SOO_S._Eastern_ABO-LN.pdf

PDF 292 KB Posted

Attached to
AB0/LN2 S. E. Region of the U. S.
Solicitation number
SPE601-15-R-0309
Issued by

About this file

Statement of Objectives

View the file

Other files

File Type Posted
SF30_SPE60115R03090001.pdf PDF
S._East_ABO-LN_Ktr_Pricing.xlsx XLSX spreadsheet
Contractor_Past_Performance.doc DOC document
SF1449_0309.pdf PDF
SF1449-0309_4_Feb_15.pdf PDF
A-A-59503C 2 .pdf PDF
S._East_ABO-LN_Ktr_Pricing.xlsx XLSX spreadsheet
FAR_ _DFAR_Clauses_For_S._East_ABO-LN_Buy_3_Feb_15.pdf PDF
ITO_0309.pdf PDF
Schedule_B_S._East_ABO-LN_Basic_Sch.pdf PDF
SF1449_0309.pdf PDF
AEROSPACE_CLAUSES_S._East_ABO_LN_3_Feb_15.pdf PDF
MIL-PRF-27210J.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPE601-15-R-0309

ABO and LN2Multiple Locations CONUS Southeastern Region

STATEMENT OF OBJECTIVES

2 Oct 14

Charlotte ANG, NC

1. DESCRIPTION OF REQUIREMENT: Defense Logistics Agency Energy (DLA Energy), as the Department of Defense (DoD) Integrated Materiel Manager (IMM) for Aerospace Energy products and related services, requires delivery of Aviator’s Breathing Oxygen (ABO). The Contractor shall provide all materials, supplies, product, management, tools, equipment, transportation and labor necessary to deliver product f.o.b. destination into Government-owned tanks at Charlotte ANG, NC.

2. PRODUCT SPECIFICATIONS:

2.1. ABO (NSN 6830-00-808-9531) shall meet the requirements of Type II of specification MIL-PRF-27210J, dated 7 Aug 2013.

2.1.1. MIL-PRF-27210J, paragraph 4.2.1: Preproduction samples are not required if the Contractor’s fill point is already supplying one or more DoD locations with ABO in accordance with all the requirements of MIL-PRF-27210J, including the requirement for submitting periodic samples to a Government approved laboratory listed below in paragraph 2.1.5 “ABO Sample Submission Table”.

2.1.2. MIL-PRF-27210J, paragraph 4.2.2: Preproduction samples (if required) and all periodic sample submissions shall be submitted at the Contractor’s expense to a laboratory listed below in paragraph 2.1.5, “ABO Sample Submission Table”.

Contractor’s submitting samples shall attach/include a properly prepared DD Form 1222, Request for and Results of Test, with each sample clearly marking them as either a Preproduction and/or a Periodic Sample. The submitting Contractor shall also arrange return shipment of the sample containers from the assigned Government laboratory.

2.1.3. MIL-PRF-27210J, paragraph 4.3.1.2: A representative sample of Type II may also be obtained by withdrawing a sample from the sampling port on the shipping container directly into the analytical instrument(s).

2.1.4. The entire contents of a Type II ABO shipping conveyance offered for acceptance by the Government should be produced from a facility that meets all of the requirements of this Statement of Objectives. If the shipping conveyance contains any liquid product that was not produced from an approved facility (such as a product heel from a different fill point), a representative sample shall be drawn from the conveyance (after filling) and tested to determine compliance with the requirements of this Statement of Objectives and Table 1 of MIL-PRF-27210J.

CONUS Southeastern Region

2.1.5. ABO Sample Submission Table.

2.2. In addition to the reports required elsewhere within this contract, one copy of a Certificate of Analysis for each sample required by the specification shall be submitted as an attachment to the applicable Wide Area Workflow (WAWF) Combo document or documented on the WAWF Statement of Quality tab.

3. PRODUCT ORDERING: The DLA Energy Contracting Officer shall issue Individual Delivery Orders (DD Form 1155) for obligation of funds for orders to be issued during that specific timeframe by the appointed Delivery Scheduler. The individual orders placed by the appointed Delivery Scheduler will designate the specific quantity to be delivered at the customer location specified in the contract.

4. PRODUCT DELIVERY:

4.1. Product shall be delivered within 7 days after receipt of an order from the appointed Delivery Scheduler. No emergency deliveries are anticipated.

4.2. Deliveries shall be made from 0730-1600 hours, Monday-Friday, excluding federal holidays.

ABO SAMPLE SUBMISSION TABLE

SUPPLIER FILLPOINTS LOCATED IN THE BELOW

STATES:

ARE ASSIGNED THE BELOW LABS

FOR SUBMITTING PRE-

PRODUCTION AND PERIODIC

SAMPLES:

AR, CT, DE, IL, IN, IA, KS, KY, ME, MD, MA, MI, MN, MO,

NE, NH, NJ, NY, NC, ND, OH, OK, PA, RI, TN, TX, VT, VA,

WV, WI

Aerospace Fuels Laboratory (FP2070)

AFPA/PTPLA

2430 C Street Bldg 70 Area B Wright-Patterson AFB OH 45433-7632

PH (937)255-0739

AK, AZ, CA, CO, ID, MT, ND, NV, NM, OR, UT, WA, WY Aerospace Fuels Laboratory (FP2075)

AFPA/PTPLE

1747 Utah Ave Bldg 6670 Vandenberg AFB CA 93437-5220

PH (805)606-5873

AL, FL, GA, LA, MS, SC Aerospace Fuels Laboratory (FP2078)

AFPA /PTPLH

15251 Scrub Jay Street Bldg 54800 Cape Canaveral AFS FL 32920

PH (321)853-5441

Or Navair Depot Jacksonville Materials Engineering Lab Code 4.9.7.5 Building 793 Jacksonville FL 32212-0016 3-5441

CONUS Southeastern Region

4.3. Product deliveries shall be made to the following address:

145 AW

Bldg 54 4930 Minuteman Way Charlotte, NC 28208

5. DESCRIPTION OF GOVERNMENT-OWNED ABO TANK: ABO shall be delivered into the following Government-owned storage vessel listed below. The storage vessel will be trailer accessible.

Location Tank Capacity-Gallons MAWP Bldg 54 5,000 GL 50 psig

6. TANK OVER-PRESSURE PROTECTION: If it is determined during supplier site visits or upon review of tank technical information that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure During Filling of Cryogenic Vessels, the Contractor shall provide and install the additional tank protection which may encompass any of the methods identified in the P-59. NOTE:

Over-protection devices shall not be installed on Government-owned storage tanks without prior coordination with DLA Energy-FEM and the activity that physically possesses the tank(s).

7. INSPECTION AND ACCEPTANCE: Inspection for quality shall be performed at origin. Quantity determination and acceptance shall be at destination.

8. METHOD OF MEASUREMENT: Quantity determination to be performed at delivery location by use of a truck mounted calibrated flow meter.

9. HOT FILLS: Occasionally, the Contractor may be required to perform a “Hot Fill” in order to cool-down and refill any tank that has gone empty and is warm.

10. SECURITY REQUIREMENTS: The Contractor’s driver will be escorted from the main gate to the facility.

CONUS Southeastern Region

Pope AFB, NC

1. DESCRIPTION OF REQUIREMENT: Defense Logistics Agency Energy (DLA Energy), as the Department of Defense (DoD) Integrated Materiel Manager (IMM) for Aerospace Energy products and related services, requires delivery of Aviator’s Breathing Oxygen (ABO). The Contractor shall provide all materials, supplies, product, management, tools, equipment, transportation and labor necessary to deliver product f.o.b. destination into Government-owned tanks at Pope AFB, NC.

2. PRODUCT SPECIFICATIONS:

2.1. ABO (NSN 6830-00-808-9531) shall meet the requirements of Type II of specification MIL-PRF-27210J, dated 7 Aug 2013.

2.1.1. MIL-PRF-27210J, paragraph 4.2.1: Preproduction samples are not required if the Contractor’s fill point is already supplying one or more DoD locations with ABO in accordance with all the requirements of MIL-PRF-27210J, including the requirement for submitting periodic samples to a Government approved laboratory listed below in paragraph 2.1.5 “ABO Sample Submission Table”.

2.1.2. MIL-PRF-27210J, paragraph 4.2.2: Preproduction samples (if required) and all periodic sample submissions shall be submitted at the Contractor’s expense to a laboratory listed below in paragraph 2.1.5, “ABO Sample Submission Table”.

Contractor’s submitting samples shall attach/include a properly prepared DD Form 1222, Request for and Results of Test, with each sample clearly marking them as either a Preproduction and/or a Periodic Sample. The submitting Contractor shall also arrange return shipment of the sample containers from the assigned Government laboratory.

2.1.3. MIL-PRF-27210J, paragraph 4.3.1.2: A representative sample of Type II may also be obtained by withdrawing a sample from the sampling port on the shipping container directly into the analytical instrument(s).

2.1.4. The entire contents of a Type II ABO shipping conveyance offered for acceptance by the Government should be produced from a facility that meets all of the requirements of this Statement of Objectives. If the shipping conveyance contains any liquid product that was not produced from an approved facility (such as a product heel from a different fill point), a representative sample shall be drawn from the conveyance (after filling) and

CONUS Southeastern Region that specific timeframe by the appointed Delivery Scheduler. The individual orders placed by the appointed Delivery Scheduler will designate the specific quantity to be delivered at the customer location specified in the contract.

4. PRODUCT DELIVERY:

4.1. Product shall be delivered within 7 days after receipt of an order from the appointed Delivery Scheduler. No emergency deliveries are anticipated.

4.2. Deliveries shall be made from 0700-1700 hours, Monday-Friday, excluding federal holidays.

4.3. Product deliveries shall be made to the following address:

ABO SAMPLE SUBMISSION TABLE

PRODUCTION AND PERIODIC

SAMPLES:

AR, CT, DE, IL, IN, IA, KS, KY, ME, MD, MA, MI, MN, MO,

NE, NH, NJ, NY, NC, ND, OH, OK, PA, RI, TN, TX, VT, VA,

WV, WI

Aerospace Fuels Laboratory (FP2070)

AFPA/PTPLA

2430 C Street Bldg 70 Area B Wright-Patterson AFB OH 45433-7632

PH (937)255-0739

AK, AZ, CA, CO, ID, MT, ND, NV, NM, OR, UT, WA, WY Aerospace Fuels Laboratory (FP2075)

AFPA/PTPLE

1747 Utah Ave Bldg 6670 Vandenberg AFB CA 93437-5220

PH (805)606-5873

AL, FL, GA, LA, MS, SC Aerospace Fuels Laboratory (FP2078)

AFPA /PTPLH

15251 Scrub Jay Street Bldg 54800 Cape Canaveral AFS FL 32920

PH (321)853-5441

Or Navair Depot Jacksonville Materials Engineering Lab Code 4.9.7.5

Bldg 775 1039 Hurst Drive Pope AFB, NC 28308

5. DESCRIPTION OF GOVERNMENT-OWNED ABO TANKS: ABO shall be delivered into the following Government-owned storage vessels listed below. The storage vessel will be trailer accessible.

Bldg 775 2 - 5,000 GL ea 50 psig ea protection is required to comply with CGA P-59, Prevention of Over-Pressure During Filling of Cryogenic Vessels, the Contractor shall provide and install the additional tank protection which may encompass any of the methods identified in the P-59. NOTE:

Over-protection devices shall not be installed on Government-owned storage tanks without prior coordination with DLA Energy-FEM and the activity that physically possesses the tank(s).

7. INSPECTION AND ACCEPTANCE: Inspection for quality shall be performed at origin. Quantity determination and acceptance shall be at destination.

8. METHOD OF MEASUREMENT: Quantity determination to be performed at delivery location by use of a truck mounted calibrated flow meter.

9. HOT FILLS: Occasionally, the Contractor may be required to perform a “Hot Fill” in order to cool-down and refill any tank that has gone empty and is warm.

Seymour Johnson AFB, NC

Aerospace Energy products and related services, requires delivery of Aviator’s Breathing Oxygen (ABO). The Contractor shall provide all materials, supplies, product, management, tools, equipment, transportation and labor necessary to deliver product f.o.b. destination into Contractor-provided tanks at Seymour Johnson AFB, NC.

2. PRODUCT SPECIFICATIONS:

2.1. ABO (NSN 6830-00-808-9531) shall meet the requirements of Type II of specification MIL-PRF-27210J, dated 7 Aug 2013.

2.1.1. MIL-PRF-27210J, paragraph 4.2.1: Preproduction samples are not required if the Contractor’s fill point is already supplying one or more DoD locations with ABO in accordance with all the requirements of MIL-PRF-27210J, including the requirement for submitting periodic samples to a Government approved laboratory listed below in paragraph 2.1.5 “ABO Sample Submission Table”.

2.1.2. MIL-PRF-27210J, paragraph 4.2.2: Preproduction samples (if required) and all periodic sample submissions shall be submitted at the Contractor’s expense to a laboratory listed below in paragraph 2.1.5, “ABO Sample Submission Table”.

Contractor’s submitting samples shall attach/include a properly prepared DD Form 1222, Request for and Results of Test, with each sample clearly marking them as either a Preproduction and/or a Periodic Sample. The submitting Contractor shall also arrange return shipment of the sample containers from the assigned Government laboratory.

2.1.3. MIL-PRF-27210J, paragraph 4.3.1.2: A representative sample of Type II may also be obtained by withdrawing a sample from the sampling port on the shipping container directly into the analytical instrument(s).

2.1.4. The entire contents of a Type II ABO shipping conveyance offered for acceptance by the Government should be produced from a facility that meets all of the requirements of this Statement of Objectives. If the shipping conveyance contains any liquid product that was not produced from an approved facility (such as a product heel from a different fill point), a representative sample shall be drawn from the conveyance (after filling) and

CONUS Southeastern Region that specific timeframe by the appointed Delivery Scheduler. The individual orders placed by the appointed Delivery Scheduler will designate the specific quantity to be delivered at the customer location specified in the contract.

4. PRODUCT DELIVERY:

4.1. Product shall be delivered within 7 days after receipt of an order from the appointed Delivery Scheduler. No emergency deliveries are anticipated.

4.2. Deliveries shall be made from 0700-1600 hours, Monday-Friday, excluding federal holidays.

4.3. Product deliveries shall be made to the following address:

ABO SAMPLE SUBMISSION TABLE

PRODUCTION AND PERIODIC

SAMPLES:

AR, CT, DE, IL, IN, IA, KS, KY, ME, MD, MA, MI, MN, MO,

NE, NH, NJ, NY, NC, ND, OH, OK, PA, RI, TN, TX, VT, VA,

WV, WI

Aerospace Fuels Laboratory (FP2070)

AFPA/PTPLA

2430 C Street Bldg 70 Area B Wright-Patterson AFB OH 45433-7632

PH (937)255-0739

AK, AZ, CA, CO, ID, MT, ND, NV, NM, OR, UT, WA, WY Aerospace Fuels Laboratory (FP2075)

AFPA/PTPLE

1747 Utah Ave Bldg 6670 Vandenberg AFB CA 93437-5220

PH (805)606-5873

AL, FL, GA, LA, MS, SC Aerospace Fuels Laboratory (FP2078)

AFPA /PTPLH

15251 Scrub Jay Street Bldg 54800 Cape Canaveral AFS FL 32920

PH (321)853-5441

Or Navair Depot Jacksonville Materials Engineering Lab Code 4.9.7.5

Bldg. 3425 81825 Jabara Ave.

Seymour Johnson AFB, NC 27530

5. DESCRIPTION OF CONTRACTOR-PROVIDED ABO TANK: The Contractor shall provide the following ABO bulk low-pressure storage tank:

Location Tank Capacity-Gallons Bldg 3425 1 – 1,000-2,000 GL

6. INSTALLATION, MAINTENANCE AND REMOVAL OF CONTRACTOR-PROVIDED

TANKS AND EQUIPMENT: Contractor shall install their Contractor-provided tanks/equipment on existing cement pads, within the existing system footprints, no later than 30 calendar days from start of contract performance. The Contractor shall also perform all inspections and maintenance of Contractor-provided tanks/equipment to assure system provides safe and uninterrupted support. Contractor-provided tanks/equipment shall be removed by the Contractor within 30 calendar days after contract termination. Contractor-provided tanks may be chilled through initial deliveries, but initial deliveries into Contractor-provided tanks shall not qualify as a “Hot Fill” service.

The Contractor will coordinate with the current supplier to effect removal of current equipment and installation of new equipment or to change out of existing system or tanks to eliminate any delay in supply of product.

7. TANK PURGE: The DoD tank user will periodically sample the ABO in the Contractor-provided tanks to determine that the product quality meets customer use limits. In the event the ABO does not meet customer use limits, the Contractor shall remove the tank from service and drain the ABO from the tank until empty. Once empty, the Contractor shall purge the tank, using either a liquid or gaseous method, in accordance with tank technical/operations manuals. Following the purging process, the Contractor shall refill the tank with specification ABO and return the tank to service.

8. INSPECTION AND ACCEPTANCE: Inspection for quality shall be performed at origin. Quantity determination and acceptance shall be at destination.

9. METHOD OF MEASUREMENT: Quantity determination to be performed at delivery location by use of a truck mounted calibrated flow meter.

CONUS Southeastern Region

Shaw AFB, SC

Aerospace Energy products and related services, requires delivery of Aviator’s Breathing Oxygen (ABO) and Liquid Nitrogen (LN2). The Contractor shall provide all materials, supplies, product, management, tools, equipment, transportation and labor necessary to deliver product f.o.b. destination into Contractor-provided tanks at Shaw AFB, SC.

2. PRODUCT SPECIFICATIONS:

2.1. ABO (NSN 6830-00-808-9531) shall meet the requirements of Type II of specification MIL-PRF-27210J, dated 7 Aug 2013.

2.1.1. MIL-PRF-27210J, paragraph 4.2.1: Preproduction samples are not required if the Contractor’s fill point is already supplying one or more DoD locations with ABO in accordance with all the requirements of MIL-PRF-27210J, including the requirement for submitting periodic samples to a Government approved laboratory listed below in paragraph 2.1.5 “ABO Sample Submission Table”.

2.1.2. MIL-PRF-27210J, paragraph 4.2.2: Preproduction samples (if required) and all periodic sample submissions shall be submitted at the Contractor’s expense to a laboratory listed below in paragraph 2.1.5, “ABO Sample Submission Table”.

Contractor’s submitting samples shall attach/include a properly prepared DD Form 1222, Request for and Results of Test, with each sample clearly marking them as either a Preproduction and/or a Periodic Sample. The submitting Contractor shall also arrange return shipment of the sample containers from the assigned Government laboratory.

2.1.3. MIL-PRF-27210J, paragraph 4.3.1.2: A representative sample of Type II may also be obtained by withdrawing a sample from the sampling port on the shipping container directly into the analytical instrument(s).

2.1.4. The entire contents of a Type II ABO shipping conveyance offered for acceptance by the Government should be produced from a facility that meets all of the requirements of this Statement of Objectives. If the shipping conveyance contains any liquid product that was not produced from an approved facility (such as a product heel from a different fill point), a representative sample shall be drawn from the conveyance (after filling) and

CONUS Southeastern Region

2.2. LN2 (NSN 6830-00-285-4769) shall meet the requirements of Type II, Grade B, Commercial Item Description A-A 59503C dated 3 Mar 2011, Nitrogen, Technical.

2.3. In addition to the reports required elsewhere within this contract, one copy of a Certificate of Analysis for each sample required by specification shall be submitted as an attachment to the applicable Wide Area Workflow (WAWF) Combo document or that specific timeframe by the appointed Delivery Scheduler. The individual orders placed by the appointed Delivery Scheduler will designate the specific quantity to be delivered at the customer location specified in the contract.

4. PRODUCT DELIVERY:

4.1. For routine deliveries, product shall be delivered within 7 days after receipt of an order from the appointed Delivery Scheduler. For emergency deliveries, product shall be delivered within 2 days after receipt of an order from the appointed Delivery Scheduler.

PRODUCTION AND PERIODIC

SAMPLES:

AR, CT, DE, IL, IN, IA, KS, KY, ME, MD, MA, MI, MN, MO,

NE, NH, NJ, NY, NC, ND, OH, OK, PA, RI, TN, TX, VT, VA,

WV, WI

Aerospace Fuels Laboratory (FP2070)

AFPA/PTPLA

2430 C Street Bldg 70 Area B Wright-Patterson AFB OH 45433-7632

PH (937)255-0739

AK, AZ, CA, CO, ID, MT, ND, NV, NM, OR, UT, WA, WY Aerospace Fuels Laboratory (FP2075)

AFPA/PTPLE

1747 Utah Ave Bldg 6670 Vandenberg AFB CA 93437-5220

PH (805)606-5873

AL, FL, GA, LA, MS, SC Aerospace Fuels Laboratory (FP2078)

AFPA /PTPLH

15251 Scrub Jay Street Bldg 54800 Cape Canaveral AFS FL 32920

PH (321)853-5441

Or Navair Depot Jacksonville Materials Engineering Lab Code 4.9.7.5

CONUS Southeastern Region

4.2. Deliveries shall be made from 0700-1600 hours, Monday-Friday, excluding federal holidays.

4.3. Product deliveries shall be made to the following address:

20 LRS/LGRF

784 Fighting Falcon St., Bldg. 1725 Shaw AFB, SC 29152

5. DESCRIPTION OF CONTRACTOR-PROVIDED ABO & LN2 TANKS: The Contractor shall provide the following ABO and LN2 bulk low-pressure storage tanks:

Location Tank Capacity-Gallons Bldg 1725 1 – 1,500-2,000 GL ABO

1 – 1,500-2,000 GL LN2

6. INSTALLATION, MAINTENANCE AND REMOVAL OF CONTRACTOR-PROVIDED

TANKS AND EQUIPMENT: Contractor shall install their Contractor-provided tanks/equipment on existing cement pads, within the existing system footprints, no later than 30 calendar days from start of contract performance. The Contractor shall also perform all inspections and maintenance of Contractor-provided tanks/equipment to assure system provides safe and uninterrupted support. Contractor-provided tanks/equipment shall be removed by the Contractor within 30 calendar days after contract termination. Contractor-provided tanks may be chilled through initial deliveries, but initial deliveries into Contractor-provided tanks shall not qualify as a “Hot Fill” service.

The Contractor will coordinate with the current supplier to effect removal of current equipment and installation of new equipment or to change out of existing system or tanks to eliminate any delay in supply of product.

7. TANK PURGE: The DoD tank user will periodically sample the ABO in the Contractor-provided tanks to determine that the product quality meets customer use limits. In the event the ABO does not meet customer use limits, the Contractor shall remove the tank from service and drain the ABO from the tank until empty. Once empty, the Contractor shall purge the tank, using either a liquid or gaseous method, in accordance with tank technical/operations manuals. Following the purging process, the Contractor shall refill the tank with specification ABO and return the tank to service.

8. INSPECTION AND ACCEPTANCE: Inspection for quality shall be performed at origin. Quantity determination and acceptance shall be at destination.

9. METHOD OF MEASUREMENT: Quantity determination to be performed at delivery location by use of a truck mounted calibrated flow meter.

CONUS Southeastern Region

Charleston AFB, SC

Aerospace Energy products and related services, requires delivery of Aviator’s Breathing Oxygen (ABO). The Contractor shall provide all materials, supplies, product, management, tools, equipment, transportation and labor necessary to deliver product f.o.b. destination into Government-owned tanks at Charleston AFB, SC.

2. PRODUCT SPECIFICATIONS:

2.1. ABO (NSN 6830-00-808-9531) shall meet the requirements of Type II of specification MIL-PRF-27210J, dated 7 Aug 2013.

2.1.1. MIL-PRF-27210J, paragraph 4.2.1: Preproduction samples are not required if the Contractor’s fill point is already supplying one or more DoD locations with ABO in accordance with all the requirements of MIL-PRF-27210J, including the requirement for submitting periodic samples to a Government approved laboratory listed below in paragraph 2.1.5 “ABO Sample Submission Table”.

2.1.2. MIL-PRF-27210J, paragraph 4.2.2: Preproduction samples (if required) and all periodic sample submissions shall be submitted at the Contractor’s expense to a laboratory listed below in paragraph 2.1.5, “ABO Sample Submission Table”.

Contractor’s submitting samples shall attach/include a properly prepared DD Form 1222, Request for and Results of Test, with each sample clearly marking them as either a Preproduction and/or a Periodic Sample. The submitting Contractor shall also arrange return shipment of the sample containers from the assigned Government laboratory.

2.1.3. MIL-PRF-27210J, paragraph 4.3.1.2: A representative sample of Type II may also be obtained by withdrawing a sample from the sampling port on the shipping container directly into the analytical instrument(s).

2.1.4. The entire contents of a Type II ABO shipping conveyance offered for acceptance by the Government should be produced from a facility that meets all of the requirements of this Statement of Objectives. If the shipping conveyance contains any liquid product that was not produced from an approved facility (such as a product heel from a different fill point), a representative sample shall be drawn from the conveyance (after filling) and

CONUS Southeastern Region that specific timeframe by the appointed Delivery Scheduler. The individual orders placed by the appointed Delivery Scheduler will designate the specific quantity to be delivered at the customer location specified in the contract.

4. PRODUCT DELIVERY:

4.1. For routine deliveries, product shall be delivered within 7 days after receipt of an order from the appointed Delivery Scheduler. For emergency deliveries, product shall be delivered within 2 days after receipt of an order from the appointed Delivery Scheduler.

4.2. Deliveries shall be made from 0700-1300 hours, Monday-Friday, excluding federal holidays.

4.3. Product deliveries shall be made to the following address:

ABO SAMPLE SUBMISSION TABLE

PRODUCTION AND PERIODIC

SAMPLES:

AR, CT, DE, IL, IN, IA, KS, KY, ME, MD, MA, MI, MN, MO,

NE, NH, NJ, NY, NC, ND, OH, OK, PA, RI, TN, TX, VT, VA,

WV, WI

Aerospace Fuels Laboratory (FP2070)

AFPA/PTPLA

2430 C Street Bldg 70 Area B Wright-Patterson AFB OH 45433-7632

PH (937)255-0739

AK, AZ, CA, CO, ID, MT, ND, NV, NM, OR, UT, WA, WY Aerospace Fuels Laboratory (FP2075)

AFPA/PTPLE

1747 Utah Ave Bldg 6670 Vandenberg AFB CA 93437-5220

PH (805)606-5873

AL, FL, GA, LA, MS, SC Aerospace Fuels Laboratory (FP2078)

AFPA /PTPLH

15251 Scrub Jay Street Bldg 54800 Cape Canaveral AFS FL 32920

PH (321)853-5441

Or Navair Depot Jacksonville Materials Engineering Lab Code 4.9.7.5

CONUS Southeastern Region

628 LRS/LGRF

Bldg 674 200 Long St.

Joint Base Charleston, SC 29404

5. DESCRIPTION OF GOVERNMENT-OWNED ABO TANKS: ABO shall be delivered into the following Government-owned storage vessels listed below. The storage vessels will be trailer accessible.

Location Tank Capacity-Gallons MAWP Bldg 674 3 – 6,000 GL ea 55 psig ea

6. TANK OVER-PRESSURE PROTECTION: If it is determined during supplier site visits or upon review of tank technical information that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure During Filling of Cryogenic Vessels, the Contractor shall provide and install the additional tank protection which may encompass any of the methods identified in the P-59. NOTE:

Over-protection devices shall not be installed on Government-owned storage tanks without prior coordination with DLA Energy-FEM and the activity that physically possesses the tank(s).

7. INSPECTION AND ACCEPTANCE: Inspection for quality shall be performed at origin. Quantity determination and acceptance shall be at destination.

8. METHOD OF MEASUREMENT: Quantity determination to be performed at delivery location by use of a truck mounted calibrated flow meter.

9. HOT FILLS: Occasionally, the Contractor may be required to perform a “Hot Fill” in order to cool-down and refill any tank that has gone empty and is warm.

10. SECURITY REQUIREMENTS: Individuals seeking access to the installation will require a preprinted manifest with the cryogenics area address listed as the destination address. Additionally, current valid driver’s license, motor vehicle liability insurance, and vehicle registration must be immediately available to any requestor while operating a vehicle on the installation.

Dobbins ARB, GA

Energy), as the Department of Defense (DoD) Integrated Materiel Manager (IMM) for Aerospace Energy products and related services, requires delivery of Aviator’s Breathing Oxygen (ABO). The Contractor shall provide all materials, supplies, product, management, tools, equipment, transportation and labor necessary to deliver product f.o.b. destination into Government-owned tanks at Dobbins ARB, GA.

2. PRODUCT SPECIFICATIONS:

2.1. ABO (NSN 6830-00-808-9531) shall meet the requirements of Type II of specification MIL-PRF-27210J, dated 7 Aug 2013.

2.1.1. MIL-PRF-27210J, paragraph 4.2.1: Preproduction samples are not required if the Contractor’s fill point is already supplying one or more DoD locations with ABO in accordance with all the requirements of MIL-PRF-27210J, including the requirement for submitting periodic samples to a Government approved laboratory listed below in paragraph 2.1.5 “ABO Sample Submission Table”.

2.1.2. MIL-PRF-27210J, paragraph 4.2.2: Preproduction samples (if required) and all periodic sample submissions shall be submitted at the Contractor’s expense to a laboratory listed below in paragraph 2.1.5, “ABO Sample Submission Table”.

Contractor’s submitting samples shall attach/include a properly prepared DD Form 1222, Request for and Results of Test, with each sample clearly marking them as either a Preproduction and/or a Periodic Sample. The submitting Contractor shall also arrange return shipment of the sample containers from the assigned Government laboratory.

2.1.3. MIL-PRF-27210J, paragraph 4.3.1.2: A representative sample of Type II may also be obtained by withdrawing a sample from the sampling port on the shipping container directly into the analytical instrument(s).

2.1.4. The entire contents of a Type II ABO shipping conveyance offered for acceptance by the Government should be produced from a facility that meets all of the requirements of this Statement of Objectives. If the shipping conveyance contains any liquid product that was not produced from an approved facility (such as a product heel from a different fill point), a representative sample shall be drawn from the conveyance (after filling) and tested to determine compliance with the requirements of this Statement of Objectives that specific timeframe by the appointed Delivery Scheduler. The individual orders placed by the appointed Delivery Scheduler will designate the specific quantity to be delivered at the customer location specified in the contract.

4. PRODUCT DELIVERY:

4.1. Product shall be delivered within 7 days after receipt of an order from the appointed Delivery Scheduler. No emergency deliveries are anticipated.

4.2. Deliveries shall be made from 0700-1400 hours, Monday-Friday, excluding federal holidays.

4.3. Product deliveries shall be made to the following address:

Base Fuels Bldg. 531 Dobbins ARB, GA 30069

5. DESCRIPTION OF GOVERNMENT-OWNED ABO TANKS: ABO shall be delivered into the following Government-owned storage vessel listed below. The storage vessels will be trailer accessible.

PRODUCTION AND PERIODIC

SAMPLES:

AR, CT, DE, IL, IN, IA, KS, KY, ME, MD, MA, MI, MN, MO,

NE, NH, NJ, NY, NC, ND, OH, OK, PA, RI, TN, TX, VT, VA,

WV, WI

Aerospace Fuels Laboratory (FP2070)

AFPA/PTPLA

2430 C Street Bldg 70 Area B Wright-Patterson AFB OH 45433-7632

PH (937)255-0739

AK, AZ, CA, CO, ID, MT, ND, NV, NM, OR, UT, WA, WY Aerospace Fuels Laboratory (FP2075)

AFPA/PTPLE

1747 Utah Ave Bldg 6670 Vandenberg AFB CA 93437-5220

PH (805)606-5873

AL, FL, GA, LA, MS, SC Aerospace Fuels Laboratory (FP2078)

AFPA /PTPLH

15251 Scrub Jay Street Bldg 54800 Cape Canaveral AFS FL 32920

PH (321)853-5441

Or Navair Depot Jacksonville Materials Engineering Lab Code 4.9.7.5

Bldg 990 LOX Area 1 – 3,000 GL 60 psig 1534 Hun Rd 1 – 2,000 GL 60 psig Dobbins ARB, GA 30069 protection is required to comply with CGA P-59, Prevention of Over-Pressure During Filling of Cryogenic Vessels, the Contractor shall provide and install the additional tank protection which may encompass any of the methods identified in the P-59. NOTE:

Over-protection devices shall not be installed on Government-owned storage tanks without prior coordination with DLA Energy-FEM and the activity that physically possesses the tank(s).

7. INSPECTION AND ACCEPTANCE: Inspection for quality shall be performed at origin. Quantity determination and acceptance shall be at destination.

8. METHOD OF MEASUREMENT: Quantity determination to be performed at delivery location by use of a truck mounted calibrated flow meter.

9. HOT FILLS: Occasionally, the Contractor may be required to perform a “Hot Fill” in order to cool-down and refill any tank that has gone empty and is warm.

10. SECURITY REQUIREMENTS: Enter the base off Atlanta Road through Dobbins Gate #2 for truck security check. Call Base Fuels at 678-655-4861 to be escorted to LOX Bldg. 990.

Moody AFB, GA

Energy), as the Department of Defense (DoD) Integrated Materiel Manager (IMM) for Aerospace Energy products and related services, requires delivery of Aviator’s Breathing Oxygen (ABO). The Contractor shall provide all materials, supplies, product, management, tools, equipment, transportation and labor necessary to deliver product f.o.b. destination into Government-owned tanks at Moody AFB, GA.

2. PRODUCT SPECIFICATIONS:

2.1. ABO (NSN 6830-00-808-9531) shall meet the requirements of Type II of specification MIL-PRF-27210J, dated 7 Aug 2013.

2.1.1. MIL-PRF-27210J, paragraph 4.2.1: Preproduction samples are not required if the Contractor’s fill point is already supplying one or more DoD locations with ABO in accordance with all the requirements of MIL-PRF-27210J, including the requirement for submitting periodic samples to a Government approved laboratory listed below in paragraph 2.1.5 “ABO Sample Submission Table”.

2.1.2. MIL-PRF-27210J, paragraph 4.2.2: Preproduction samples (if required) and all periodic sample submissions shall be submitted at the Contractor’s expense to a laboratory listed below in paragraph 2.1.5, “ABO Sample Submission Table”.

Contractor’s submitting samples shall attach/include a properly prepared DD Form 1222, Request for and Results of Test, with each sample clearly marking them as either a Preproduction and/or a Periodic Sample. The submitting Contractor shall also arrange return shipment of the sample containers from the assigned Government laboratory.

2.1.3. MIL-PRF-27210J, paragraph 4.3.1.2: A representative sample of Type II may also be obtained by withdrawing a sample from the sampling port on the shipping container directly into the analytical instrument(s).

2.1.4. The entire contents of a Type II ABO shipping conveyance offered for acceptance by the Government should be produced from a facility that meets all of the requirements of this Statement of Objectives. If the shipping conveyance contains any liquid product that was not produced from an approved facility (such as a product heel from a different fill point), a representative sample shall be drawn from the conveyance (after filling) and tested to determine compliance with the requirements of this Statement of Objectives

PRODUCTION AND PERIODIC

SAMPLES:

AR, CT, DE, IL, IN, IA, KS, KY, ME, MD, MA, MI, MN, MO,

NE, NH, NJ, NY, NC, ND, OH, OK, PA, RI, TN, TX, VT, VA,

WV, WI

Aerospace Fuels Laboratory (FP2070)

AFPA/PTPLA

2430 C Street Bldg 70 Area B Wright-Patterson AFB OH 45433-7632

PH (937)255-0739

that specific timeframe by the appointed Delivery Scheduler. The individual orders placed by the appointed Delivery Scheduler will designate the specific quantity to be delivered at the customer location specified in the contract.

4. PRODUCT DELIVERY:

4.1. Product shall be delivered within 7 days after receipt of an order from the appointed Delivery Scheduler. No emergency deliveries are anticipated.

4.2. Deliveries shall be made from 0900-1500 hours, Monday-Friday, excluding federal holidays.

4.3. Product deliveries shall be made to the following address:

Bldg 728 8272 Knights Way Moody AFB, GA 31699

5. DESCRIPTION OF GOVERNMENT-OWNED ABO TANKS: ABO shall be delivered into the following Government-owned storage vessel listed below. The storage vessels will be trailer accessible.

Location Tank Capacity-Gallons MAWP Bldg 728 2 – 3,000 GL ea 25 psig ea 8272 Knights Way Moody AFB, GA 31699

AK, AZ, CA, CO, ID, MT, ND, NV, NM, OR, UT, WA, WY Aerospace Fuels Laboratory (FP2075)

AFPA/PTPLE

1747 Utah Ave Bldg 6670 Vandenberg AFB CA 93437-5220

PH (805)606-5873

AL, FL, GA, LA, MS, SC Aerospace Fuels Laboratory (FP2078)

AFPA/PTPLH

15251 Scrub Jay Street Bldg 54800 Cape Canaveral AFS FL 32920

PH (321)853-5441

Or Navair Depot Jacksonville Materials Engineering Lab Code 4.9.7.5

CONUS Southeastern Region

6. TANK OVER-PRESSURE PROTECTION: If it is determined during supplier site visits or upon review of tank technical information that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure During Filling of Cryogenic Vessels, the Contractor shall provide and install the additional tank protection which may encompass any of the methods identified in the P-59. NOTE:

Over-protection devices shall not be installed on Government-owned storage tanks without prior coordination with DLA Energy-FEM and the activity that physically possesses the tank(s).

7. INSPECTION AND ACCEPTANCE: Inspection for quality shall be performed at origin. Quantity determination and acceptance shall be at destination.

8. METHOD OF MEASUREMENT: Quantity determination to be performed at delivery location by use of a truck mounted calibrated flow meter.

9. HOT FILLS: Occasionally, the Contractor may be required to perform a “Hot Fill” in order to cool-down and refill any tank that has gone empty and is warm.

10. SECURITY REQUIREMENTS: When the Contractor’s driver gets to the gate, their truck will need to be inspected. If they do not have the correct credentials, they will need to be escorted to the delivery location.

Robins AFB, GA

Energy), as the Department of Defense (DoD) Integrated Materiel Manager (IMM) for Aerospace Energy products and related services, requires delivery of Aviator’s Breathing Oxygen (ABO). The Contractor shall provide all materials, supplies, product, management, tools, equipment, transportation and labor necessary to deliver product f.o.b. destination into Government-owned tanks at Robins AFB, GA.

2. PRODUCT SPECIFICATIONS:

2.1. ABO (NSN 6830-00-808-9531) shall meet the requirements of Type II of specification MIL-PRF-27210J, dated 7 Aug 2013.

2.1.1. MIL-PRF-27210J, paragraph 4.2.1: Preproduction samples are not required if the Contractor’s fill point is already supplying one or more DoD locations with ABO in accordance with all the requirements of MIL-PRF-27210J, including the requirement for

CONUS Southeastern Region

2.1.2. MIL-PRF-27210J, paragraph 4.2.2: Preproduction samples (if required) and all periodic sample submissions shall be submitted at the Contractor’s expense to a laboratory listed below in paragraph 2.1.5, “ABO Sample Submission Table”.

Contractor’s submitting samples shall attach/include a properly prepared DD Form 1222, Request for and Results of Test, with each sample clearly marking them as either a Preproduction and/or a Periodic Sample. The submitting Contractor shall also arrange return shipment of the sample containers from the assigned Government laboratory.

2.1.3. MIL-PRF-27210J, paragraph 4.3.1.2: A representative sample of Type II may by the Government should be produced from a facility that meets all of the requirements of this Statement of Objectives. If the shipping conveyance contains any liquid product that was not produced from an approved facility (such as a product heel from a different fill point), a representative sample shall be drawn from the conveyance (after filling) and tested to determine compliance with the requirements of this Statement of Objectives

ABO SAMPLE SUBMISSION TABLE

PRODUCTION AND PERIODIC

SAMPLES:

AR, CT, DE, IL, IN, IA, KS, KY, ME, MD, MA, MI, MN, MO,

NE, NH, NJ, NY, NC, ND, OH, OK, PA, RI, TN, TX, VT, VA,

WV, WI

Aerospace Fuels Laboratory (FP2070)

AFPA/PTPLA

2430 C Street Bldg 70 Area B Wright-Patterson AFB OH 45433-7632

PH (937)255-0739

AK, AZ, CA, CO, ID, MT, ND, NV, NM, OR, UT, WA, WY Aerospace Fuels Laboratory (FP2075)

AFPA/PTPLE

1747 Utah Ave Bldg 6670 Vandenberg AFB CA 93437-5220

PH (805)606-5873

AL, FL, GA, LA, MS, SC Aerospace Fuels Laboratory (FP2078)

AFPA /PTPLH

15251 Scrub Jay Street Bldg 54800 Cape Canaveral AFS FL 32920

PH (321)853-5441

Or Navair Depot Jacksonville Materials Engineering Lab Code 4.9.7.5

CONUS Southeastern Region as an attachment to the applicable Wide Area Workflow (WAWF) Combo document or documented on the WAWF Statement of Quality tab.

3. PRODUCT ORDERING: The DLA Energy Contracting Officer shall issue Individual Delivery Orders (DD Form 1155) for obligation of funds for orders to be issued during that specific timeframe by the appointed Delivery Scheduler. The individual orders placed by the appointed Delivery Scheduler will designate the specific quantity to be delivered at the customer location specified in the contract.

4. PRODUCT DELIVERY:

4.1. Product shall be delivered within 7 days after receipt of an order from the appointed Delivery Scheduler. No emergency deliveries are anticipated.

4.2. Deliveries shall be made from 0800-1500 hours, Monday-Friday, excluding federal holidays.

4.3. Product deliveries shall be made to the following address:

78 LRS/LGRF

640 Richard Ray Blvd.

Robins AFB, GA 31098-2122

5. DESCRIPTION OF GOVERNMENT-OWNED ABO TANKS: ABO shall be delivered into the following Government-owned storage vessels listed below. The storage vessels will be trailer accessible.

Location Tank Capacity-Gallons MAWP Bldg 32 1 – 3,000 GL 20 psig Flightline

Bldg. 2064 1 – 3,000 GL 20 psig Beale Drive 1 – 2,000 GL 20 psig

6. TANK OVER-PRESSURE PROTECTION: If it is determined during supplier site visits or upon review of tank technical information that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure During Filling of Cryogenic Vessels, the Contractor shall provide and install the additional tank protection which may encompass any of the methods identified in the P-59. NOTE:

Over-protection devices shall not be installed on Government-owned storage tanks without prior coordination with DLA Energy-FEM and the activity that physically possesses the tank(s).

7. INSPECTION AND ACCEPTANCE: Inspection for quality shall be performed at origin. Quantity determination and acceptance shall be at destination.

CONUS Southeastern Region

8. METHOD OF MEASUREMENT: Quantity determination to be performed at delivery location by use of a truck mounted calibrated flow meter.

9. HOT FILLS: Occasionally, the Contractor may be required to perform a “Hot Fill” in order to cool-down and refill any tank that has gone empty and is warm.

10. SECURITY REQUIREMENTS: The Contractor’s driver will be checked at the front gate and escorted to the delivery location.

Savannah ANG, GA

Energy), as the Department of Defense (DoD) Integrated Materiel Manager (IMM) for Aerospace Energy products and related services, requires delivery of Aviator’s Breathing Oxygen (ABO). The Contractor shall provide all materials, supplies, product, management, tools, equipment, transportation and labor necessary to deliver product f.o.b. destination into Government-owned tanks at Savannah ANG, GA.

2. PRODUCT SPECIFICATIONS:

2.1. ABO (NSN 6830-00-808-9531) shall meet the requirements of Type II of specification MIL-PRF-27210J, dated 7 Aug 2013.

2.1.1. MIL-PRF-27210J, paragraph 4.2.1: Preproduction samples are not required if the Contractor’s fill point is already supplying one or more DoD locations with ABO in accordance with all the requirements of MIL-PRF-27210J, including the requirement for laboratory listed below in paragraph 2.1.5, “ABO Sample Submission Table”.

Contractor’s submitting samples shall attach/include a properly prepared DD Form 1222, Request for and Results of Test, with each sample clearly marking them as either a Preproduction and/or a Periodic Sample. The submitting Contractor shall also arrange return shipment of the sample containers from the assigned Government laboratory.

CONUS Southeastern Region

2.1.3. MIL-PRF-27210J, paragraph 4.3.1.2: A representative sample of Type II may also be obtained by withdrawing a sample from the sampling port on the shipping container directly into the analytical instrument(s).

2.1.4. The entire contents of a Type II ABO shipping conveyance offered for acceptance by the Government should be produced from a facility that meets all of the requirements of this Statement of Objectives. If the shipping conveyance contains any liquid product that was not produced from an approved facility (such as a product heel from a different fill point), a representative sample shall be drawn from the conveyance (after filling) and tested to determine compliance with the requirements of this Statement of Objectives that specific timeframe by the appointed Delivery Scheduler. The individual orders placed by the appointed Delivery Scheduler will designate the specific quantity to be delivered at the customer location specified in the contract.

PRODUCTION AND PERIODIC

SAMPLES:

AR, CT, DE, IL, IN, IA, KS, KY, ME, MD, MA, MI, MN, MO,

NE, NH, NJ, NY, NC, ND, OH, OK, PA, RI, TN, TX, VT, VA,

WV, WI

Aerospace Fuels Laboratory (FP2070)

AFPA/PTPLA

2430 C Street Bldg 70 Area B Wright-Patterson AFB OH 45433-7632

PH (937)255-0739

AK, AZ, CA, CO, ID, MT, ND, NV, NM, OR, UT, WA, WY Aerospace Fuels Laboratory (FP2075)

AFPA/PTPLE

1747 Utah Ave Bldg 6670 Vandenberg AFB CA 93437-5220

PH (805)606-5873

AL, FL, GA, LA, MS, SC Aerospace Fuels Laboratory (FP2078)

AFPA /PTPLH

15251 Scrub Jay Street Bldg 54800 Cape Canaveral AFS FL 32920

PH (321)853-5441

Or Navair Depot Jacksonville Materials Engineering Lab Code 4.9.7.5

CONUS Southeastern Region

4. PRODUCT DELIVERY:

4.1. Product shall be delivered within 7 days after receipt of an order from the appointed Delivery Scheduler. No emergency deliveries are anticipated.

4.2. Deliveries shall be made from 0730-1600 hours, Monday-Friday, excluding federal holidays.

4.3. Product deliveries shall be made to the following address:

165 AW GA ANG

Bldg 1412 Travis Field Savannah/Hilton Head IAP, GA Garden City, GA 31408-9001

5. DESCRIPTION OF GOVERNMENT-OWNED ABO TANKS: ABO shall be delivered into the following Government-owned storage vessel listed below. The storage vessels will be trailer accessible.

Location Tank Capacity-Gallons MAWP Bldg 1412 1 – 3,000 GL 65 psig

6. TANK OVER-PRESSURE PROTECTION: If it is determined during supplier site visits or upon review of tank technical information that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure During Filling of Cryogenic Vessels, the Contractor shall provide and install the additional tank protection which may encompass any of the methods identified in the P-59. NOTE:

Over-protection devices shall not be installed on Government-owned storage tanks without prior coordination with DLA Energy-FEM and the activity that physically possesses the tank(s).

7. INSPECTION AND ACCEPTANCE: Inspection for quality shall be performed at origin. Quantity determination and acceptance shall be at destination.

8. METHOD OF MEASUREMENT: Quantity determination to be performed at delivery location by use of a truck mounted calibrated flow meter.

9. HOT FILLS: Occasionally, the Contractor may be required to perform a “Hot Fill” in order to cool-down and refill any tank that has gone empty and is warm.

10. SECURITY REQUIREMENTS: The Contractor’s driver must have driver’s license, company identification, and bill of lading.

CONUS Southeastern Region

Trident Refit Facility, GA

1. DESCRIPTION OF REQUIREMENT: Defense Logistics Agency Energy (DLA Energy), as the Department of Defense (DoD) Integrated Materiel Manager (IMM) for Aerospace Energy products and related services, requires delivery of Aviator’s Breathing Oxygen (ABO) and Liquid Nitrogen (LN2). The Contractor shall provide all materials, supplies, product, management, tools, equipment, transportation and labor necessary to deliver product f.o.b. destination into Government-owned tanks at Trident Refit Facility, GA.

2. PRODUCT SPECIFICATIONS:

2.1. ABO (NSN 6830-00-808-9531) shall meet the requirements of Type II of specification MIL-PRF-27210J, dated 7 Aug 2013.

2.1.1. MIL-PRF-27210J, paragraph 4.2.1: Preproduction samples are not required if the Contractor’s fill point is already supplying one or more DoD locations with ABO in accordance with all the requirements of MIL-PRF-27210J, including the requirement for submitting periodic samples to a Government approved laboratory listed below in paragraph 2.1.5 “ABO Sample Submission Table”.

2.1.2. MIL-PRF-27210J, paragraph 4.2.2: Preproduction samples (if required) and all periodic sample submissions shall be submitted at the Contractor’s expense to a laboratory listed below in paragraph 2.1.5, “ABO Sample Submission Table”.

Contractor’s submitting samples shall attach/include a properly prepared DD Form 1222, Request for and Results of Test, with each sample clearly marking them as either a Preproduction and/or a Periodic Sample. The submitting Contractor shall also arrange return shipment of the sample containers from the assigned Government laboratory.

2.1.3. MIL-PRF-27210J, paragraph 4.3.1.2: A representative sample of Type II may also be obtained by withdrawing a sample from the sampling port on the shipping container directly into the analytical instrument(s).

2.1.4. The entire contents of a Type II ABO shipping conveyance offered for acceptance by the Government should be produced from a facility that meets all of the requirements of this Statement of Objectives. If the shipping conveyance contains any liquid product that was not produced from an approved facility (such as a product heel from a different fill point), a representative sample shall be drawn from the conveyance (after filling) and

2.2. LN2 (NSN 6830-01-618-6060) shall meet the requirements of Type II, Grade B, Commercial Item Description A-A 59155 dated 5 Mar 2003, Nitrogen, High Purity, Special Purpose.

2.3. In addition to the reports required elsewhere within this contract, one copy of a Certificate of Analysis for each sample required by the specification shall be submitted that specific timeframe by the appointed Delivery Scheduler. The individual orders placed by the appointed Delivery Scheduler will designate the specific quantity to be delivered at the customer location specified in the contract.

4. PRODUCT DELIVERY:

4.1. For routine deliveries, product shall be delivered within 7 days after receipt of an order from the appointed Delivery Scheduler. For emergency deliveries, product shall be delivered within 2 days after receipt of an order from the appointed Delivery Scheduler.

4.2.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .