Specs.pdf

PDF 6 MB Posted

Attached to
Newburyport Harbor Dredging
Solicitation number
W912WJ22B0011
Issued by

About this file

This federal solicitation seeks dredging services for Newburyport Harbor in Massachusetts. Approximately 220,000 to 250,000 cubic yards of sandy material will be hydraulically dredged from the 15-foot and 9-foot navigation channels and pumped onto an adjacent beach for placement. The solicitation number is W912WJ22B0011 and was issued by the Department of the Army Corps of Engineers New England District. Dredging must occur between September 2022 and March 2023 to avoid environmental impacts. The selected contractor will be responsible for dredging, transporting via pipeline, and grading the dredged materials at the placement site according to specifications.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
Amendment 0003.pdf PDF
Amendment 0003_Figure 1.jpg JPG image
Amendment 0002_Images.pdf PDF
Amendment 0003_Grain Size Analysis Curves.pdf PDF
Amendment 0003_Figure 2.jpg JPG image
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Drawings.pdf PDF
W912WJ22B0011.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number:

W912WJ22B0011

Maintenance Dredging

Newburyport Harbor, Newburyport, Massachusetts

Construction Solicitation and Specifications

May 2022

Maintenance Dredging, Newburyport Harbor, Newburyport, MA

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 32 00 GEOTECHNICAL DATA

00 41 00 BIDDING SCHEDULE

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 22 00 MEASUREMENT AND PAYMENT

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 QUALITY CONTROL

01 45 01 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 54 50 DREDGING PLANT AND EQUIPMENT

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 PROJECT IDENTIFICATION

01 71 23 FIELD ENGINEERING FOR DREDGING

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 93 00 PLANTING

DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON

35 20 23 DREDGING AND DREDGED MATERIAL PLACEMENT

35 20 23.23 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM - HOPPER

DREDGE

35 20 23.33 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM - PIPELINE

HYDRAULIC DREDGE

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

DOCUMENT 00 32 00

GEOTECHNICAL DATA

PART 1 GENERAL

1.1 SUMMARY

1.2 REFERENCES

1.3 EXAMINATION OF SAMPLES

1.4 SOIL CLASSIFICATION

1.5 INTERPRETATION

1.6 LABORATORY TESTS

-- End of Section Table of Contents --

DOCUMENT 00 32 00 Page 1

DOCUMENT 00 32 00

GEOTECHNICAL DATA

PART 1 GENERAL

1.1 SUMMARY

The surface conditions described in the specifications are the result of site surveys, borings, and laboratory tests. Copies of the logs of explorations, laboratory test results, and locations at the site where subsurface investigations were performed are located at the end of the specifications within the Suitability Determination document. A March 2017 summary of the subsurface materials expected to be encountered during dredging is contained in Section 35 20 23 DREDGING AND DREDGED MATERIAL PLACEMENT, Subpart "Results of Explorations".

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referenced to in the text by basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D421 (1985; 2007) Standard Practice For Dry Preparation Of Soil Samples For Particle-Size Analysis and Determination Of Soil Constants

ASTM D422 (1963; R 2007; E 2014; E 2014)

Particle-Size Analysis of Soils

ASTM D2216 (2019) Standard Test Methods for Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass

ASTM D2487 (2017; E 2020) Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System)

ASTM D2488 (2017; E 2018) Standard Practice for Description and Identification of Soils (Visual-Manual Procedure)

ASTM D2850 (2003a) Unconsolidated - Undrained Triaxial Compression Test on Cohesive Soils

ASTM D2974 (2020; E 2020) Moisture, Ash, and Organic Matter of Peat and Other Organic Soils

1.3 EXAMINATION OF SAMPLES

Subsurface explorations were performed by the U.S. Army Corps of Engineers.

DOCUMENT 00 32 00 Page 2

1.4 SOIL CLASSIFICATION

The soil classification of the U.S. Army Corps of Engineers soil samples was done in accordance with ASTM D2488 in the field and ASTM D2487 in the laboratory.

1.5 INTERPRETATION

Subsurface investigation data are provided only for information purposes and for the convenience of the Contractor. The data shown on the boring logs is for the specific locations indicated only and no assurance is given that these conditions are representative of conditions between borings or areas adjacent thereto. The responsibility lies with the Contractor to interpret subsurface conditions that may affect his work.

1.6 LABORATORY TESTS

Laboratory tests were generally performed in accordance with the following test methods:

a. Moisture Content: ASTM D2216.

b. Organic Content: ASTM D2974.

c. Particle-Size Analysis: ASTM D422, ASTM D421.

d. Unconsolidated-Undrained Triaxial Testing: ASTM D2850.

Note: Not all samples were tested in the laboratory using all the methods described above.

-- End of Document --

DOCUMENT 00 32 00 Page 3

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 WORK COVERED BY CONTRACT DOCUMENTS

1.1.1 Dredge Seasons

1.2 REFERENCES

1.3 SUBMITTALS

1.4 PROJECT/SITE CONDITIONS

1.4.1 Physical Data

1.5 SUPERINTENDENCE BY THE CONTRACTOR

1.6 SEQUENCING AND SCHEDULING

1.6.1 Operational Period, Restrictions, and Hours

1.6.2 Work Sequence

1.6.2.1 General

1.6.2.2 Two-Week Schedule of Work Activities

1.6.2.3 Initial Project Schedule

1.6.2.4 Periodic Schedule Updates

1.6.3 Organization at the Site

1.6.3.1 General

1.6.3.2 Rate of Progress

1.7 CONTRACTOR USE OF PREMISES

1.7.1 Storage Areas

1.7.1.1 Work Limits

1.7.2 Contractor's Receipt of Supplies

1.7.3 Access to Work Site

1.7.4 Protection and Security

1.7.5 Work By Other Contractors

1.7.6 Emergency Contacts

1.7.7 Damaged Property

1.7.8 Contractor's Receipt of Supplies

1.7.9 Daily Clean Up

1.7.10 Government Sanitary Facilities

1.8 QUALITY ASSURANCE

1.9 COORDINATION

1.9.1 Daily Dredge Operations Location Map (DOLM)

1.9.2 Public Notice

1.9.3 Notice to Mariners

1.9.4 Aids to Navigation

1.9.5 Moorings

1.9.6 Points of Contact

1.9.7 Coordination Meeting

1.10 PRE-DREDGING PHOTOGRAPHIC AND VIDEO SURVEY

1.11 GENERAL SAFETY REQUIREMENTS

1.11.1 General

1.11.2 Contractor's Project Superintendent

1.12 ENVIRONMENTAL PROTECTION

1.13 PRECONSTRUCTION CONFERENCE

PART 2 PRODUCTS

SECTION 01 11 00 Page 1

PART 3 EXECUTION

SECTION 01 11 00 Page 2

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 WORK COVERED BY CONTRACT DOCUMENTS

The general description below is given to indicate the approximate scope of this project only. It does not limit the work required under the project drawings and specifications.

Work of this projet includes dredging of shoaled sediments from the 9-Foot and 15-Foot Federal Navigation Channels, to their authorized dimensions and limits. Within the 15-Foot Entrance Channel, an additional foot of material is required to be removed (effectively cleared to a target depth of 16 feet below Mean Lower Low Water datum). One foot of allowable overdepth for material removal is authorized for both channel depths.

Dredging activities may be undertaken by Hydraulic Pipeline or Hopper Dredge Plant means.

All dredge material shall be transported to and placed at the Plum Island Beach Placement Area. Once pumped to the placement area, the dredge material shall be shaped and graded to the specified berm width and slopes indicated on the contract drawings.

1.1.1 Dredge Seasons

(a) Operational Restrictions:

To avoid impacts to local environmental resources and due to environmental restrictions, the work required under this contract will only be permitted between certain dates, as shown below:

(1) Hydraulic Dredging of the 9-Foot Channel: 1 September 2022 through 1 February 2023.

(2) Hydraulic Dredging of the 15-Foot Channel: 1 September 2022 through 15 March 2023.

(3) Hopper Dredging of the 9-Foot Channel: 1 January through 1 February 2023.

(4) Hopper Dredging of the 15-Foot Channel: 2 December through 15 March 2023.

(5) All Other Work on receiving beach: 1 September 2022 through 15 March 2023.

"All other work" shall include, but not be limited to, preparation of and work on receiving beach, pipeline installation and removal, sand fence installation, placement of dredged material within the placement area, and grading of beachfill.

(b) Notice to Proceed (NTP) Received after September 1, 2022:

SECTION 01 11 00 Page 3

The Contractor shall be required to:

(1) Commence on preliminary work by promptly placing all orders, awarding subcontracts, processing required submittals and details under this contract within 15 calendar days after the NTP to ensure immediate readiness to commence dredging; and

(2) Commence dredging at the site within 30 calendar days after the date the Contractor receives the NTP, provided that the dates are within the permitted dredging and placement windows as specified above in subpart "Operational Restrictions."

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Initial Project Schedule ; G, RO

In accordance with the contract clauses, the Contractor shall, within 5 days after receipt of Notice to Proceed (NTP) or as otherwise determined by the Contracting Officer, submit for approval a practicable project schedule. When changes are authorized that result in contract time extensions, the Contractor shall submit a revised project schedule for approval by the Contracting Officer.

Two-Week Schedule of Work Activities

In addition to the scheduling and notification requirements specified elsewhere in the contract, the Contractor shall provide to the Contracting Officer a detailed schedule of work activities, which the Contractor intends to perform over the following two week period (Monday thru Friday for two weeks).

Pre-Dredging Photographic and Video Survey ; G, RO

The Contractor shall submit a pre-dredging photographic and video survey as described in this section.

Notice to Mariners

Submit a copy of Notice to Mariners to the Contracting Officer.

SECTION 01 11 00 Page 4

Public Notice

Submit a copy of the proposed Public Notice to the Contracting Officer for approval, prior to publication.

Aids to Navigation

Submit proof of coordination with the USCG for any necessary relocation or movement of aids to navigation.

Safe Harbor Plan ; G, RO

The Contractor shall submit a Safe Harbor Plan to the Contracting Officer for approval prior to the start of on-site work. The Safe Harbor Plan shall include a written description of the Contractor's plan to provide for the safety and security of floating plant, equipment, and personnel in the event of a storm or other site emergency. The location for the docking of floating plant and the off-loading of equipment and crews shall be clearly indicated.

SD-07 Certificates

Periodic Schedule Updates ; G, RO

1.4 PROJECT/SITE CONDITIONS

1.4.1 Physical Data

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

a. Site Conditions: The indications of physical conditions on the drawings and in the specifications are the result of site investigations and surveys. The conditions represented prevailed at the time the investigations and surveys were made. A pre-dredge survey may be performed by the Government prior to the start of Contractor dredging operations at the site. Before commencing work at the site, the Contractor shall verify the existing conditions indicated on the drawings and in the specifications. See CONTRACT CLAUSE entitled "SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK".

b. Weather Conditions: The monthly normal mean temperature and the monthly normal mean precipitation for the site may be obtained by the Contractor from the nearest U.S. National Weather Service Office.

c. Conditions of 9 Foot Channel: Under most weather conditions, the 9 Foot Channel has swells up to 1 foot. The 9 Foot Channel was last dredged in 2011 and has experienced considerable shoaling since that time.

d. Conditions at 15 Foot Entrance Channel: The tidal currents at the entrance to the harbor can be substantial, creating potentially dangerous conditions. Under good weather conditions, the sea swell is typically 1-2 feet in a northerly direction. In normal weather conditions, the sea swell can range from 2 to 4 feet or more.

SECTION 01 11 00 Page 5

e. Channel Traffic: The channels are used primarily by a combination of recreation and commercial vessels, which may cause interference with contract operations. The Government will not undertake to keep the channel free from vessels or other obstructions, except to the extent of applicable regulations. The Contractor will be required to conduct the work in such a manner as to obstruct navigation as little as possible, and in the event the Contractor's plant and/or pipeline so obstructs the channel as to make difficult or endanger the passage of any vessels, the plant and/or pipeline shall be promptly moved on the approach of any vessel to such an extent as may be necessary to afford a practicable passage.

1.5 SUPERINTENDENCE BY THE CONTRACTOR

a. At all times during the performance of the contract and until the work is completed and accepted, the Contractor shall directly superintend the work and have on the worksite a competent project superintendent who is satisfactory to the Contracting Officer and has the authority to act for the Contractor.

b. The qualified superintendent, and competent alternate, shall be capable of reading, writing, and conversing fluently in the English language.

c. The project superintendent must have a minimum of 10 years experience in construction with at least 5 of those years as a superintendent on projects similar in size and complexity. The individual must be familiar with the requirements of EM 385-1-1 and have experience in the areas of hazard identification and safety compliance. The individual must be capable of interpreting a critical path schedule and construction drawings. The qualification requirements for the alternate superintendent are the same as for the project superintendent. The Contracting Officer may request proof of the superintendent's qualifications at any point in the project if the performance of the superintendent is in question.

d. The project superintendent is primarily responsible for managing and coordinating day-to-day production and schedule adherence on the project.

The superintendent is required to attend partnering meetings, and quality control meetings.

e. The project superintendent shall maintain a physical presence at the site at all times and be responsible for all construction and related activities at the site, except as otherwise acceptable to the Contracting Officer.

f. The Project Superintendent is subject to removal by the Contracting Officer for non-compliance with requirements specified in the contract and for failure to manage the project to insure timely completion.

Furthermore, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders is acceptable as the subject of claim for extension of time for excess costs or damages by the Contractor.

g. The project superintendent may not serve as the Site Safety and Health Officer (SSHO) or the CQC System Manager.

SECTION 01 11 00 Page 6

1.6 SEQUENCING AND SCHEDULING

1.6.1 Operational Period, Restrictions, and Hours

a. The work shall be performed within the permitted environmental window as noted in Subpart "Dredge Seasons" of this section of the specifications."

b. Operational Hours: The Contractor will be allowed to perform work 24 hours per day, 7 days per week, including holidays, for the entire contract performance period.

1.6.2 Work Sequence

1.6.2.1 General

There are certain essential criteria relative to the preparation of a work sequence and time schedule which the Contractor will be required to implement and follow during the prosecution of the work (see Subpart OPERATIONAL RESTRICTIONS). Minor variations in the sequence of the items of work as specified may be made by the Contractor, provided such variations do not conflict with critical elements of the schedule.

Proposed minor variations shall be noted on the progress charts submittal required by CONTRACT CLAUSE, entitled SCHEDULES FOR CONSTRUCTION CONTRACTS. Variations shall be approved by the Contracting Officer prior to implementation.

1.6.2.2 Two-Week Schedule of Work Activities

In addition to the scheduling and notification requirements specified elsewhere in this section, the Contractor shall provide to the Contracting Officer a detailed schedule of work activities, which the Contractor intends to perform over the following two week period (Monday thru Friday for two weeks). At a minimum, the two-week schedule shall include the planned station ranges of anticipated channel work, approximate volume of material to be dredged, and the station range of beach berm construction to be accomplished. The schedule of work activities shall be updated and submitted by the Contractor to the Contracting Officer on a weekly basis, by noon on every Thursday during the prosecution of work period.

1.6.2.3 Initial Project Schedule

The initial project schedule shall be in the form of a chart graphically indicating the sequence proposed to accomplish each work feature or operation pursuant to FAR Clause 52.236-15 "Schedules for Construction Contracts". Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The chart shall be prepared to show the starting and completion dates of all work features on a linear horizontal time scale beginning with date of Notice to Proceed and indicating calendar days to completion. The scheduling of the entire project is required. Provide a schedule that is a forward planning as well as a project monitoring tool.

The Contractor shall indicate on the chart the important work features or operations that are critical to the timely overall completion of the project. Key dates for such important work features and portions of work features are milestone dates and shall be so indicated on the chart.

Failure to develop the Project Schedule to an appropriate level of detail will result in its disapproval. The Contracting Officer will consider, but is not limited to, the following characteristics and requirements to

SECTION 01 11 00 Page 7 determine appropriate level of detail, as appropriate to the project:

1. Activity Durations

2. Design and Permit Activities

3. Procurement Activities

4. Mandatory Tasks

a. Submission, review and acceptance of SD-01 Preconstruction Submittals (individual activity for each).

b. Submission, review and acceptance of features requiring design completion and submission, review and acceptance of design packages.

c. Submission of mechanical/electrical/information systems layout drawings.

d. Long procurement activities

e. Submission and approval of O & M manuals.

f. Submission and approval of as-built drawings.

g. Submission and approval of installed equipment lists.

h. Submission and approval of test data, and reports

i. Show Government and other agency activities that could impact progress. These activities include, but are not limited to:

approvals, acceptance, design reviews, environmental permit approvals by State regulators, inspections, utility tie-in, Government Furnished Equipment (GFE), etc.

j. Identify dredge plant type used and acknowledgment of work to be completed within the respective environmental work window associated with the proposed plant type.

This schedule will be the medium through which the timeliness of the Contractor's construction effort is appraised. Anticipated adverse weather delay days shall be included in the schedule.

Submit the Initial Project Schedule for approval within 30 calendar days after notice to proceed is issued. No payment will be made for work items not fully detailed in the Project Schedule.

An Early Completion Schedule is an Initial Project Schedule (IPS) that indicates all scope of the required contract work will be completed before the contractually required completion date.

No IPS indicating an Early Completion will be accepted without being fully resource-loaded (including crew sizes and manhours) and the Government agreeing that the schedule is reasonable and achievable.

The Government is under no obligation to accelerate work items it is responsible for to ensure that the early completion is met nor is it responsible to modify incremental funding (if applicable) for the project

SECTION 01 11 00 Page 8 to meet the contractor's accelerated work.

1.6.2.4 Periodic Schedule Updates

An updated schedule showing actual progress shall be submitted monthly and with each pay request. Changes to the base-line schedule shall be outlined in a narrative describing the reason for the change.

1.6.3 Organization at the Site

1.6.3.1 General

The Contractor shall employ ample personnel and sufficient equipment to accomplish the work of this contract in the least amount of time, within the prosecution period specified in the SPECIAL CONTRACT REQUIREMENTS, Subpart COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK (APR 1984) FAR 52.211-10.

1.6.3.2 Rate of Progress

Prosecute the work diligently and maintain a production rate of not less than 75,000 cubic yards for a consecutive 30 calendar day period.

Should the Contractor fail to maintain a satisfactory rate of progress, the Contracting Officer may require that additional personnel and equipment be placed on the work and weekend and overtime work be performed, in order that the work be brought up to schedule and maintained.

1.7 CONTRACTOR USE OF PREMISES

1.7.1 Storage Areas

See Section 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS.

1.7.1.1 Work Limits

The limits of work consist of the shoaled areas of the channel as shown on the contract drawings, and the side slope areas (assumed 1V:3H) which shall be dredged to obtain the required depth with allowable overdepth, and the Plum Island Beach Placement Area as shown on the contract drawings.

1.7.2 Contractor's Receipt of Supplies

The Contractor shall be responsible for all arrangements for the receipt of materials and supplies at the job site. Government personnel are not permitted to receive or sign for items delivered to the site.

1.7.3 Access to Work Site

Access to the project site and storage and staging area is as shown on the contract drawings and will be discussed at the Preconstruction Conference.

1.7.4 Protection and Security

a. Protection to Contractor personnel or their equipment cannot be provided at the worksite by the Government.

b. The Contractor shall protect all its personnel, Government personnel, and the general public from injury.

SECTION 01 11 00 Page 9

c. The Contractor shall conduct all its work so as to prevent injury or unsafe conditions during construction.

1.7.5 Work By Other Contractors

During the performance period of this contract, no other work is anticipated to occur by other contractors.

1.7.6 Emergency Contacts

The Contractor shall provide a list of emergency contacts in the event of an emergency. The list shall include the contact names, addresses, and telephone numbers. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.7.7 Damaged Property

Work shall proceed in a manner which will minimize disturbance or risk of damage to boats, structures, and surrounding lands. The Contractor shall repair such items damaged in the course of carrying out the work at no additional cost to the Government. All repairs shall match similar existing items in all aspects. All replacements shall be in kind.

1.7.8 Contractor's Receipt of Supplies

The Contractor shall be responsible for all arrangements for the receipt of materials and supplies at the job site. Government personnel are not permitted to receive or sign for items delivered to the site.

1.7.9 Daily Clean Up

The Contractor shall at all times keep rubbish from entering surrounding lands and water. Rubbish accumulated at the temporary facilities shall be removed from the premises daily.

1.7.10 Government Sanitary Facilities

Toilet facilities are not available on site for Contractor's use and Government use. The Contractor shall provide portable toilets for its personnel, subcontractors, and Government personnel, as specified in Section 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS.

1.8 QUALITY ASSURANCE

a. All items of work not addressed in the contract documents shall be completed in strict accordance with the manufacturers’ specifications.

b. The Government is not obligated to inspect the Contractor’s work, or to protect the Contractor from the consequences of its work. Government inspections are a general examination of the Contractor’s conduct and workmanship and are solely for the purpose of the Government.

Government-designated Quality Assurance Representatives (QARs) do not have the authority to accept work, nor is a Government inspection to be construed as conclusive.

c. Government agents including QARs and project engineers are not authorized to change the contract without the written approval of the Contracting Officer; this lack of authority extends to all situations in

SECTION 01 11 00 Page 10 which the action of these agents could be construed as constituting a change.

d. The quality of workmanship is subject to audit by Government or Government-designated QARs at any time during the contract. The Contractor shall cooperate fully and provide all information necessary for this audit.

e. The Contractor shall submit all requests for changes in writing to the CONTRACTING OFFICER. Do not proceed with changes without possession of written authorization of the Contracting Officer.

f. The Contractor shall not conceal any work unless the Contracting Officer has approved all items of work which are to be concealed. The Contractor shall notify the Contracting Officer of its intention to conceal work at least 24 hours in advance of concealment.

1.9 COORDINATION

1.9.1 Daily Dredge Operations Location Map (DOLM)

The Contractor shall prepare a Dredge Operations Location Map (DOLM) for each day that dredging activities are planned for this project. The DOLM shall indicate the locations where dredge(s) shall be working during a specific 24 hour period, planned placement activity, and other significant activities planned. The DOLM shall be prepared in PDF format and forwarded to the parties indicated on a distribution list that will be provided to the Contractor after receipt of the Notice to Proceed. An example of a DOLM is attached at the end of the specifications. All information shown on the example is required for each DOLM prepared, including vessel information, location, maps, channel stations, etc. The DOLM's shall be prepared and distributed a minimum of 24 hours prior to the start of the period addressed in the specific DOLM.

1.9.2 Public Notice

The public shall be notified of this dredging project at least one week before commencement of dredging operations at the site. A brief description of the work to be performed and the intended schedule of dredging and placement operations shall be published in a newspaper of general circulation in the area adjacent to the dredging. The notice shall include the locations where the work is to be performed, the time sequence of events, a map of the the placement site, the location and limits of the placement site, and the procedure the Contractor will use to respond to claims of loss of fishing gear during the dredging work. The notice shall include the Contractor's point of contact and telephone number.

1.9.3 Notice to Mariners

Before beginning dredging operations, the Contractor shall coordinate with the U.S. Coast Guard (USCG) to issue a "Notice to Mariners" regarding the work to be performed and the Contractor's proposed operations.

The Corps of Engineers and the USCG have agreed to phraseology when issuing navigational bulletins and notices. The information furnished shall be consistent with USCG Broadcast Notice to Mariners and Local Notice to Mariners. When requesting local USCG offices to issue navigational information for Corps of Engineers work involving marine

SECTION 01 11 00 Page 11 construction, the following terminology shall be used, as applicable:

For cautionary areas: "Mariners are urged to use extreme caution in the area."

For dredging and work operations: "Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made."

1.9.4 Aids to Navigation

Aids to navigation (beacons, buoys, markers, etc.) have been placed by the USCG in the vicinity of the project area. The Contractor shall not remove, change the location of, obstruct, willfully damage, make fast to, or interfere with these aids to navigation. If the work of this project requires the temporary movement or relocation of any aid to navigation, the Contractor shall notify the USCG and the Contracting Officer of the requirement 30 days in advance, in writing. USCG personnel will then move or relocate the aid to navigation as appropriate for the progress of the work. Under no circumstances shall the Contractor move or relocate an aid to navigation under his own authority with his own personnel. The Contractor shall also contact the USCG at the completion of all work and the removal of all marine plant.

1.9.5 Moorings

Refer to Subpart MOORINGS in Section 35 20 23 DREDGING AND DREDGED

MATERIAL PLACEMENT.

1.9.6 Points of Contact

Coast Guard (Notice to Mariners and Aids to Navigation):

Mary Swanson, 1st Coast Guard District Contact Telephone Number: 617-223-8356

Boston Waterways Management:

Mr. Tim Chase, Assistant Branch Chief (Primary Contact) Contact Phone Number: 617-447-1620

LCDR Ben Lyons, Branch Chief (Secondary Contact) Contact Telephone Numbers: 617-223-3028

City of Newburyport Chief of Staff - City of Newburyport Office of Mayor Donna D. Holaday 60 Pleasant Street Newburyport, MA 01950 Contact Telephone Number: 978-465-4413 Email: MCoogan@CityofNewburyport.com

City of Newburyport Harbormaster Capt. Paul Hogg 60 Pleasant Street Newburyport, MA 01950 Contact Telephone Number: 978-360-6963 Email: PHogg@CityofNewburyport.com

SECTION 01 11 00 Page 12

1.9.7 Coordination Meeting

The Contractor shall attend an on-site Coordination Meeting arranged by the Contracting Officer, which will occur prior to the start of dredging.

Subjects addressed will include project scheduling and coordination with local entities, and other topics as appropriate. The Contractor employees in attendance shall include the Project Manager, Project Superintendent, Quality Control Manager, and Site Safety and Health Officer. Other attendees will include reperentatives from the U.S. Army Corps of Engineers, Coast Guard, and local entities.

1.10 PRE-DREDGING PHOTOGRAPHIC AND VIDEO SURVEY

The Contractor shall perform a pre-dredging photographic and video survey at the project site to with the Contracting Officer. This pre-dredging photographic and video survey shall include still photographs and videos in sufficient quantity to fully document the existing condition of all bulkheads, piers, piles, fenders, dune areas, breakwaters, jetties and other shorefront features, including parking lots and other paved areas, the storage and staging area, and beach access path, within and adjacent to areas to be dredged as part of this contract. The survey shall provide full coverage of all access and staging areas and material placement areas. A written narrative shall be prepared by the Contractor which organizes and summarizes the findings of the pre-dredging survey photographs and videos. The narrative shall separately organize all items by individual owners. The condition of each item shall also be documented in writing. The written narrative, together with the photographs and videos, shall constitute a "Pre-Dredging Photographic and Video Survey Report", which shall be submitted to the Contracting Officer for approval. No on-site dredging work shall be performed until this "Pre-Dredging Photographic and Video Survey Report" has been approved.

Damage to features caused by the Contractor's operations shall be repaired by the Contractor at no additional expense to the Government. Photographs shall be geo-referenced with a GIS Map of photograph locations indicated shall be part of the survey submittal.

1.11 GENERAL SAFETY REQUIREMENTS

1.11.1 General

The Contractor shall take all necessary precautions in observing safety regulations in accordance with Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS, and shall assume the responsibility to guard against causing of fires and/or explosions and to protect Government property. The Contractor shall perform the work in a manner consistent with security and with fire safety regulations especially with regards to ingress and egress. Temporary closures shall not compromise life safety, security or fire safety.

1.11.2 Contractor's Project Superintendent

The Contractor's project superintendent shall take an active role in enforcing the safety requirements by participation in safety conferences, hazard analysis, tool box meetings, walk-through inspections, correction of violations, etc., and including that of any subcontractor's work.

1.12 ENVIRONMENTAL PROTECTION

To provide for control of all environmental pollution arising from

SECTION 01 11 00 Page 13 construction activities, the Contractor and its subcontractors, in the performance of this contract, shall comply with Section 01 57 19 ENVIRONMENTAL PROTECTION, and all applicable federal, state, and local laws and regulations concerning environmental protection pollution control and abatement.

1.13 PRECONSTRUCTION CONFERENCE

The Contracting Officer will conduct a preconstruction conference with key Contractor personnel. The purpose of the conference is to review contract requirements and to establish a working relationship between the Contractor's Staff and the U.S. Army Corps of Engineers personnel who will be closely associated with the project. During the conference, the Contracting Officer will inform the Contractor concerning Job Safety, Quality Control, Labor Relations, and Environmental Protection. The Contracting Officer will also review the contract requirements relative to the conditions contained in the "Water Quality Certification" and other environmental permits issued for this project. The Contractor's Superintendent, Quality Control Representative, and Site Safety and Health Officer (SSHO) shall attend this conference.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --

SECTION 01 11 00 Page 14

FILE NAME:

DRAWING DATE:

DRAWN BY:

USACE JOB NO:

GLDD JOB N0.

APPROVED BY:

SCALE:

PAGE OF

EE

BOSTON GLDD TRAFFIC MAP

ALX

OCT 17, 2017

W912WJ-16-C-0036

1AJB 1

EQUIPMENT TRAFFIC MAP

15666 TO FIT

E6EPGTJM

Text Box Daily Dredge Operations Location Map Example

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 CONTRACT COST BREAKDOWN

1.2 JOB PAYMENT ITEMS

1.3 UNIT PRICE PAYMENT ITEMS

1.4 BIDDING SCHEDULE - PAYMENT ITEMS

PART 2 PRODUCTS

PART 3 EXECUTION

SECTION 01 22 00 Page 1

SECTION 01 22 00

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 CONTRACT COST BREAKDOWN

The Contractor must furnish within 30 days after the date of Notice to Proceed, and prior to the submission of its first partial payment estimate, a breakdown of its single job pay item or items which will be reviewed by the Contracting Officer as to propriety of distribution of the total cost to the various accounts. Any unbalanced items as between early and late payment items or other discrepancies will be revised by the Contracting Officer to agree with a reasonable cost of the work included in the various items. This Contract cost breakdown will then be utilized as the basis for progress payments to the Contractor.

1.2 JOB PAYMENT ITEMS

Payment items for the work of this contract for which contract job payments will be made are listed in the BIDDING SCHEDULE and described below. The job price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.3 UNIT PRICE PAYMENT ITEMS

Payment items for the work of this contract on which the contract unit price payments will be made are listed in the BIDDING SCHEDULE and described below. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items. In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid. If the bidder shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.

1.4 BIDDING SCHEDULE - PAYMENT ITEMS

Payment items for the work of this contract on which the contract progress payments will be based are listed in the BIDDING SCHEDULE and are described below. All costs for items of work, which are not specifically mentioned to be included in a particular Bidding Schedule job or unit price payment item, shall be included in the listed job or unit price item most closely associated with the work involved. Any bid price for items indicated in the BIDDING SCHEDULE which are unbalanced as to price may be rejected as non-responsive. An unbalanced bid is one which is based on price significantly less than cost for some work and price which is significantly overstated for other work.

SECTION 01 22 00 Page 2

Base Bid Items

A. Item No. 0001, "Mobilization and Demobilization."

Payment will be made for all costs associated with mobilization and demobilization (as defined in Special Contract Requirements clause "PAYMENT FOR MOBILIZATION AND DEMOBILIZATION") for dredging and placement operations.

Costs included with Payment Item 0001 shall only include those costs associated with the mobilization and demobilization required to complete dredging and the transportation to and placement at the Plum Island Beach Placement Area.

Unit of Measure: Job.

B. Item No. 0002, "Dredging of 15-Foot Federal Navigation Channel with Placement of Dredged Material at the Plum Island Beach Placement Area"

The contract price per cubic yard for Bidding Schedule Payment Item 0002 shall include all cost associated with the removal of dredged material encountered from dredging the Federal Navigation channel to the specified depths, and the transportation to and placement at the Plum Island Beach Placement Area as indicated on the Contract Drawings and as specified in Section 01 11 00 SUMMARY OF WORK and Section 35 20 23 DREDGING AND DREDGE MATERIAL PLACEMENT. Costs included with Payment Item 0002 shall only include those costs associated with dredging, the transportation of, and the placement of dredged material at the Plum Island Beach Placement Area.

The total amount of material removed and paid for under the contract for Bidding Schedule Payment Item 0002 will be measured by the cubic yard in place by computing the volume between the bottom surface shown by soundings of the last pre-dredge survey made before dredging begins and the bottom surface shown by the soundings of a post-dredge survey made as soon as practicable after the removal of the material.

Dredged material will be included that is within the limits of the side slopes, required overdepth, and allowable overdepth as described in Section 35 20 23 DREDGING AND DREDGE MATERIAL PLACEMENT, paragraph "DREDGING LIMITS", less any deductions that may be required for misplaced material described in subparagraph "Placement In Non-Approved Areas".

The Contract Drawings are believed to accurately represent conditions existing on the date of the survey shown on the drawings, but the depths and the specific areas to be dredged shown thereon may be verified and corrected by soundings taken by the Government before dredging begins. Determination of quantities removed and the deductions made to determine quantities after having once been made by the Contracting Officer, will not be reopened, except on evidence of collusion, fraud, or obvious error. Refer to Special Contract Requirements, subparagraph "CONTRACT DRAWINGS AND SPECIFICATIONS" for additional information and requirements regarding contract drawings.

Monthly partial payments will be based on approximate quantities determined by Contractor quality control surveys. The pre-dredge survey made immediately before dredging, and the after dredge survey made as soon as practicable after the removal of the material, will be

SECTION 01 22 00 Page 3 performed by the Government at no cost to the Contractor.

No separate measurement or payment will be made for the removal of debris during dredging operations as specified in Section 35 20 23 DREDGING AND DREDGE MATERIAL PLACEMENT, paragraph "DEBRIS MANAGEMENT".

Unit of Measure: Cubic Yard (CD).

Optional Items

C. Item No. 0003, "Additional Mobilization and Demobilization for the Work Required by Item 0004".

Payment will be made for all costs associated with mobilization and demobilization (as defined in Special Contract Requirements clause "PAYMENT FOR MOBILIZATION AND DEMOBILIZATION") for dredging and placement operations. This item includes only the incremental mobilization and demobilization costs associated with the work required by Optional Item 0004, which may include but is not limited to additional hydraulic pipeline segments and booster pumps.

Unit of Measure: Job.

D. Item No. 0004, "Dredging of 9-Foot Federal Navigation Channel with Placement of Dredged Material at the Plum Island Beach Placement Area."

The contract price per cubic yard for Bidding Schedule Payment Item 0003 shall include all cost associated with the removal of dredged material encountered from dredging the Federal Navigation channel to the specified depths, and the transportation to and placement at the Plum Island Beach Placement Area as indicated on the Contract Drawings and as specified in Section 01 11 00 SUMMARY OF WORK and Section 35 20 23 DREDGING AND DREDGE MATERIAL PLACEMENT. Costs included with Payment Item 0003 shall only include those costs associated with dredging, the transportation of, and the placement of dredged material at the Plum Island Beach Placement Area.

The total amount of material removed and paid for under the contract for Bidding Schedule Payment Item 0003 will be measured by the cubic yard in place by computing the volume between the bottom surface shown by soundings of the last pre-dredge survey made before dredging begins and the bottom surface shown by the soundings of a post-dredge survey made as soon as practicable after the removal of the material.

Dredged material will be included that is within the limits of the side slopes and allowable overdepth as described in Section 35 20 23 DREDGING AND DREDGE MATERIAL PLACEMENT, paragraph "DREDGING LIMITS", less any deductions that may be required for misplaced material described in subparagraph "Placement In Non-Approved Areas".

The Contract Drawings are believed to accurately represent conditions existing on the date of the survey shown on the drawings, but the depths and the specific areas to be dredged shown thereon may be verified and corrected by soundings taken by the Government before dredging begins. Determination of quantities removed and the deductions made to determine quantities after having once been made by the Contracting Officer, will not be reopened, except on evidence of collusion, fraud, or obvious error. Refer to Special Contract

SECTION 01 22 00 Page 4

Requirements, subparagraph "CONTRACT DRAWINGS AND SPECIFICATIONS" for additional information and requirements regarding contract drawings.

Monthly partial payments will be based on approximate quantities determined by Contractor quality control surveys. The pre-dredge survey made immediately before dredging, and the after dredge survey made as soon as practicable after the removal of the material, will be performed by the Government at no cost to the Contractor.

No separate measurement or payment will be made for the removal of debris during dredging operations as specified in Section 35 20 23 DREDGING AND DREDGE MATERIAL PLACEMENT, paragraph "DEBRIS MANAGEMENT".

Unit of Measure: Cubic Yard (CD).

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 22 00 Page 5

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 30 00

ADMINISTRATIVE REQUIREMENTS

PART 1 GENERAL

1.1 MINIMUM INSURANCE REQUIREMENTS

1.2 SUPERVISION

1.3 PRECONSTRUCTION CONFERENCE

1.4 PARTNERING

1.4.1 Team-Led (Informal) Partnering

1.5 ELECTRONIC MAIL (E-MAIL) ADDRESS

PART 2 PRODUCTS

PART 3 EXECUTION

SECTION 01 30 00 Page 1

SECTION 01 30 00

ADMINISTRATIVE REQUIREMENTS

PART 1 GENERAL

1.1 MINIMUM INSURANCE REQUIREMENTS

Provide the minimum insurance coverage required by FAR 28.307-2 Liability, during the entire period of performance under this contract. Provide other insurance coverage as required by State law.

1.2 SUPERVISION

See Section 01 11 00 SUMMARY OF WORK, Subpart SUPERINTENDENCE BY THE

CONTRACTOR.

1.3 PRECONSTRUCTION CONFERENCE

See Section 01 11 00 SUMMARY OF WORK, Subpart PRECONSTRUCTION CONFERENCE.

1.4 PARTNERING

To most effectively accomplish this Contract, the Contractor and Government must form a cohesive partnership with the common goal of drawing on the strength of each organization in an effort to achieve a successful project without safety mishaps, conforming to the Contract, within budget and on schedule. The partnering team must consist of personnel from both the Government and Contractor including project level and corporate level leadership positions. Key Personnel from the Government, Contractor, and key subcontractors are required to participate in the Partnering process.

1.4.1 Team-Led (Informal) Partnering

A. The Contracting Officer will coordinate the initial Team-Led (Informal) Partnering Session with key personnel of the project team, including Contractor and Government personnel. The Partnering Session will be co-led by the Government Construction Manager and Contractor's Project Manager.

B. The Initial Team-led Partnering session may be held concurrently with the Pre-Construction meeting. Partnering sessions will be held at a location mutually agreed to by the Contracting Officer and the Contractor, typically at a conference room at the project site or at the Contractor's temporary trailer.

C. The Initial Team-Led Partnering Session will be conducted and facilitated using electronic media (a video and accompanying forms) provided by Contracting Officer.

D. The Partners will determine the frequency of the follow-on sessions.

E. Participants will bear their own costs for meals, lodging and transportation associated with Partnering.

SECTION 01 30 00 Page 2

1.5 ELECTRONIC MAIL (E-MAIL) ADDRESS

Establish and maintain electronic mail (e-mail) capability along with the capability to open various electronic attachments as text files, pdf files, and other similar formats. Within 10 days after contract award, provide the Contracting Officer a single (only one) e-mail address for electronic communications from the Contracting Officer related to this contract including, but not limited to contract documents, invoice information, request for proposals, and other correspondence. The Contracting Officer may also use email to notify the Contractor of base access conditions when emergency conditions warrant, such as hurricanes or terrorist threats. Multiple email addresses are not allowed.

It is the Contractor's responsibility to make timely distribution of all Contracting Officer initiated e-mail with its own organization including field office(s). Promptly notify the Contracting Officer, in writing, of any changes to this email address.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 30 00 Page 3

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 GENERAL

1.1 SUMMARY

1.1.1 Submittal Information

1.1.2 Project Type

1.1.3 Submission of Submittals

1.2 DEFINITIONS

1.2.1 Submittal Descriptions (SD)

1.2.2 Approving Authority

1.2.3 Work

1.3 SUBMITTALS

1.4 SUBMITTAL CLASSIFICATION

1.4.1 Government Approved (G)

1.4.1.1 Approval Codes

1.4.2 For Information Only

1.5 PREPARATION

1.5.1 Transmittal Form

1.5.2 Submittal Format

1.5.2.1 Format of SD-01 Preconstruction Submittals

1.5.2.2 Format for SD-02 Shop Drawings

1.5.2.2.1 Drawing Identification

1.5.2.3 Format of SD-03 Product Data

1.5.2.3.1 Product Information

1.5.2.3.2 Standards

1.5.2.3.3 Data Submission

1.5.2.4 Format of SD-04 Samples

1.5.2.4.1 Sample Characteristics

1.5.2.4.2 Sample Incorporation

1.5.2.4.3 Comparison Sample

1.5.2.5 Format of SD-05 Design Data

1.5.2.6 Format of SD-06 Test Reports

1.5.2.7 Format of SD-07 Certificates

1.5.2.8 Format of SD-08 Manufacturer's Instructions

1.5.2.8.1 Standards

1.5.2.9 Format of SD-09 Manufacturer's Field Reports

1.5.2.10 Format of SD-10 Operation and Maintenance Data (O&M)

1.5.2.11 Format of SD-11 Closeout Submittals

1.5.3 Source Drawings for Shop Drawings

1.5.3.1 Source Drawings

1.5.3.2 Terms and Conditions

1.6 QUANTITY OF SUBMITTALS

1.6.1 Number of SD-04 Samples

1.7 INFORMATION ONLY SUBMITTALS

1.8 PROJECT SUBMITTAL REGISTER

1.8.1 Submittal Management

1.8.2 Preconstruction Use of Submittal Register

SECTION 01 33 00 Page 1

1.8.3 Contractor Use of Submittal Register

1.8.4 Approving Authority Use of Submittal Register

1.8.5 Action Codes

1.8.5.1 Contractor Action Codes

1.8.6 Delivery of Copies

1.9 VARIATIONS

1.9.1 Considering Variations

1.9.2 Proposing Variations

1.9.3 Warranting that Variations are Compatible

1.9.4 Review Schedule Extension

1.10 SCHEDULING

1.11 GOVERNMENT APPROVING…