructions from the contractor.

X On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

a. Approved First Articles will be returned to the contractor for shipment with production item.

b. Disposition of disapproved First Articles will remain the same as marked above.

X Other Disposition:

Prepaid return label

11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL

a. X Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, X Air Force.

b. X Offerors currently in production of the same or similar article for a Government, DoD, X Air Force contract and who have received First Article approval under the existing contract.

c. X Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, X Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.

d. X Provided not more than 36 months have elapsed since completion of the contract.

e. First Article testing will not be waived.

f. X See Remarks in block 12 below.

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:

A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION

12. REMARKS

Moore, Rickey CNAME: 21 NOV 2018DATE:

The 1 unplated first article shall be delivered to the government for material/process certification and dimensional testing. This exhibit will be destroyed during testing. The 2nd exhibit is for the contractor first article testing as described on the contractor first article test plan and includes form, fit, and function testing. If approved, this exhibit may be included in the production quantity. The form, fit, function portion of the testing shall not commence until the contractor has received written notification that the exhibit delivered to the government has passed all tests. The contractor is responsible for testing all requirements in the Contractor Test Plan and FFF memo.

13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING TEST

(Name, Organization, Phone)

Moore, Rickey C

409 SCMS / GU E A

479-926-5532

468-5532

14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING

TEST (Name, Organization, Phone)

Moore, Rickey C

409 SCMS / GU E A

479-926-5532

468-5532

Page 2 of 2AFMC IMT 260, 20020830, V-3 Version 10Generated by PRPS using Jasper Reports on 23 Jan 2019

File details come from the government source that posted it.