Specifications.pdf
PDF 602 KB Posted
- Attached to
- Dock Lift Replacement Federal contract opportunity
- Solicitation number
- 12505B25R0003
About this file
This document is a specification for construction work on a Shipping/Receiving Improvements - Dock Lift project at the National Center for Agricultural Utilization Research (NCAUR) USDA-ARS facility in Peoria, Illinois.
The key details are:
- The project involves shipping/receiving improvements and the installation of a new dock lift at the NCAUR facility.
- The work is divided into several sections including construction progress documentation, submittal procedures, temporary facilities and controls, and execution requirements.
- The construction schedule must be submitted within 10 days of the Notice of Award and the Contractor's Construction Schedule (CPM Schedule) must be submitted within 30 days.
- The project has a 60-day period of performance after receipt of the Notice to Proceed.
- Bonds are required if the contract exceeds $35,000.
- A site visit is scheduled for November 19 and 20, 2024, but attendance is not mandatory.
- All questions must be submitted in writing by November 27, 2024.
- The procurement requires the use of biobased products to the extent reasonably available.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit Sign In 11202024.pdf | ||
| RFIs.pdf | ||
| Site Visit Sign In 11192024.pdf | ||
| SF30 - Amendment 01.pdf | ||
| SF-1442.pdf | ||
| Attachments.pdf | ||
| ARS-371.pdf | ||
| ARS-372.pdf | ||
| Wage Determination.pdf | ||
| Drawings.pdf | ||
| Statement of Work.pdf | ||
| Past Performance Questionnaire.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Shipping / Receiving Improvements National Center for Agricultural Utilization Research (NCAUR) USDA-ARS, Peoria, IL
GR-1
General Requirements Shipping / Receiving Improvements – Dock Lift
01 32 00 - 1 Construction Progress Documentation
DIVISION 01 – GENERAL REQUIREMENTS
01 32 00 – CONSTRUCTION PROGRESS DOCUMENTATION
PART 1 - GENERAL
1. RELATED DOCUMENTS
a. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
2. SUMMARY
a. Section includes administrative and procedural requirements for documenting the pro-gress of construction during performance of the Work, including the following:
i. Startup construction schedule.
ii. Contractor's construction schedule.
iii. Construction schedule updating reports.
iv. Daily construction reports.
v. Material location reports.
vi. Site condition reports.
vii. Special reports.
b. Related Requirements:
i. Section 013300 "Submittal Procedures" for submitting schedules and reports.
3. DEFINITIONS
a. Activity: A discrete part of a project that can be identified for planning, scheduling, moni-toring, and controlling the construction project. Activities included in a construction schedule consume time and resources.
i. Critical Activity: An activity on the critical path that must start and finish on the planned early start and finish times.
ii. Predecessor Activity: An activity that precedes another activity in the network.
iii. Successor Activity: An activity that follows another activity in the network.
b. CPM: Critical path method, which is a method of planning and scheduling a construction project where activities are arranged based on activity relationships. Network calculations determine when activities can be performed and the critical path of Project.
c. Critical Path: The longest connected chain of interdependent activities through the net-work schedule that establishes the minimum overall Project duration and contains no float.
d. Event: The starting or ending point of an activity.
e. Float: The measure of leeway in starting and completing an activity.
i. Float time is not for the exclusive use or benefit of either Owner or Contractor, but is a jointly owned, expiring Project resource available to both parties as needed to meet schedule milestones and Contract completion date.
01 32 00 - 2 Construction Progress Documentation
ii. Free float is the amount of time an activity can be delayed without adversely af-fecting the early start of the successor activity.
iii. Total float is the measure of leeway in starting or completing an activity without adversely affecting the planned Project completion date.
f. Resource Loading: The allocation of manpower and equipment necessary for the com-pletion of an activity as scheduled.
4. INFORMATIONAL SUBMITTALS
a. Format for Submittals: Submit required submittals in the following format:
i. Working electronic copy of schedule file, where indicated.
ii. PDF electronic file.
b. Contractor's Construction Schedule: Initial schedule, of size required to display entire schedule for entire construction period.
c. Construction Schedule Updating Reports: Submit at weekly intervals or as agreed upon with CO/COR.
d. Daily Construction Reports: Submit at daily intervals or as agreed upon with CO/COR.
e. Material Location Reports: Submit as agreed upon with CO/COR.
f. Site Condition Reports: Submit at time of discovery of differing conditions.
g. Special Reports: Submit at time of unusual event.
5. QUALITY ASSURANCE
a. Scheduling Consultant Qualifications: An experienced specialist in CPM scheduling and reporting, with capability of producing CPM reports and diagrams within 24 hours of Owner's request.
6. COORDINATION
a. Coordinate Contractor's construction schedule with the schedule of values, list of subcon-tracts, submittal schedule, progress reports, payment requests, and other required schedules and reports.
i. Secure time commitments for performing critical elements of the Work from enti-ties involved.
ii. Coordinate each construction activity in the network with other activities and schedule them in proper sequence.
PART 2 - PRODUCTS
1. CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL
a. Time Frame: Extend schedule from date established for the Notice of Award to date of fi-nal completion.
01 32 00 - 3 Construction Progress Documentation
i. Contract completion date shall not be changed by submission of a schedule that shows an early completion date, unless specifically authorized by Change Order.
b. Activities: Treat each story or separate area as a separate numbered activity for each main element of the Work. Comply with the following:
i. Activity Duration: Define activities so no activity is longer than 20 days, unless specifically allowed by CO/COR.
ii. Procurement Activities: Include procurement process activities for the following long lead items and major items, requiring a cycle of more than 60 days, as sep-arate activities in schedule. Procurement cycle activities include, but are not lim-ited to, submittals, approvals, purchasing, fabrication, and delivery.
iii. Submittal Review Time: Include review and resubmittal times indicated in Section 013300 "Submittal Procedures" in schedule. Coordinate submittal review times in Contractor's construction schedule with submittal schedule.
iv. Startup and Testing Time: Include no fewer than 15 days for startup and testing.
v. Beneficial Occupancy: include date of Beneficial Occupancy.
vi. Substantial Completion: Indicate completion in advance of date established for
Substantial Completion and allow time for CO/COR/EPM administrative proce-dures necessary for certification of Substantial Completion.
vii. Punch List and Final Completion: Include not more than 30 days for completion of punch list items and final completion.
c. Constraints: Include constraints and work restrictions indicated in the Contract Docu-ments and as follows in schedule and show how the sequence of the Work is affected.
i. Phasing: Arrange list of activities on schedule by phase.
ii. Work under More Than One Contract: Include a separate activity for each con-tract.
iii. Work by Owner: Include a separate activity for each portion of the Work per-formed by Owner.
iv. Products Ordered in Advance: Include a separate activity for each product includ-ing delivery date(s). Delivery dates indicated stipulate the earliest possible deliv-ery date.
v. Owner-Furnished Products: Include a separate activity for each product including delivery date(s). Delivery dates indicated stipulate the earliest possible delivery date.
vi. Work Restrictions: Show the effect of the following items on the schedule:
1. Coordination with existing construction.
2. Limitations of continued occupancies.
3. Uninterruptible services.
4. Partial occupancy before Substantial Completion.
5. Use of premises restrictions.
6. Provisions for future construction.
7. Seasonal variations.
8. Environmental control.
vii. Work Stages: Indicate important stages of construction for each major portion of the Work, including, but not limited to, the following:
1. Subcontract awards.
2. Submittals.
3. Purchases.
4. Mockups.
01 32 00 - 4 Construction Progress Documentation
5. Fabrication.
6. Sample testing.
7. Deliveries.
8. Installation.
9. Tests and inspections.
10. Adjusting.
11. Curing.
12. Building flush-out.
13. Startup and placement into final use and operation.
viii. Construction Areas: Identify each major area of construction for each major por-tion of the Work. Indicate where each construction activity within a major area must be sequenced or integrated with other construction activities to provide for the following:
1. Structural completion.
2. Temporary enclosure and space conditioning.
3. Permanent space enclosure.
4. Completion of mechanical installation.
5. Completion of electrical installation.
6. Substantial Completion.
ix. Other Constraints: NA
d. Milestones: Include milestones indicated in the Contract Documents in schedule, includ-ing, but not limited to, the Notice to Proceed, Substantial Completion, and final comple-tion.
i. Temporary enclosure and space conditioning.
ii. <Insert milestones not indicated elsewhere>.
e. Upcoming Work Summary: Prepare summary report indicating activities scheduled to oc-cur or commence prior to submittal of next schedule update. Summarize the following is-sues:
i. Unresolved issues.
ii. Unanswered Requests for Information.
iii. Rejected or unreturned submittals.
iv. Notations on returned submittals.
v. Pending modifications affecting the Work and Contract Time.
f. Recovery Schedule: When periodic update indicates the Work is 14 or more calendar days behind the current approved schedule, submit a separate recovery schedule indicat-ing means by which Contractor intends to regain compliance with the schedule. Indicate changes to working hours, working days, crew sizes, and equipment required to achieve compliance, and date by which recovery will be accomplished.
2. STARTUP CONSTRUCTION SCHEDULE
a. Bar-Chart Schedule: Submit startup, horizontal, bar-chart-type construction schedule within ten days of date established for the Notice of Award.
b. Preparation: Indicate each significant construction activity separately. Identify first work-day of each week with a continuous vertical line. Outline significant construction activities
01 32 00 - 5 Construction Progress Documentation for first 60 days of construction. Include skeleton diagram for the remainder of the Work and a cash requirement prediction based on indicated activities.
3. CONTRACTOR'S CONSTRUCTION SCHEDULE (CPM SCHEDULE)
a. CPM Schedule: Prepare Contractor's construction schedule using a cost- and resource-loaded, time-scaled CPM network analysis diagram for the Work.
i. Develop network diagram in sufficient time to submit CPM schedule so it can be accepted for use no later than 30 days after date established for the Notice to Proceed.
1. Failure to include any work item required for performance of this Contract shall not excuse Contractor from completing all work within applicable completion dates, regardless of Architect's approval of the schedule.
ii. Establish procedures for monitoring and updating CPM schedule and for report-ing progress. Coordinate procedures with progress meeting and payment request dates.
iii. Use "one workday" as the unit of time for individual activities. Indicate nonwork-ing days and holidays incorporated into the schedule in order to coordinate with the Contract Time.
b. CPM Schedule Preparation: Prepare a list of all activities required to complete the Work.
Using the startup network diagram, prepare a skeleton network to identify probable criti-cal paths.
i. Activities: Indicate the estimated time duration, sequence requirements, and rela-tionship of each activity in relation to other activities. Include estimated time frames for the following activities:
1. Preparation and processing of submittals.
2. Mobilization and demobilization.
3. Purchase of materials.
4. Delivery.
5. Fabrication.
6. Utility interruptions.
7. Installation.
8. Work by Owner that may affect or be affected by Contractor's activities.
9. Testing
10. Punch list and final completion.
11. Activities occurring following final completion.
ii. Critical Path Activities: Identify critical path activities, including those for interim completion dates. Scheduled start and completion dates shall be consistent with Contract milestone dates.
iii. Processing: Process data to produce output data on a computer-drawn, time-scaled network. Revise data, reorganize activity sequences, and reproduce as often as necessary to produce the CPM schedule within the limitations of the Contract Time.
iv. Format: Mark the critical path. Locate the critical path near center of network; lo-cate paths with most float near the edges.
1. Subnetworks on separate sheets are permissible for activities clearly off the critical path.
01 32 00 - 6 Construction Progress Documentation
c. Contract Modifications: For each proposed contract modification and concurrent with its submission, prepare a time-impact analysis using a network fragment to demonstrate the effect of the proposed change on the overall project schedule.
4. REPORTS
a. Daily Construction Reports: Prepare a daily construction report recording the following in-formation concerning events at Project site:
i. List of subcontractors at Project site.
ii. List of separate contractors at Project site.
iii. Approximate count of personnel at Project site.
iv. Equipment at Project site.
v. Material deliveries.
vi. High and low temperatures and general weather conditions, including presence of rain or snow.
vii. Accidents.
viii. Meetings and significant decisions.
ix. Unusual events (see special reports).
x. Stoppages, delays, shortages, and losses.
xi. Meter readings and similar recordings.
xii. Emergency procedures.
xiii. Orders and requests of authorities having jurisdiction.
xiv. Change Orders received and implemented.
xv. Construction Change Directives received and implemented.
xvi. Services connected and disconnected.
xvii. Equipment or system tests and startups.
xviii. Partial completions and occupancies.
xix. Substantial Completions authorized.
b. Material Location Reports: At weekly intervals, prepare and submit a comprehensive list of materials delivered to and stored at Project site. List shall be cumulative, showing ma-terials previously reported plus items recently delivered. Include with list a statement of progress on and delivery dates for materials or items of equipment fabricated or stored away from Project site. Indicate the following categories for stored materials:
i. Material stored prior to previous report and remaining in storage.
ii. Material stored prior to previous report and since removed from storage and in-stalled.
iii. Material stored following previous report and remaining in storage.
c. Site Condition Reports: Immediately on discovery of a difference between site conditions and the Contract Documents, prepare and submit a detailed report. Submit with a Re-quest for Information. Include a detailed description of the differing conditions, together with recommendations for changing the Contract Documents.
5. SPECIAL REPORTS
a. General: Submit special reports directly to Owner within one day(s) of an occurrence.
Distribute copies of report to parties affected by the occurrence.
b. Reporting Unusual Events: When an event of an unusual and significant nature occurs at Project site, whether related directly to the Work, prepare and submit a special report.
List chain of events, persons participating, response by Contractor's personnel, evalua-
01 32 00 - 7 Construction Progress Documentation tion of results or effects, and similar pertinent information. Advise Owner in advance when these events are known or predictable.
PART 3 - EXECUTION
1. CONTRACTOR'S CONSTRUCTION SCHEDULE
a. Scheduling Consultant: Engage a consultant to provide planning, evaluation, and report-ing using CPM scheduling.
i. In-House Option: Owner may waive the requirement to retain a consultant if Con-tractor employs skilled personnel with experience in CPM scheduling and report-ing techniques. Submit qualifications.
ii. Meetings: Scheduling consultant shall attend all meetings related to Project pro-gress, alleged delays, and time impact.
b. Contractor's Construction Schedule Updating: At monthly intervals, update schedule to reflect actual construction progress and activities. Issue schedule one week before each regularly scheduled progress meeting.
i. Revise schedule immediately after each meeting or other activity where revisions have been recognized or made. Issue updated schedule concurrently with the report of each such meeting.
ii. Include a report with updated schedule that indicates every change, including, but not limited to, changes in logic, durations, actual starts and finishes, and ac-tivity durations.
iii. As the Work progresses, indicate final completion percentage for each activity.
c. Distribution: Distribute copies of approved schedule to CO/ACO/COR/EPM, separate contractors, testing and inspecting agencies, and other parties identified by Contractor with a need-to-know schedule responsibility.
i. Post copies in Project meeting rooms and temporary field offices.
ii. When revisions are made, distribute updated schedules to the same parties and post in the same locations. Delete parties from distribution when they have com-pleted their assigned portion of the Work and are no longer involved in perfor-mance of construction activities.
END OF SECTION 01 32 00
01 33 00 - 1 Submittal Procedures
01 33 00 – SUBMITTAL PROCEDURES
b. See Attachments section of SOW for “Material Approved Submittal” form.
c. See Attachments section of SOW for “Schedule of Materials Submittal” form.
d. See Attachments section of SOW for “Recently Replaced Component” form.
e. See Attachments section of SOW for “AD-107” form.
a. Section includes requirements for the submittal schedule and administrative and proce-dural requirements for submitting Shop Drawings, Product Data, Samples, and other submittals.
i. Section 013200 "Construction Progress Documentation" for submitting schedules and reports, including Contractor's construction schedule.
ii. Section 017823 "Operation and Maintenance Data" for submitting operation and maintenance manuals.
iii. Section 017839 "Project Record Documents" for submitting record Drawings, record Specifications, and record Product Data.
a. Action Submittals: Written and graphic information and physical samples that require re-sponsive action. Action submittals are those submittals indicated in individual Specifica-tion Sections as "action submittals."
b. Informational Submittals: Written and graphic information and physical samples that do not require responsive action. Submittals may be rejected for not complying with re-quirements. Informational submittals are those submittals indicated in individual Specifi-cation Sections as "informational submittals."
c. Portable Document Format (PDF): An open standard file format licensed by Adobe Sys-tems used for representing documents in a device-independent and display resolution-independent fixed-layout document format.
4. ACTION SUBMITTALS
a. Submittal Schedule: Submit a schedule of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, ordering, man-ufacturing, fabrication, and delivery when establishing dates. Include additional time re-
01 33 00 - 2 Submittal Procedures quired for making corrections or revisions to submittals and additional time for handling and reviewing submittals required by those corrections.
i. Coordinate submittal schedule with list of subcontracts, the schedule of values, and Contractor's construction schedule.
ii. Initial Submittal: Submit concurrently with startup construction schedule. Include submittals required during the first 60 days of construction. List those submittals required to maintain orderly progress of the Work and those required early be-cause of long lead time for manufacture or fabrication.
iii. Final Submittal: Submit concurrently with the first complete submittal of Contrac-tor's construction schedule.
1. Submit revised submittal schedule to reflect changes in current status and timing for submittals.
iv. Format: Arrange the following information in a tabular format:
1. Scheduled date for first submittal.
2. Specification Section number and title.
3. Submittal category: Action; informational.
4. Name of subcontractor.
5. Description of the Work covered.
6. Scheduled date for final release or approval.
7. Scheduled date of fabrication.
8. Scheduled dates for purchasing.
9. Scheduled dates for installation.
10. Activity or event number.
5. SUBMITTAL ADMINISTRATIVE REQUIREMENTS
a. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.
i. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.
ii. Submit all submittal items required for each Specification Section concurrently unless partial submittals for portions of the Work are indicated on approved sub-mittal schedule.
iii. Submit action submittals and informational submittals required by the same Specification Section as separate packages under separate transmittals.
iv. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.
1. Owner reserves the right to withhold action on a submittal requiring co-ordination with other submittals until related submittals are received.
b. Processing Time: Allow time for submittal review, including time for resubmittals, as fol-lows. Time for review shall commence on receipt of submittal. No extension of the Con-tract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals.
i. Initial Review: Allow 15 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required. Owner will advise Contractor when a submittal being processed must be delayed for coordination.
01 33 00 - 3 Submittal Procedures
ii. Intermediate Review: If intermediate submittal is necessary, process it in same manner as initial submittal.
iii. Resubmittal Review: Allow 15 days for review of each resubmittal.
c. Electronic Submittals: Identify and incorporate information in each electronic submittal file as follows:
i. Assemble complete submittal package into a single indexed file incorporating submittal requirements of a single Specification Section and transmittal form with links enabling navigation to each item.
ii. Name file with submittal number or other unique identifier, including revision identifier.
iii. Provide means for insertion to permanently record Contractor's review and ap-proval markings and action taken by CO/COR.
iv. Transmittal Form for Electronic Submittals: Use electronic form provided by Owner, containing the following information:
1. Project name.
2. Date.
3. Name and address of Architect/Engineer (if applicable)
4. Name of Construction Manager (if applicable)
5. Name of Contractor.
6. Name of firm or entity that prepared submittal.
7. Names of subcontractor, manufacturer, and supplier.
8. Category and type of submittal.
9. Submittal purpose and description.
10. Specification Section number and title.
11. Specification paragraph number or drawing designation and generic name for each of multiple items.
12. Drawing number and detail references, as appropriate.
13. Location(s) where product is to be installed, as appropriate.
14. Related physical samples submitted directly.
15. Indication of full or partial submittal.
16. Transmittal number, numbered consecutively.
17. Submittal and transmittal distribution record.
18. Other necessary identification.
19. Remarks.
d. Options: Identify options requiring selection by CO/COR/EPM.
e. Resubmittals: Make resubmittals in same form and number of copies as initial submittal.
i. Note date and content of previous submittal.
ii. Note date and content of revision in label or title block and clearly indicate extent of revision.
iii. Resubmit submittals until they are marked with approval notation from Architect's action stamp.
f. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppli-ers, fabricators, installers, authorities having jurisdiction, and others as necessary for per-formance of construction activities. Show distribution on transmittal forms.
g. Use for Construction: Retain complete copies of submittals on Project site. Use only final action submittals that are marked with approval notation from Architect's action stamp.
01 33 00 - 4 Submittal Procedures
1. SUBMITTAL PROCEDURES
a. General Submittal Procedure Requirements: Prepare and submit submittals required by individual Specification Sections. Types of submittals are indicated in individual Specifica-tion Sections.
i. Submit electronic submittals via email as PDF electronic files.
ii. Manufacturers / products that are submitted as “Approved Equal” are reviewed during the submittal / shop drawing process and not prior to bidding. Contractor shall be responsible for submitting information to show equivalence.
Determination by CO/COR on equivalence is final.
iii. Each submittal shall include a completed “Material Approval Submittal” form. See “Attachments” section of the SOW for this form.
b. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
i. If information must be specially prepared for submittal because standard pub-lished data are not suitable for use, submit as Shop Drawings, not as Product Data.
ii. Mark each copy of each submittal to show which products and options are appli-cable.
iii. Include the following information, as applicable:
1. Manufacturer's catalog cuts.
2. Manufacturer's product specifications.
3. Standard color charts.
4. Statement of compliance with specified referenced standards.
5. Testing by recognized testing agency.
6. Application of testing agency labels and seals.
7. Notation of coordination requirements.
8. Availability and delivery time information.
iv. For equipment, include the following in addition to the above, as applicable:
1. Wiring diagrams showing factory-installed wiring.
2. Printed performance curves.
3. Operational range diagrams.
4. Clearances required to other construction, if not indicated on accompa-nying Shop Drawings.
v. Submit Product Data before or concurrent with Samples.
vi. Submit Product Data in the following format:
1. PDF electronic file.
c. Shop Drawings: Prepare Project-specific information, drawn accurately to scale.
i. Preparation: Fully illustrate requirements in the Contract Documents. Include the following information, as applicable:
1. Identification of products.
2. Schedules.
01 33 00 - 5 Submittal Procedures
3. Compliance with specified standards.
4. Notation of coordination requirements.
5. Notation of dimensions established by field measurement.
6. Relationship and attachment to adjoining construction clearly indicated.
7. Seal and signature of professional engineer if specified.
ii. Sheet Size: Except for templates, patterns, and similar full-size drawings, submit
Shop Drawings on sheets at least 8-1/2 by 11 inches (215 by 280 mm), but no larger than 30 by 42 inches (750 by 1067 mm).
iii. Submit Shop Drawings in the following format:
1. PDF electronic file.
iv. Include one hard copy of each approved shop drawing in the Operations and Maintenance Manual submitted to the Government during Closeout Procedures.
d. Samples: Submit Samples for review of kind, color, pattern, and texture for a check of these characteristics with other elements and for a comparison of these characteristics between submittal and actual component as delivered and installed.
i. Transmit Samples that contain multiple, related components such as accessories together in one submittal package.
ii. Identification: Attach label on unexposed side of Samples that includes the fol-lowing:
1. Generic description of Sample.
2. Product name and name of manufacturer.
3. Sample source.
4. Number and title of applicable Specification Section.
5. Specification paragraph number and generic name of each item.
iii. For projects where electronic submittals are required, provide corresponding electronic submittal of Sample transmittal, digital image file illustrating Sample characteristics, and identification information for record.
iv. Disposition: Maintain sets of approved Samples at Project site, available for qual-ity-control comparisons throughout the course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set.
1. Samples that may be incorporated into the Work are indicated in individ-ual Specification Sections. Such Samples must be in an undamaged condition at time of use.
2. Samples not incorporated into the Work, or otherwise designated as Owner's property, are the property of Contractor.
v. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.
1. Number of Samples: Submit one full set(s) of available choices where color, pattern, texture, or similar characteristics are required to be select-ed from manufacturer's product line. CO/COR will return submittal with options selected.
01 33 00 - 6 Submittal Procedures
vi. Samples for Verification: Submit full-size units or Samples of size indicated, pre-pared from same material to be used for the Work, cured and finished in manner specified, and physically identical with material or product proposed for use, and that show full range of color and texture variations expected. Samples include, but are not limited to, the following: partial sections of manufactured or fabricated components; small cuts or containers of materials; complete units of repetitively used materials; swatches showing color, texture, and pattern; color range sets;
and components used for independent testing and inspection.
1. Number of Samples: Submit three sets of Samples. Architect will retain one Sample sets; remainder will be returned. Mark up and retain one re-turned Sample set as a project record sample.
a. Submit a single Sample where assembly details, workmanship, fabrication techniques, connections, operation, and other similar characteristics are to be demonstrated.
b. If variation in color, pattern, texture, or other characteristic is in-herent in material or product represented by a Sample, submit at least three sets of paired units that show approximate limits of variations.
e. Contractor's Construction Schedule: Comply with requirements specified in Section
013200 "Construction Progress Documentation."
f. Closeout Submittals and Maintenance Material Submittals: Comply with requirements specified in Section 017700 "Closeout Procedures."
g. Maintenance Data: Comply with requirements specified in Section 017823 "Operation and Maintenance Data."
h. Qualification Data: Prepare written information that demonstrates capabilities and experi-ence of firm or person. Include lists of completed projects with project names and ad-dresses, contact information of architects and owners, and other information specified.
i. Welding Certificates: Prepare written certification that welding procedures and personnel comply with requirements in the Contract Documents. Submit record of Welding Proce-dure Specification and Procedure Qualification Record on AWS forms. Include names of firms and personnel certified.
j. Installer Certificates: Submit written statements on manufacturer's letterhead certifying that Installer complies with requirements in the Contract Documents and, where required, is authorized by manufacturer for this specific Project.
k. Manufacturer Certificates: Submit written statements on manufacturer's letterhead certify-ing that manufacturer complies with requirements in the Contract Documents. Include ev-idence of manufacturing experience where required.
l. Product Certificates: Submit written statements on manufacturer's letterhead certifying that product complies with requirements in the Contract Documents.
m. Material Certificates: Submit written statements on manufacturer's letterhead certifying that material complies with requirements in the Contract Documents.
01 33 00 - 7 Submittal Procedures
n. Material Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements in the Contract Documents.
o. Product Test Reports: Submit written reports indicating that current product produced by manufacturer complies with requirements in the Contract Documents. Base reports on evaluation of tests performed by manufacturer and witnessed by a qualified testing agen-cy, or on comprehensive tests performed by a qualified testing agency.
p. Research Reports: Submit written evidence, from a model code organization acceptable to authorities having jurisdiction, that product complies with building code in effect for Project. Include the following information:
i. Name of evaluation organization.
ii. Date of evaluation.
iii. Time period when report is in effect.
iv. Product and manufacturers' names.
v. Description of product.
vi. Test procedures and results.
vii. Limitations of use.
q. Preconstruction Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of tests performed be-fore installation of product, for compliance with performance requirements in the Contract Documents.
r. Compatibility Test Reports: Submit reports written by a qualified testing agency, on test-ing agency's standard form, indicating and interpreting results of compatibility tests per-formed before installation of product. Include written recommendations for primers and substrate preparation needed for adhesion.
s. Field Test Reports: Submit written reports indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final loca-tion, for compliance with requirements in the Contract Documents.
t. Design Data: Prepare and submit written and graphic information, including, but not lim-ited to, performance and design criteria, list of applicable codes and regulations, and cal-culations. Include list of assumptions and other performance and design criteria and a summary of loads. Include load diagrams if applicable. Provide name and version of software, if any, used for calculations. Include page numbers.
1. CONTRACTOR'S REVIEW
a. Action and Informational Submittals: Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to
CO/COR/EPM.
b. Project Closeout and Maintenance Material Submittals: See requirements in Section 017700 "Closeout Procedures."
01 33 00 - 8 Submittal Procedures
c. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of re-viewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.
2. CO/COR ACTION
a. Action Submittals: CO/COR/EPM will review each submittal, make marks to indicate cor-rections or revisions required, and return it. CO will stamp each submittal with an action stamp and will mark stamp appropriately to indicate action.
b. Informational Submittals: CO/COR/EPM will review each submittal and will not return it or will return it if it does not comply with requirements. CO/COR/EPM will forward each submittal to appropriate party.
c. Partial submittals prepared for a portion of the Work will be reviewed when use of partial submittals has received prior approval from CO/COR.
d. Incomplete submittals are unacceptable, will be considered nonresponsive, and will be returned for resubmittal without review.
e. Submittals not required by the Contract Documents may be returned by the CO/COR without action.
END OF SECTION 01 33 00
01 50 00 - 1 Temporary Facilities and Controls
01 50 00 – TEMPORARY FACILITIES AND CONTROLS
PART 1 – GENERAL
a. Drawings and general provisions of the Contract, including General and Supplementary Con-ditions and other Division 01 Specification Sections, apply to this Section.
a. Section includes requirements for temporary utilities, support facilities, and security and pro-tection facilities.
3. Related Requirements:
a. Section 015050 – Construction Fencing, Covered Walkways, and Tree Protection
b. Section 017300 – Execution
4. USE CHARGES
a. General: Installation and removal of and use charges for temporary facilities shall be included in the Contract Sum unless otherwise indicated. Allow other entities to use temporary ser-vices and facilities without cost, including, but not limited to, Owner's construction forces, Ar-chitect, occupants of Project, testing agencies, and authorities having jurisdiction.
b. Water and Sewer Service from Existing System: Water from Owner's existing water system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations.
c. Electric Power Service from Existing System: Electric power from Owner's existing system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations.
5. ACTION SUBMITTALS
a. Site Plan (Logistics Plan): Show support facilities, temporary facilities, temporary signage in-cluding sign message, utility hookups, staging areas, and parking areas for construction per-sonnel. Update and submit upon request.
6. INFORMATIONAL SUBMITTALS (As applicable to the Work)
a. Erosion- and Sedimentation-Control Plan: Show compliance with requirements of EPA Con-struction General Permit or authorities having jurisdiction, whichever is more stringent.
b. Fire-Safety Program: Show compliance with requirements of NFPA 241 and authorities hav-ing jurisdiction. Indicate Contractor personnel responsible for management of fire-prevention program.
c. Moisture-Protection Plan: Describe procedures and controls for protecting materials and con-struction from water absorption and damage.
01 50 00 - 2 Temporary Facilities and Controls
i. Describe delivery, handling, and storage provisions for materials subject to water ab-sorption or water damage.
ii. Indicate procedures for discarding water-damaged materials, protocols for mitigating water intrusion into completed Work, and replacing water-damaged Work.
iii. Indicate sequencing of work that requires water, such as sprayed fire-resistive mate-rials, plastering, and terrazzo grinding, and describe plans for dealing with water from these operations. Show procedures for verifying that wet construction has dried suffi-ciently to permit installation of finish materials.
d. Dust and HVAC Control Plan: Submit coordination drawing and narrative that indicates the dust and HVAC control measures proposed for use, proposed locations, and proposed time frame for their operation. Identify further options if proposed measures are later determined to be inadequate. Include the following:
i. Locations of dust-control partitions at each phase of work.
ii. HVAC system isolation schematic drawing.
iii. Location of proposed air-filtration system discharge.
iv. Waste handling procedures.
v. Other dust-control measures.
e. Maintenance Records: For each facility, systems or equipment utilized during the construc-tion period, up to the date of Substantial Completion, provide the maintenance records for that facility, system or equipment.
f. Contractor’s Safety Program:
i. Submit Contractor’s Job Safety Program
1. Describe procedures and controls to prevent and/or minimize exposure to potentially hazardous work environments and activities facing Government employees and contractors who maintain our facilities and property.
g. Security Enclosure and Lockup:
i. Submit the name of the person responsible for locking and securing the construction area when the Contractor is not on site.
7. QUALITY ASSURANCE
a. Electric Service: Comply with NECA, NEMA, and UL standards and regulations for temporary electric service. Install service to comply with NFPA 70.
b. Tests and Inspections: Arrange for authorities having jurisdiction to test and inspect each temporary utility before use. Obtain required certifications and permits.
c. Accessible Temporary Egress: Comply with applicable provisions in the U.S. Architectural & Transportation Barriers Compliance Board's ADA-ABA Accessibility Guidelines and ICC/ANSI A117.1.
8. PROJECT CONDITIONS
a. Temporary Use of Permanent Facilities, Systems and Equipment: Engage Installer of each permanent service to assume responsibility for operation, maintenance, and protection of each permanent service during its use as a construction facility before Owner's acceptance, 01 50 00 - 3 Temporary Facilities and Controls regardless of previously assigned responsibilities. The service may be existing to remain, or a new service installed by the Contractor. If the service is utilized by the Contractor temporarily for construction Maintenance is required to be performed according to the Operations and Maintenance manual for each specific facility, system or equipment.
1. MATERIALS
a. Chain-Link Fencing: Minimum 2-inch (50-mm), 0.148-inch- (3.8-mm-) thick, galvanized-steel, chain-link fabric fencing; minimum 6 feet (1.8 m) high with galvanized-steel pipe posts; mini-mum 2-3/8-inch- (60-mm-) OD line posts and 2-7/8-inch- (73-mm-) OD corner and pull posts.
b. Polyethylene Sheet: Reinforced, fire-resistive sheet, 10-mil (0.25-mm) minimum thickness, with flame-spread rating of 15 or less per ASTM E 84 and passing NFPA 701 Test Method 2.
c. Dust-Control Adhesive-Surface Walk-off Mats: Provide mats minimum 36 by 60 inches (914 by 1624 mm).
d. Insulation: Unfaced mineral-fiber blanket, manufactured from glass, slag wool, or rock wool;
with maximum flame-spread and smoke-developed indexes of 25 and 50, respectively.
2. TEMPORARY FACILITIES (as applicable to the length of the Work)
a. Field Offices, General:
i. Unless noted otherwise, prefabricated or mobile units with serviceable finishes, tem-perature controls, and foundations adequate for normal loading.
b. Common-Use Field Office: Of sufficient size to accommodate needs of Owner, Architect, Construction Manager, and construction personnel office activities and to accommodate Pro-ject meetings specified in other Division 01 Sections. Keep office clean and orderly. Furnish and equip offices as follows:
i. Furniture required for Project-site documents including file cabinets, plan tables, plan racks, and bookcases.
ii. Conference room of sufficient size to accommodate meetings of ten individuals. Pro-vide electrical power service and 120-V ac duplex receptacles, with no fewer than one receptacle on each wall. Furnish room with conference table, chairs, and 4-foot- (1.2-m-) square tack and marker boards.
iii. Drinking water and private toilet.
iv. Coffee machine and supplies.
v. Heating and cooling equipment necessary to maintain a uniform indoor temperature of 68 to 72 deg F (20 to 22 deg C).
vi. Lighting fixtures capable of maintaining average illumination of 20 fc (215 lx) at desk height.
c. Storage and Fabrication Sheds: Provide sheds sized, furnished, and equipped to accommo-date materials and equipment for construction operations.
i. Store combustible materials apart from building.
3. EQUIPMENT
01 50 00 - 4 Temporary Facilities and Controls
a. Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by lo-cations and classes of fire exposures.
b. HVAC Equipment: Unless Owner authorizes use of permanent HVAC system, provide vent-ed, self-contained, liquid-propane-gas or fuel-oil heaters with individual space thermostatic control.
i. Use of gasoline-burning space heaters, open-flame heaters, or salamander-type heating units is prohibited.
ii. Heating Units: Listed and labeled for type of fuel being consumed, by a qualified test-ing agency acceptable to authorities having jurisdiction and marked for intended loca-tion and application.
iii. Permanent HVAC System: If Owner authorizes use of permanent HVAC system for temporary use during construction, provide filter with MERV of 8 at each return-air grille in system and remove at end of construction and clean HVAC system as re-quired in Section 017700 "Closeout Procedures".
c. Air-Filtration Units: Primary and secondary HEPA-filter-equipped portable units with four-stage filtration. Provide single switch for emergency shutoff. Configure to run continuously.
1. INSTALLATION, GENERAL
a. Locate facilities where they will serve Project adequately and result in minimum interference with performance of the Work. Relocate and modify facilities as required by progress of the Work.
i. Provide each facility ready for use when needed to avoid delay. Do not remove until facilities are no longer needed or are replaced by authorized use of completed per-manent facilities.
2. LOGISTICS PLAN
a. Contractor shall prepare a logistics plan, for Owner’s approval, which addresses and includes the following:
i. Continuous unrestricted emergency vehicle access and/or emergency exit access for building occupants, both within the building and on the site. Pedestrian exits from a building must be accessible and a hard surface at all times.
ii. The Contractor’s fence must allow emergency vehicle access to the surrounding buildings.
iii. Contractor shall stage removal and construction in a way that access will be always provided to other parts of the building if it is occupied and/or other buildings on cam-pus.
iv. The location and identification of temporary Utility Installations
v. The location and identification of Support Facilities. If temporary lighting is required for campus pedestrians, include plans, fixture cuts and light level calculations.
vi. The location, identification, and connection methodology for temporary Utility Installa-tions.
vii. Temporary Signage locations, size, and exact sign design, including text at each lo-cation.
viii. Protection of existing conditions to remain, including detailed methodology.
ix. Location of Construction Fencing, barriers, and gates
01 50 00 - 5 Temporary Facilities and Controls
3. TEMPORARY UTILITY INSTALLATION (as applicable to the Work)
a. General: Install temporary service or connect to existing service.
i. Arrange with utility company, Owner, and existing users for time when service can be interrupted, if necessary, to make connections for temporary services.
b. Sewers and Drainage: Provide temporary utilities to remove effluent lawfully.
c. Water Service: Install water service and distribution piping in sizes and pressures adequate for construction.
d. Water Service: Connect to Owner's existing water service facilities. Clean and maintain water service facilities in a condition acceptable to Owner. At Substantial Completion, restore these facilities to condition existing before initial use.
e. Sanitary Facilities: Provide temporary toilets, wash facilities, and drinking water for use of construction personnel. Comply with requirements of authorities having jurisdiction for type, number, location, operation, and maintenance of fixtures and facilities.
f. Heating and Cooling: Provide temporary heating and cooling required by construction activi-ties for curing or drying of completed installations or for protecting installed construction from adverse effects of low temperatures or high humidity. Select equipment that will not have a harmful effect on completed installations or elements being installed.
g. Isolation of Work Areas in Occupied Facilities: Prevent dust, fumes, and odors from entering occupied areas.
i. Prior to commencing work, isolate the HVAC system in area where work is to be per-formed according to coordination drawings.
1. Disconnect supply and return ductwork in work area from HVAC systems servicing occupied areas.
2. Maintain negative air pressure within work area using HEPA-equipped air-filtration units, starting with commencement of temporary partition construc-tion, and continuing until removal of temporary partitions is complete.
ii. Maintain dust partitions during the Work. Use vacuum collection attachments on dust-producing equipment. Isolate limited work within occupied areas using portable dust-containment devices.
iii. Perform daily construction cleanup and final cleanup using approved, HEPA-filter-equipped vacuum equipment.
h. Ventilation and Humidity Control: Provide temporary ventilation required by construction ac-tivities for curing or drying of completed installations or for protecting installed construction from adverse effects of high humidity. Select equipment that will not have a harmful effect on completed installations or elements being installed. Coordinate ventilation requirements to produce ambient condition required and minimize energy consumption.
i. Provide dehumidification systems when required to reduce substrate moisture levels to level required to allow installation or application of finishes.
01 50 00 - 6 Temporary Facilities and Controls
i. Electric Power Service: Connect to Owner's existing electric power service. Maintain equip-ment in a condition acceptable to Owner.
j. Electric Power Service: Provide electric power service and distribution system of sufficient size, capacity, and power characteristics required for construction operations.
i. Install electric power service overhead unless otherwise indicated.
ii. Connect temporary service to Owner's existing power source, as directed by Owner.
k. Lighting: Provide temporary lighting with local switching that provides adequate illumination for construction operations, observations, inspections, and traffic conditions.
i. Install and operate temporary lighting that fulfills security and protection requirements without operating entire system.
ii. Install lighting for Project identification sign.
l. Telephone Service: Provide temporary telephone service in common-use facilities for use by all construction personnel. Install one telephone line(s) for each field office.
i. Provide additional telephone lines for the following:
1. Provide a dedicated telephone line for each facsimile machine in each field office.
ii. At each telephone, post a list of important telephone numbers.
1. Police and fire departments.
2. Ambulance service.
3. Contractor's home office.
4. Contractor's emergency after-hours telephone number.
5. Architect's office.
6. Engineers' offices.
7. Owner's office.
8. Principal subcontractors' field and home offices.
iii. Provide superintendent with cellular telephone or portable two-way…