QQ65916 Police Station Site Work and Restoration.pdf

PDF 337 KB Posted

Attached to
Construction, Police Station Site Work and Restoration
Solicitation number
65916
Issued by
Fairfax County, Fairfax City, Virginia

About this file

This document is an Invitation for Bids (IFB) for a construction project related to site work and restoration at the Fairfax City Police Station in Fairfax, Virginia. The City of Fairfax is soliciting bids from licensed, qualified companies to provide site work and restoration to support the City's current Fencing Contractor. The scope of work includes demolishing the island, masonry pier and foundation, existing gates and motor controllers, curb and asphalt demolition, milling and overlay paving, limited full depth pavement, and final paving. Bidders must have a Class A contractor's license and provide a resume of the proposed project superintendent. The contract requires substantial completion by the contract completion date, with final completion within 30 days thereafter. Bidders are required to visit the site prior to submitting a bid.

The contract will be awarded to the lowest responsive and responsible bidder. The City reserves the right to reject any or all bids and waive informalities. Pricing terms, set-asides, incumbent information, and funding sources are not provided. The City requires the selected contractor to maintain specific insurance coverages and to comply with various legal and regulatory requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QQ 65916 Page | 1

CONTENTS

1. SCOPE OF WORK

2. AWARD

3. BIDDER QUALIFICATIONS

4. TIME FOR COMPLETION

5. SUBMITTALS

6. CONDITIONS AT SITE

7. SUBCONTRACTS

8. SCHEDULE OF VALUES

9. PROJECT MEETINGS

10. SEPARATE CONTRACTS

11. SUPERINTENDENCE BY CONTRACTOR

12. CONTRACT DOCUMENTS

13. BID ACCEPTANCE PERIOD

14. BID SUBMITTAL

15. BIDDER INTERESTED IN MORE THAN ONE BID

16. APPLICABLE LAWS AND COURTS

17. ANTI-DISCRIMINATION

18. ETHICS IN PUBLIC CONTRACTING

19. IMMIGRATION REFORM AND CONTROL ACT OF 1986

20. DEBARMENT STATUS

21. ANTITRUST

22. CLARIFICATION OF TERMS

23. PAYMENT

24. QUALIFICATIONS OF BIDDERS

25. DEFAULT

26. INDEMNIFICATION

27. NON-LIABILITY

28. TAXES

29. INSURANCE

30. DRUG-FREE WORKPLACE

31. NONDISCRIMINATION OF CONTRACTORS

32. AUTHORIZATION TO CONDUCT BUSINESS IN THE COMMONWEALTH

33. CONTRACT DOCUMENTS

34. INSPECTION

QQ 65916 Page | 2

35. SUPERINTENDENCE BY CONTRACTOR

36. ACCESS TO WORK

37. AVAILABILITY OF MATERIALS

38. CONTRACTOR’S TITLE TO MATERIALS

39. WARRANTY OF MATERIALS AND WORKMANSHIP

40. USE OF PREMISES AND REMOVAL OF DEBRIS

41. PROTECTION OF PERSONS AND PROPERTY

42. CONTRACTOR’S RIGHT TO STOP WORK OR TERMINATE THE CONTRACT

43. OWNER’S RIGHT TO TERMINATE THE CONTRACT FOR CAUSE

44. TERMINATION BY OWNER FOR CONVENIENCE

45. GUARANTEE OF WORK

46. LAWS AND REGULATIONS

47. CONTRACTOR REGISTRATION

GENERAL TERMS AND CONDITIONS

QQ 65916 Page | 3

1. SCOPE OF WORK: The City of Fairfax (“City” or “Owner”) is soliciting competitive bids from licensed, qualified companies to provide site work and restoration to support the City’s current Fencing Contractor, Long Fence. New gates and fencing will enhance the security of the City police station. The awarded “Site Work and Restoration” Contractor shall provide all necessary labor, supervision, equipment, tools, material, transportation and resources necessary to complete the described “Scope of Work” described in the Specifications Section of the IFB and in the Measurement and Payment section of the Bid Submission Form. Work to be performed at the Fairfax City Police Station, 3730 Blenheim Blvd, Fairfax, VA.

The approved drawings include the complete Project. The Project has been separated into three distinct trades;

(Project 1) Electrical, (Project 2) Fencings and Gates, and (Project 3) site work related to asphalt, new masonry piers, demolition and related final restoration. Accordingly, the scope of services in this solicitation is limited to Project 3;

site work and restoration as described on the following sheets:

1. Drawing C0.00 - Applies

2. Drawing C1.000 - Applies to the Fencing and Gates Contractor except the masonry pier shown illustrates the existing masonry pier to be demolished and disposed and the new masonry piers to be constructed by the Project 3 Contractor.

3. Drawing C1.001 - Applies. Asphalt Work by the Project 3 Contractor shall be coordinated with the Fencing Contractor to ensure vehicle detection loops for the gates are protected from milling operations and operate properly.

4. Drawing C2.000 - Site work and demolition work are to be provided by the Project 3 Contractor as shown and specified except the fencing and gates is to be provided by the Fencing and Gates Contractor.

5. Drawing C3.000 - Paving and masonry piers and related limited demolition is to be provided by the Project 3 Contractor. Wood fencing demolition and electrical work shall be provided by others.

6. Drawing S0-001 - Applies for structural design and construction of masonry pier foundations and masonry piers.

Two masonry piers shall be constructed on the two combined foundations for the main gate (Section 4/S0.001).

Two masonry piers shall be constructed on pier foundations provided by the site work and restoration contractor.

Provide the masonry pier mortar mix design to the City for approval.

The purpose of Project 3 will be to assist and support the Fencing and Gates Contractor currently under contract with the City. Accordingly, the Work will consist of demolishing the island located at the existing main gate, one masonry pier and foundation, the two existing gates and motor controllers and related conduits in the immediate vicinity. Work will include curb and asphalt demolition, milling and overlay paving at both gates, limited full depth pavement, and final paving to complete the restored pavement and to include a short section of curb for the main gate.

Some Work will involve coordination with the Fencing and Gates Contractor when requested in order to facilitate gate demolition at the south gate, milling and overlay paving at the south gate, and temporary pavement patch at the main gate. All other Work may be assumed by the Project 3 Contractor to occur after the gates are substantially completed.

The public site may be inspected by interested bidders during daylight hours.

2. AWARD: The City will make an award to the lowest responsive and responsible bidder. The City reserves the right to reject any or all bids, in whole or in part, to waive informalities and to delete items prior to making the award, whenever it is deemed in the sole opinion of the City to be in its best interest. Evaluation will be based on net prices.

Unit prices, extensions and grand total must be shown. In case of arithmetic errors, the unit price will govern. If cash discount for prompt payment is offered, it must be clearly shown in the space provided. Discounts for prompt payment will not be considered in making awards.

QQ 65916 Page | 4

3. BIDDER QUALIFICATIONS:

a. Class A contractor’s license required.

b. A resume of the bidder’s proposed project superintendent/manager who will be directly involved in the execution of the project showing experience on at least three (3) projects of similar scope and size for which the individual had responsibilities either with the bidder or with another company, and which have been completed within the past five (5) years. Include location, cost, date completed, owner’s name and address.

4. TIME FOR COMPLETION:

a. The Contractor shall achieve Substantial Completion on or before the Contract Completion Date. Unless otherwise specified, the Contractor shall achieve Final Completion within thirty (30) Days after the Contract Completion Date.

b. The Contractor acknowledges and agrees that the Owner is relying upon the Time for Completion and

Contract Completion Date for planning the use and Beneficial Occupancy of the Work and for all other purposes. If the Contractor fails to achieve Substantial Completion by the Contract Completion Date, the Contractor shall be subject to payment of actual damages incurred by the Owner or liquidated damages, if provided for in the Contract.

c. The Contractor, in submitting its bid or proposal, acknowledges that the Time for Completion is a reasonable duration and period for performing the Work and that it has taken into consideration normal weather conditions for the period of performance. Normal weather does not mean statistically average weather, but rather means a range of weather patterns which might be anticipated based on weather conditions and events for the past ten (10) years. Normal weather conditions shall be determined from the public historical records available, including the U.S. Department of Commerce, Local Climatological Data Sheets, National Oceanic and Atmospheric Administration / Environmental Data and Information Service, National Climatic Center and National Weather Service. The data sheets to be used shall be those for the locality or localities closest to the Site. No additional compensation, costs or damages will be paid to the Contractor because of normal weather conditions, including normal adverse weather to be anticipated during the Project. An extension of time for abnormal adverse weather conditions which directly impact the Work will be considered by the Owner upon under the following conditions, all of which must be strictly complied with and demonstrated by the Contractor:

1. A request for extension of time-based on abnormal adverse weather conditions must be made in writing within fourteen (14) Days of the completion of the calendar month during which the abnormal adverse weather conditions impacted the Work at the Site. The request for additional time shall be substantiated by weather data collected during the period of delay at the Site. Said data must demonstrate an actual departure from weather conditions that could have been anticipated at the Site during the dates in question.

2. The abnormal adverse weather must have caused a delay to the Contract Completion Date as a result of a delay to the Critical Path as depicted on the accepted “critical path method” schedule or the approved bar graph schedule current at the time of the weather event. No extension will be considered for any portion of any delay which consumes only Float.

QQ 65916 Page | 5

3. All of the evidence and data supporting the request (including both historical data and the recordings at the Site during the time of delay) must be furnished to the Owner before the end of the calendar month following the month for which the request is made.

Compliance with the requirements of this section is a condition precedent to the Contractor’s entitlement to any change or adjustment to the Contract Completion Date for impacts from abnormal weather conditions.

d. The Contractor’s execution of the Contract is a representation and agreement that the Contractor has visited the Site and reviewed the requirements of the bid documents, the Contract Documents, local conditions, availability of materials, equipment, and labor, the reasonable time required for the Owner to respond to Submittals, and any other factors which may affect the performance of the Work, and has taken all these factors into consideration in submitting its bid and executing this Contract.

5. SUBMITTALS:

Submittals, such as concrete mix, mortar, asphalt, aggregate, pavement paint, and a brick sample as well as applicable catalog cuts shall be submitted as soon as practicable to facilitate the Work.

6. CONDITIONS AT SITE:

The Contractor shall have visited the Site prior to bidding or submitting its proposal and is totally responsible for having ascertained pertinent local conditions such as location, accessibility and general character of the Site, and the character and extent of existing conditions, improvements and work within or adjacent to the Site. The Contractor shall not submit any claims or any request for adjustments of the Contract Price or Contract Completion Date which result from its failure to consider such conditions.

If in the performance of the Work the Contractor encounters (i) hidden physical conditions of a building being modified which are materially different from those ordinarily encountered or generally recognized as inherent in the activities being performed or (ii) subsurface or concealed latent conditions which are materially different from those frequently present in the locality or from those indicated in the Contract Documents, the Contractor shall promptly provide Notice to the Owner and A/E before the conditions are disturbed and not later than seven (7) Days after discovery.

The A/E shall promptly review the conditions and propose such changes or adjustments, if any, in the Contract Documents that may be necessary to address the conditions. The Contractor must request any change in the Contract Price or Contract Completion Date for such conditions pursuant to the applicable requirements in Section Error!

Reference source not found. of these General Conditions. Compliance with the requirements of this section is a condition precedent to the Contractor’s entitlement to any change or adjustment in the Contract Price or Contract Completion Date as a result of such Site conditions.

If the Contractor, during the course of the Work, observes the existence of any material which he knows, should know, or has reason to believe is hazardous to human health, the Contractor shall promptly notify the Owner in writing before the material is disturbed further or the affected work is performed. The Owner will provide the Contractor with instructions regarding the disposition of the material. The Contractor shall not perform any Work involving the material or any Work causing the material to be less accessible prior to receipt of special instructions from the Owner.

The Contractor must request any change in the Contract Price or Contract Completion Date for such conditions pursuant to the applicable requirements in Sections Error! Reference source not found. and Error! Reference source not found. of these General Conditions. Compliance with the requirements of this section is a condition precedent to the Contractor’s entitlement to any change or adjustment in the Contract Price or Contract Completion Date as a result of such Site conditions.

QQ 65916 Page | 6

7. SUBCONTRACTS:

The Contractor shall, as soon as practicable after the signing of the Contract, notify the Owner and A/E in writing of the names of all Subcontractors proposed for the principal parts of the Work and of such others as the A/E may direct.

Where the Specifications establish qualifications or criteria for Subcontractors, manufacturers, or individuals performing Work on the Project, the Contractor shall be responsible for ascertaining that those proposed meet the criteria or qualifications. The Contractor shall not employ any Subcontractor that the Owner may, within a reasonable time, object to as unsuitable. Neither the Owner nor the A/E shall direct the Contractor to contract with any particular Subcontractor unless provided in the Specifications or Invitation for Bids.

The Owner may select a particular Subcontractor for a certain part of the Work and designate on the Invitation for Bids or Request for Proposal that the Subcontractor shall be used for the part of the Work indicated and that the Subcontractor has agreed to perform the Work for the subcontract amount stipulated on the bid or Proposal form.

The Contractor shall include the stipulated amount plus its markups in the bid or Proposal. In such case, the Contractor shall be responsible for that Subcontractor and its work and the Subcontractor shall be responsible to the Contractor for its work just as if the Contractor had selected the Subcontractor. If the Contractor has a reasonable objection to the Subcontractor designated, then the Contractor shall note the exception in its bid or proposal and the reason for the exception and maintain appropriate provisions for coordinating the work of the Subcontractor. The Owner, at its sole discretion, may accept the Contractor’s bid or proposal with the exception noted and contract separately with the Subcontractor under the provisions of Section 7 of the Contract or designate a different Subcontractor.

The Owner shall, on request, furnish to any Subcontractor, if practicable, the amounts of payments made to the Contractor, the Schedule of Values and Requests for Payment submitted by the Contractor, and any other documentation submitted by the Contractor which would tend to show what amounts are due and payable by the Contractor to the Subcontractor.

The Contractor shall be fully responsible to the Owner for all acts and omissions of its agents and employees and all tiers of Subcontractors and Suppliers performing or furnishing any of the Work. Nothing in the Contract Documents shall create any contractual relationship between Owner or A/E and any Subcontractor, Supplier or other Person, nor shall it create any obligation on the part of Owner or A/E to pay for or to see to the payment of any moneys due any Subcontractor, Supplier or other Person, except as may otherwise be required by law.

The Contractor shall be fully responsible for its invitees at the Site and for those of its Subcontractors, Suppliers, and their employees, including any acts or omissions of such invitees.

The Contractor agrees that it is responsible for all dealings and coordination with Subcontractors and Suppliers, and their subcontractors, employees and invitees, including, but not limited to, the Subcontractors’ or Suppliers’ claims, demands, actions, disputes and similar matters unless specifically provided otherwise by the Contract or by statute.

8. SCHEDULE OF VALUES:

The Schedule of Values shall be submitted within two weeks of the pre-construction meeting. The schedule shall be separated by activities and requirements of the technical specifications sections to illustrate actual costs and pricing to facilitate accurate costs for changes in the Work.

9. PROJECT MEETINGS:

Project Meetings shall consist of a pre-construction meeting and three additional meetings as required by the City to complete the Work.

QQ 65916 Page | 7

10. SEPARATE CONTRACTS:

The Owner reserves the right to let other contracts in connection with the Project, the work under which may proceed simultaneously with the execution of this Contract. The Contractor shall afford separate contractors reasonable opportunity for the introduction and storage of their materials and the execution of their work. The Contractor shall cooperate with them and shall take all reasonable action to coordinate its Work with that of separate contractors. If the Owner has listed other separate contracts in the Invitation for Bids or Requests for Proposal which it expects to proceed simultaneously with the Work of the Contractor, and has included the estimated timing of such other contracts in the Invitation for Bids or Requests for Proposal, the Contractor shall integrate the schedule of those separate contracts into its scheduling. The Contractor shall make every reasonable effort to assist the Owner in maintaining the schedules for all separate contracts. If the work performed by a separate contractor is Defective or performed so as to prevent or threaten to prevent the Contractor from carrying out its Work according to the Contract, the Contractor shall immediately notify the Owner and the A/E upon discovering such conditions.

If a dispute arises between the Contractor and any separate contractor(s) as to their responsibility for cleaning up the Site, the Owner may clean up and charge the cost thereof to the respective contractors in proportion to their responsibility. If the Contractor disputes the Owner’s apportionment of clean-up costs, it shall be the Contractor’s burden to demonstrate and prove the correct apportionment.

11. SUPERINTENDENCE BY CONTRACTOR:

a. The contractor shall have a competent foreman or superintendent, satisfactory to the owner, on the job site at all times during the progress of the work. The contractor shall be responsible for all construction means, methods, techniques, sequences, and procedures for coordinating all portions of the work under the contract except where otherwise specified in the contract documents, and for all safety and worker health programs and practices. The contractor shall notify the owner, in writing, of any proposed change in superintendent including the reason therefore prior to making such change.

b. The contractor shall, at all times, enforce strict discipline and good order among the workers on the project, and shall not employ on the work any unfit person, anyone not skilled in the work assigned to him, or anyone who will not work in harmony with those employed by the contractor, the subcontractors, the owner or the owner’s separate contractors and their subcontractors.

c. The owner may, in writing, require the contractor to remove from the work any employee the owner deems to be incompetent, careless, not working in harmony with others on the site, or otherwise objectionable.

12. CONTRACT DOCUMENTS:

(a) The contract entered into by the parties shall consist of the Invitation for Bids, the bid submitted by the contractor; General Terms and Conditions, these Additional Terms and Conditions; the Special Terms and Conditions; the drawings, if any; the specifications; and all modifications and addenda to the foregoing documents, all of which shall be referred to collectively as the contract documents.

(b) All time limits stated in the contract documents, including but not limited to the time for completion of the work, are of the essence of the contract.

(c) Anything called for by one of the contract documents and not called for by the others shall be of like effect as if required or called for by all, except that a provision clearly designed to negate or alter a provision contained in one or more of the other contract documents shall have the intended effect.

QQ 65916 Page | 8

13. BID ACCEPTANCE PERIOD: Any bid in response to this solicitation shall be valid for ( ) days. At the end of the days the bid may be withdrawn at the written request of the bidder. If the bid is not withdrawn at that time it remains in effect until an award is made or the solicitation is canceled.

14. BID SUBMITTAL:

Sealed bids shall be received and time stamped online through the eVA website, no later than date at time, (Bid Closing”). Bidders are responsible for ensuring its submission prior to Bid Closing. The time a Bid is received shall be determined by the time stamp on the Bid receipt by the time clock on the eVA Sourcing and Contracting website. The City of Fairfax is not responsible for any technical difficulties which may result in the Bidders response not uploading in time, or any responses that are not properly uploaded. The City will not receive any bids in person. Any paper submissions received will be not be considered and will be returned, unopened, to the offeror. Bids received after the Closing date/time shall not be considered.

15. BIDDER INTERESTED IN MORE THAN ONE BID: If more than one bid is offered by a bidder, directly or indirectly, all such bids may be rejected. A bidder who has quoted prices on work, materials, or supplies to a bidder is not disqualified from quoting prices to other bidders or firms submitting a bid directly for the work, materials or supplies.

16. APPLICABLE LAWS AND COURTS: This solicitation and any resulting contract shall be governed in all respects by the laws of the Commonwealth of Virginia, without regard to its choice of law provisions, and any litigation with respect thereto shall be brought in the circuit courts of the Commonwealth. The contractor shall comply with all applicable federal, state and local laws, rules and regulations.

17. ANTI-DISCRIMINATION: By submitting their bids, bidders certify to the City that they will conform to the provisions of the Federal Civil Rights Act of 1964, as amended, as well as the Virginia Fair Employment Contracting Act of 1975, as amended, where applicable, the Virginians With Disabilities Act, the Americans With Disabilities Act and § 2.2-4311 of the Virginia Public Procurement Act (VPPA).

18. ETHICS IN PUBLIC CONTRACTING: By submitting their bids, bidders certify that their bids are made without collusion or fraud and that they have not offered or received any kickbacks or inducements from any other bidder, supplier, manufacturer or subcontractor in connection with their bid, and that they have not conferred on any public employee having official responsibility for this procurement transaction any payment, loan, subscription, advance, deposit of money, services or anything of more than nominal value, present or promised, unless consideration of substantially equal or greater value was exchanged.

19. IMMIGRATION REFORM AND CONTROL ACT OF 1986: By entering into a written contract with the City of Fairfax, the

Contractor certifies that the Contractor does not, and shall not during the performance of the contract for goods and services in the City, knowingly employ an unauthorized alien as defined in the federal Immigration Reform and Control Act of 1986.

20. DEBARMENT STATUS: By participating in this procurement, the vendor certifies that they are not currently debarred by the City of Fairfax from submitting a response for the type of goods and/or services covered by this solicitation.

Vendor further certifies that they are not debarred from filling any order or accepting any resulting order, or that they are an agent of any person or entity that is currently debarred by the City of Fairfax.

If a vendor is created or used for the purpose of circumventing a debarment decision against another vendor, the non-debarred vendor will be debarred for the same time period as the debarred vendor.

QQ 65916 Page | 9

21. ANTITRUST: By entering into a contract, the contractor conveys, sells, assigns, and transfers to the City of Fairfax all rights, title and interest in and to all causes of action it may now have or hereafter acquire under the antitrust laws of the United States and the Commonwealth of Virginia, relating to the particular goods or services purchased or acquired by the Commonwealth of Virginia under said contract.

22. CLARIFICATION OF TERMS: If any prospective bidder has questions about the specifications or other solicitation documents, the prospective bidder should contact the Purchasing Agent no later than five working days before the due date. Any revisions to the solicitation will be made only by addendum issued by the Purchasing Agent.

23. PAYMENT: Invoices for items ordered, delivered and accepted shall be submitted by the contractor directly to the payment address shown on the purchase order/contract. All invoices shall show the contract number and/or purchase order number; social security number (for individual contractors) or the federal employer identification number (for proprietorships, partnerships, and corporations). Any payment terms requiring payment in less than 30 days will be regarded as requiring payment 30 days after invoice or delivery, whichever occurs last. This shall not affect offers of discounts for payment in less than 30 days, however.

24. QUALIFICATIONS OF BIDDERS: The City of Fairfax may make such reasonable investigations as deemed proper and necessary to determine the ability of the bidder to perform the services/furnish the goods and the bidder shall furnish to the City all such information and data for this purpose as may be requested. The City reserves the right to inspect bidder’s physical facilities prior to award to satisfy questions regarding the bidder’s capabilities. The City further reserves the right to reject any bid if the evidence submitted by, or investigations of, such bidder fails to satisfy the City that such bidder is properly qualified to carry out the obligations of the contract and to provide the services and/or furnish the goods contemplated therein.

25. DEFAULT: In case of failure to deliver goods or services in accordance with the contract terms and conditions, the City, after due oral or written notice, may procure them from other sources and hold the contractor responsible for any resulting additional purchase and administrative costs. This remedy shall be in addition to any other remedies which the City may have.

26. INDEMNIFICATION: Contractor agrees to indemnify the City, its officers, agents, and employees for any loss, liability, cost, or reasonable settlement cost incurred as a result of any claims, damages and actions of any kind or nature, whether at law or in equity, arising from or caused by the use of any materials, goods, or equipment of any kind or nature furnished by the contractor/any services of any kind or nature furnished by the contractor, provided that such liability is not attributable to the sole negligence of the City or to failure of the City to use the materials, goods, or equipment in the manner already and permanently described by the contractor on the materials, goods or equipment delivered.

27. NON-LIABILITY: The Contractor shall not be liable in damages for delay in shipment or failure to deliver when such delay or failure is the result of fire, flood, strike, the transportation carrier, act of God, act of Government, act of an alien enemy or by any other circumstances which, in the Purchasing Agent's opinion, are beyond the reasonable control of the Contractor. Under such circumstances, however, the Purchasing Agent may, at their discretion terminate the contract.

28. TAXES: Sales to the City of Fairfax are normally exempt from State sales tax. State sales and use tax certificates of exemption, Form ST-12, will be issued upon request. Deliveries against this contract shall usually be free of Federal excise and transportation taxes. The City’s excise tax exemption registration number is 54-6001266.

29. INSURANCE: By signing and submitting a bid under this solicitation, the bidder certifies that if awarded the contract, it will have the following insurance coverage at the time the contract is awarded. For construction contracts, if any

QQ 65916 Page | 10 subcontractors are involved, the subcontractor will have workers’ compensation insurance in accordance with §§ 2.2- 4332 and 65.2-800 et seq. of the Code of Virginia. The bidder further certifies that the contractor and any subcontractors will maintain these insurance coverage during the entire term of the contract and that all insurance coverage will be provided by insurance companies authorized to sell insurance in Virginia by the Virginia State Corporation Commission.

MINIMUM INSURANCE COVERAGES AND LIMITS:

1. Workers’ Compensation - Statutory requirements and benefits. Coverage is compulsory for employers of three or more employees, to include the employer. Contractors who fail to notify the City of increases in the number of employees that change their workers’ compensation requirements under the Code of Virginia during the course of the contract shall be in noncompliance with the contract.

2. Employer’s Liability - $100,000.

3. Commercial General Liability - $1,000,000 per occurrence and $2,000,000 in the aggregate. Commercial General

Liability is to include bodily injury and property damage, personal injury and advertising injury, products and completed operations coverage. The City of Fairfax shall be added as an additional insured to the policy by an endorsement.

4. Automobile Liability - $1,000,000 combined single limit.

5. Contract Identification – All documentation and copies of endorsements required hereunder shall state this

Contract's number and title.

6. Certificate Holder ‐ The Certificate Holder must be identified as:

City of Fairfax, Virginia c/o City Risk Manager 10455 Armstrong Street, Suite 331 Fairfax, Virginia 22030

30. DRUG-FREE WORKPLACE: During the performance of this contract, the contractor agrees to (i) provide a drug-free workplace for the contractor's employees; (ii) post in conspicuous places, available to employees and applicants for employment, a statement notifying employees that the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana is prohibited in the contractor's workplace and specifying the actions that will be taken against employees for violations of such prohibition; (iii) state in all solicitations or advertisements for employees placed by or on behalf of the contractor that the contractor maintains a drug-free workplace; and (iv) include the provisions of the foregoing clauses in every subcontract or purchase order of over $10,000, so that the provisions will be binding upon each subcontractor or vendor.

For the purposes of this section, “drug-free workplace” means a site for the performance of work done in connection with a specific contract awarded to a contractor, the employees of whom are prohibited from engaging in the unlawful manufacture, sale, distribution, dispensation, possession or use of any controlled substance or marijuana during the performance of the contract.

31. NONDISCRIMINATION OF CONTRACTORS: A bidder, offeror, or contractor shall not be discriminated against in the solicitation or award of this contract because of race, religion, color, sex, national origin, age, disability, faith-based organizational status, any other basis prohibited by state law relating to discrimination in employment or because the

QQ 65916 Page | 11 bidder or offeror employs ex-offenders unless the City has made a written determination that employing ex-offenders on the specific contract is not in its best interest. If the award of this contract is made to a faith-based organization and an individual, who applies for or receives goods, services, or disbursements provided pursuant to this contract objects to the religious character of the faith-based organization from which the individual receives or would receive the goods, services, or disbursements, the public body shall offer the individual, within a reasonable period of time after the date of his objection, access to equivalent goods, services, or disbursements from an alternative provider.

32. AUTHORIZATION TO CONDUCT BUSINESS IN THE COMMONWEALTH: A contractor organized as a stock or nonstock corporation, limited liability company, business trust, or limited partnership or registered as a registered limited liability partnership shall be authorized to transact business in the Commonwealth as a domestic or foreign business entity if so required by Title 13.1 or Title 50 of the Code of Virginia or as otherwise required by law. Any business entity described above that enters into a contract with a public body pursuant to the Virginia Public Procurement Act shall not allow its existence to lapse or its certificate of authority or registration to transact business in the Commonwealth, if so required under Title 13.1 or Title 50, to be revoked or cancelled at any time during the term of the contract. A public body may void any contract with a business entity if the business entity fails to remain in compliance with the provisions of this section.

33. CONTRACT DOCUMENTS:

(a) The contract entered into by the parties shall consist of the Invitation for Bids, the bid submitted by the contractor; General Terms and Conditions, these Additional Terms and Conditions; the Special Terms and Conditions; the drawings, if any; the specifications; and all modifications and addenda to the foregoing documents, all of which shall be referred to collectively as the contract documents.

(b) All time limits stated in the contract documents, including but not limited to the time for completion of the work, are of the essence of the contract.

(c) Anything called for by one of the contract documents and not called for by the others shall be of like effect as if required or called for by all, except that a provision clearly designed to negate or alter a provision contained in one or more of the other contract documents shall have the intended effect.

34. INSPECTION: All material and workmanship shall be subject to inspection, examination, and test by the owner and its project inspector at any and all times during construction. The project inspector shall have authority to reject defective material and workmanship and require its correction. Rejected workmanship shall be satisfactorily corrected and rejected material shall be satisfactorily replaced with proper material without charge therefore, and the contractor shall promptly segregate and remove the rejected material from the premises. If the contractor fails to proceed at once with replacement of rejected material and/or the correction of defective workmanship, the owner may, by contract or otherwise, replace such material and/or correct such workmanship and charge the cost to the contractor, or may terminate the right of the contractor to proceed, the contractor and surety being liable for any damages.

35. SUPERINTENDENCE BY CONTRACTOR:

a. The contractor shall have a competent foreman or superintendent, satisfactory to the owner, on the job site at all times during the progress of the work. The contractor shall be responsible for all construction means, methods, techniques, sequences, and procedures for coordinating all portions of the work under the contract except where otherwise specified in the contract documents, and for all safety and worker health programs and practices. The contractor shall notify the owner, in writing, of any proposed change in superintendent including the reason therefore prior to making such change.

QQ 65916 Page | 12

b. The contractor shall, at all times, enforce strict discipline and good order among the workers on the project, and shall not employ on the work any unfit person, anyone not skilled in the work assigned to him, or anyone who will not work in harmony with those employed by the contractor, the subcontractors, the owner or the owner’s separate contractors and their subcontractors.

c. The owner may, in writing, require the contractor to remove from the work any employee the owner deems to be incompetent, careless, not working in harmony with others on the site, or otherwise objectionable.

36. ACCESS TO WORK: The owner, the owner’s inspectors and other testing personnel, and inspectors from the

Department of Labor and Industry shall have access to the work at all times. The contractor shall provide proper facilities for access and inspection.

37. AVAILABILITY OF MATERIALS: If material specified in the contract documents is not available on the present market, alternate materials may be proposed by the contractor for approval of the owner.

38. CONTRACTOR’S TITLE TO MATERIALS: No materials or supplies for the work shall be purchased by the contractor or by any subcontractor subject to any security interest, installment or sales contract or any other agreement or lien by which an interest is retained by the seller or is given to a secured party. The contractor warrants that he has clear title to all materials and supplies which he uses in the work or for which he accepts payment in whole or in part.

39. WARRANTY OF MATERIALS AND WORKMANSHIP:

a. The contractor warrants that, unless otherwise specified, all materials and equipment incorporated in the work under the contract shall be new, in first class condition, and in accordance with the contract documents. The contractor further warrants that all workmanship shall be of the highest quality and in accordance with contract documents and shall be performed by persons qualified at their respective trades.

b. Work not conforming to these warranties shall be considered defective.

c. This warranty of materials and workmanship is separate and independent from and in addition to any of the contractor’s other guarantees or obligations in this contract.

40. USE OF PREMISES AND REMOVAL OF DEBRIS:

a. The contractor shall:

(1) Perform his contract in such a manner as not to interrupt or interfere with the operation of any existing activity on the premises or with the work of any contractor;

(2) Store his apparatus, materials, supplies, and equipment in such orderly fashion at the site of the work as will not unduly interfere with the progress of his work or the work of any other contractor; and

(3) Place upon the work or any part thereof only such loads as are consistent with the safety of that portion of the work.

b. The contractor expressly undertakes, either directly or through his subcontractor(s), to effect all cutting, filling, or patching of his work required to make the same conform to the drawings and specifications, and, except with the consent of the owner, not to cut or otherwise alter the work of any other contractor. The contractor shall

QQ 65916 Page | 13 not damage or endanger any portion of the work or premises, including existing improvements, unless called for by the contract.

c. The contractor expressly undertakes, either directly or through his subcontractor(s), to clean up frequently all refuse, rubbish, scrap materials, and debris caused by his operations, to the end that at all times the site of the work shall present a neat, orderly, and workmanlike appearance. No such refuse, rubbish, scrap material, and debris shall be left within the completed work nor buried on the building site, but shall be removed from the site and properly disposed of in a licensed landfill or otherwise as required by law.

d. The contractor expressly undertakes, either directly or through his subcontractor(s), before final payment, to remove all surplus material, false work, temporary structures, including foundations thereof, plants of any description and debris of every nature resulting from his operations and to put the site in a neat, orderly condition; to thoroughly clean and leave reasonably dust free all finished surfaces including all equipment, piping, etc., on the interior of all buildings included in the contract; and to thoroughly clean all glass installed under the contract including the removal of all paint and mortar splatters and other defacements. If a contractor fails to clean up at the completion of the work, the owner may do so and charge for costs thereof to the contractor.

e. During and at completion of the work, the contractor shall prevent site soil erosion, the runoff of silt and/or debris carrying water from the site, and the blowing of debris off the site in accordance with the applicable requirements and standards of the Virginia Erosion and Sediment Control Handbook, latest edition, and of the contract documents.

f. The contractor shall not operate or disturb the setting of any valves, switches or electrical equipment on the service lines to the building except by proper previous arrangement with the owner. The contractor shall give ample advance notice of the need for cut-offs which will be scheduled at the convenience of the owner.

41. PROTECTION OF PERSONS AND PROPERTY:

a. The contractor expressly undertakes, both directly and through its subcontractor(s), to take every precaution at all times for the protection of persons and property which may come on the building site or be affected by the contractor’s operation in connection with the work.

b. The contractor shall be solely responsible for initiating, maintaining, and supervising all safety precautions and programs in connection with the work.

c. The provisions of all rules and regulations governing safety as adopted by the Safety Codes Commission of the Commonwealth of Virginia, issued by the Department of Labor and Industry under Title 40.1 of the Code of Virginia shall apply to all work under this contract.

d. The contractor shall continuously maintain adequate protection of all his work from damage and shall protect the owner’s property from injury or loss arising in connection with this contract. He shall make good any such damage, injury, or loss, except such as may be directly due to errors in the contract documents or caused by agents or employees of the owner. He shall adequately protect adjacent property to prevent any damage to it or loss of use and enjoyment by its owners. He shall provide and maintain all passageways, guard fences, lights, and other facilities for protection required by public authority, local conditions, any of the contract documents or erected for the fulfillment of his obligations for the protection of persons and property.

QQ 65916 Page | 14

e. In an emergency affecting the safety or life of persons or of the work, or of the adjoining property, the contractor, without special instruction or authorization from the owner, shall act, at his discretion, to prevent such threatened loss or injury. Also, should he, to prevent threatened loss or injury, be instructed or authorized to act by the owner, he shall so act immediately, without appeal. Any additional compensation or extension of time claimed by the contractor on account of any emergency work shall be determined as provided by paragraph O, of the General Terms and Conditions.

42. CONTRACTOR’S RIGHT TO STOP WORK OR TERMINATE THE CONTRACT: If the work should be stopped under any order of any court or other public authority for a period of ninety (90) days through no fault of the contractor or of anyone employed by him, or if the owner should fail to pay to the contractor within thirty (30) days when no dispute exists as to the sum, then the contractor may, upon ten (10) calendar days written notice to the owner, stop work or terminate the contract and recover from the owner payment for the cost of the work actually performed, together with overhead and profit thereon, but profit shall be recovered only to the extent that the contractor can demonstrate that he would have had profit on the entire contract if he had completed the work. The contractor may not receive profit or any other type of compensation for parts of the work not performed. The contractor may recover the cost of physically closing down the job site, but no other costs of termination. The owner may offset any claims it may have against the contractor against the amounts due to the contractor. In no event shall termination of the contract by the contractor terminate the obligations of the contractor’s surety on its payment and performance bonds.

43. OWNER’S RIGHT TO TERMINATE THE CONTRACT FOR CAUSE:

a. If the contractor should be adjudged as bankrupt, or if he should make a general assignment for the benefit of his creditors, or if a receiver should be appointed on account of his insolvency, the owner may terminate the contract. If the contractor should persistently or repeatedly refuse or should fail, except in cases for which extension of time is provided, to supply enough properly skilled workmen or proper materials, or if he should fail to make prompt payment to subcontractors or suppliers of material or labor, or persistently disregards laws, ordinances, or the written instructions of the owner, or otherwise be guilty of a substantial violation of any provision of the contract, then the owner may terminate the contract.

b. Prior to termination of the contract, the owner shall give the contractor and his surety ten (10) calendar days written notice, during which the contractor and/or his surety may rectify the cause of the termination. If rectified to the satisfaction of the owner within said ten (10) days, the owner may rescind his notice of termination. If it does not, the termination for cause shall become effective at the end of the ten-day (10) notice period. In the alternative, the owner may postpone the effective date of the termination notice, at his sole discretion, if he should receive reassurances from the contractor and/or its surety that the causes of termination will be remedied in a time and manner which the owner finds acceptable. If at any time more than ten (10) days after the notice of termination, the owner determines that contractor and/or its surety has not or is not likely to rectify the causes of termination in an acceptable manner or within the time allowed, then the owner may immediately terminate the contract for cause by giving written notice to the contractor and its surety. In no event shall termination for cause terminate the obligations of the contractor’s surety on its payment and performance bonds.

c. Notice of terminations, whether initial or given after a period of postponement, may be served upon the contractor and the surety by mail or any other means at their last known places of business in Virginia or elsewhere, by delivery to any officer or management/supervisory employee of either wherever they may be found, or, if no such officer, employee or place of business is known or can be found by reasonable inquiry within three (3) days, by posting the notice at the job site. Failure to accept or pick up registered or certified mail addressed to the last known address shall be deemed to be delivery.

QQ 65916 Page | 15

d. Upon termination of the contract, the owner shall take possession of the premises and of all materials, tools, and appliances thereon and finish the work by whatever method he may deem expedient. In such case the contractor shall not be entitled to receive any further payment. If the expense of finishing the work, including compensation for additional managerial and administrative services shall exceed the unpaid balance of the contract price, the contractor shall pay the difference to the owner, together with any other expenses of terminating the contract and having it completed by others.

e. If it should be judicially determined that the owner improperly terminated this contract for cause, then the termination shall be deemed to be a termination for the convenience of the owner.

f. Termination of the contract under this section is without prejudice to any other right or remedy of the owner.

44. TERMINATION BY OWNER FOR CONVENIENCE:

a. Owner may terminate this contract at any time without cause, in whole or in part, upon giving the contractor notice of such termination. Upon such termination, the contractor shall immediately cease work and remove from the project site all of its labor forces and such of its materials as owner elects not to purchase or to assume in the manner hereinafter provided. Upon such termination, the contractor shall take such steps as owner may require to assign to the owner the contractor’s interest in all subcontracts and purchase orders designated by owner. After all such steps have been taken to owner’s satisfaction, the contractor shall receive as full compensation for termination and assignment the following:

(1) All amounts then otherwise due under the terms of this contract,

(2) Amounts due for work performed subsequent to the latest Request for Payment through the date of termination,

(3) Reasonable compensation for the actual cost of demobilization incurred by the contractor as a direct result of such termination. The contractor shall not be entitled to any compensation for lost profits or for any other type of contractual compensation or damage other than those provided by the preceding sentence.

Upon payment of the forgoing, owner shall have no further obligations to the contractor of any nature.

b. In no event shall termination for the convenience of the owner terminate the obligations of the contractor’s surety on its payment and performance bonds.

45. GUARANTEE OF WORK:

a. Except as otherwise specified, all work shall be guaranteed by the contractor against defects resulting from the use of inferior materials, equipment, or workmanship for one…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .