SPE603-19-R-0501_-_27Feb19.pdf

PDF 2 MB Posted

Attached to
SPE603-19-R-0501 Laughlin AFB Texas Federal contract opportunity
Solicitation number
SPE60319R0501
Issued by
Defense Logistics Agency Energy

About this file

SPE603-19-R-0501 Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to SPE603-19-R-0501 Laughlin AFB Texas, newest first.
File Type Posted
SF30_SPE60319R05010013.pdf PDF
Wage_Determination_2015-5303_Rev_12.pdf PDF
SF_30_Amendment_0012.pdf PDF
SF30.pdf PDF
Wage_Determination_WD15-5303_(Rev._11).pdf PDF
revised_B34.01.pdf PDF
SPE60319R0501_0010_14Jun19.pdf PDF
52.217-9_and_52.212-2.pdf PDF
B34.01.pdf PDF
SPE60319R0501_0009.pdf PDF
Laughlin_AFB_COCO_PWS_(13_June_2019).pdf PDF
Attachment_A.pdf PDF
SF30_0008.pdf PDF
SF30_SPE60319R05010007.pdf PDF
Laughlin_AFB_COCO_PWS_(10_May_2019).pdf PDF
Laughlin_Questions_and_Answers.pdf PDF
Laughlin_Preproposal_sign_in_sheet_Redacted.pdf PDF
SF_30_0006.pdf PDF
Air_Force-COCO_-_Lease_Outgrant_Template_May_2019.pdf PDF
SF30_SPE60319R05010005.pdf PDF
SF30_SPE60319R05010004.pdf PDF
SPE60319R0501.pdf PDF
SPE60319C0501_AMD_0002.pdf PDF
Attachment_A.pdf PDF
SPE60319C0501_0001.pdf PDF
Attach_I_PWS_1FEB2019.pdf PDF
Attachment_IV_PAST_PERFORMANCE_Consent_Form.pdf PDF
Attachment_V_-_E_QAPs.pdf PDF
Attachment_III_Ktr_Perf_Assessment_Qs.pdf PDF
Attachment_II_OSP_26FEB2019.pdf PDF
Attachment_VI_WAGE_DETERMINATION.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER

0076154173

2. CONTRACT NO. 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER

SPE603-19-R-0501

6. SOLICITATION ISSUE

DATE

2019 FEB 28

a. NAME

Dominique Vest DDV5662

b. TELEPHONE NUMBER (No Collect calls)

Phone: 571-767-8731

8. OFFER DUE DATE/

LOCAL TIME

2019 APR 19

9. ISSUED BY CODE SPE603

DLA ENERGY

BULK PETROLEUM SERVICES

8725 JOHN J. KINGMAN ROAD

FORT BELVOIR VA 22060

USA

10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

8 (A)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

NAICS: 493190

SIZE STANDARD:

11. DELIVERYFOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE 16. ADMINISTERED BY CODE

17a. CONTRACTOR/ CODE

OFFEROR

FACILITY

CODE

TELEPHONE NO.

18a. PAYMENT WILL BE MADE BY CODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

See Schedule

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF. OFFER

DATED . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or Print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or Print) 31c. DATE SIGNED

SEE SCHEDULE

7. FOR SOLICITATION

INFORMATION CALL:

SEE SCHEDULE

09:00 AM

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE ADDENDUM

EDWOSB

SPE603-19-R-0501

Laughlin AFB, TX (COCO)

ADDITIONAL INSTRUCTIONS FOR ALL PROSPECTIVE OFFERORS

Note: See FAR 52.212-1- INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS (OCT 2018) and Addendum and FAR 52.212-2- EVALUATION – COMMERCIAL ITEMS (OCT 2014) for complete instructions on how to submit a proposal.

A. Attached is Solicitation SPE603-19-R-0501 for the procurement of Contractor Owned Contractor Operated (COCO) retail fuel services at Laughlin AFB, Texas. In accordance with the attached Performance Work Statement (PWS), these services include fuel operations, management and administration pertaining to the receipt, storage and handling, and issue of DLA Energy fuel products.

B. The NAICS code is 493190 and the threshold is $27.5 million in annual receipts.

C. A pre-proposal conference will be scheduled for March 25, 2019. An amendment will be issued providing the date and time of the pre-proposal conference. (See provision L-0003 L198 PRE-PROPOSAL CONFERENCE (SERVICES) (DLA ENERGY JUL 2018) for details and directions). Interested parties planning to attend should submit names, phone numbers, e-mail address and company represented to Ms.

Dominique Vest via e-mail at Dominique.1.Vest@dla.mil no later than March 18, 2019. Technical questions should also be submitted NLT March 15, 2019 via e-mail and all response will be posted in an Amendment to the solicitation in https://www.fbo.gov/ (FedBizOpps).

D. FAXED PROPOSALS ARE NOT AUTHORIZED. Please e-mail your proposal to:

bidcustodian@dla.mil. All e-mail proposals MUST include three volumes as outlined below. Late proposals will be processed in accordance with FAR 15.208 – Submission, Modification, Revision, and Withdrawal of Proposals. When submitting a proposal via e-mail, please ensure it is sent within enough time in order for it to be processed through the server. Offerors’ proposals shall be prepared in three (3) separate volumes and provided in the quantities shown below:

Volume Title No. of Copies Required Page Limit I Technical Proposal 1 PDF electronic copy 70 II Offeror Submission

Package (OSP) includes Price Proposal

1 PDF electronic copy of OFFEROR

SUBMISSION PACKAGE

None

III Past Performance 1 PDF electronic copy None

Note: The Offeror must submit one (1) submission of the technical proposal. The first 50 pages will address the PWS and 20 additional pages will address Laughlin AFB, TX PWS in Appendix A that details the site specific requirements for a maximum total of 70 pages for submission.

For Verification of Receipt: Contact Dominique Vest at Dominique.1.Vest@dla.mil (571) 767-8731.

Complete and return the PDF electronic copy of the Offeror Submission Package and the PDF electronic copy of the Technical Proposal submissions as described in 52.212-1 INSTRUCTIONS TO OFFERS – COMMERCIAL ITEMS (OCT 2018) with Addendum (JAN 2017). Your prices must be inserted in Clause B-0001 B34.01 SERVICES TO BE FURNISHED (DLA ENERGY FEB 1991) in the Offeror Submission Package.

E. Any exceptions to any part of this solicitation must be specifically identified in a cover letter to your proposal.

F. The Government intends to evaluate proposals, hold discussions with offerors, and award a contract.

This procurement will use Source Selection Procedures using the Lowest Price Technically Acceptable mailto:Careka.Squire@dla.mil https://www.fbo.gov/ mailto:bidcustodian@dla.mil mailto:Careka.Squire@dla.mil process in accordance with (IAW) FAR 15.101-2. See FAR 52.212-2 EVALUATION - COMMERCIAL ITEMS (Oct 2014) for evaluation factors. The resulting type of contract will be Firm-Fixed-Price.

G. NOTICE REGARDING SUSPENSIONS/DEBARMENT/INELIGIBILITY: Any contract awarded to a

Contractor who, at the time of award, was suspended, debarred, and ineligible for receipt of contract with Government Agencies or in receipt of a notice of proposed debarment from any Government Agency, is voidable at the option of the Government.

H. Care should be taken to mail correspondence relating to this solicitation or resulting contract to the appropriate office as indicated in the applicable clauses.

I. Tax Exempt Number: For the Defense Logistics Agency- Energy is: 31-4420477.

J. Department of Labor Wage Determination: The minimum wage rates and fringe benefits applicable to the period of performance are contained in the following Wage Determination (See Attachment VI).

Location: Laughlin AFB, TX Wage Determination: 2015-5303 Revision: 10

K. Pricing of Services:

1. The prices submitted must be inclusive of all direct costs, indirect costs, and profit. Offerors

MUST include ALL cost associated with providing the services described herein.

2. The Government SHALL NOT be responsible for compensating the Contractor for any cost tied to solicitation requirements but not factored into the proposed prices, either by the Contractor’s intention or by mistake.

TABLE OF CONTENTS

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS 9

B-0001 B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991) 9

SECTION C - SPECIFICATIONS/STATEMENT OF WORK

THE PERFORMANCE WORK STATEMENT IS HEREBY INCORPORATED BY REFERENCE (IBR) AS IF

FULLY SET FORTH HEREIN. SEE ATTACHMENT I

PWS PERFORMANCE WORK STATEMENT Attach I

C-0001 C19.01 SECURITY AND FIRE PROTECTION (DLA ENERGY AUG 1988) 11

C-0002 C19.04 REMOVAL OF WATER BOTTOMS (DLA ENERGY FEB 1998) 11

C-0003 C19.07 SAMPLING AND TESTING OF PETROLEUM PRODUCTS (STORAGE) (DLA

ENERGY JAN 2012)

SECTION E - INSPECTION AND ACCEPTANCE

THE QUALITY ASSURANCE PROVISIONS (QAP) PROVISIONS LISTED IN THIS SECTION ARE HEREBY

INCORPORATED IN FULL TEXT UNDER ATTACHMENT V OF THIS SOLICITATION

52.246-4 INSPECTION OF SERVICES- FIXED PRICE (AUG 1996) (IBR) 12

E-0001 ENERGY QAP E1.01 CONTRACTOR RESPONSIBILITY FOR GOVERNMENT INSPECTION

OF SERVICES (DLA ENERGY JAN 2012)

Attach

V E-0002 ENERGY QAP E1.11 QUALITY CONTROL PLAN (DLA ENERGY MAR 2000) Attach

V

E-0003 ENERGY QAP E18 INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE

TANKS (DLA ENERGY APR 2016)

Attach

V

E-0004 ENERGY QAP E22 LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS

(DLA ENERGY APR 2016)

Attach

V

E-0005 ENERGY QAP E28 CONTRACTOR INSPECTION RESPONSIBILITIES (STORAGE) (DLA

ENERGY DEC 2011)

Attach

V E-0006 ENERGY QAP E34 TEST FOR SULFIDES IN WATER (DLA ENERGY MAY 1987) Attach

V

E-0007 ENERGY QAP E35 NONCONFORMING SUPPLIES AND SERVICES (DLA ENERGY DEC

2011) Attach

V E-0008 ENERGY QAP E36 INSPECTION (STORAGE) (DLA ENERGY FEB 1970) Attach

V

SECTION F- DELIVERIES OR PERFORMANCE 13

52.242-15 STOP-WORK ORDER (AUG 1989) 13

F-0001 F1.04 GENERAL RECEIVING AND STORING CONDITIONS (DLA ENERGY DEC 2017) 14

F-0002 F1.05 GENERAL SHIPPING CONDITIONS (DLA ENERGY OCT 1997) 17

F-0003 F1.11 DLA INTERNET BID BOARD SYSTEM (DIBBS) (DLA ENERGY APR 2014) 20

F-0004 F1.14 DETERMINATION OF QUANTITY (STORAGE) (DLA ENERGY NOV 1997) 21

F-0005 F76 CONTRACT PERIOD/PERFORMANCE REQUIREMENTS (STORAGE) (DLA ENERGY

DEC 1991)

SECTION G - CONTRACT ADMINISTRATION DATA 23

252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (JUN

2012)

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEVIATION) (MAY 2013) 24

G-0001 G3 INVOICE NUMBERING REQUIREMENTS (DLA ENERGY AUG 1998) 26

G-0002 G9.06 ADDRESS TO WHICH REMITTANCE SHOULD BE MAILED (DLA ENERGY JAN

2017)

G-0003 G21 DESIGNATION OF PROPERTY ADMINISTRATOR (DLA ENERGY MAY 2009) 27

G-0004 G22 DESIGNATION OF THE DEFENSE FUEL REGION (DLA ENERGY JUL 1997) 27

SECTION H - SPECIAL CONTRACT REQUIREMENTS 27

H-0001 H11 GUARD SERVICE (DLA ENERGY MAR 1982) 27

H-0002 H19 REPORTING AND CONTAINING OIL SPILLS (DOMESTIC STORAGE) (DLA ENERGY

JAN 2012)

H-0003 H51.03 INSURANCE REQUIREMENTS FOR CONTRACTORS AND SUBCONTRACTORS

(DLA ENERGY JAN 2012)

SECTION I - CONTRACT CLAUSES 29

52.202-1 DEFINITIONS (NOV 2013) 29

52.203-3 GRATUITIES (APR 1984) 29

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS

(OCT 2010)

52.203.19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS

OR STATEMENTS (JAN 2017)

52.204-4 PRINTED OR COPIED DOUBLE SIDED ON POSTCONSUMER FIBER CONTENT PAPER

(MAY 2011)

52.204-9 PERSONAL IDENTIFY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011) 35

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS

(OCT 2018)

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018) 38

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL 2016) 40

52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (JUN

2016)

52.204-22 ALTERNATIVE LINE ITEM PROPOSAL (JAN 2017) 43

52.209-6 PROTECTING THE GOVERNMENTS INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (OCT

2015)

52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY

MATTERS (OCT 2018)

52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS (NOV

2015)

52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS (OCT 2018) 46

Addendum 1 to 52.212-4

ADDENDUM TO FAR 52.212-4 CONTRACT TERMS AND CONDITIONS- COMMERICAL

ITEMS (OCT 2018) REFERENCES 52.243-1 CHANGES-FIXED PRICE (AUG 1987)

ALTERNATE II (APR 1984)

Addendum 2 to 52.212-4

ADDENDUM 2 TO FAR 52.212-4 CONTRACT TERMS AND CONDITIONS –

COMMERCIAL ITEMS (OCT 2018) REFERENCES 52.215-8 ORDER OF PRECEDENCE

UNIFORM CONTRACT FORMAT (OCT 1997)

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR

EXECUTIVE ORDERS – COMMERCIAL ITEMS (OCT 2018)

52.217-8 OPTION TO EXTEND SERVICES (NOV 1999) 60

52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) 60

52.219-4 NOTICE OF PRICE EVALUATION FOR HUBZONE SMALL BUSINESS CONCERNS (OCT

2014)

52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2018) 62

52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (AUG 2018) 64

52.219-16 LIQUIDATED DAMAGES – SUBCONTRACTING PLAN (JAN 1999) 74

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013) 75

52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES. (FEB 1997) 76

52.222-3 CONVICT LABOR (JUN 2003) 76

52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015) 77

52.222-26 EQUAL OPPORTUNITY (SEP 2016) 77

52.222-41 SERVICE CONTRACT LABOR STANDARDS (AUG 2018) 80

52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014) 86

52.222-43 FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT LABOR STANDS – PRICE

ADJUSTMENT (MULTIPLE YEAR AND OPTIONS CONTRACTS) (AUG 2018)

52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015) 88

52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (DEC 2015) 94

52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (JAN 2017) 98

52.223-10 WASTE REDUCTION PROGRAM (MAY 2011) 103

52.223-18 ENCOURAGING CONTRACTING POLICIES TO BAN TEXT MESSAGING WHILE

DRIVING (AUG 2011)

52.223-19 COMPLIANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEMS (MAY 2011) 104

52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008) 105

52.227-1 AUTHORIZATION AND CONSENT (DEC 2007) 105

52.228-5 INSURANCE – WORK ON A GOVERNMENT INSTALLATION (JAN 1997) 105

52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013) 106

52.232-17 INTEREST (MAY 2014) 107

52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR AWARD

MANAGEMENT (OCT 2018)

52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013) 110

52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS

(DEC 2013)

52.233-1 DISPUTES (MAY 2014) 110

52.233-3 PROTEST AFTER AWARD (AUG 1996) 112

52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004) 113

52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND VEGETATION (APR

1984)

52.237-3 CONTINUITY OF SERVICES (JAN 1991) 113

52.242-13 BANKRUPTCY (JUL 1995) 113

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) 114

52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984) 114

52.253-1 COMPUTER GENERATED FORMS (JAN 1991) 114

252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991) 114

252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP

2011)

252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (SEP 2013) 115

252.203-7003 AGENCY OFFICE OF THE INSPECTOR GENERAL (DEC 2012) 115

252.204-7000 DISCLOSURE OF INFORMATION (OCT 2016) 116

252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992) 116

252.204-7012 SAFEGUARDING COVERED DEFENSE INFRMATION AND CYBER INCIDENT

REPORTING (OCT 2016)

252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION SUPPORT

(MAY 2016)

252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS (DEC 1991) 121

252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE

GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM (OCT

2015)

252.219-7003 SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS) – BASIC (APR 2018) 122

252.223-7006 PROHIBITION ON STORAGE AND DISPOSAL OF TOXIC AND HAZARDOUS

MATERIALS (SEP 2014)

252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (DEC 2017) 123

252.226-7001 UTILIZATION OF INDIAN ORGANIZATIONS, INDIAN-OWNED ECONOMIC

ENTERPRISES, AND NATIVE HAWAIIN SMALL BUSINESS CONCERNS (SEP 2004)

252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006) 128

252.237-7010 PROHIBITION ON INTERROGATION OF DETAINEES BY CONTRACTOR PERSONNEL

(JUN 2013)

252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991) 129

252.243-7002 REQUEST FOR EQUITABLE ADJUSTMENT (DEC 2012) 129

252.244-7000 SUBCONTRACTS FOR COMMERCIAL ITEMS (DOD CONTRACTS) (JUN 2013) 130

252.246-7004 SAFETY OF FACILITIES, INFRASTRUCTURE, AND EQUIPMENT FOR MILITARY

OPERATIONS (OCT 2010)

252.247-7023 TRANSPORATION OF SUPPLIES BY SEA (APR 2014) 131

252.247-7024 NOTIFICATION OF TRANSPORTATION OF SUPPLIES BY SEA (MAR 2000) 134

52.204-9000 CONTRACTOR PERSONNEL SECURITY REQUIREMENTS (JUL 2015) 134

52.233-9001 DISPUTES AGREEMENT TO USE ALTERNATIVE DISPUTE RESOLUTION (ADR) (DEC

2016)

I-0001 I1.01-4 DEFINITIONS (CONT’D) (STORAGE) (DLA ENERGY JUN 2009) 138

I-0002 I11.01-2 ADMINISTRATIVE COST OF TERMINATION FOR CAUSE – COMMERCIAL

ITEMS (DLA ENERGY FEB 1996)

I-0003 I102.02 FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT ACT – PAYROLL

TAX ADJUSTMENT (DLA ENERGY JAN 2012)

I-0004 I116 RESPONSIBILITY FOR GOVERNMENT-OWNED PETROLEUM PRODUCTS (DLA

ENERGY JAN 2012)

I-0005 I119.04 INVENTORY CONTROL RECORDS AND SYSTEMS OF RECORD (DLA ENERGY

AUG 2017)

I-0006 I147 DEMURRAGE (DLA ENERGY NOV 1989) 147

I-0007 I180.02 ENVIRONMENTAL PROTECTION (STORAGE) (DLA ENERGY JAN 2012) 147

I-0008 I291 CONTRACTOR PUBLIC KEY INFRASTRUCTURE (PKI) IMPLEMENTATION (SEP

2009)

SECTION J - ATTACHMENTS 148

PERFORMANCE WORK STATEMENT (PWS) Attach

I OFFEROR SUBMISSION PACKAGE (OSP) Attach

II

CONTRACT PERFORMANCE ASSESSMENT FORM Attach

III

PAST PERFORMANCE INFORMATION DISCLOSURE CONSENT FORM Attach

IV

DLA ENERGY QUALITY ASSURANCE PROVISIONS (E QAPS) Attach

V DEPARTMENT OF LABOR WAGE DETERMINATION Attach

VI

SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS OR

RESPONDENTS

52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985) 149

52.203-11 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE

CERTAIN FEDERAL TRANSACTIONS (SEP 2007)

52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (JUL 2016) 150

52.204-17 OWNERSHIP OR CONTROL OF OFFEROR (JUL 2016) 151

52.204-20 PREDECESSOR OF OFFEROR (JUL 2016) 152

52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) 153

52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY

OR A FELONY CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)

52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS -- COMMERCIAL ITEMS (OCT

2018) ALTERNATE I (OCT 2014)

52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (OCT 2014), ALTERNATE I (SEP

2015)

52.222-56 CERTIFICATION REGARDING TRAFFICKING IN PERSONS COMPLIANCE PLAN (MAR

2015)

52.225-25 PROHIBITION ON CONTRACTING WITH ENTITIES ENGAGING IN CERTAIN

ACTIVITIES OR TRANSACTIONS RELATING TO IRAN-REPRESENTATION AND

CERTIFICATION (AUG 2018)

52.223-1 BIOBASED PRODUCT CERTIFICATION (MAY 2012) 177

252.203-7005 REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD OFFICIALS

(NOV 2011)

252.225-7031 SECONDARY ARAB BOYCOTT OF ISRAEL (JUN 2005) 177

252.247-7022 REPRESENTATION OF EXTENT OF TRANSPORTATION BY SEA (AUG 1992) 178

K-0001 K15 RELEASE OF PRICES (DLA ENERGY MAR 2009) 178

K-0002 K33.01 AUTHORIZED NEGOTIATORS (DLA ENERGY APR 2007) 178

K-0003 K150 WIDE AREA WORKFLOW (DLA ENERGY MAY 2014) 178

SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS 179

52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018) 179

52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS (OCT 2018) 180

Addendum to 52.212-1

ADDENDUM TO 52.212-1 – INSTRUCTIONS TO OFFERS – COMMERCIAL ITEMS (OCT

2018)

52.216-1 TYPE OF CONTRACT (APR 1984) 189

52.222-24 PREAWARD ON-SITE EQUAL OPPORTUNITY COMPLIANCE EVALUATION (FEB 1999) 189

52.233-2 SERVICE OF PROTEST (SEP 2006) 189

52.237-1 SITE VISIT (APR 1984) 189

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) 189

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984) 189

52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984) 190

252.204-7008 COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION CONTROLS

(OCT 2016)

252.215-7008 ONLY ONE OFFER (OCT 2013) 190

L-0001 L1.02 PROPOSAL ACCEPTANCE PERIOD (DLA ENERGY NOV 1991) 192

L-0002 L2.11-4 EMAIL PROPOSALS (DLA ENERGY OCT 2010) 192

L-0003 L82 WAGE DETERMINATION (DLA ENERGY FEB 2009) 193

L-0004 L198 PREPROPOSAL CONFERENCE (SERVICES) (DLA ENERGY JUL 2018) 193

SECTION M – EVALUATION FACTORS FOR AWARD 194

52.212-2 EVALUATION -- COMMERCIAL ITEMS (OCT 2014) 194

52.217-5 EVALUATION OF OPTIONS (JUL 1990) 200

M-0001 M7 SOCIOECONOMIC EVALUATION (DLA ENERGY FEB 2005) 200

M-0002 M43.01 EVALUATION OF OPTIONS (DLA ENERGY MAR 2009) 201

M-0003 M72 EVALUATION OF OFFERS (EXCEPTIONS/DEVIATIONS) (DLA ENERGY APR 1997) 201

SECTION B - SUPPLIES OR SERVICES AND PRICES OR COSTS

B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991)

The services to be furnished during the period specified herein and the unit prices are as follows:

The Contractor shall provide Contractor Owned Contractor Operated (COCO) retail/bulk fuel services for the receipt, storage, protection, and shipping of MOGAS and ULSD fuel services at Laughlin AFB, TX.

LINE ITEM 0001 (BASE): CONUS COCO Optimization of Fuel Facilities, V20000037: (FIRM-FIXED PRICE)

The Contractor shall provide Contractor Owned Contractor Operated (COCO) retail/bulk fuel services in accordance with the Performance Work Statement and all other terms and conditions set forth herein for the period 1200 hours July 01, 2020 through 1200 hours June 30, 2024.

PLACE OF PERFORMANCE: Laughlin AFB, Texas

The offered price per month for performing these services at the location(s) above is $____________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE TOTAL

0001 M1NA 48 Months $____________ $______________ (July 01, 2020 through June 30, 2024)

LINE ITEM 0002 (OPTION 1): CONUS COCO Optimization of Fuel Facilities, V20000037: (FIRM-FIXED

PRICE)

The Contractor shall provide Contractor Owned Contractor Operated (COCO) retail/bulk fuel services in accordance with the Performance Work Statement and all other terms and conditions set forth herein for the period 1200 hours July 01, 2024 through 1200 hours June 30, 2029.

PLACE OF PERFORMANCE: Laughlin AFB, Texas

The offered price per month for performing these services at the location(s) above is $

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE TOTAL

0002 M1NA 60 Months $____________ $______________ (July 01, 2024 through June 30, 2029)

LINE ITEM 0003 (OPTION 2): CONUS COCO Optimization of Fuel Facilities, V20000037: (FIRM-FIXED

PRICE)

The Contractor shall provide Contractor Owned Contractor Operated (COCO) retail/bulk fuel services in accordance with the Performance Work Statement and all other terms and conditions set forth herein for the period 1200 hours July 01, 2029 through 1200 hours June 30, 2034.

PLACE OF PERFORMANCE: Laughlin AFB, Texas

The offered price per month for performing these services at the location(s) above is $

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE TOTAL

0003 M1NA 60 Months $____________ $______________ (July 01, 2029 through June 30, 2034)

LINE ITEM 0004 (OPTION 3): CONUS COCO Optimization of Fuel Facilities, V20000037: (FIRM-FIXED

PRICE)

The Contractor shall provide Contractor Owned Contractor Operated (COCO) retail/bulk fuel services in accordance with the Performance Work Statement and all other terms and conditions set forth herein for the period 1200 hours July 01, 2034 through 1200 hour June 30, 2039.

PLACE OF PERFORMANCE: Laughlin AFB, Texas

The offered price per month for performing these services at the location(s) above is $

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE TOTAL

0004 M1NA 60 Months $____________ $______________ (July 01, 2034 through June 30, 2039)

LINE ITEM 0005 (OPTION 4): CONUS COCO Optimization of Fuel Facilities, V20000037: (FIRM-FIXED

PRICE)

The Contractor shall provide Contractor Owned Contractor Operated (COCO) retail/bulk fuel services in accordance with the Performance Work Statement and all other terms and conditions set forth herein for the period 1200 hours July 01, 2039 through 1200 hours June 30, 2044.

PLACE OF PERFORMANCE: Laughlin AFB, Texas

The offered price per month for performing these services at the location(s) above is $

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE TOTAL

0005 M1NA 60 Months $____________ $______________ (July 01, 2039 through June 30, 2044)

LINE ITEM 0006 (OPTION 5): CONUS COCO Optimization of Fuel Facilities, V20000037: (FIRM-FIXED

PRICE)

The Contractor shall provide Contractor Owned Contractor Operated (COCO) retail/bulk fuel services in accordance with the Performance Work Statement and all other terms and conditions set forth herein for the period 1200 hours July 01, 2044 through 1200 hours June 31, 2048.

PLACE OF PERFORMANCE: Laughlin AFB, Texas

The offered price per month for performing these services at the location(s) above is $

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE TOTAL

0006 M1NA 48 Months $____________ $______________ (July 01, 2044 through June 30, 2048)

All General and Administrative (G&A) expenses and profit will be included in the monthly price for base and option periods.

SECTION C - SPECIFICATIONS/Statement of work

The Performance Work Statement is hereby incorporated by reference if fully set forth herein. See Attachment I.

C-0001 C19.01 SECURITY AND FIRE PROTECTION (DLA ENERGY AUG 1988)

(a) The entire facility shall be enclosed by a fence suitable to deter unauthorized access. The fence shall be fitted with gates that may be padlocked when not in use.

(b) A method of visitor and entrance control will be in effect. A visitor register shall be maintained.

(c) An internal, self-powered communication system linking all critical points of the facility, capable of serving both as an alarm system and for conduct of terminal operation, will be in use.

(d) A water supply and fire fighting equipment conforming to National Fire Protection Association and American Petroleum Institute standards will be maintained. At locations outside the United States, other standards may be used with prior approval of the Contracting Officer.

(e) In the event of an emergency at a CONUS COCO terminal, the Contractor shall seek the assistance of the following as appropriate: local ambulance service; local fire department; local, county, and State police; regional office of the Federal Bureau of Investigation; Secret Service; U.S. Marshal's Service; and the Federal Emergency Management Agency.

C-0002 C19.04 REMOVAL OF WATER BOTTOMS (DLA ENERGY FEB 1998)

Storage tanks for DLA Energy use shall be equipped with positive water sumps for removal of all water bottoms.

All storage tanks shall be drained of water a minimum of once each week and whenever storage tank gauging indicates water is present. (Weekly water drainage is necessary because the datum plate may not necessarily be the low point in the storage tank. Water could possibly accumulate below the datum plate and not show up in the gauging process.) Additionally, all storage tanks shall be drained of water prior to any transfer of fuel and after a minimum of 4 hours or maximum of 24 hours settling time following each product receipt. Storage tanks equipped with floating roofs shall be gauged for water after each rain and drained if water is found present. Product and water levels shall be gauged before and after the draining of water. Water gauges of each storage tank shall be taken and recorded each time it is gauged for product. (Each storage tank shall be equipped with a fuel/water separation system for collection of all product or water dispensed from its bottom water drain(s). This system shall have the capability to return separated product back into the same storage tank.)

C-0003 C19.07 SAMPLING AND TESTING OF PETROLEUM PRODUCTS (STORAGE) (DLA ENERGY

JAN 2012)

(a) SAMPLING. The samples identified in the solicitation attachment entitled MINIMUM REQUIREMENTS FOR STORAGE SAMPLING AND TESTING are a required part of the services to be provided. The Contractor must provide these samples using qualified personnel, facilities, and equipment on-site and shall include all associated costs in the monthly service charge. These on-site resources may be provided by Contractor personnel or by a commercial source acting on behalf of the Contractor. The Quality Representative will not be responsible for taking any samples for the Contractor. All samples must be taken in accordance with ASTM D 4057, Standard Practice for Manual Sampling of Petroleum and Petroleum Products (API Manual of Petroleum Measurement Standards (MPMS), Chapter 8.1).

(b) TESTING. The tests identified in this solicitation attachment entitled MINIMUM REQUIREMENTS FOR STORAGE SAMPLING AND TESTING are a required part of the services to be provided. Those tests identified in the attachment which are part of a higher order analysis (defined as follows: Composite Samples, Storage Tanks After Receipt, Interface Mixture, Dormant Stocks, and Individual Tests, including particulate contamination) shall be provided by the Contractor using one of the following options (the Contractor shall check the appropriate box below):

[ ] The Contractor will perform the tests using its own qualified personnel, facilities, and equipment. (All costs for this service are to be included in the monthly service charge.)

[ ] The Contractor will not perform the tests using its own personnel, but will provide on a seven days per week, 24 hours a day basis, it’s own facilities and equipment for testing of product by Government personnel. (All costs for this service are to be included in the monthly service charge.)

[ ] The Contractor will not provide its own personnel, facilities, or equipment. Instead, the Contractor will, within 24 hours after sampling, transport any sample(s) to a commercial laboratory approved by the Government and arrange for that commercial laboratory to perform all the required tests. The Government, at its own option, may direct that samples be tested at a Government laboratory under contract to the Government. In this case, transport of such samples is still the responsibility of the Contractor. (The Government will reimburse the Contractor for the actual costs of the tests performed by their commercial laboratory. All other associated costs must be included in the monthly service charge.)

All other tests found in the above referenced attachment, which are not part of a higher order analysis, shall be provided in accordance with the CONTRACTOR INSPECTION RESPONSIBILITIES (STORAGE) contract text.

(c) All facilities and equipment to be provided, whether that of a Contractor or a commercial laboratory, must conform to the standards for such facilities and equipment established by the Occupational Safety and Health Act and the National Fire Protection Association or local regulations, whichever is more stringent.

SECTION E – INSPECTION AND ACCEPTANCE

52.246-4 INSPECTION OF SERVICES -- FIXED-PRICE (AUG 1996)

(a) Definition. “Services,” as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.

(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.

(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.

(d) If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.

(e) If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may—

(1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and

(2) Reduce the contract price to reflect the reduced value of the services performed.

(f) If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may—

(1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service; or

(2) Terminate the contract for default.

THE QUALITY ASSURANCE PROVISIONS (QAP) LISTED IN THIS SECTION ARE HEREBY

INCORPORATED IN FULL TEXT UNDER ATTACHMENT V OF THIS SOLICITATION.

E-0001 ENERGY QAP E1.01 CONTRACTOR RESPONSIBILITY FOR GOVERNMENT INSPECTION

OF SERVICES (DLA ENERGY JAN 2012)

E-0002 ENERGY QAP E1.11-1 QUALITY CONTROL PLAN (GOCO) (AIR FORCE) (DLA ENERGY APR 2007)

E-0003 ENERGY QAP E18 INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS

(DLA ENERGY APR 2016)

E-0004 ENERGY QAP E22 LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS (DLA

ENERGY APR 2016)

E-0005 ENERGY QAP E28 CONTRACTOR INSPECTION RESPONSIBILITIES (STORAGE) (DLA

ENERGY DEC 2011)

E-0006 ENERGY QAP E34 TEST FOR SULFIDES IN WATER (DLA ENERGY MAY 1987)

E-0007 ENERGY QAP E35 NONCONFORMING SUPPLIES AND SERVICES (DLA ENERGY DEC 2011)

E-0008 ENERGY QAP E36 INSPECTION (STORAGE) (DLA ENERGY FEB 1970)

SECTION F - DELIVERIES OR PERFORMANCE

52.242-15 STOP-WORK ORDER (AUG 1989)

(a) The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Within a period of 90 days after a stop-work is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the Contracting Officer shall either—

(1) Cancel the stop-work order; or

(2) Terminate the work covered by the order as provided in the Default, or the Termination for Convenience of the Government, clause of this contract.

(b) If a stop-work order issued under this clause is canceled or the period of the order or any extension thereof expires, the Contractor shall resume work. The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if—

(1) The stop-work order results in an increase in the time required for, or in the Contractor’s cost properly allocable to, the performance of any part of this contract; and

(2) The Contractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage; provided, that, if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon the claim submitted at any time before final payment under this contract.

(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.

(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.

F-0001 F1.04 GENERAL RECEIVING AND STORING CONDITIONS (DLA ENERGY DEC 2017)

(a) Notice will be furnished to the Contractor of upcoming product receipts. The notice will include the method of receipt, the source, grade, or type of product, and any special instructions.

(b) The Contractor shall transfer and store each grade of product in a manner that preserves the quality of the product and will prevent contamination. The responsibility for preventing contamination rests with the Contractor.

(c) When requested, the Contractor will transfer product between tanks to consolidate like types or grades.

(d) Whenever a product is to be removed from a tank to accomplish cleaning or repair of the tank, or to change product, or to effect the release of the tank to the Contractor, the Contractor shall strip such tank to preclude loss of recoverable fuel. The Contractor shall provide the Quality Assurance Representative (QAR) with information pertaining to the amount of fuel deemed unrecoverable, the reason why the fuel cannot be recovered, and an analysis of the unrecovered fuel quality. All unrecoverable tank bottoms/line fill quantities will be reported to the Property Administrator for disposition instructions. Contaminated/off-specification product will be reported to the QAR in order to obtain disposition instructions. Tanks out of service for repair shall be removed from revenue until such time as they are returned to Government Service. Tanks out of service for cleaning shall be governed by the INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS contract provision.

(e) Custody of product received by pipeline, and risk of loss thereof, shall pass from the carrier to the Contractor when the product passes the flange connecting the carrier's pipeline and the Contractor's pipeline.

(f) Custody of product received by transport truck, and risk of loss thereof, shall pass from the carrier to the Contractor when the product passes from the transport truck discharge hoses into the Contractor's receiving facilities.

(g) Custody of product received by tank car, and risk of loss thereof, shall pass from the carrier to the Contractor when the tank car comes to rest on the Contractor's siding.

(h) Custody of product received from tanker or barge, and risk of loss thereof, shall pass from the carrier to the Contractor when the fuel passes the vessel’s permanent hose connection.

(i) The Contractor shall be held accountable for demurrage charges arising from delay(s) in receipt by tank cars or transport trucks, except when the delay(s) are caused by reason beyond the control and without the fault or negligence of the Contractor and its subcontractors.

(j) The Contractor will prepare and process the following certificate on bond paper when it is necessary to upgrade or downgrade a product:

I certify that ______________ gallons of _____________________ have been upgraded/downgraded

(quantity) (product) from ___________________ to ____________________. This action was required because

(product) (product)

(enter reason for the action)

Signature of Contractor Representative

[ ] I concur with the Contractor’s certification.

[ ] I do not concur with the Contractor’s certification for the following reasons:

Signature of Quality Representative

(A receipt transaction will be reflected on the monthly stock report for the gain in product, with a shipment being reflected for the losing product.)

(k) The following subparagraphs apply only to barges and tankers.

(1) SCHEDULED ARRIVAL DATE AND BASIC ALLOWED LAYTIME.

(i) The Contractor shall be notified in advance of the scheduled arrival date. Each notice will specify the quantity to be delivered, the cargo number, the name of the vessel, and the scheduled arrival date. For tankers, the notice will also include the size of the vessel and the expected time of arrival. For tankers, the notice of delivery will be furnished at least 72 hours in advance of the scheduled arrival date; for barges, at least 48 hours in advance of the scheduled arrival date. The Government will provide the maximum notice practicable when the anticipated vessel transit time from the loading point is less than the 72/48 hours. Changes in the scheduled arrival date that will provide less than the 48 hours notice for barges and the 72 hours notice for tankers will require the verbal approval of the Contractor. This verbal approval is to be confirmed in writing as soon as practicable.

(ii) The Contractor shall provide a reachable berth, free of charge, where the vessel can be safely moored and afloat with necessary access thereto as soon as possible, but no later than, for barges, within 3 hours after issue of notice of readiness to unload, and, for tankers, within 6 hours after issue of notice of readiness, PROVIDED --

(A) If the vessel is tendered for unloading on a date earlier than the last agreed scheduled arrival date, the Government’s vessel shall be unloaded as soon as possible in its proper turn with other vessels, and laytime shall not commence until the vessel moors alongside or, for barges, 3:00 A.M.

local time; for tankers, 6:00 A.M. local time, on the last agreed scheduled arrival date, whichever occurs first.

(B) If the vessel is tendered for unloading later than 12:00 noon of the day following the last scheduled arrival date, the vessel shall be unloaded in its proper turn with other vessels. Laytime shall commence when the vessel moors alongside, provided a good faith effort is made by the Contractor to moor the vessel in its turn with other vessels as loading berths become available.

(iii) Laytime shall commence either (A) at the expiration of the notice period prescribed in subparagraph

(ii) above, berth or no berth, or (B) immediately when the vessel moors alongside, with or without notice of readiness, whichever occurs first.

(iv) Laytime, once started, shall continue 24 hours per day, 7 days per week, without interruption, from its commencement until unloading of the barge or tanker is completed and hoses have been disconnected.

(v) Unless otherwise provided in the Schedule, the Contractor shall be allowed and will complete unloading within laytime determined as follows:

(A) FOR BARGES: One hour for each 2,000 barrels of product to be unloaded.

(B) FOR TANKERS: Thirty-six hours of discharge of a full vessel cargo. When partial vessel cargoes are to be unloaded, the 36 hours will be prorated based on quantities discharged in each port.

(vi) Hoses and loading arms for unloading a barge or tanker will be furnished, connected, and disconnected by the Contractor.

(2) INCREASES TO BASIC ALLOWED LAYTIME.

(i) If, after laytime commences, the conditions or facilities of the barge or tanker to be unloaded do not permit unloading, basic allowed laytime shall be increased by the duration of the delay.

(ii) If the vessel is delayed in reaching its berth and the delay is caused by the fault of the vessel, basic allowed laytime shall be increased by the duration of the delay.

(iii) If the vessel owner’s or operator’s regulations prohibit unloading at any time after laytime has commenced, the lost time shall be added to the basic allowed laytime.

(iv) If, for any reason, the Contractor is delayed in unloading the barge or tanker because of actions of a Government representative, acting under the contract, that arise through no fault or negligence on the part of the Contractor or its subcontractors, basic allowed laytime shall be increased by the duration of the delay.

(v) There will be no increase to basic allowed laytime (nor other reductions to any resulting demurrage time) for saved laytime arising out of other loadings/discharges.

(vi) Delays, after commencement of laytime, attributed to causes beyond the control and without the fault or negligence of the Contractor or the U.S. Government will result in increasing the basic allowed laytime by one half of the delay time.

(3) PAYMENT OF DEMURRAGE. For all hours of laytime which elapse in excess of the basic allowed laytime for unloading provided for by subparagraph (k)(1)(v), or as otherwise provided in the Schedule, the Contractor shall pay demurrage to the Government as follows:

(i) USS, USNS, OR TIME CHARTERED VESSELS. At the demurrage rate for the vessel loaded computed to the nearest whole hour as published by the Military Sealift Command and in effect on the date the loading of the vessel is completed.

(ii) VOYAGE CHARTERED VESSELS. At the demurrage rate cited in the charter, except that the demurrage payable by the Contractor shall in no event exceed the demurrage expense incurred by the Government under the Charter.

F-0002 F1.05 GENERAL SHIPPING CONDITIONS (DLA ENERGY OCT 1997)

(a) The Contractor will prepare the inspection and shipment documents covering deliveries made from the terminal in accordance with instructions contained in the Documentation and Product Property Control Plan.

Normally, the document will consist of DD Form 250 for tank car, tank truck, pipeline, and packaged shipments, and DD Form 250-1 and ullage/innage reports in the case of barge and tanker shipments. The Contractor will distribute the DD Forms 250 and the Quality Representative (QR) will distribute the DD Forms 250-1. When the QR is not present for release or shipment of product inspected at these facilities, and the Contractor's quality control program has been approved by the responsible Government Quality Office in accordance with paragraph

246.471 of the DOD FAR Supplement, the Contractor will insert the following certification on the inspector's copy of the shipping documents:

"I certify that the above supplies were (a) in the quantity indicated, (b) taken from Government-owned and approved stocks, and (c) loaded into inspected and approved containers. This shipment was released in accordance with paragraph 246.471-2 of the DoD FAR Supplement under authorization of (NAME and TITLE OF THE

AUTHORIZED REPRESENTATIVE OF THE CONTRACT ADMINISTRATION OFFICE)

in a letter dated (DATE OF AUTHORIZING LETTER). (SIGNATURE AND TITLE OF

CONTRACTOR'S DESIGNATED REPRESENTATIVE)."

(b) Shipment of products hereunder will be made only pursuant to a "release" furnished by the Product Property Administrator or his designated representative. The "release" will indicate the consignees who are authorized to issue "calls" or "orders" for shipment of product. Such "release" will be periodically furnished to the Contractor by the cognizant Product Property Administrator.

(c) Conveyances required for shipments shall be furnished or designated by the Government. The Contractor shall inspect all shipping conveyances prior to loading to insure that product loaded will not be lost or contaminated by the condition of the equipment. Tank truck inspection must be performed by qualified Contractor personnel.

Delegation of this responsibility shall not be passed to the tank truck operator/driver. The tank truck operator/driver may be permitted to physically load the tank truck; however, the loading operation must be under the surveillance and direction of Contractor personnel. Equipment found to be unsatisfactory shall be reported as follows: (1) TANKERS AND BARGES. Report immediately by telephone to the QR; if not present, the master of the tanker or barge or to the carrier's agent or general office; (2) TANK CARS. Report to the QR and by wire (Government Rate, Collect) to Commander, Eastern Area, Military Traffic Management Command, ATTN: MTE- INR-O, Brooklyn, NY 11250. Any shortage or overage of tank cars shall be similarly reported; (3) TRANSPORT TRUCKS. Contractor shall expeditiously report to the Traffic Manager of the appropriate Defense Fuel Region, Government QR, and to the carrier's terminal where equipment is domiciled.

(d) Except when loading barges or tankers, or making pipeline deliveries, strainers of 100 mesh or finer shall be utilized in loading aviation fuels and jet lubricating oil and 60 mesh or finer in the case of reciprocating engine oil.

Strainers shall be located as near the loading point as practicable. Contractor shall furnish and periodically inspect and clean such strainers and repair same, if necessary, keeping a written record thereof.

(e) Contractor shall affix serially numbered seals to the dome covers of tank cars and all openings in the case of tank trucks in such a manner that entry could only be gained by breaking a seal. Such seals will be furnished by the Contractor. Seal numbers will be indicated on shipping documents.

(f) Placards, as required by 49 CFR 172.506 and 49 CFR 172.508, shall be furnished and affixed to all tank cars and tank trucks by Contractors unless placards are already affixed.

(g) FOR TANK CARS ONLY.

(1) If Government-owned or leased tank cars are furnished, the Contractor will maintain records showing each day a car is received or forwarded by car number and will furnish the information to the Defense Fuel Regional Office upon request.

(2) Bottom outlet gaskets and manway cover gaskets, when required due to deterioration or loss, shall be furnished and applied to tank cars by the Contractor.

(3) The Contractor shall (i) inspect empty Government-owned tank cars located on the Contractor's premises and (ii) ship tank cars located on the Contractor's premises to repair facilities as directed by the Government.

(h) Unless otherwise directed, the Contractor shall prepare and distribute Government bills of lading utilized in shipments. Such bills of lading, routing instructions, and transportation assistance will be furnished by the Defense Fuel Region placing orders.

(i) The Contractor shall comply with routing instructions furnished by the Government. Such instruction will include names, routes, route order numbers, and other pertinent information. The Contractor shall be responsible for scheduling of commercial transport trucks, trucks and trailer, and tank wagons to its plant in accordance with such routing instructions and consonant with the applicable order. The Contractor shall provide sufficient advance notice to carriers and schedule the carrier's equipment for loading. The Contractor shall reimburse the Government for any demurrage incurred as a result of improper scheduling.

(j) Custody of product shipped by pipeline, and risk of loss thereof, shall pass from the Contractor to the carrier when the product passes the flange connecting the Contractor's pipeline and the carrier's pipeline.

(k) Custody of product shipped by transport truck, and risk of loss thereof, shall pass from the Contractor to the carrier when the loaded transport truck is released for shipment by the Contractor.

(l) Custody of product shipped by tank car, and risk of loss thereof, shall pass from the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.