Final_Kuwait_Solicitation.pdf

PDF 1 MB Posted

Attached to
Kuwait Supply Program SPE602-19-R-0708
Solicitation number
SPE602-19-R-0708
Issued by

About this file

This is an award notice for a non-competitive bulk fuels requirements contract valued at an estimated 94.5 million USG. The contract is between the Defense Logistics Agency Energy and Kuwait Petroleum Corporation to supply 62 million USG of JP-1, 28 million USG of DF-2, and 4.5 million USG of MUR delivered FOB origin within Kuwait from July 1, 2019 to June 30, 2020 with a 30-day carryover period. The fuels will be delivered by tank truck to various locations in Kuwait. The award is non-competitive as Kuwait Petroleum Corporation is identified as the only source authorized to supply within Kuwait.

View the file

Other files

File Type Posted
J&A_KUWAIT_(REDACTED_FOR_FBO).pdf PDF
Attachment_Fill-Ins.docx DOCX document
Attachment_QAPS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER

0078988225

2. CONTRACT NO. 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER

SPE602-19-R-0708

6. SOLICITATION ISSUE

DATE

2019 MAY 15

a. NAME

Roger Wilson

b. TELEPHONE NUMBER (No Collect calls)

Phone: 571-767-9310

8. OFFER DUE DATE/

LOCAL TIME

2019 MAY 20

9. ISSUED BY CODE SPE602

DLA ENERGY

BULK PETROLEUM PRODUCT

8725 JOHN J. KINGMAN ROAD

FORT BELVOIR VA 22060

USA

10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

8 (A)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

NAICS: 324110

SIZE STANDARD:

11. DELIVERYFOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

DO-C9

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE 16. ADMINISTERED BY CODE

17a. CONTRACTOR/ CODE

OFFEROR

FACILITY

CODE

TELEPHONE NO.

18a. PAYMENT WILL BE MADE BY CODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

See Schedule

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF. OFFER

DATED . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or Print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or Print) 31c. DATE SIGNED

SEE SCHEDULE

7. FOR SOLICITATION

INFORMATION CALL:

SEE SCHEDULE

01:00 PM EDT

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE ADDENDUM

EDWOSB

X 1

32a. QUANTITY IN COLUMN 21 HAS BEEN

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:RECEIVED INSPECTED

COMPLETE PARTIAL FINAL

STANDARD FORM 1449 (REV. 2/2012) BACK

36. PAYMENT

PARTIAL FINAL

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

37. CHECK NUMBER

38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER 40. PAID BY

42a. RECEIVED BY (Print) 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42b. RECEIVED AT (Location)

Solicitation Notes:

1. The enclosed solicitation covers the periods:

JULY 1, 2019 through JUNE 30, 2020 plus a 30-day carry-over period

2. NOTICE: Any contract awarded to a contractor who, at the time of award, was suspended, debarred, or ineligible for receipt of contracts with Government agencies, or was in receipt of a notice of proposed debarment for any Government agency, is voidable at the option of the Government.

3. For emergency situation during non-duty hours, the number to contact is (571)767-8420 at the DLA Energy Operations Center, Contingency Plans and Operations Division (DLA Energy – QED).

4. INSTRUCTIONS ON SUBMITTING OFFER:

a. The following items MUST be returned to DLA Energy to constitute a valid offer: STANDARD FORM 1449 with blocks 17a and 30a – c completed.

b. Pursuant to L2.11-4 EMAIL PROPOSALS, offers submitted via e-mail constitute an offeror’s hard copy. It must contain all required representations and certifications as well as all required signatures. The email address in which to submit offers is:

BulkFuelsBidCustodian@dla.mil

c. By submission of this package, you are stating ALL terms and conditions of the entire solicitation are accepted and apply to your offer unless clearly stated herein.

d. The Contractor must submit exceptions and deviation requests to any Solicitation Terms and Conditions in accordance with Contract Text M72 Evaluation of Offers (Exceptions/Deviations)(DLA Energy 1997).

e. Offerors must acknowledge receipt and acceptance of all amendments to this solicitation.

mailto:%20BulkFuelsBidCustodian@dla.mil mailto:%20BulkFuelsBidCustodian@dla.mil

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

B1 SUPPLIES TO BE FURNISHED (BULK) (DLA ENERGY JAN 2012)

(a) The minimum and maximum quantities are defined in the contract provision DELIVERY-ORDER

LIMITATIONS – SCOPE OF CONTRACT.

(b) The supplies to be furnished during the contract period of July 1, 2019 – June 30, 2020 with a 30-day carryover period and all associated data are as follows:

TURBINE FUEL, AVIATION (JA1)

NSN: 9130-00-753-5026

PURCHASE REQUEST NO. 0078988225

THE TOTAL ESTIMATED JA1 QUANTITY IS – 62,000,000 USG

Item FOB LOCATION DODAAC MODE 0001 ORIGIN Kuwait- Various Locations SE7F05 TT*

DIESEL FUEL (DF2)

NSN: 9140-00-286-5294

PURCHASE REQUEST NO. 0078988225

THE TOTAL ESTIMATED DF2 QUANTITY IS – 28,000,000 USG

0002 ORIGIN Kuwait- Various Locations SE7F05 TT*

GASOLINE, AUTOMOTIVE (MUR)

NSN: 9140-00-148-7103

PURCHASE REQUEST NO. 0078988225

THE TOTAL ESTIMATED MUR QUANTITY IS – 4,500,000 USG

0003 ORIGIN Kuwait- Various Locations SE7F05 TT*

B19.34 ECONOMIC PRICE ADJUSTMENT (OVERSEAS BULK) (DLA ENERGY JAN 2012)

(a) WARRANTIES. The Contractor warrants that—

(1) The unit prices set forth in this offer and/or contract do not include allowances for any portion of the contingency covered by this contract provision; and

(2) The prices to be invoiced hereunder for listed items shall be computed in accordance with these escalation provisions.

(b) DEFINITIONS. As used throughout this contract provision, the term—

(1) Base unit price means the unit price set forth opposite the item in the Schedule.

(2) Reference price means the market price indicator set forth in the Table in (f) below with which the base unit price is to fluctuate. NOTE: The term market price indicator will be referred to hereafter as “reference price” in this contract provision.

(3) Date of delivery is defined as follows:

(i) FOR TANKER OR BARGE DELIVERIES.

(A) F.O.B. ORIGIN. The date and time vessel commences loading.

(B) F.O.B. DESTINATION. The date and time vessel commences discharging.

(ii) FOR PIPELINE DELIVERIES. The date and time product commences to move past the specified f.o.b. point.

(iii) FOR ALL OTHER TYPES OF DELIVERIES. The date product is received.

(c) ADJUSTMENTS.

(1) The Contractor shall give written notice to the Contracting Officer, Defense Logistics Agency Energy (DLA Energy), of any delivery and associated change in the reference price within 15 working days from the date thereof. Contractor failure to timely notify the Contracting Officer of any delivery and associated change in the reference price may result in late or incorrect payment of the relevant invoice.

(2) Subject to the conditions of this contract provision, the prices payable under this contract shall be the base unit price increased or decreased by the same number of cents, or fraction thereof, that the reference price shall have increased or decreased.

(3) An increase or decrease in any reference price published in a trade price service or in a commercial journal shall apply only to deliveries made on and after the effective date of the price change as stated in the publication.

(4) The Contracting Officer will issue a modification to this contract to reflect any change pursuant to this provision. However, no increase in a contract unit price shall be executed pursuant to this provision until the increase in the applicable published reference price has been verified by the Contracting Officer.

(5) FAILURE TO DELIVER. Notwithstanding any other conditions of this contract provision, no upward adjustment shall apply to product scheduled under the contract to be delivered before the effective date of the adjustment, unless the Contractor’s failure to deliver according to the delivery schedule results from causes beyond the Contractor’s control and without its fault or negligence, within the meaning of paragraphs (f), Excusable Delays, and (m), Termination for Cause, of the CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS clause of this contract, in which case the contract shall be amended to make an equitable extension of the delivery schedule.

(6) UPWARD CEILING ON ECONOMIC PRICE ADJUSTMENT. The Contractor agrees that the total increase in any contract unit price pursuant to these economic price adjustment provisions shall not exceed 285% percent of the award price, except as provided hereafter.

(i) If at any time the Contractor has reason to believe that within the near future a price adjustment under the conditions of this contract provision will be required that will exceed the current contract ceiling price for any item, the Contractor shall promptly notify the Contracting Officer in writing of the expected increase. The notification shall include a revised ceiling the Contractor believes is sufficient to permit completion of remaining contract performance, along with appropriate explanation and documentation as required by the Contracting Officer.

(ii) If an actual increase in the reference price would raise a contract unit price for an item above the current ceiling, the Contractor shall have no obligation under this contract to fill pending or future orders for such item, as of the effective date of the increase, unless the Contracting Officer issues a contract modification to raise the ceiling. If the contract ceiling will not be raised, the Contracting Officer shall so promptly notify the Contractor in writing.

(7) REVISION OF REFERENCE PRICE INDICATOR. In the event—

(i) Any applicable reference price is discontinued or its method of derivation is altered substantially; or (ii)Contracting Officer determines that the reference price consistently and substantially failed to reflect market conditions— the parties shall mutually agree upon an appropriate and comparable substitute for determining the price adjustments hereunder. The contract shall be modified to reflect such substitute effective on the date the indicator was discontinued, altered, or began to consistently and substantially fail to reflect market conditions. If the parties fail to agree on an appropriate substitute, the matter shall be resolved in accordance with paragraph (d), Disputes, of the CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS clause of this contract.

(8) CONVERSION FACTORS. If this contract provision requires quantity conversion for economic price adjustment purposes, the conversion factors for applicable products, as specified in the CONVERSION FACTORS provision, apply unless otherwise specified in the Schedule.

(d) EXAMINATION OF RECORDS. The Contractor agrees that the Contracting Officer or designated representatives shall have the right to examine the Contractor's books, records, documents, or other data the Contracting Officer deems necessary to verify Contractor adherence to the conditions of this contract provision.

(e) FINAL INVOICE. The Contractor shall include a statement on the final invoice that the amounts invoiced hereunder have applied all decreases required by this contract provision.

(f) TABLE.

Name of Publication: PLATTS ASIA PACIFIC/ARAB GULF MARKETSCAN Product Price Assessments: (FOB ARAB GULF)

NOTES:

Product prices will adjust twice per month, based on the average of the high and low assessments contained in the Platts publication referenced above. The average of the high and low assessments will then be converted into a price per gallon by dividing the high and low assessments by 42 (standard BBL to USG conversion). The conversion factor used to calculate Metric Ton (MT) to U.S. Barrel (BBL) is 8.455 for MUR. The price per USG will be rounded to six decimal places, as shown above. Prices will change on the 1st and 16th of each month. The effective reference price for a delivery made during the 1st through the 15th will be the average of the highs and lows for the previous month’s prices effective for the 16th through the end of the month. The effective price for a delivery during the period of the 16th through the end of the month will be the average of the highs and lows for the prices published applicable to the dates from the 1st through the 15th of the month. Saturdays, Sundays, and holidays specified by Platts shall be considered Platts non-trading days and shall not be included in any average. Averages will be calculated only on the days Platts publishes an effective price.

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

Refer to Solicitation Attachment for the applicable C QAPS within this solicitation.

SECTION E – INSPECTION AND ACCEPTANCE

Refer to Solicitation Attachment for the applicable E QAPS within this solicitation.

SECTION F – DELIVERIES OR PERFORMANCE

FAR 52.211-16 VARIATION IN QUANTITY (APR 1984)

(a) A variation in the quantity of any item called for by this contract will not be accepted unless the variation has been caused by conditions of loading, shipping, or packing, or allowances in manufacturing processes, and then only to the extent, if any, specified in paragraph (b) of this clause.

(b) The permissible variation shall be limited to:

10 Percent increase

10 Percent decrease

This increase or decrease shall apply to each delivery order.

F1 DELIVERY CONDITIONS FOR TANK CARS, BOXCARS, TRUCKS, TRANSPORT

TRUCKS, TRUCKSAND TRAILERS, TANK WAGONS, PIPELINE, AND LIGHTERS

(DLA ENERGY JAN 2012)

PRODUCT REFERENCE PRODUCT

(LOCATION)

REFERENCE PRICE/USG

EFFECTIVE APRIL 1, 2019

(Excludes All Taxes) JA1 Jet Kerosene Arab Gulf $1.852476 DF2 Gasoil 0.25%, FOB Arab Gulf $1.841143

MUR Naphtha FOB Arab Gulf

$1.505180

(a) On items calling for delivery at Contractor's refinery, terminal, or bulk plant f.o.b. tank car, boxcar, truck, transport truck, truck and trailer, tank wagon, pipeline, or lighter—

(1) Supplies ordered hereunder shall be delivered, at Contractor's expense, into equipment specified in the

Schedule.

(2) Unless otherwise specified in the Schedule, all deliveries shall be made upon the day specified in the order provided that the Contractor shall have received the order at least 48 hours prior to the day so specified, except for deliveries—

(i) By pipeline (other than into vessel, dredge, or barge for use as ships' bunkers) for which the Contractor shall be given 15 days' notice prior to the date so specified; and

(ii) Into vessel, dredge, or barge by any means of delivery including pipeline for use as ships' bunkers, for which deliveries the Contractor shall be given 24 hours' notice prior to the specific time delivery is to be made.

(3) All packaged or drummed material to be delivered f.o.b. boxcar, truck, or lighter shall be loaded (braced and Blocked where necessary) by the Contractor as follows

(i) RAIL SHIPMENTS IN CONTINENTAL UNITED STATES AND ALASKA.

(A) In accordance with the LOADING, BLOCKING, AND BRACING OF FREIGHT CAR

SHIPMENTS contract provision.

(B) To the extent there is no conflict between the standards mentioned in paragraph (a) of the

LOADING, BLOCKING, AND BRACING OF FREIGHT CAR SHIPMENTS contract provision, when a freight advantage to the Government would result, the Contractor will load boxcars to maximum capacity, including multiple tiering.

(ii) TRUCK SHIPMENTS IN THE UNITED STATES. In accordance with ICC Regulations and best commercial practices.

(iii) RAIL SHIPMENTS AND TRUCK SHIPMENTS - OVERSEAS, POSSESSIONS AND TERRITORIES. In accordance with best commercial practices and local regulations, or as indicated in the Schedule.

(iv) LIGHTER. In accordance with best commercial practices.

(4) Except for supplies delivered f.o.b. boxcar, truck, or lighter, title to the supplies delivered, and risk of loss thereof, shall pass from the Contractor to the Government when the supplies pass into the receiving conveyance. Title to supplies delivered f.o.b. boxcar, truck, or lighter, and risk of loss thereof, shall pass from the Contractor to the Government at the time the car, truck, or lighter is released to, and accepted by, the carrier.

(b) On items calling for delivery f.o.b. destination by means of tank car, boxcar, truck, transport truck, truck and trailer, tank wagon, pipeline, or lighter--

(1) Supplies ordered hereunder shall be delivered, all transportation charges paid, to the destination and by means of the transportation equipment specified in the Schedule or, if no specific destination is indicated in the Schedule, to the destination specified in the order. Delivery shall be accomplished at Contractor's expense into Government storage or into the type of receiving equipment otherwise specified in the Schedule or in the order, except for--

(i) Delivery by tank car which shall be accomplished by spotting the car alongside the unloading manifold connection at the specified destination;

(ii) Delivery by boxcar which shall be accomplished at the specified destination as follows:

(A) If such activity has a railroad siding, by spotting the car alongside the unloading platform or elsewhere at such destination as may be designated by the receiving activity; or (B)If such activity does not have a railroad siding at the unloading platform of the railroad siding serving such activity, and if the freight tariff provides for free pickup and delivery service, delivery shall be made to the activity specified in the order;

(iii) Delivery by truck which shall be accomplished by spotting the truck at the unloading platform at the specified destination and by placing the drummed or packaged supplies at the tailgate of the truck; and

(iv) Delivery by lighter which shall be accomplished as indicated in the Schedule.

(2) Unless otherwise specified in the Schedule, all deliveries by tank car or boxcar shall be made within 24 hours from the time specified in the order, provided that such order shall have been received by the Contractor at least

120 hours prior to the time so specified; all other deliveries, except as hereinafter indicated, shall be made on the day specified in the delivery order and unless otherwise authorized by the receiving activity during normal working hours of such activity, provided that such order shall have been received by the Contractor at least 48 hours prior to the days so specified. Pipeline deliveries (except those into vessel, dredge, or barge) shall be made on the day specified in the delivery order, provided the order shall have been received by the Contractor at least 15 days prior to the day so specified. Delivery into vessels, dredges, or barges from a marine service station or by means of transport truck, truck and trailer, tank wagon, or pipeline shall be made at the specific time specified in the order, provided that such order shall have been received by the Contractor at least 24 hours prior to the specific time such delivery is required to be made.

(3) The Contractor shall not be required to deliver by transport truck or truck and trailer a quantity less than a full load nor into more than one storage tank, with the following exceptions:

(i)An order placed under an item of this contract calling for delivery by transport truck of motor gasoline, fuel oil, diesel fuel, or kerosene, or, if this procurement is for Central America only, jet fuel, may require delivery of a quantity as low as 5,200 gallons whenever the activity is restricted either by a tank capacity or by a directive from receiving a larger quantity; and

(ii) Where the Schedule provides for multiple drop delivery, the Contractor may be required to deliver into more than one storage tank. Where truck and trailer is the method of delivery specified, the Contractor may, at its option, make delivery by transport truck. In the case of deliveries in Alaska, where truck and trailer or transport truck is the method of delivery specified, the Contractor may, at its option, make delivery by tank wagon.

(4) The Contractor shall not be required to deliver by tank wagon a quantity of less than 575 liters (or 150 gallons) but, at the Government's option, may be required to deliver into more than one storage tank.

(5) When delivery of fuel oil or lubricating oil is made by tank car, such car shall be equipped with steam coils, if specified in the order, to facilitate the unloading of such product.

(6) When delivery is made by tank wagon, such wagon shall be equipped with pump, meter, and a minimum of 100 feet (30 meters) of hose. Where delivery is made by transport truck or truck and trailer, such delivery equipment shall be equipped with a minimum of 15 feet of hose.

(7) When delivery is made by tank wagon, transport truck, or truck and trailer to a Government facility--

(i) The Contractor shall provide properly maintained delivery equipment and properly trained delivery personnel to reasonably assure that delivery can be made without damage to vegetation and asphalt pavement adjacent to storage facilities being filled. The Contractor's delivery personnel who have not exercised reasonable care and delivery equipment which is poorly maintained, may be refused entrance to the installation by the installation Commander.

(ii) The Contractor shall present delivery equipment and product in such condition at destination so as to permit complete off-loading within the prescribed free time.

(8) Unless otherwise provided in the Schedule, free time for unloading trucks, transport trucks, or trucks and trailers shall be unlimited.

(9) Except for supplies delivered by tank car, boxcar, truck, or lighter, title to supplies delivered, and risk of loss thereof, shall pass from the Contractor to the Government when the supplies pass into the receiving facilities.

Title to supplies delivered by tank car or boxcar, and risk of loss thereof, shall pass from the Contractor to the Government at the time the car is released by the carrier for unloading. Title to supplies delivered by truck, and risk of loss thereof, shall pass from the Contractor to the Government when the drummed or packaged supplies are removed from the truck. Title to supplies delivered by lighter, and risk of loss thereof, shall pass from the Contractor to the Government at the time the receiving vessel's tackle is attached to the supplies to be unloaded.

F1.09 DETERMINATION OF QUANTITY (DLA ENERGY AUG 2015)

Quantity. The quantity of supplies furnished under this contract shall be determined as follows:

Free on Board (f.o.b.) origin. All invoice quantities shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).

Deliveries into tanker or barge. On items requiring delivery at the Contractor's refinery, terminal, or bulk plant on an f.o.b. origin basis into a tanker or barge, the quantity shall be determined (at the Contractor's option) on the basis of calibrated meter; or

Shipping/shore tank measurement.

Deliveries into pipeline. On items requiring delivery at the Contractor's refinery, terminal, or bulk plant on an f.o.b. origin basis into a pipeline, the quantity shall be determined (at the Contractor's option) on the basis of calibrated meter; or shipping tank measurements.

Deliveries into rail tank car. On items requiring delivery at the Contractor's refinery, terminal, or bulk plant on an f.o.b. origin basis, the quantity shall be determined (at the Contractor's option) on the basis of calibrated loading rack meter; or, using calibrated scales; or certified capacity table for the rail tank car.

Deliveries into tank truck, truck and trailer, or tank wagon. On items requiring delivery at the Contractor's refinery, terminal, or bulk plant on an f.o.b. origin basis into a tank truck, truck and trailer or tank wagon, the quantity shall be determined (at the Contractor's option) on the basis of calibrated loading rack meter; or weight, using calibrated scales; or certified capacity table for the conveyance or container.

Deliveries into intermodal container. On items requiring delivery at the Contractor's refinery, terminal, or bulk plant on an f.o.b. origin basis into an intermodal container, the quantity shall be determined (at the Contractor's option) on the basis of calibrated loading rack meter, loading either through top or bottom tank outlets (top loading requires loading gantry or "fall arrest" system), or certified capacity table for the container, or weight, using calibrated scales.

F.o.b. destination.

Deliveries by tanker or barge.

On items requiring delivery on an f.o.b. destination basis by tanker or barge, the invoice quantity shall be determined (at the Government's option) on the basis of calibrated meters on the receiving tank system; or receiving tank measurements. All invoice quantities shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).

Deliveries by pipeline.

On items requiring delivery by pipeline on an f.o.b. pipeline junction or f.o.b. destination basis, the invoice quantity shall be determined (at the Government's option) on the basis of calibrated meters on the pipeline junction or the receiving tank system; or receiving tank measurements.

F.o.b. pipeline junction is defined as the junction between a Contractor-owned or controlled pipeline and a Government- owned or controlled pipeline.

All invoice quantities shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).

Deliveries by rail tank car.

On items requiring delivery on an f.o.b. destination basis by rail tank car, the quantity of supplies furnished under this contract shall be determined (at the Government's option) on the basis of calibrated meter on the receiving tank system; or weight, using calibrated scales at the receiving location; or certified capacity table for the rail tank car; or receiving tank measurements.

All invoice quantities shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).

Deliveries by tank truck/truck and trailer/tank wagon/intermodal container.

On items requiring delivery on a f.o.b. destination basis by tank truck, truck and trailer, tank wagon or intermodal container, the quantity shall be determined —in the following order of preference:

Calibrated temperature compensating meters on the receiving system (as identified in the schedule). Calibrated temperature compensating meter on the delivery conveyance (as identified in the schedule). Weight, using calibrated scales at the receiving location (as identified in the schedule).

Calibrated meters on the receiving system, requiring manual volume correction (as identified in the schedule).

Loading ticket mechanically imprinted with the volume corrected (net) quantity. The ticket must be generated at the time of loading and be based on a calibrated loading rack meter or calibrated scales.

Calibrated meter on the delivery conveyance, requiring manual volume ccorrection. Loading ticket, not volume corrected (requiring manual volume correction).

Invoice quantities for all residual fuels and lubricating oils and invoice quantities for other products that are in excess of 5,000 gallons (or 18,900 liters) shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius). Invoice quantities of nonresidual fuels which are less than 5,000 gallons (or 18,900 liters) do not require correction to net gallons (or liters). For this purpose, residual fuels are any products with a viscosity equal to or greater than a regular (not light) number 4 fuel oil (ASTM D 396).

Water bottoms.

Every delivery must be free of all water bottoms prior to discharge; and The Contractor is responsible for their removal and disposal.

Measurement restrictions. All methods of measurement described in this contract text are subject to government safety and environmental restrictions, foreign or domestic. Such restrictions may prohibit, or render ineffective, a particular method in some cases.

Measurement standards. All measurements and calibrations made to determine quantity shall be in accordance with the most recent edition of the API Manual of Petroleum Measurement Standards (MPMS). Outside the U.S., other technically equivalent national or international standards may be used. Certified capacity tables shall mean capacity tables prepared by an independent inspector or any independent surveyor to the aforementioned measurement and calibrations standards. In addition, the following specific standards will be used as applicable:

API MPMS Chapter 11.1, Temperature and Pressure Volume Correction Factors for Generalized Crude Oils, Refined Products, and Lubricating Oils (this chapter is an adjunct to ASTM D 1250, IP 200 and International Organization for Standardization (ISO) 91- 1). Either the 2004 or 1980 version of the standard may be used.

Either the printed tables (an adjunct to the 1980 version) or the computer subroutine version of the standard may be used. In case of disputes, the computer subroutine for the 2004 version of the standard will be the referee method.

For crude oils, JP4, and Jet B, use Volume I, Tables 5A and 6A; Volume VII, Tables 53A and 54A; or Volume IV, Tables 23A and 24A.

For lubricating oils, use Tables 5D and 6D, Tables 53D and 54D, or Tables 23D and 24D.

For all other fuels and fuel oils, use Volume II, Tables 5B and 6B; Volume VIII, Tables 53B and 54B; or Volume V, Tables 23B and 24B.

For chemicals/additives use Volume III, Table 6C (or Volume IX, Table 54C), or volume correct in accordance with the product specification.

Volume XII, Table 52, shall be used to convert cubic meters at 15 degrees Celsius to barrels at 60 degrees Fahrenheit. Convert liters at 15 degrees Celsius to cubic meters at 15 degrees Celsius by dividing by 1,000.

Convert gallons at 60 degrees Fahrenheit to barrels at 60 degrees Fahrenheit by dividing by 42. Should foreign law restrict conversion by this method, the method required by law shall be used.

As an option to (b) (1) (v), liters may be converted to gallons using Table F1.09A (see below). If this option is used, it must be agreed upon by both parties and shall remain in effect for the duration of the contract. Should foreign law restrict conversion by this method, the method required by law shall be stated in the offer.

If the original measurement is by weight and quantity is required in U.S. gallons, then— Volume XI, Table 8, shall be used to convert pounds to U.S. gallons at 60 degrees Fahrenheit. Volume XII, Table 58, shall be used to convert metric tons to U.S. gallons at 60 degrees Fahrenheit.

API MPMS, Chapter 4, Proving Systems. All meters used i n determining product volume shall be calibrated using this standard with the frequency required by local regulation (foreign or domestic). If no local regulation exists, then the frequency of calibration shall be that recommended by the meter manufacturer or every 12 months, whichever is more frequent. A meter calibration log/calibration certificates shall be maintained which as a minimum contains number/name of each meter;

calibration frequency; date of the last calibration; due date for next calibration; name and signature of the person performing the calibration; traceability to master meter/prover used for calibration; and calibration report number.

Each meter shall be marked with the date of the last calibration and due date for the next calibration. All calibration meter records and logs/certificates shall be kept on file and made available upon request. All calibration records (including logs or certificates) shall be retained on file for a period of three years.

API MPMS Chapter 12, Calculation of Petroleum Quantities. All calculations of net quantities shall be made in accordance with this chapter. Outside the U.S., use of a tank shell correction factor is not required unless its use is a customary practice for custody transfer.

Table F1.09a Conversion Factor Table

Density @ 15ºC Gallons at 60ºF to Liters at 15ºC; Multiply by Liters at 15C to Gallons at 60F, Multiply by

0.723 – 0.768 3.78286 0.26435

0.769 – 0.779 3.78309 0.26433

0.780 – 0.798 3.78334 0.26432

0.799 – 0.859 3.78356 0.26430

0.860 – 0.964 3.78381 0.26428

0.965 – 1.074 3.78405 0.26427

Shipping documentation. When the Contractor’s shipping document (such as a truck’s metered ticket) is used to determine, or verify, the payment quantity under this contract, the following information shall be provided on that shipping document: gross and net quantity (gallons or liters, as required), observed and corrected API gravity/density, and the temperature (Fahrenheit or Celsius) at which the product was measured. This information shall be mechanically imprinted on the shipping document.

Although this will apply primarily to the use of meters in various applications, it also applies to any other quantity determination method. The following exceptions apply:

Where Government documents are the sole basis for payment, such as Department of Defense (DD) Form 250/250- 1s, the information is not required.

Where conveyances with temperature-compensating meters are used, the shipping document shall only be annotated with the corrected API gravity/density, the net quantity, and a statement that a temperature-compensating meter was used to determine net quantity.

Where conveyances with temperature compensating meters are not used, the shipping document shall be only be annotated with the API gravity (or density), gross quantity, and a statement that volume correction was not required.

Right to representative. For f.o.b. origin deliveries, the Government has the right to have a representative present to witness the measurement of quantity. For f.o.b. destination deliveries, the Contractor has the right to have a representative present to witness the delivery and measurement of quantity.

F1.11 DLA INTERNET BID BOARD SYSTEM (DIBBS) (DLA ENERGY) (APR 2014)

THIS PROVISION ONLY APPLIES TO DLA FUNDED LINE ITEMS.

(a) Contractor Registration. Contractors must register in DIBBS to obtain a login account at https://www.dibbs.bsm.dla.mil. The login account will allow a contractor to register a primary and alternate email address for notifications. Contractors are strongly encouraged to establish a group email address for the primary email address for the contractor’s authorized point of contacts. The registered email addresses will be the only email used by the government to make notifications.

(b) All contractors must have an active System for Award Management (SAM) account, http://www.sam.gov in order to register for DIBBS.

(c) The Contractor shall use DIBBS to receive orders. DLA Energy will not be using DIBBS receipt of quotes capability. All quotations, proposals, bids shall be submitted in accordance with the terms and conditions of the solicitation.

(d) Preparation and Transmission of Orders

(1) The Government may issue an order for a specific delivery or a series of deliveries (e.g., several deliveries during a week). The Government may also elect to issue an order covering a longer period (including monthly orders) and make periodic calls against these orders designating specific delivery dates, times, andquantities.

(2) Only a DLA Energy warranted Contracting Officer can issue an order, either orally or in writing, against a contract. An oral order issued by the warranted Contracting Officer shall provide the required advance notice to the Contractor and the following information: Interim order number;

contract number; item number; ceiling price; quantity; delivery location; and the required delivery and/ or servicedate.

(i) For all product orders, the Contractor will receive an electronically signed written order via DIBBS, within 24 hours or one business day after the warranted Contracting Officer issues an oral order.

(ii) For all service orders, the Contractor will receive an electronically signed written order via DIBBS, within five business days after issuing the oralorder.

(iii) Interim order number is subject to change once the electronically signed written order is received By the contractor. The order number on the written order will take precedence over the interim order number, if different.

(iv) Regardless of the unit price cited on the written order, the office designated to make payments on the written order will pay the applicable unit price in effect under the terms and conditions of the contract.

(v) Once the order has been issued, an email will be sent to the Contractor to provide notice that the order is available on the contract-specific web page. The order will also be submitted to thepayment office.

(3) Calls against previously issued orders must be confirmed in writing within 24 hours or one business day via email message. The email confirmation will reference the previously issued order number and item number and designate specific delivery location, dates, and quantity to be delivered against that order.

(4) The Contractor’s non receipt of a written or electronic confirmation of an oral order or oral call against a written or electronic order does not relieve the Contractor from its obligation to perform in accordance with the oral order or oral call against a written or electronic order. The Contractor should contact the DLA Energy Contracting Officer if problems are experienced with receipt of the electronic or written confirmation.

F1.25 DELIVERY AND ORDERING PERIODS (DLA ENERGY JAN 2012)

(a) This contract provision applies to all modes of delivery, whether origin or destination.

(b) The period of this contract during which the Ordering Officer may order and the Contractor shall deliver, if ordered, shall be as follows unless the item in the Schedule specifies otherwise:

(1) Ordering Period Begins: Date of Award and Ends: June 30, 2020

(2) Delivery Period Begins: July 1, 2019 and Ends: 30 days after the end of the ordering period.

(c) Notwithstanding the foregoing, deliveries made prior to the delivery period at the option of the Contractor and pursuant to an order by the Government shall be deemed to have been made under this contract at the applicable contract price(s).

(d) Insofar as practicable, the Government will attempt to lift in approximately equal monthly quantities for the life of the contract. However, if the monthly pro rata for tanker lifting is less than the Contractor's maximum parcel size, the Government reserves the right to order volumes equal to the maximum parcel size per delivery.

(e) Unless otherwise specifically stated in this contract, and notwithstanding (e) above, where the total estimated quantity for any individual product or grade of product awarded under this contract is equal to or less than 30,000 barrels, the Government may order, and the Contractor shall deliver, if ordered, the entire quantity in one delivery.

(f) Nothing included in this contract provision shall restrict the Government's rights under the DELIVERY-ORDER LIMITATIONS - SCOPE OF CONTRACT provision.

F51 SHIPMENT AND ROUTING (OVERSEAS) (DLA ENERGY NOV 2005)

(a) The Contractor shall make shipments of the supplies ordered hereunder by the method specified in the

Schedule, to the delivery point, in the quantity, and according to the delivery date specified in the order or in the Schedule.

(b) On items calling for delivery at Contractor's refinery, terminal, or bulk plant on an f.o.b. origin basis, transportation equipment will be furnished by the Government; PROVIDED, however, that the Contractor shall, without additional cost to the Government, arrange to obtain any railway boxcars required for shipments to be made hereunder. Whenever any item of the Schedule specifies delivery by more than one method, selection of the method to be used shall be at Government's option. Government-furnished transportation equipment that the Contractor finds unsatisfactory for loading shall be reported as follows:

(1) TANKERS AND BARGES. Report to the Quality Representative (QR).

(2) TANK CARS. Report to the QR.

(3) TRANSPORT TRUCKS, TRUCKS AND TRAILERS, AND TANK WAGONS. Report to the QR and to carrier's general office, or to home base or station of such equipment.

(c) If the supplies are to be delivered f.o.b. tank car, boxcar, truck, transport truck, truck and trailer, or tank wagon at Contractor's refinery, terminal, or bulkplant –

(1) The Contractor shall ship the supplies under Government bills of lading, which will be furnished, or arranged for, by the Ordering Officer. If requested by the Government, the Contractor shall prepare Government bills of lading.

(2) The Contractor shall comply with routing instructions furnished by the Government. Such instructions will include carrier names, routes, route order numbers, and other pertinent information. The Contractor shall be responsible for scheduling of commercial transport trucks, trucks and trailers, and tank wagons to its plant in accordance with such routing instructions and consonant with the applicable order. The Contractor shall reimburse the Government for any demurrage incurred as a result of improper scheduling.

(d) On all tank car and boxcar (carload only) shipments, whether delivery is made on an f.o.b. origin or f.o.b.

destination basis, the Contractor shall send to the consignee at the time of shipment a facsimile or electronic mail notice which shall indicate grade of product, date of shipment, car and seal numbers, bill of lading number, and net quantities.

(e) The Contractor shall furnish serially numbered seals and effectively seal all tank cars, boxcars, transport trucks, trucks and trailers, tankers, and barges, whether delivery is made on an f.o.b. origin or f.o.b. destination basis. The marking on the seal shall be indicated on all shipping documents.

F92.03 REFINERY SHUTDOWN SCHEDULE FOR CONTRACT PERIOD (DLA Energy Bulk

MAY 2019)

(a) The offeror shall furnish to the Contracting Officer a refinery shutdown schedule for the contract period.

DLA Energy will review the offered quantity, parcel sizes, and lift intervals in conjunction with the turnaround period to ensure that the entire offered quantity can be delivered during the performance period and will meet operational requirements.

(b) The offeror shall provide the following information for each product offered:

(1) No shutdowns planned [ ]

(2) Shutdowns Planned [ ]

(i) Refinery location:________________________________________________________________;

(ii) Shutdown period:________________________________________________________________;

(iii) Impact of shutdown period on supply availability:______________________________________

(c) Unless the offeror states otherwise, the offer will be evaluated on the basis that there will be no refinery shutdowns for turnarounds that will have an impact on supply availability.

SECTION G – CONTRACT ADMINISTRATION DATA

DFARS 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC SL4701 Issue By DoDAAC SPE602 Admin DoDAAC** SPE602 Inspect By DoDAAC Ship To Code Ship From Code Mark For Code Service Approver (DoDAAC) https://wawf.eb.mil/

Service Acceptor (DoDAAC) Accept at Other DoDAAC LPO DoDAAC DCAA Auditor DoDAAC Other DoDAAC(s)

(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert “See Schedule” or “Not applicable.”)

(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

energy.helpdesk@dla.mil; 1-800-446-4950

(Contracting Officer: Insert applicable information or “Not applicable.”)

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

G3 INVOICE NUMBERING REQUIREMENTS (DLA ENERGY AUG 1998)

Each invoice submitted for payment under this contract shall be identified by an individual invoice number. The number shall not be duplicated on subsequent invoices. Duplicate invoice numbers or invoices that do not include numbers may be rejected.

G6 INVOICE DISCREPANCIES (BULK) (DLA ENERGY JAN 2012)

(a) In the event of a discrepancy between the invoiced quantity of fuel and the quantity of fuel received, as shown on the “Original Receiving Report for Payment of Invoice” form, as described in the SUBMISSION OF INVOICES FOR PAYMENT - COMMERCIAL ITEMS (BULK) contract provision, the Contractor shall be paid for actual quantities of fuel received, based on the “Original Receiving Report for Payment of Invoice” form, at the applicable price in effect in accordance with the terms of the contract.

(b) In the event of a discrepancy between the unit price on the invoice and the unit price as calculated under the contract, the Contractor shall be paid the applicable price in effect in accordance with the terms of the contract.

G12 SUPPLEMENTAL INVOICING INFORMATION (BULK) (DLA ENERGY SEP 2002)

Supplemental information required by the contract as authorized by 5 CFR part 1315.

(a) Description of the item shall include the Government product code, such as JP8, JP5, F76, etc.

(b) Pipeline shipments shall include the Commercial Batch Number for each pipeline shipment, if available. (For origin pipeline shipments, the Contractor will include the Commercial Batch Number as provided by the ordering office.)

mailto:energy.helpdesk@dla.mil

SECTION H – SPECIAL CONTRACT REQUIREMENTS

H19.02 REPORTING REQUIREMENTS FOR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .