CDRLs_A001-_A004.pdf
PDF 197 KB Posted
- Attached to
- Gun Housings
- Solicitation number
- SPRWA1-19-R-0052
About this file
CDRL's Form 1423-1; A001 - A004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPRWA119R0052_Amended.pdf | ||
| 19-R-0052_Attachments.pdf | ||
| SPRWA1-19-R-0052.pdf | ||
| Pricing_Matrix_19-R-0052.xlsx | XLSX spreadsheet | |
| FA_-_AFMC_260.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
A
MGMT
Housing, Machine Gun 30mm
A001 Item Unique Identification (IUID) Marking Plan (P/N 205F120)
DI-MGMT-81803 Per Contract AFSC 409 SCMS/GUME
LT
A C
1 TIME
N/A
See Blk 16
N/A
PCO 1 0 1
See BLK 16
PM 1 0 1
See BLK 16
Engineer 1 0 1 See BLK 16
WAWF 1 0 1
See BLK 16
4 0 4
1 1
Changes to office symbols and/or e-mail addresses, when necessary, shall be made by letter through the PCO/ACO without further revision to this CDRL.
BLK 7: The contractor shall submit Marking Plan with a letter of transmittal.
Submit invoice in WAWF, DoDAAC FA8554 <https://wawf.eb.mil/>, after submittal of final Marking Plan to account for all previously submitted.
BLK 8: Approval will be required within 90 days of Contract Award.
BLK 9: DISTRIBUTION C. Distribution authorized to U.S. Government Agencies and their contractors due to critical technology as 9 April 2012. Other requests for this document shall be referred to 409 SCMS/GUEA, 235 Byron Street, Suite 19A, RAFB, GA 31098-1670.
BLK 12 and 13: Initial submission shall be due within 45 days of Contract Award.
The government has 15 days to accept/reject and provide comments. The contractor shall have 10 days to incorporate changes.
BLK 14: Reproducible documents (text, drawings, tables, charts, graphic packages used to create figures, and other type documents) shall be delivered in an appropriate, applicable and editable format (AutoCAD, ProE, Microsoft Visio, and compatible Microsoft Office 2007 products) on a CD-ROM, FTP, or via electronic mail to the PCO/Buyer/Spec, ACO, PM/COR, and Engineer, A final approved copy shall be delivered in an editable format and PDF.
PCO: Lorey M. Barwick, email: lorey.barwick.1@us.af.mil
PM: Lindsay K. Palumbo email: lindsay.palumbo@us.af.mil
Engineer: Rickey C. Moore email: rickey.moore@us.af.mil
12-13-13
13 Dec 2018
Date
Control Number
JONES.DAVID.
N.1229899402
Digitally signed by
JONES.DAVID.N.122989
Date: 2018.12.13 08:46:33 -05'00'
DMO Signature
12 Dec 2018
SEALY.TRACEE.A.1
229963011
Digitally signed by
SEALY.TRACEE.A.1229963011
Date: 2018.12.13 09:26:12 -05'00'
BRIGMOND.RONAL
D.L.1381864436
Digitally signed by
BRIGMOND.RONALD.L.1381864436
Date: 2018.12.12 10:53:49 -05'00'
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
A
MGMT
Housing, Machine Gun 30mm
A002 Item Unique Identification (IUID) Marking Activity and Verification Report
(P/N 205F120)
DI-MGMT-81804A Per Contract AFSC 409 SCMS/GUME
LT
A C
1 TIME
N/A
See Blk 16
N/A
PCO 1 0 1
See BLK 16
PM 1 0 1
See BLK 16
Engineer 1 0 1 See BLK 16
WAWF 1 0 1
See BLK 16
4 0 4
1 1
Changes to office symbols and/or e-mail addresses, when necessary, shall be made by letter through the PCO/ACO without further revision to this CDRL.
BLK 7: The contractor shall submit Marking Plan with a letter of transmittal.
Submit invoice in WAWF, DoDAAC FA8554 <https://wawf.eb.mil/>, after submittal of final Marking Plan to account for all previously submitted.
BLK 8: Approval will be required within 90 days of Contract Award.
BLK 9: DISTRIBUTION C. Distribution authorized to U.S. Government Agencies and their contractors due to critical technology as 9 April 2012. Other requests for this document shall be referred to 409 SCMS/GUEA, 235 Byron Street, Suite 19A, RAFB, GA 31098-1670.
BLK 12 and 13: Initial submission shall be due within 45 days of Contract Award.
The government has 15 days to accept/reject and provide comments. The contractor shall have 10 days to incorporate changes.
BLK 14: Reproducible documents (text, drawings, tables, charts, graphic packages used to create figures, and other type documents) shall be delivered in an appropriate, applicable and editable format (AutoCAD, ProE, Microsoft Visio, and compatible Microsoft Office 2007 products) on a CD-ROM, FTP, or via electronic mail to the PCO/Buyer/Spec, ACO, PM/COR, and Engineer, A final approved copy shall be delivered in an editable format and PDF.
PCO: Lorey M. Barwick, email: lorey.barwick.1@us.af.mil
PM: Lindsay K. Palumbo email: lindsay.palumbo@us.af.mil
Engineer: Rickey C. Moore email: rickey.moore@us.af.mil
12-13-14
13 Dec 2018
Date
Control Number
JONES.DAVID.
N.1229899402
Digitally signed by
JONES.DAVID.N.122989
Date: 2018.12.13 08:47:39 -05'00'
DMO Signature
12 Dec 2018
SEALY.TRACEE.A.1
229963011
Digitally signed by
SEALY.TRACEE.A.1229963011
Date: 2018.12.13 09:23:31 -05'00'
BRIGMOND.RONAL
D.L.1381864436
Digitally signed by
Date: 2018.12.12 10:55:13 -05'00'
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
A
NDTI
Housing, Machine Gun 30mm
A003 First Article Qualification Test Plan and Procedures (P/N 205F120)
DI-NDTI-81307A Per Contract AFSC 409 SCMS/GUME
LT
A C
1 TIME
N/A
See Blk 16
N/A
PCO 1 0 1
See BLK 16
PM 1 0 1
See BLK 16
Engineer 1 0 1 See BLK 16
First Article Manage 1 0 1 See BLK 16
4 0 4
1 1
Changes to office symbols and/or e-mail addresses, when necessary, shall be made by letter through the PCO/ACO without further revision to this CDRL.
Block 8: The Government has 45 calendar days to approve.
Block 12: 45 days ARO contract.
BLK 14: Electronic delivery of Draft copies via e-mail to the following Distribution Addresses shall be delivered in PDF format.
First Article Manager: David Lewis email: david.lewis.49@ur.af.mil
PCO: Lorey M. Barwick, email: lorey.barwick.1@us.af.mil
PM: Lindsay K. Palumbo email: lindsay.palumbo@us.af.mil
Engineer: Rickey C. Moore email: rickey.moore@us.af.mil
12-13-15
13 Dec 2018
Date
Control Number
JONES.DAVID.
N.1229899402
Digitally signed by
JONES.DAVID.N.122989
Date: 2018.12.13 08:48:48 -05'00'
DMO Signature
12 Dec 2018
SEALY.TRACEE.A.1
229963011
Digitally signed by
SEALY.TRACEE.A.1229963011
Date: 2018.12.13 09:25:33 -05'00'
BRIGMOND.RONAL
D.L.1381864436
Digitally signed by
Date: 2018.12.12 10:54:53 -05'00'
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
| A_CONTRACT_LINE_ITEM_NO: |
| B_EXHIBIT: A |
| TDP: |
| TM: |
| OTHER: NDTI |
| E_CONTRACTPR_NO: |
| FCONTRACTOR: |
| DSYSTEMITEM: Housing, Machine Gun 30mm |
| 1_DATA_ITEM_NO: A004 |
| 2_TITLE_OF_DATA_ITEM: First Article Qualification Test Report |
| 3_SUBTITLE: (P/N 205F120) |
| 4_AUTHORITY_Data_Acquisit: DI-NDTI-81307A |
| 5_CONTRACT_REFERENCE: Per Contract |
| 6_REQUIRING_OFFICE: AFSC 409 SCMS/GUME |
| 7_DID_250_REQ: LT |
| 8_APP_CODE: A |
| DIST_STATEMENT: C |
| 10_FREQUENCY: 1 TIME |
| 11_AS_OF_DATE: N/A |
| 12_DATE_OF_FIRST_SUBMISSI: See Blk 16 |
| 13_DATE_OF_SUBSEQUENT_SUB: N/A |
| addressee1: PCO |
| draft1: 1 |
| reg1: 0 |
| repro1: 1 |
| addressee2: See BLK 16 |
| draft2: |
| reg2: |
| repro2: |
| addressee3: |
| draft3: |
| reg3: |
| repro3: |
| addressee4: PM |
| draft4: 1 |
| reg4: 0 |
| repro4: 1 |
| addressee5: See BLK 16 |
| draft5: |
| reg5: |
| repro5: |
| addressee6: |
| draft6: |
| reg6: |
| repro6: |
| addressee7: Engineer |
| draft7: 1 |
| reg7: 0 |
| repro7: 1 |
| addressee8: See BLK 16 |
| draft8: |
| reg8: |
| repro8: |
| addressee9: |
| draft9: |
| reg9: |
| repro9: |
| addressee10: First Article Manager |
| draft10: 1 |
| reg10: 0 |
| repro10: 1 |
| addressee11: See BLK 16 |
| draft11: |
| reg11: |
| repro11: |
| addressee12: |
| draft12: |
| reg12: |
| repro12: |
| addressee13: |
| draft13: |
| reg13: |
| repro13: |
| addressee14: |
| draft14: |
| reg14: |
| repro14: |
| addressee15: |
| draft15: |
| reg15: |
| repro15: |
| addressee16: |
| draft16: |
| reg16: |
| repro16: |
| addressee17: |
| draft17: |
| reg17: |
| repro17: |
| addressee18: |
| draft18: |
| reg18: |
| repro18: |
| addressee19: |
| draft19: |
| reg19: |
| repro19: |
| addressee20: |
| draft20: |
| reg20: |
| repro20: |
| addressee21: |
| draft21: |
| reg21: |
| repro21: |
| addressee22: |
| draft22: |
| reg22: |
| repro22: |
| addressee23: |
| draft23: |
| reg23: |
| repro23: |
| addressee24: |
| draft24: |
| reg24: |
| repro24: |
| addressee25: |
| draft25: |
| reg25: |
| repro25: |
| addressee26: |
| draft26: |
| reg26: |
| repro26: |
| addressee27: |
| draft27: |
| reg27: |
| repro27: |
| addressee28: |
| draft28: |
| reg28: |
| repro28: |
| addressee29: |
| draft29: |
| reg29: |
| repro29: |
| addressee30: |
| draft30: |
| reg30: |
| repro30: |
| addressee31: |
| draft31: |
| reg31: |
| repro31: |
| addressee32: |
| draft32: |
| reg32: |
| repro32: |
| addressee33: |
| draft33: |
| reg33: |
| repro33: |
| addressee34: |
| draft34: |
| reg34: |
| repro34: |
| addressee35: |
| draft35: |
| reg35: |
| repro35: |
| addressee36: |
| draft36: |
| reg36: |
| repro36: |
| addressee37: |
| draft37: |
| reg37: |
| repro37: |
| addressee38: |
| draft38: |
| reg38x: |
| repro38: |
| total_draft: 4 |
| reg38t: 0 |
| total_repro: 4 |
| 17_PRICE_GROUP: |
| ESTIMATED_TOTAL_PRICE: |
| G_PREPARED_BY: |
| H_DATE: |
| 1_APPROVED_BY: |
| J_DATE: |
| Page: 1 |
| of_pages: 1 |
| Reset: |
| 16_REMARKS: Changes to office symbols and/or e-mail addresses, when necessary, shall be made by letter through the PCO/ACO without further revision to this CDRL. |
Block 8: The Government has 45 calendar days to approve.
Block 12: Test Report due 45 calendar days from completion of First Article Testing or 270 Days After Contract award.
BLK 14: Electronic delivery Draft copies via e-mail to the following Distribution Addresses shall be delivered in PDF format.
First Article Manager: David Lewis email: david.lewis.49@ur.af.mil
PCO: Lorey M. Barwick, email: lorey.barwick.1@us.af.mil
PM: Lindsay K. Palumbo email: lindsay.palumbo@us.af.mil
Engineer: Rickey C. Moore email: rickey.moore@us.af.mil
| Text6: 12-13-16 |
| Text1: 13 Dec 2018 |
| Text10: Date |
| Text11: Control Number |
| Text12: DMO Signature |
| Text16: |
| Text15: 12 Dec 2018 |
File details come from the government source that posted it.