Specifications - Police Station Site Work and Restoration.pdf
PDF 525 KB Posted
- Solicitation number
- 65916
- Issued by
- Fairfax County, Fairfax City, Virginia
About this file
This document is a set of specifications for site work and restoration at the City of Fairfax Police Station. The work includes demolishing an existing traffic island, masonry pier, gates, and related asphalt and curb, and then restoring the pavement with milling, overlay, and full-depth replacement as needed. The contractor will work in coordination with the existing Fencing and Gates Contractor. The project is located in Fairfax County and Fairfax City, Virginia.
The restoration work includes excavation, grading, asphalt pavement, pavement markings, signs, and landscaping. Specific requirements cover items such as dewatering, subgrade preparation, asphalt paving, pavement markings, and lawn establishment. Contractors must meet quality assurance standards for materials and installation. The contractor will be responsible for project cleanup, protection of existing facilities, and maintenance of traffic during construction.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF FAIRFAX, POLICE STATION SITE WORK AND RESTORATION
GENERAL SITEWORK REQUIREMENTS 01 0200 - 1
SECTION 01 0200 – GENERAL SITEWORK REQUIREMENTS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. The provisions of the Contract Documents apply to the work of this Section.
1.2 SITEWORK LAYOUT
A. Monuments and Benchmarks
1. Maintain all monuments, property corners, benchmarks and other reference points.
2. If these are disturbed or destroyed during construction operations, have them replaced by a surveyor licensed in the Commonwealth of Virginia. This replacement shall be at no additional expense to the
Contract.
B. Laying out the Work.
1. Obtain project control from Surveyor of Record provided by the City, Timmons Group, and set benchmarks as may be required.
2. Protect these points throughout construction.
3. Layout work utilizing these reference points.
C. Record Drawings
1. Maintain a record of the horizontal and vertical locations of all underground utilities and piping, both newly installed and existing encountered.
2. Maintain a record of any variations of the work.
3. Identify and accurately locate capped utilities and other subsurface structural, electrical, or mechanical conditions.
4. Maintain handwritten record drawings throughout construction, recording information as work is performed, Record Drawings shall be available for periodic inspection during the course of the project.
5. Submit final, complete record drawings at Substantial Completion.
6. Record Drawings shall be prepared and certified by the Surveyor of Record.
1.3 EASEMENTS (N/A)
1.4 MAINTENANCE OF TRAFFIC
A. Maintain vehicular and pedestrian traffic to the building and secured parking lot at all times. Comply with all applicable safety requirements. Piers shall be installed to facilitate traffic into and from the parking area.
1.5 CORRELATION OF CONSTRUCTION DOCUMENTS
A. Review Contract Documents thoroughly prior to the start of construction.
B. Report any conflict or discrepancy discovered in the Construction Documents to the Engineer prior to the start of construction.
GENERAL SITEWORK REQUIREMENTS 01 0200 - 2
C. Report any conflict or discrepancy discovered between the Contract Documents and state and local governmental regulations to the Engineer prior to the start of construction.
1.6 PROJECT CONDITIONS
A. The conditions existing at the time of inspection for bidding purposes will be maintained by the Owner to the extent practical. However, minor variations may occur due to natural occurrences prior to the start of Work.
B. The location of existing underground utilities indicated is approximate only. Field locate all existing underground utilities in the area of work, regardless of whether or not they are indicated. Call “Miss
Utility” prior to the start of demolition work for assistance in the location of existing underground utilities.
C. Should charted, uncharted or incorrectly charted utilities be encountered during demolition, contact the
Engineer immediately for instructions. Cooperate with Owner and utility companies to keep services and facilities in operation.
1.7 SCHEDULING
A. The parking lot must be always secured during construction. Plan Work accordingly.
PART 2 - PRODUCTS
Not Applicable
PART 3 – EXECUTION
3.1 PROJECT CLEAN UP
A. Clean site as construction progresses. Do not allow trash or other waste materials to accumulate.
B. Prior to requesting the punch-list inspection, clean the site to the following requirements:
1. Power wash all walks and pavements within project area.
2. The remainder of the site shall be broom clean.
3. Remove all trash and debris.
3.2 EXISTING FACILITIES
A. Preserve existing signs, markers, guardrails, fences and other amenities, to be retained, in their original condition unless written permission is obtained for their removal and replacement.
B. Replace damaged items at no additional cost to the Contract.
END OF SECTION 01 0200
SELECTIVE SITE DEMOLITION 02 4113 - 1
SECTION 02 4113 - SELECTIVE SITE DEMOLITION
A. The provisions of the Contract Documents apply to the Work of this Section.
1.2 SUMMARY
A. This Section includes the following:
1. Demolition and removal of existing asphalt and/or concrete pavement, concrete and/or asphalt walks, curbs and gutters, brick piers, and other exterior site items indicated or not indicated which constitute
Work.
2. Removal and/or relocation of existing underground utilities.
3. Coordination with the Fencing and Gates Contractor to build the masonry piers and demolish the rear gate piers to facilitate construction of the gate corners.
4. Rebuild the masonry piers in locations shown on the drawings.
5. Removal and disposal of fence and posts as shown on the drawings.
1.3 DEFINITIONS
A. Remove: Remove and legally dispose of items except those indicated to be reinstalled, salvaged, or to remain the City's property.
B. Remove and Reinstall: Remove items indicated; clean, service, and otherwise prepare them for reuse; store and protect against damage. Reinstall items in the same locations or in locations indicated.
C. Existing to Remain: Protect items indicated to remain against damage and soiling. When permitted by the
A/E, items may be removed to a suitable, protected storage location and then cleaned and reinstalled in their original locations.
1.4 MATERIALS OWNERSHIP
A. Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indicated to remain the City's property, remove demolished materials from the site with further disposition at the Contractor's option.
B. Storage or sale of removed items or materials on-site will not be permitted.
C. Historical items, relics, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, antiques, and other items of interest or value to the City, which may be encountered, remain the City's property. Carefully remove and deliver promptly to the City.
1.5 SUBMITTALS
A. Prior to construction photograph or videotape in sufficient detail existing conditions of adjoining construction and site improvements that might be misconstrued after construction as damage caused by the
Work.
B. Record drawings at Project Closeout.
SELECTIVE SITE DEMOLITION 02 4113 - 2
C. See Section 01 0200.Proposed dust-control measures.
D. Schedule of selective demolition activities indicating the following:
1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity.
2. Interruption of utility services.
3. Detailed sequence of selective demolition and removal work to ensure uninterrupted progress of City’s on-site and fencing and gate operations by others.
4. Coordination of City's continuing occupancy of portions of existing building and of City's partial utilization of the Site.
5. Locations of temporary means of ingress and egress.
E. Inventory of items to be removed or turned over to City.
1.6 QUALITY ASSURANCE
A. Regulatory Requirements: All work shall comply with Federal, State and local laws and regulations concerning hauling and disposal of demolition debris, including hazardous wastes, if any.
B. Conduct a pre-construction conference with the City and A/E prior to the start of Work and obtain all necessary permits for this work, including a City License to conduct Work within the corporate limits of the City.
1.7 PROJECT CONDITIONS
A. City assumes no responsibility for actual condition of items or structures to be demolished. Conditions existing at the time of inspection for bidding purposes will be maintained by the City to the extent practical.
However, minor variations may occur prior to the start of demolition work.
B. Should charted, uncharted or incorrectly charted utilities be encountered during demolition, contact the
Architect immediately for instructions. Cooperate with City and utility companies to keep services and facilities in operation.
C. Do not interrupt existing utilities serving facilities occupied and used by the City and others, except when permitted in writing by the City. Provide acceptable temporary utility service as required to maintain
City’s operations.
1.8 SCHEDULING
A. City will occupy the Police Station adjacent to the Work. Conduct selective demolition so that the Owner's operations will not be disrupted. Provide not less than 72 hours notice to Owner of activities that will affect Owner's operations.
B. Arrange selective demolition schedule, approved by the City, so as not to interfere with City’s on-site operations.
C. Notify and coordinate any required relocation and/or removal of existing underground utilities, poles, meters or other above ground appurtenances with the appropriate utility company (i.e. power, telephone, cable and natural gas/propane) prior to the start of selective demolition work.
1.9 USE OF EXPLOSIVES
A. Do not use explosives to perform selective site demolition work.
SELECTIVE SITE DEMOLITION 02 4113 - 3
(Not Applicable)
PART 3 - EXECUTION
3.1 EXAMINATION
A. Call “Miss Utility” prior to the start of demolition work for assistance in the location of existing underground utilities. Field locate all existing underground utilities in the area of work, regardless of whether or not they are indicated.
B. Verify that utilities indicated as removed, abandoned and/or relocated have been disconnected and capped.
C. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.
D. Inventory materials to be removed and reinstalled or turned over to the City.
3.2 PROTECTION OF PERSONS AND PROPERTY
A. Drain, purge, or otherwise remove all dangerous materials before proceeding with selective demolition operations.
B. Conduct demolition operations and remove debris to ensure minimum interference with roads, streets, walks and other adjacent occupied and used facilities.
1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from City. Provide alternate routes around closed or obstructed traffic ways as required by Police operations to include using the completed back gate when demolishing the existing old gate and related traffic island.
C. Conduct demolition operations to prevent injury to people and damage to adjacent buildings and facilities to remain. Ensure safe passage of people around selective demolition area.
1. Erect temporary protection, such as walks, fences, railings, canopies, and covered passageways, where required by authorities having jurisdiction.
2. Protect existing site improvements, appurtenances, and landscaping to remain.
D. Barricade areas of demolition occurring as part of this work, and post with warning lights as required by the
City.
E. Protect structures, buildings, utilities, walks, pavements, existing vegetation and other facilities to remain from damage caused by settlement, lateral movement, undermining, washout and other hazards created by demolition operations.
3.3 POLLUTION CONTROLS
A. Perform all work in accordance with the requirements of the latest edition of the Virginia Erosion and
Sediment Control Handbook and those of the local Erosion Control official.
B. Clean adjacent structures and improvements of dust, dirt, and debris caused by the Work. Return adjacent areas to existing condition after selective demolition.
3.4 DEMOLITION OF EXISTING FACILITIES
SELECTIVE SITE DEMOLITION 02 4113 - 4
A. Utilities
1. Coordinate the removal and/or relocation of existing utilities with the appropriate utility companies as required for the Work.
2. Remove existing horizontal assets as indicated and terminate in a manner conforming to the City building codes.
3. Provide adequate means of support and protection during demolition and other construction operations for existing horizontal assets that are to remain in place. Repair horizontal assets damaged by construction operations to the satisfaction of the horizontal asset’s owner and City.
B. Asphalt Pavement
1. Remove asphalt concrete pavement by sawcutting to the full depth of the pavement. Provide neat sawcuts at the limits of pavement removal indicated.
C. Concrete Pavement, Walks and Curbs
1. Remove concrete pavement and walks to the nearest joint. Sawcut concrete if joints are not present adjacent to the area of demolition.
2. Sawcut concrete along straight lines to a depth of not less than 2 inches. Break out remainder of concrete, provided that the broken area is concealed in the finished work, and the remaining concrete is sound. At locations where the broken face cannot be concealed, grind smooth or sawcut entirely through concrete.
3.5 DISPOSAL OF DEMOLISHED MATERIALS
A. Promptly dispose of demolished materials. Do not allow demolished materials to accumulate on-site.
B. Do not burn demolished materials or debris.
C. Transport and legally dispose of demolished materials off City’s property and to the proper landfill or landfill transfer station.
3.6 CLEANUP AND REPAIR
A. Upon completion of demolition work remove all tools, equipment and demolition materials from site.
Remove demolition work area protection and leave areas clean.
B. Repair demolition performed in excess of that required. Return elements of construction and surfaces to remain to the condition existing prior to the start of construction. Repair adjacent construction or surfaces soiled or damaged by demolition work.
END OF SECTION 02 4113
SITE CLEARING 31 1000 - 1
SECTION 31 1000 - SITE CLEARING
1. Protection of existing trees.
2. Removal of trees and other vegetation.
3. Topsoil stripping.
A. Remove: Remove and legally dispose of items indicated. Removal includes digging out and off-site disposing of stumps and roots.
B. Tree Protection Zone: The area surrounding individual trees or groups of trees to be protected during Work, and defined by the drip line of individual trees or the perimeter drip line of groups of trees, unless otherwise indicated.
C. Topsoil: Friable, clay loam surface soil, found in varying depths.
1.4 MATERIALS OWNERSHIP
A. Except for stripped topsoil or other materials indicated to remain Owner's property, cleared materials shall become Contractor's property and shall be removed from Project site.
1.5 SUBMITTALS
A. Photographs or videotape, sufficiently detailed, of existing conditions of trees, plantings and other improvements adjoining the construction that might be misconstrued as damage caused by the Work.
A. Traffic: Conduct site clearing operations to ensure minimum interference with roads, streets, walks, and other adjacent occupied or used facilities. Do not close or obstruct streets, walks or other occupied or used facilities without permission from authorities having jurisdiction.
B. Protection of Existing Improvements: Provide protections necessary to prevent damage to existing improvements indicated to remain in place.
1. Protect existing improvements on adjoining properties and on Owner's property.
2. Restore existing improvements damaged by clearing operations to their original condition.
C. The conditions existing at the time of inspection for bidding purposes will be maintained by the Owner to the extent practical. However, minor variations may occur due to natural occurrences prior to the start of work.
D. Do not commence work until erosion and sedimentation control measures are in place.
SITE CLEARING 31 1000 - 2
2.1 TREE PROTECTION FENCING
A. Tree protection fencing shall conform to standard and specification 3.38-2 (plastic fence) of the Virginia
Erosion and Sediment Control Handbook.
3.1 PROTECTION OF EXISTING TREES AND VEGETATION
A. Install tree protection fencing as indicated. Erect and maintain a temporary fence around the drip line of individual trees or around the perimeter drip line of groups of trees to remain.
1. Do not store construction materials, debris, topsoil or other excavated material within the tree protection zone.
2. Do not permit vehicles or other equipment within the tree protection zone.
3. Maintain tree protection zones free of weeds and trash.
B. Protect existing trees and other vegetation indicated to remain in place, against unnecessary cutting, breaking or skinning of roots, skinning or bruising of bark, smothering of trees by stockpiling construction materials or excavated materials within drip line, excess foot or vehicular traffic, or parking of vehicles within drip line.
C. Provide protection for roots over 1-1/2 inch diameter that are cut during construction operations. Coat cut faces with emulsified asphalt, or other acceptable coating, formulated for use on damaged plant tissues. Temporarily cover exposed roots with wet burlap to prevent roots from drying out; cover with earth as soon as possible.
D. Repair or replace trees and vegetation indicated to remain which are damaged by construction operations, in a manner acceptable to Architect.
3.2 SITE CLEARING
A. General: Remove trees, shrubs, grass and other vegetation as required to permit installation of the Work. Cut minor roots and branches of trees indicated to remain in a clean and careful manner, where such roots and branches obstruct installation of the Work.
B. Clearing and Grubbing: Clear site of trees, shrubs and other vegetation within the clearing limits indicated.
1. Completely remove stumps, roots, and other debris.
2. Use only hand methods for grubbing inside drip line of trees indicated to remain.
3. Fill depressions caused by clearing and grubbing operations with satisfactory soil material, unless further excavation or earthwork is indicated. Place fill material in horizontal layers not exceeding 6 inches loose depth, and thoroughly compact to a density equal to adjacent original ground.
C. Selective Clearing: Clear areas designated as “Selective Clearing” of all ground covers, underbrush and trees less than 6-inches in diameter at breast height. Coordinate extent of material removed with Engineer.
1. Remove trees that appear to be dying or weakening for any reason and at any point during construction up to and including Substantial Completion at the Architect’s direction.
3.3 TOPSOIL STRIPPING
A. Remove heavy growths of grass from areas before stripping.
SITE CLEARING 31 1000 - 3
B. Strip topsoil to whatever depths are encountered, but to a minimum of at least 4 inches.
C. Strip topsoil in a manner to prevent intermingling with underlying subsoil or other material.
1. Remove subsoil and nonsoil materials from topsoil, including trash, debris, weeds, roots, and other waste materials.
D. Where existing trees are indicated to remain, leave existing topsoil in place within drip lines to prevent damage to root system.
E. Temporarily stockpile topsoil in storage piles in areas indicated or directed. Construct storage piles to provide free drainage of surface water. Cover storage piles, if required, to prevent wind erosion.
1. Do not stockpile topsoil within tree protection zones.
2. Stockpile surplus topsoil to allow for respreading deeper topsoil.
F. Dispose of unsuitable or excess topsoil in a legal manner off-site.
3.4 DISPOSAL OF WASTE MATERIALS
A. Removal from Owner's Property: Remove waste materials generated by clearing operations from Owner's property and dispose of in a legal manner off-site.
1. Remove waste materials and debris from the site in a manner to prevent spillage. Pavements and the area adjacent to the site shall remain free from mud, dirt and debris at all times.
2. Clean up debris resulting from site clearing operations continuously with the progress of the work.
END OF SECTION 31 1000
EARTHWORK 31 2000 - 1
SECTION 31 2000 - EARTHWORK
B. Refer to Section 31 1000 for topsoil stripping and Section 32 9200 for topsoil placement.
1. Excavation, filling, backfilling, and grading indicated and necessary for proper completion of the work.
2. Preparing of subgrade for piers, walks, and pavements.
3. Excavating and backfilling of trenches.
4. Excavating and backfilling for underground mechanical and electrical utilities and buried mechanical and electrical appurtenances.
1.3 SUBMITTALS
A. VDOT approved Job Mix for stone.
B. Imported fill (if required): Submit location of borrow pit and a sample of the soil for approval to the Owner’s
Geotechnical Engineer a minimum of fourteen (14) working days prior to use
C. Geotextile Fabric
1.4 DEFINITIONS
A. Excavation: Removal of all material encountered to design subgrade elevations indicated for cut areas and to subsoil elevations in fill areas. Excavation also includes subsequent respreading, moisture conditioning, compaction, and grading of satisfactory materials removed.
B. Unauthorized Excavation: Removal of materials beyond the limits indicated in the definition of “Excavation” without specific direction of Owner.
C. Subgrade: The undisturbed earth (in cut) or the compacted soil layer (in fill) immediately below granular subbase, drainage fill, or topsoil materials.
D. Subsoil: The undisturbed earth immediately below the existing topsoil layer.
E. Structures: The area extending a minimum of ten (10) feet beyond the edge of foundations, slabs, curbs, underground tanks, piping or other man-made stationary features occurring above or below ground surface.
F. Pavements: The area extending 10 feet beyond the exterior limits of paved areas and down to undisturbed soils at a one horizontal to one vertical slope. The area extending 3 feet beyond the exterior limits of walks and down to undisturbed soils at a one horizontal to one vertical slope.
G. Subbase Material: Artificially graded mixture of crushed gravel or crushed stone meeting VDOT specifications. Material type is indicated on the drawings.
H. Drainage/Porous Fill: Washed, evenly graded mixture of crushed stone, or crushed or uncrushed gravel meeting the requirements of VDOT No. 57 Stone.
EARTHWORK 31 2000 - 2
I. Rock: Hard bed rock, boulders or similar material requiring the use of rock drills and/or explosives for removal. The criteria for classification of general excavation as rock is any material which cannot be dislodged by a Caterpillar D-8 Tractor, or equivalent, equipped with a single tooth hydraulically operated power ripper. The criteria for trench rock shall be that a Caterpillar 345 Backhoe, or equivalent, with a proper width bucket cannot remove the material.
1.5 QUALITY ASSURANCE
A. Codes and Standards: Perform excavation work in compliance with applicable requirements of authorities having jurisdiction.
B. Environmental Compliance:
1. Comply with the requirements of the latest edition of the Virginia Erosion and Sediment Control
Handbook for erosion control during earthwork operations.
C. Testing and Inspection Service: Owner will employ and pay for an independent Geotechnical testing and inspection laboratory to perform soil testing and inspection service during earthwork operations. Cooperate with Owner’s Geotechnical Engineer as required for testing and inspection of work. These services do not relieve the responsibility for compliance with Contract Document requirements.
A. Bidders and interested parties (prior to receipt of bids) are encouraged to conduct their own soil and subsurface investigations, examinations, tests, and exploratory borings to determine the nature of the soil conditions underlying the project site. Contact the Owner's office to make an appointment to enter the site for the purpose of conducting your own investigation prior to bid.
B. Existing Utilities: Do not interrupt existing utilities serving facilities occupied by the Owner of others except when permitted under the following conditions and then only after arranging to provide acceptable temporary utility services.
1. Notify Engineer not less than 48 hours in advance of proposed utility interruptions.
2. Do not proceed with utility interruptions without receiving Owner’s written permission.
3. Existing utilities across or along the line of work are indicated only in an approximate location. Locate all underground lines and structures. Call “Miss Utility” at 1-800-552-7001 prior to construction. If utilities are marked that are not shown on the plans, locate utility vertically and horizontally and provide information to Engineer. Repair and correct any damage to underground lines and structures.
1.7 SAFETY
A. Protection of Persons and Property: Barricade open excavations occurring as part of this work and post with warning lights.
1. Operate warning lights as recommended by authorities having jurisdiction and governing regulations and standards.
2. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earthwork operations.
B. Work within the road right-of-way shall meet all requirements of the latest edition of the Virginia Department of Transportation Work Area Protection Manual.
EARTHWORK 31 2000 - 3
2.1 SOIL MATERIALS
A. Satisfactory soil materials are defined as those complying with ASTM D2487 soil classification groups CL, GC, SC, GW, GP, GM, SM, SW, and SP.
B. Unsatisfactory soil materials are defined as those complying with ASTM D2487 soil classification groups CH, OL, OH, MH, ML and PT.
C. Backfill and Fill Materials: Satisfactory soil materials free of clay, rock or gravel larger than 4 inches in any dimension (2 inches for material used in trench backfill), debris, waste, frozen materials, organics, vegetation and other deleterious matter.
D. Imported material for structural fill shall comply with ASTM D2487 soil classification groups CL, ML, SC, SM, SP, SW, GC, GM, GP, or GW.
2.2 ACCESSORIES
A. Non-woven Geotextile Fabric (for drainage): Mirafi 140N, or equivalent.
B. Woven Geotextile Fabric (for reinforcement): PROPEX 2002, or equivalent.
3.1 PREPARATION
A. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earthwork operations.
B. Preparation of subgrade for earthwork operations including removal of vegetation, topsoil, debris, obstructions, and deleterious materials from ground surface is specified in Section 31 1000 "Site Clearing."
C. Protect and maintain erosion and sedimentation controls during earthwork operations.
3.2 DEWATERING
A. Prevent surface water and subsurface or groundwater from flowing into excavations and from flooding project site and surrounding area.
1. Do not allow water to accumulate in excavations. Remove water to prevent softening of foundation bottoms, undercutting footings, and soil changes detrimental to stability of subgrade and foundations.
Provide and maintain pumps, well points, sumps, suction and discharge lines, and other dewatering system components necessary to convey water away from excavations.
2. Establish and maintain temporary drainage ditches and other diversions outside excavation limits to convey rainwater and water removed from excavations to collecting or runoff areas. Do not use utility trench excavations as temporary drainage ditches.
B. Should any springs or running water be encountered in the excavation, notify the Engineer and provide discharge by trenches (or other acceptable means) and drain to an appropriate point of disposal. Provide temporary drainage facilities to minimize the flow of rainwater onto adjacent property. Repair any damage to property or to subgrade as a result of construction and/or dewatering (or lack thereof) operations at no additional cost to the Contract. If permanent provision must be made for disposal of water other than as indicated, the Contract price shall be adjusted.
EARTHWORK 31 2000 - 4
C. Soils encountered may require disking, scarifying, moisture conditioning, harrowing, pulverizing or other special or careful handling when utilized as fill. No additional payment will be made for these operations.
3.3 EXCAVATION
A. Excavation consists of removal, placement and disposal of material encountered when establishing required subgrade or finish grade elevations.
1. Excavation includes removal and disposal of pavements and other obstructions visible on ground surface;
underground structures, utilities and other items indicated to be demolished and removed; together with earth and other materials encountered that are not classified as rock or unauthorized excavation.
3.4 EXCAVATION FOR WALKS AND PAVEMENTS
A. Cut surface under pavements to comply with cross-sections, elevations and grades as indicated.
3.5 EXCAVATION FOR UTILITY TRENCHES
A. Excavate trenches to uniform width, sufficiently wide to provide ample working room and a minimum of 6 to
9 inches of clearance on both sides of pipe or conduit.
B. Excavate trenches to depth indicated or required to establish indicated slope and invert elevations and to support bottom of pipe or conduit on undisturbed soil. Beyond building perimeter, excavate trenches to allow installation of top of pipe below frost line.
1. Where rock is encountered, carry excavation to required elevations and backfill with VDOT #57 crushed stone prior to installation of pipe.
2. For pipes or conduit less than 6 inches in nominal size, and for flat-bottomed, multiple-duct conduit units, do not excavate beyond indicated depths. Hand-excavate bottom cut to accurate elevations and support pipe or conduit on undisturbed soil.
3. For pipes and equipment 6 inches or larger in nominal size, shape bottom of trench to fit bottom of pipe for 90 degrees (bottom 1/4 of the circumference). Fill depressions with tamped sand backfill. At each pipe joint, dig bell holes to relieve pipe bell of loads ensure continuous bearing of pipe barrel on bearing surface.
3.6 EXCAVATION STABILITY
A. General: Comply with local codes, ordinances, and requirements of agencies having jurisdiction.
B. Slope sides of excavations to comply with local codes, ordinances, and requirements of agencies having jurisdiction. Shore and brace where sloping is not possible because of space restrictions or stability of material excavated. Maintain sides and slopes of excavations in safe condition until completion of backfilling.
C. Shoring and Bracing: Provide materials for shoring and bracing, such as sheet piling, uprights, stringers, and cross braces, in good serviceable condition. Maintain shoring and bracing in excavations regardless of time period excavations will be open. Extend shoring and bracing as excavation progresses.
3.7 SUBGRADE INSPECTION
A. Notify Geotechnical Engineer when mass, trench and footing excavations have reached required subgrade.
The Owner may arrange for an inspection of conditions by the Owner’s Geotechnical Engineer. Alternative procedures for arranging this review may be implemented at the Owner’s written option.
B. If the Owner’s Geotechnical Engineer determines that the subgrade bearing conditions are unacceptable, the
Owner will authorize additional excavation until suitable bearing conditions are encountered.
EARTHWORK 31 2000 - 5
C. Proof-roll subgrade below pavements with heavy pneumatic-tired equipment to identify soft pockets and areas of excess yielding. Do not proof-roll wet or saturated subgrades.
1. Completely proof-roll subgrade in one direction, repeating proof-rolling in direction perpendicular to first direction. Limit vehicle speed to 3 mph.
2. Proof-roll with a loaded 10-wheel, tandem-axle dump truck weighing not less than 15 tons.
3. Excavate soft spots, unsatisfactory soils, and areas of excessive pumping or rutting, as determined by
Geotechnical Engineer, and replace with compacted backfill or fill as directed.
D. Under supervision of the Owner’s Geotechnical Engineer, proofroll subgrade in cut areas below pavement(s) with a loaded dump truck or other approved pneumatic tired vehicle. Should any unstable sub-soil be encountered below pavement, break up the top eight inches of ground surface, pulverize, moisture-condition to optimum moisture content, and compact to percentage of maximum density as stated in Percentage of
Maximum Density Requirements. Perform this work at no additional cost and/or time to the Contract.
E. Reconstruct subgrades damaged by freezing temperatures, frost, rain, accumulated water, or construction activities, as directed by Geotechnical Engineer, without additional compensation.
3.8 UNAUTHORIZED EXCAVATION
A. Correct Unauthorized Excavation as follows:
1. Under footings, foundation bases, or retaining walls, fill unauthorized excavation by extending indicated bottom elevation of footing or base to excavation bottom without altering required top elevation. Lean concrete fill may be used to bring elevations to proper position when acceptable to Geotechnical
Engineer.
2. Elsewhere, backfill and compact unauthorized excavations as indicated for authorized excavations of same classification unless otherwise directed by Geotechnical Engineer.
3.9 STORAGE OF EXCAVATED MATERIALS
A. Temporarily stockpile excavated materials acceptable for use as backfill and fill. Place, grade, and shape stockpiles for proper drainage. Cover to prevent windblown dust.
1. Stockpile excavated materials away from edge of excavations. Do not store within the drip line of trees to remain.
3.10 BACKFILL AND FILL
A. Backfill excavations as promptly as work permits, but not until completion of the following:
1. Acceptance by local authority having jurisdiction of construction below finished grade, including perimeter insulation.
2. Review, approval, and recording of the locations of underground utilities.
3. Removal of concrete formwork.
4. Removal of shoring and bracing (including backfilling of voids with satisfactory materials).
5. Removal of trash and debris from excavation.
6. Permanent or temporary horizontal bracing is in place on horizontally supported walls.
B. Place backfill on subgrades free of mud, frost, snow or ice.
C. Ground Surface Preparation: Remove vegetation, debris, obstructions, and deleterious materials from ground surface prior to placement of fills.
EARTHWORK 31 2000 - 6
D. Bench sloped surfaces steeper than 1 vertical to 4 horizontal so fill material will bond with existing material.
Plow, scarify, bench or break up sloped surfaces flatter than 1 vertical to 4 horizontal so fill material will bond with existing material.
E. Place soil material in layers to required subgrade elevations, for each area classification listed below, using materials indicated in Part 2 of this Section.
1. Under grassed areas, use satisfactory excavated or borrow material.
2. Under walks, curbs, and pavements, use satisfactory excavated or borrow material.
3. Under building slabs, use satisfactory excavated or borrow materials and drainage/porous fill material as indicated.
3.11 UTILITY TRENCH BACKFILL
A. Place backfill on subgrades free of mud, frost, snow, or ice.
B. Place and compact bedding course on trench bottoms and where indicated. Shape bedding course to provide continuous support for bells, joints, and barrels of pipes and for joints, fittings, and bodies of conduits.
C. Backfill trenches with concrete where trench excavations pass within 18 inches of column or wall footings and that are carried below bottom of such footings or that pass under wall footings. Place concrete to level of bottom of adjacent footing.
D. Provide 4-inch thick, concrete-base slab support for piping or conduit less than 30 inches below surface of roadways. After installing and testing, completely encase piping or conduit in a minimum of 4 inches of concrete before backfilling or placing roadway subbase.
E. Place and compact initial backfill of subbase material, free of particles larger than 1 inch in any dimension, to a height of 12 inches over the utility pipe or conduit.
1. Carefully compact initial backfill under pipe haunches and compact evenly up on both sides and along the full length of utility piping or conduit to avoid damage or displacement of piping or conduit.
Coordinate backfilling with utilities testing.
F. Backfill voids with satisfactory soil while installing and removing shoring and bracing.
G. Place and compact final backfill of satisfactory soil to final subgrade elevation.
H. Install warning tape directly above utilities, 12 inches below finished grade, except 6 inches below subgrade under pavements and slabs.
I. Do not backfill trenches until any required testing and inspections have been completed and Geotechnical
Engineer authorizes backfilling. Backfill carefully to avoid damage or displacement of pipe systems.
J. Under piping and conduit and equipment, use crushed stone where required over rock bearing surface and for correction of unauthorized excavation. Shape excavation bottom to fit bottom 90 degrees of cylinder.
K. Place backfill and fill materials evenly adjacent to structures, piping, or conduit to required elevations. Prevent wedging action of backfill against structures or displacement of piping or conduit by carrying material uniformly around structure, piping, or conduit to approximately same elevation in each lift.
3.12 SOIL MOISTURE CONTROL
A. Uniformly moisten or aerate subgrade and each subsequent fill or backfill soil layer before compaction to within 2 percentage points of optimum moisture content.
1. Do not place backfill or fill soil material on surfaces that are muddy, frozen, or contain frost or ice.
2. Remove and replace or scarify and air dry otherwise satisfactory soil material that exceeds optimum moisture content by 2 percentage points and is too wet to compact to specified dry unit weight.
EARTHWORK 31 2000 - 7
B. Moisture Control: Where subgrade or layer of soil material must be moisture conditioned before compaction, uniformly apply water to surface of subgrade or layer of soil material. Apply water in minimum quantity as necessary to prevent free water from appearing on surface during or after compaction operations. Maintain the moisture content of the structural fill materials to within 2 percentage points of the optimum moisture content until permanently covered.
C. Remove and replace, or scarify and air dry, soil material that is too wet to permit compaction to required density.
1. Stockpile or spread soil material that has been removed because it is too wet to permit compaction. Assist drying by discing, harrowing, or pulverizing until moisture content is reduced to a satisfactory value.
2. Work wet materials as directed by the Owner’s Geotechnical Engineer. Base bids on working material daily for a maximum of five days of acceptable weather.
3. No additional payment will be made for these operations.
4. Time extensions will not be granted for working wet material on site.
3.13 COMPACTION OF SOIL BACKFILL AND FILLS
A. Place backfill and fill materials in layers not more than 8 inches in loose depth for material compacted by heavy compaction equipment, and not more than 4 inches in loose depth for material compacted by hand-operated tampers.
B. Before compaction, moisten or aerate each layer as necessary to provide optimum moisture content. Compact each layer to required percentage of maximum dry density or relative dry density for each area classification.
Do not place backfill or fill material on surfaces that are muddy, frozen, or contain frost or ice.
C. Control soil and fill compaction, providing minimum percentage of density indicated for each area classification indicated below. Correct improperly compacted areas or lifts as directed by Geotechnical
Engineer if soil density tests indicate inadequate compaction.
D. Percentage of Maximum Density Requirements: Compact soil to not less than the following percentages of maximum density at a moisture content within 2 percentage points of optimum in accordance with ASTM
D698:
1. Under structures, building pad and pavements, compact each layer of backfill or fill material at 95 percent maximum density. This includes ground under future expansion areas.
2. Under grass or unpaved areas, compact each layer of backfill or fill material at 90 percent maximum density.
E. Seal all fill areas at the end of each working day, utilizing a smooth drum roller.
3.14 GRADING
A. General: Rough grading of areas within the Project, including cut and fill sections and adjacent transition areas, shall be reasonably smooth, compacted and free from irregular surface changes. The degree of finish shall be that ordinarily obtainable from either blade-grader or motor patrol except as otherwise indicated. The finished subgrade surface from the grassed areas generally shall be not more than 0.2 feet above or below the final grade or approved cross section, with due allowance for topsoil.
B. The tolerance for areas within 10 feet of building perimeter, walks and all areas to be paved shall not exceed
0.10 feet above or below the established subgrade. Finish all ditches, swales and gutters to drain readily.
Unless otherwise indicated, evenly slope the subgrade to provide drainage away from building walls in all directions at a grade not less than ¼ inch per foot. Provide rounding at top and bottom of cut and fill slopes and at other breaks in grade.
C. Protection of Graded Areas: Protect newly graded areas and areas of cut, fill and design/subgrade elevations from the actions of the elements and from deterioration as a result of construction operations and weather
EARTHWORK 31 2000 - 8
conditions (frost, rains, snow, sleet, hail, etc.). Repair any settlement or washing that occurs prior to or after acceptance of the work. Fill to required subgrade levels any areas where settlement occurs. Protect trees to remain, and, at all areas of the Site where construction operations are in progress, provide protection for the safety of occupants of the existing facilities.
D. General: Uniformly grade areas to a smooth surface, free of irregular surface changes. Comply with compaction requirements and grade to cross sections, lines, and elevations indicated.
1. Provide a smooth transition between adjacent existing grades and new grades.
2. Cut out soft spots, fill low spots, and trim high spots to comply with required surface tolerances.
3.15 PAVEMENT SUBBASE COURSE:
A. General: Place subbase material, in layers of indicated thickness, over subgrade surface to support a pavement base course.
B. Grade Control: During construction, maintain lines and grades including crown and cross-slope of subbase course.
C. Shoulders: Place shoulders along edges of subbase course to prevent lateral movement. Construct shoulders of acceptable soil materials, placed in such quantity to compact to thickness of each subbase course layer.
Compact and roll at least at 12” width of shoulder simultaneously with compacting and rolling each layer of subbase course.
D. Placing: Place subbase course material on prepared subgrade in layers of uniform thickness, conforming to indicated cross-section and thickness. Maintain optimum moisture content for compacting subbase material during placement operations.
E. When a compacted subbase course is 6” thick or less, place material in a single layer. When more than 6” thick, place material in equal layers, except no single layer more than 6” or less than 3” in thickness when compacted.
F. Place subbase and base course on subgrades free of mud, frost, snow, or ice.
G. On prepared subgrade, place subbase and base course under pavements and walks as follows:
1. Place base course material over subbase course under hot-mix asphalt pavement.
2. Shape subbase and base course to required crown elevations and cross-slope grades.
3. Place subbase and base course 6 inches or less in compacted thickness in a single layer.
4. Place subbase and base course that exceeds 6 inches in compacted thickness in layers of equal thickness, with no compacted layer more than 6 inches thick or less than 3 inches thick.
5. Compact subbase and base course at optimum moisture content to required grades, lines, cross sections, and thickness to not less than 95 percent of maximum dry unit weight according to
ASTM D 698 and ASTM D 1557.
3.16 FIELD QUALITY CONTROL
A. Quality Control Testing During Construction: Allow testing service to inspect and approve each subgrade and fill layer before further backfill or construction work is performed.
1. If in the opinion of the Geotechnical Engineer, based on testing service reports and inspection, subgrade or fills have been placed that are below required density, perform additional compaction and testing until required density is obtained.
B. The Owner will engage, and pay for, the services of a Geotechnical Engineer whose function shall be to afford complete engineering control by testing of the conditions of all footing subgrades, the placement of all
EARTHWORK 31 2000 - 9
structural fills under structures, building pad and pavement areas, and all compaction where required, and to observe the proof rolling of the building pad and pavement areas.
C. The Owner’s Geotechnical Engineer will be present as deemed necessary during all phases of the Work requiring filling, compaction operations or testing. The Geotechnical Engineer will provide the Owner with written certification that fill and compaction was completed with accepted materials in accordance with the
Documents, and give a professional opinion regarding shrinkage or settlement of fill and safe load bearing capacity of fill.
D. Site Preparation and Proofrolling: The Owner’s Geotechnical Engineer will determine if any additional excavation or in-place densification is necessary to prepare a subgrade for fill placement for slab or pavement support.
E. Fill Placement and Compaction: The Owner’s Geotechnical Engineer will witness all fill operations and take sufficient in-place density tests to verify that the indicated degree of fill compaction is achieved. The Owner’s
Geotechnical Engineer will observe and approve borrow materials used and shall determine if their existing moisture contents are suitable/acceptable.
F. The Owner’s Geotechnical Engineer will submit two (2) copies each of his reports, recommendations and/or opinions to the Owner/Engineer and the Owner. Pertinent information will be provided to the Contractor as required.
3.17 EROSION CONTROL:
A. Provide erosion control methods in accordance with requirements of authorities having jurisdiction, the
Virginia Erosion and Sediment Control Handbook, and as indicated in the Contract Documents.
3.18 PROTECTION
A. Repair and reestablish grades in settled, eroded, and rutted areas to indicated tolerances.
B. Reconditioning Compacted Areas: Where subsequent construction operations or adverse weather disturbs completed compacted areas, scarify surface, reshape, and compact to required density prior to further construction.
C. Settling: Where settling is measurable or observable at excavated areas during general project warranty period, remove surface (pavement, lawn, or other finish), add backfill material, compact, and replace surface treatment. Restore appearance, quality, and condition of surface or finish to match adjacent work, and eliminate evidence of restoration to greatest extent possible.
D. Protect excavation bottoms against freezing when atmospheric temperature is less than 35 degrees F.
3.19 DISPOSAL OF WASTE MATERIALS
A. Removal from Owner's Property: Remove excess and/or waste materials, including trash and debris, and dispose of it off Owner's property in a legal manner.
B. Dispose of excess material and materials not acceptable for use as backfill or fill legally offsite.
C. Do not remove topsoil from site until it has been demonstrated to the Owner’s satisfaction that it is excess.
END OF SECTION 31 2000
ASPHALT PAVEMENT 32 1216 – 1
SECTION 32 1216 - ASPHALT PAVEMENT
1. Hot-mix asphalt paving over prepared subbase.
2. Hot –mix asphalt patching.
3. Hot-mix asphalt overlays.
4. Asphalt surface treatments
a) Coal tar sealant
1.3 SUBMITTALS
A. Job-Mix Designs: Certification, by authorities having jurisdiction, of approval of each job mix proposed for the Work.
B. Material Certificates: Certificates signed by manufacturers certifying that each material complies with requirements.
C. Traffic maintenance and Work Area Protection Plan: Submit a plan indicating sequencing and measures to be used for the maintenance and protection of traffic during operations within or immediately adjacent to existing roadways open to vehicular traffic. The City of Fairfax must approve this plan prior to commencement of the Work. Ther Work and the plan must include use of the new rear gate while demolishing the old gate, related posts and traffic island as well as restoration of the asphalt roadway.
1.4 QUALITY ASSURANCE
A. Installer Qualifications: Engage an experienced installer who has completed hot-mix asphalt paving similar in material, design, and extent to that indicated for this Project and with a record of successful in-service performance.
B. Asphalt paving materials and installation shall conform to the requirements of the latest edition of the City of Fairfax Public Facilities Manual (PFM).
1.5 PROJECT CONDITIONS
A. Environmental Limitations: Do not apply asphalt materials if substrate is wet or excessively damp or if the following conditions are not met:
1. Prime and Tack Coats: Minimum ambient temperature of 50 deg F (10 deg C), and when temperature has not been below 35 deg F (1 deg C) for 12 hours immediately prior to application.
2. Asphalt Base Course: Minimum surface temperature of 40 deg F (4 deg C) and rising at time of placement.
ASPHALT PAVEMENT 32 1216 – 2
3. Asphalt Surface Course: Minimum surface temperature of 40 deg F (4 deg C) and rising at time of placement.
1.6 TESTING AND INSPECTION
A. The Owner’s testing agency will observe the asphalt placement in the parking lots and on-site areas not in
Right-of-Way.
2.1 ASPHALT-AGGREGATE MIXTURE
A. General: Provide plant-mixed, hot-laid asphalt-aggregate mixture complying with the requirements of the
VDOT Road and Bridge Specifications and as recommended by local paving authorities to suit project conditions.
2.2 ASPHALT MATERIALS
A. Tack Coat: ASTM D 977, emulsified asphalt or ASTM D 2397, cationic emulsified asphalt, slow setting, factory diluted in water, of suitable grade and consistency for application.
B. Prime Coat: Asphalt emulsion prime conforming to VDOT requirements.
2.3 AUXILIARY MATERIALS
A. Paving Geotextile: Nonwoven polypropylene, specifically designed for paving applications, resistant to chemical attack, rot, and mildew.
A. Verify that subgrade is dry and in suitable condition to support…
This is the start of the file's text. The full file is on GovTribe.