LTC_synopsis.docx

DOCX document 12 KB Posted

Attached to
SHIPPING AND STORAGE
Solicitation number
SPRPA118R004W
Issued by

View the file

Other files

File Type Posted
ATTACHEMENT_B_LIST_OF_NIIINS_WITH_BEQs.docx DOCX document
SPRPA118R004W_Solicitation.docx DOCX document
ATTACHMENT_C_PRICING_SHEET_H1xlsx.xlsx XLSX spreadsheet
ATTACHMENT_A_LIST_OF_NIINS_WITH_CORRESPONDING_ASSET_DESCR.docx DOCX document
APPENDIX_A_LTC_NIINs.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This Requirement is for a Long-Term Firm-Fixed Price (FFP) Requirements type contract based upon Lowest Price Technically Acceptable (LPTA) evaluation criteria. The Government intends to make one (1) award. The LTC will have a three (3) year base period and two (2) one (1) year Option Periods, for a total of five (5) years. This requirement covers a total of six (6) NIINs for Shipping and Storage Containers, listed in the attachment (Appendix A). The procurements will be for quantities totaling 813 Shipping and Storage Containers used for the safe keeping and transportation of Common aircraft components.

All Shipping and Storage Containers listed in Appendix A have an assigned AMC code of 1C/2C Limited Competition in accordance with N241 Source Approval Request Policy for Reusable Shipping and Storage Container Procurements. The AMC of 1C/2C means it is suitable for competitive acquisition for the first or second time and these parts require engineering source approval by the design control activity in order to maintain the quality of the part. An alternate source must qualify in accordance with the design control activity’s procedures, as approved by the cognizant Government engineering activity. Each item has been evaluated by NAVSUP WSS Packaging Engineers Code N241 and has at least two (2) approved sources of supply. If you are unsure if you are an approved source of supply for any item, please contact Joseph Gambino at joseph.gambino@dla.mil or 215-737-4239 and include the list of NIINs, which you are interested in supplying.

All contractors will be required to submit a successful FAT during first resultant order for each NIIN awarded. There will be no waivers granted initially whether or not a FAT was previously completed under a prior contract. Once FAT is successfully completed, awardees will not be required to submit additional FAT units for the remainder of the contract for the awarded NIIN. FAT will be included on the initial delivery order for each NIIN regardless of a prior successful FAT approval for that NIIN. Once a FAT is successfully completed under the Long Term Contract (LTC) it will be waived for the remainder of the LTC for that particular NIIN.

The Government intends to make one award based upon the proposal which has the total Lowest Price Technically Acceptable (LPTA) offer for all NIINs inclusive of Options.

File details come from the government source that posted it.