AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
See Block 14
4. REQUISITION/PURCHASE REQ. NO.
Spangdahlem AB,Germany
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SPE600 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
SPE60017R0517
X
2017 JUN 15
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, X is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
12. ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By completing Items 8 and 15, and returning
DLA ENERGY
8725 JOHN J KINGMAN RD STE 4950
FT BELVOIR VA 22060-6222
USA
15C. DATE SIGNED 16C. DATE SIGNED
D. OTHER (Specify type of modification and authority)
9 AUGUST 2017
3. EFFECTIVE DATE
See Attached Continuation Sheet(s).
(X)
CHECK ONE
PAGE OF PAGES
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CONTINUED ON NEXT PAGE
Amendment 0004 under solicitation SPE600-17-R-0517, dated June 15, 2017 is hereby issued to provide response to offerors questions related to the Performance Work Statement (PWS) and to incorporate changes to the following within the solicitation:
A. Added Provision E-0006 E36 INSPECTION (STORAGE) (DLA ENERGY FEB 1970) The facilities to be provided hereunder shall be ready for inspection and acceptance by ___________________________. The Contractor shall notify the Contracting Officer of the date such tanks and facilities are available for inspection and acceptance, and the Contracting Officer, or his designated representative, shall promptly thereafter inspect such tanks and facilities. No payment will be made for services performed or facilities provided prior to ________________________.
B. Relocated clause 52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (JUL 2016) within section K of page 57 to section L on page 80.
C. Added clause 52.232-17 INTEREST (MAY 2014) (IBR)
D. Added clause 252.222-7007 REPRESENTATION REGARDING COMBATING TRAFFICKING IN PERSONS (JAN 2015)(IBR)
E. Table of Contents, clause 52.204-7 SYSTEM FOR AWARD MANAGEMENT (JUL 2013) was revised to display 52.204-7
SYSTEM FOR AWARD MANAGEMENT (OCT 2016).
F. Relocated clauses 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999) and 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT ( MAR 2000) from section F to section I.
G. Relocated clause 252.201-7000 CONTRACTING OFFICER'S REPRESETNATIVE (DEC 1991) (IBR) from page 17 section G to page 43 section I.
H. Deleted Provision H-0002 H19.01, REPORTING AND CONTAINING OIL SPILLS (OVERSEAS STORAGE)(DLA ENERGY
JAN 1982).
I. The following note is added to Addendum to 52.212-1, INSTRUCTIONS TO OFFERS - COMMERCIAL ITEMS (JAN 2017) under the instructions for Volume 1 Technical proposal: The Offeror must submit one (1) submission of the technical proposal. The first 50 pages will address the PWS and 20 additional pages will address the Spangdahlem AB PWS Base Appendix that details the site specific requirements. Total of 70 pages for submission.
J. The attached spreadsheet (see next page) answers all offerors questions related to the Performance Work Statement.
K. All other terms and conditions remain the same.
PAGE 2 OF 3 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SPE60017R0517-0004
Item Question Installation /DLA-E Reply
1 Will operations come under JIG or US Standards, ATA103 or A4A?
Specific, relevant operational and quality technical standards are provided in Appendix C
Is an asset inventory available for fixed and mobile equipment and what is the method of valuation if ultimately used by Contractor??
Government furnished equipment, if any, is listed in Appendix AF.
3 What is the number of personnel currently employed?
DLA Energy will not provide detailed information regarding current contractor.
4 What are the current shift patterns? DLA Energy will not provide detailed information regarding current contractor.
Contractor believes that this contract is subject to European TUPE legislation, this requires that all employees will be transferred to the new contractor with their current employment rights and salary.This information will have to be made available to bidders in order to accurately estimate these works and understand our obligations.
When will this information be made available to bidders?
6 Are you able to clarify what maintenance of buildings is undertaken by Contractor and BCE.
The Contractor is responsible for general cleanliness and for calling in work orders to BCE for building maintenance and repair.
The Contractor shall provide, at Contractor expense without additional government funding, all personnel, supplies, materials, fuel, equipment, vehicles, services (routine or emergency),training and other items necessary for performance of the requirements of this contract not otherwise identified in the basic PWS or Appendix AF. This clause states that the Contractor is required to carry out any duties not listed at no extra cost. The boundaries to such obligation need to be clarified.
IAW PWS C-3.1 General Scope of Work, "The Contractor will be responsible for providing the necessary personnel and resources to accomplish all tasks specified herein at Contractor expense unless otherwise specifically stated otherwise." The statement in Appendix F merely reiterates the earlier reference and is intended to stress the non-reimburseable, firm fixed price nature of the contract which is a change from previous contracts. Tasks to be performed are provided in the PWS. The Contractor is responsible for determining and providing all necessary resources to accomplish these tasks.
Is Contractor supplying operator vehicles for this contract? If yes, what specification would these need to be?
The Contractor is not providing special purpose vehicles for this contract. It is the Contractor's responsibility to determine the requirement for general purpose vehicles and propose accordingly.
We understand the contract is being let by the DLA but please can you confirm the contracting entity for this contract, is it US/German entity to ensure we as contractors can ensure all relevant taxes are understood and applied? As an example Contractor want to understand whether British Value Added Tax (VAT) is chargeable on invoices?
The contracting entity is is the Defense Logistics Agency Energy, please refer to FAR 52.229-6(c), and remember that offerors need to disclose the taxes included in their price under K-0003 K86.
Contractor kindly request a native version of “Attachment_III_- _Contractor_Performance_Assessment _Qs”
A copy of Attachment III - Contractor Performance Assessment Questionnaire is provided in Word for your convenience.
Contractor will be working to UK health and safety legislation, can we assume this will be universal for all bidders and we wont be penalised on cost.
Offerors are expected to determine applicable country laws and comply with applicable laws accordingly.
Appendix AF mentions the contractor needs to check-in and out the heating oil trucks. Can DLA provide an estimated quantity of trucks that we will be responsible for?
The number varies depending on weather, but the Contractor should anticipate an average of 3 trucks per day Monday through Friday (60 trucks per month) during the winter months.(Oct-Apr)
We are unclear about the page requirements of the Technical proposal as the instructions are slightly different between Section L and the OSP as follows: * Section L indicates the volume is limited to 70 pages, including Appendices and Attachments * OSP indicates the volume is 70 pages total and "the first 50 pages will address the PWS and the 20 additional pages will address the Spangdahlem AB PWS Base Appendix that details the site specific requirements...." Is it your intention that the OSP instructions prevail? Any clarity you can provide is much appreciated!
See paragraph I of Amendment SPE60017R05170004.
DLA Energy will not provide detailed information regarding current contractor.
Spangdahlem, Germany Responses