About this file
This is a Special Provisions document for colored surface treatment specifications applicable to the Somerville Union Square Transit Signal Priority Project in Massachusetts. The document establishes technical requirements and standards for colored surface treatments to be applied during the transit signal priority infrastructure project. The provisions detail material specifications, application procedures, and quality standards that contractors must follow when implementing colored surface treatments as part of the project scope. These special provisions serve as binding requirements that supplement the standard contract documents and ensure consistency and durability of surface treatments throughout the project.
The colored surface treatment provisions include detailed specifications for material composition, surface preparation, application methods, curing times, and inspection criteria. The provisions establish performance standards for color retention, wear resistance, and adhesion to ensure the longevity and safety of the treated surfaces. Contractors are required to comply with all specified standards and submit documentation verifying material quality and application procedures. These provisions are integral to the overall project specifications and serve to protect the integrity of the transit signal priority infrastructure improvements while ensuring public safety and visual clarity of designated transit signal priority areas.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
XXXXX COLORED SURFACE TREATMENT (CST) FOR PAVEMENT
2025 02890 - 1 6/30/25
SECTION 02890
863.1 COLORED SURFACE TREATMENT (CST) FOR PAVEMENT
PART 1 – GENERAL
1.1 DESCRIPTION OF WORK
A. Under this work, the Contractor shall furnish and apply Colored Surface Treatment (CST) for pavement at the location and in accordance with patterns as shown on the Plans or as ordered by the Engineer and in conformance with these specifications.\
B. The CST shall be capable of application on new and existing asphalt and Portland cement concrete surfaces, and shall:
1. Be VOC (Volatile Organic Compounds) compliant and lead chromate free.
2. Not contain 0.1% or more of any chemical listed by the International Agency for Research on
Cancer (IARC), the National Toxicology Program (NTP), or regulated by the US Occupational
Safety and Health Administration (OSHA) as a carcinogen.
3. Conform to current Federal, State and Local air pollution regulations, including those for the control (emission) of VOC.
4. Be packaged and stored in accordance with the manufacturer’s instructions and requirements for shelf life and storage conditions in original unopened containers. Shipping documents and containers shall have identification numbers or batch dates for confirmation of when products were manufactured, clearly labeled as to the type material and the ratio of the components to be mixed by volume as well as showing resin or hardener components, brand name, name of manufacturer, lot or batch number, temperature range for storage, expiration date and the quantity contained. Include any special instructions regarding mixing and the Material Safety
Data Sheets. This information shall be made available for inspection at any time.
5. Be colored red for bus lanes as shown on the Plans. Colors for each work type shall be approved by the Engineer prior to the material purchase by the Contractor. Friction aggregate shall include only calcined bauxite, corundum, or alternate equal anti‐skid aggregate approved by the Engineer. Aggregate used shall have a minimum hardness value of 8.0 per Mohs Hardness
Scale and be uniformly applied – providing a surface friction value >60 BPN over the entire surface.
6. Friction aggregate size shall be between 0.8‐1.2mm for bicycle facilities and 1.0‐3.0mm for bus facilities and walking facilities.
PART 2 – PRODUCTS
2.1 MATERIALS
A. Only products with a Manufacturer’s certification that the product meets the requirements of this specification, or a Product approved equal as determined by the Engineer, are deemed acceptable for use. All materials shall be pre‐approved by Engineer prior to purchase.
2025 02890 - 2 6/30/25
B. The acceptable manufacturers and products and/or an equal manufactured product for item 863.1 are as follows.
1. Transpo Industries, Inc.
Color-Safe®
Methyl-Methacrylate (MMA)
Description: Color-Safe® is your solution for long lasting bike paths, bus lanes, crosswalks, and pedestrian areas. It is an MMA based material that outperforms paint and epoxies in color retention and durability. Color-Safe® is available in standard and custom PMS colors and capable of full cure in a wide range of temperatures.
Contact: Michael S. Stenko (Mstenko@transpo.com), (914) 636-1000
20 Jones Street, New Rochelle, NY 10801 http://www.transpo.com/color-safe/index.html
2. Epoplex
Safe‐T‐Grip
1000 East Park Avenue, Maple Shade, NJ 08052
800‐822‐6920 http://www.epoplex.com
3. Ruby Lake
High Friction Surface Treatment
493 State Route 28, Richfield Springs, NY 13439
914‐523‐3766 http://rubylakeglass.com
4. Stirling Lloyd
Safetrack SC
Rockwell Road, Building A., Newington, CT 06111
860‐666‐5008 http://www.northamerica.stirlinglloyd.com
5. Pavement Surface Coatings, LLC
Endurablend
81 Ball Road, Mountain Lakes, NJ 07046
866‐215‐6120 http://www.Pavementsurfacecoatings.com
PART 3 - EXECUTION
3.1 GENERAL
mailto:Mstenko@transpo.com http://www.transpo.com/color-safe/index.html http://www.epoplex.com/ http://rubylakeglass.com/ http://www.northamerica.stirlinglloyd.com/ http://www.pavementsurfacecoatings.com/
2025 02890 - 3 6/30/25
A. CST shall be placed as shown on the Plans or as ordered by the Engineer.
B. Before any surface treatment work is begun, a schedule of operations shall be submitted for the approval of the Engineer and his/her authorized representative. At least five (5) days prior to starting application, the Contractor shall provide the Engineer with the color manufacturer's written instructions for use and provide Inspectors access to aggregate for random testing. These instructions shall include, but not be limited to, material mixing ratios and application temperatures.
C. When CST is applied under traffic, the Contractor shall provide all necessary flags, markers, signs, etc. in accordance with the MUTCD to maintain and protect traffic, and to protect marking operations and the markings until thoroughly set.
D. The Contractor shall be responsible for removing, to the satisfaction of the Engineer, all tracking marks and spilled CST applied in unauthorized areas such as utilities, drainage structures, curbs and manhole covers.
3.2 ATMOSPHERIC CONDITIONS
A. CST shall only be applied during conditions of dry weather and on dry pavement surfaces. At the time of installation the pavement surface temperature shall be at or above manufacturer recommendations.
3.3 SURFACE PREPARATION
A. The Contractor shall clean the pavement and existing durable markings to the satisfaction of the
Engineer. At the time of application, all pavement surfaces and existing durable markings shall be free of oil, dirt, dust, grease and similar foreign materials.
3.4 APPLICATION
A. Per manufacturer’s instructions. No CST product shall be spray‐applied without prior written approval from the Engineer.
B. CST shall be placed at the width, thickness, and pattern designated by the Contract Documents.
Surface treatment operations shall not begin until applicable surface preparation work is completed and approved by the Engineer, and the atmospheric conditions and pavement surface temperature are acceptable to the Engineer. The applied film thickness shall be as per manufacturer recommendations
3.5 DEFECTIVE RESULTS
A. The Contractor shall repair the CST if after application and curing it is determined by the Engineer to be defective and not in conformance with this specification. Repair of defective CST shall be the responsibility of the Contractor and shall be performed to the satisfaction of the Engineer as follows:
1. Insufficient film thickness: Repair Method: Clean and prepare the surface of the CST to the satisfaction of the Engineer. Repair shall be made by reapplying CST over the cleaned surface in accordance with the requirements of this specification at the full thickness.
2. Uncured or discolored CST and/or insufficient bond (to pavement surface or existing durable marking): Repair Method: The defective CST shall be completely removed and cleaned to the underlying pavement surface to the satisfaction of the Engineer. After surface preparation work is complete, repair shall be made by reapplying color over the cleaned pavement surface in accordance with the requirements of this specification.
2025 02890 - 4 6/30/25
3. Insufficient coefficient of friction as determined by the Engineer: Repair Method: The defective
CST shall be removed and cleaned to the underlying pavement surface or re‐coated with CST and friction aggregate using a repair method approved by the Engineer. After surface preparation work is complete, repair shall be made by reapplying color over the cleaned pavement surface in accordance with the requirements of this specification.
B. Other defects not noted above, but determined by the Engineer to need repair, shall be repaired or replaced as directed by and to the satisfaction of the Engineer. All work in conjunction with the repair or replacement of defective color shall be performed at the Contractor’s expense.
3.6 PERSONAL PROTECTIVE EQUIPMENT
A. Follow all exposure, respiratory and personal protective equipment controls, handling and safety precautions and spill and disposal procedures as identified by safety data sheets (SDS), labels and other manufacturer’s recommendations for the products used.
3.7 WORK ZONE TRAFFIC CONTROL
A. The Contractor is responsible for ensuring appropriate Work Zone Traffic Control (WZTC) in compliance with the MUTCD appropriate for the dry and complete curing time of the selected material applied. The Contractor is responsible to ensure adequate WZTC to prevent those walking, skating, bicycling, and driving from coming into contact with applied material that is still capable of being tracked. The Contractor shall be liable for such tracking and any resulting property damage should it occur.
PART 4 - MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
A. This item will be measured for payment by the total square foot area of CST and shall be the actual number of square feet furnished and installed as directed and approved by the Engineer.
4.2 BASIS OF PAYMENT
A. Work under this item shall be paid for at the contract unit price per square foot of CST which shall be full compensation for all labor, materials, tools, equipment, testing and incidental items necessary to complete the described work to the satisfaction of the Engineer.
END OF SECTION