8(a)_SOLICITATION_VANDENBERG_CA,_G-DP,_July21,_2017.pdf

PDF 1 MB Posted

Attached to
Fuel Management Services Federal contract opportunity
Solicitation number
SPE600-17-R-0502
Issued by
Defense Logistics Agency Energy

About this file

Vandenberg AFB, CA Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to Fuel Management Services, newest first.
File Type Posted
SF30_Amendment_0002.pdf PDF
SF30_Amendment_0001.pdf PDF
VANDENBERG_Questions_and_Answers.pdf PDF
VANDENBERG_PRE-PROPOSAL_ATTENDEES_LIST.pdf PDF
8(a)_SOLICITATION_VANDENBERG_rev1.pdf PDF
OSP_VANDENBERG_rev1.pdf PDF
ATTACHMENT_VII_QASP.pdf PDF
Attachment_II_-_CBA_and_Addendum.pdf PDF
ATTACHMENT_VI_Appendix_AF.pdf PDF
ATTACHMENT_IV_-_JOINT_VENTURE_CONSENT_FORM.pdf PDF
ATTACHMENT_I_-_OSP_VANDENBERG.pdf PDF
ATTACHMENT_III_-_PAST_PERFORMANCE_QUESTIONNAIRE.pdf PDF
ATTACHMENT_V_-_AF_Consolidated_PWS_-_as_of_9_Jun_17.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NO. 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NO.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

RFQ IFB RFP

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF. OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NAICS:

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8 (A)

EDWOSB

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

ADDITIONAL INSTRUCTIONS FOR ALL PROSPECTIVE OFFERORS

NOTE: See Addendum to FAR 52.212- 1 – INSTRUCTIONS TO OFFERORS - COMMERCIAL ITEMS (AUG 2015), and FAR 52.212-2 – EVALUATION-COMMERCIAL ITEMS (OCT 2014) for complete instructions on how to submit a proposal.

A pre-proposal conference will be held at Vandenberg AFB, CA on July 25, 2017. Interested parties should submit names and phone numbers of attendees to Roderick Estrada via email at roderick.estrada@dla.mil NLT July 12, 2017 at 3:00 PM Ft. Belvoir Time. Technical questions should also be submitted by Monday, July 31, 2017 at 3:00 PM Ft. Belvoir Time.

A. The NAICS code is 493190 and the threshold is $27.5 million in annual receipts. The point of contact for Small Business Affairs is Mr. Gregory Thevenin, 703-767-9465.

B. Your offer must be received in DLA Energy-FESAA by 3:00pm EST on August 22, 2017. Facsimile proposals are not authorized. Do not return the entire solicitation package. Simply complete and return one original and one copy of the Offeror Submission Package data and an original and one copy of the Technical Proposal submissions as described in 52.212-1 Instructions to Offers—Commercial Items (April 2014) with Addendum. Your prices must be inserted in Clause B-0001 B34.01 in the Offeror Submission Package.

C. DLA ENERGY–FESAA is the designated office for receipt of offers. All offerors shall clearly mark envelopes/packages sent in response to this solicitation with the words, “Offer Under Solicitation SPE600- 17- R-0501.” Mailed offers should be mailed to the following address:

US Post Office/US Post Office Express Mail offer only: Hand Carried/Courier Delivery Service only:

ATTN: DLA Energy-FESAA, Roderick Estrada Room 2945 ATTN: DLA Energy-FESAA, Roderick Estrada Rm 2945 Defense Logistics Agency Energy Mr. Roderick Estrada / Telephone: 703-767-1986 8725 John J. Kingman Road, Suite 2945 Defense Logistics Agency Energy Fort Belvoir, VA 22060-6222 8725 John J. Kingman Road, Suite 2945

Fort Belvoir, VA 22060-6222

For Verification of Receipt: Contact: Roderick.Estrada@dla.mil (703) 767-1986.

Unnecessarily elaborate brochures or other presentation beyond those sufficient to present a complete and effective response to this solicitation are not desired and may be construed as an indication of the offeror’ s lack of cost consciousness. Elaborate artwork, expensive paper and bindings, and expensive visual and other presentations are neither necessary nor wanted.

D. FAXED PROPOSALS ARE NOT AUTHORIZED. Please e-mail your proposal to:

bidcustodian@dla.mil. All e-mail proposals MUST be followed-up with the hard copy (consisting of two volumes as outlined below) NO LATER THAN FIVE (5) business days after solicitation closing. Late proposals will be processed in accordance with FAR 15.208 – Submission, Modification, Revision, and Withdrawal of Proposals. Offeror’s proposals shall be prepared in two separate volumes and provided in the quantities shown below:

mailto:bidcustodian@dla.mil

SPE600-17-R-0501

Vandenberg AFB, CA

Volume Title No. of Copies Required Page Limit

I Technical Proposal 1 hard copy & PDF electronic copy 60 II Price Proposal 1 hard copy & PDF electronic copy None

Unless you specifically state otherwise, your offer is assumed to accept all terms and conditions of this solicitation. Any exceptions to any part of this solicitation must be specifically identified in a cover letter to your proposal.

E. The Government intends to evaluate proposals and award one contract per site after written or oral discussions with all responsible offerors that submit proposals within the competitive range. This procurement will use formal Source Selection Procedures using Lowest Price Technically Acceptable source selection process (FAR 15.101-2). See 52.212-2 Evaluation—Commercial Items (Oct 2014) for evaluation methodology of factors. The resulting type of contract will be Firm Fixed Price.

F. Any contract awarded to a contractor who, at the time of award, was suspended, debarred, or ineligible for receipt of a Government contract is voidable at the option of the Government.

G. Care should be taken to mail correspondence relating to this solicitation or resulting contract to the appropriate office as indicated in the applicable clauses.

Table of Contents

SECTION B – SUPPLIES OR SERVICES AND PRICES OR COSTS

B-0001 B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991)

SECTION C – DESCRIPTIONS/SPECIFICATIONS/STATEMENT OF WORK

PERFORMANCE WORK STATEMENT – SEE SECTION J

252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008)

SECTION E – INSPECTION AND ACCEPTANCE

E-0001 ENERGY QAP E1.11-1 QUALITY CONTROL PLAN (GOCO)(AIR FORCE)(DLA Energy

APR 2007)

E-0002 ENERGY QAP E22.01 QUALITY REPRESENTATIVE (DLA ENERGY JUL 1992)

E-0003 ENERGY QAP E28 CONTRACTOR INSPECTION RESPONSIBILITIES (STORAGE) (DLA

ENERGY DEC 2011)

E-0004 ENERGY QAP E29 INITIAL ON-STATION INSPECTION (AARD) (DLA ENERGY MAR

1997) 14

E-0007 ENERGY QAP E35 NONCONFORMING SUPPLIES AND SERVICES (DLA ENERGY DEC

2011) 15

SECTION F - DELIVERIES OR PERFORMANCE

F-0001 F1.05 GENERAL SHIPPING CONDITIONS (DLA ENERGY OCT 1997)

F-0002 F1.11 DLA INTERNET BID BOARD SYSTEM (DIBBS) (DLA ENERGY APR 2014)

SECTION G - CONTRACT ADMINISTRATION DATA

252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

G-0001 G3 INVOICE NUMBERING REQUIREMENTS (DLA ENERGY AUG 1998)

G-0002 G9.06 ADDRESS TO WHICH REMITTANCE SHOULD BE MAILED (DLA ENERGY DEC

1999) 25

G-0003 G21 DESIGNATION OF PROPERTY ADMINISTRATOR (DLA ENERGY MAY 2009)

G-0004 G22 DESIGNATION OF THE DEFENSE FUEL REGION (DLA ENERGY JUL 1997)

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H-0001 H9.01 TECHNICAL DIRECTION (DLA ENERGY FEB 1992

H-0002 H11 GUARD SERVICE (DLA ENERGY MAR 1982)

H-0003 H19 REPORTING AND CONTAINING OIL SPILLS (DOMESTIC STORAGE) (DLA

ENERGY JAN 2012)

H-0004 H51.03 INSURANCE REQUIREMENTS FOR CONTRACTORS AND SUBCONTRACTORS

(DLA ENERGY JAN 2012)

SECTION I - CONTRACT CLAUSES

52.202-1 DEFINITIONS (Nov 2013)

52.203-3 GRATUITIES (APR 1984)

52.203-6 RESTRICTION ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS

(Oct 2010)

52.203-13 – CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY

AGREEMENTS OR STATEMENTS (Jan 2017)

52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT (May

2011) 35

52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011) ... 35

52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (JUL 2016)

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL 2016)

52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS (JAN 2017)

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR

EXECUTIVE ORDERS – COMMERCIAL (jan 2017)

52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (NOV 2016)

52.219-17 – SECTION 8(A) aWARD (Dec 1996)

52.219-18 – NOTIFICATION OF COMPETITION ON LIMITED TO ELIGIBLE 8(A) CONCERNS ... 55

52.223-1 – BIOBASED PRODUCT CERTIFICATION (May 2012)

52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND

CONSTRUCTION CONTRACTS (SEP 2013)

52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011), ALT I

(MAY 2011)

52.223-10 WASTE REDUCTION PROGRAM (MAY 2011)

52.223-19 COMPLIANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEMS (MAY 2011)

52.224-1 PRIVACY ACT NOTIFICATION (APR 1984)

52.228-5 INSURANCE-WORK ON A GOVERNMENT INSTALLATION (JAN 1997)

52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS

(DEC 2013)

52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND VEGETATION (APR

1984) 58

52.237-3 CONTINUITY OF SERVICES (JAN 1991)

52.242-13 BANKRUPTCY (JUL 1995)

52.243-1 –CHANGES – FIXED-PRICE (AUG 1987), ALT I (APR 1984)

52.245-9 USE AND CHARGES (APR 2012)

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

52.253-1 COMPUTER GENERATED FORMS (JAN 1991)

52.204-9000 CONTRACTOR PERSONNEL SECURITY REQUIREMENTS (AUG 2014)

252.201-7000 CONTRACTING OFFICER’S REPRESENTATIVE (DEC 1991)

252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS

(SEP 2011)

252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (SEP

2013) 79

252.203-7003 AGENCY OFFICE OF THE INSPECTOR GENERAL (DEC 2012)

252.203-7005 REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD

OFFICIALS (NOV 2011)

252.204-7000 DISCLOSURE OF INFORMATION (AUG 2013)

252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)

252.204-7008 COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION

CONTROLS (DEVIATION 2016-O0001)(OCT 2015)

252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT 81

REPORTING (DEVIATION 2016-O0001)(OCT 2015)

252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE

GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM(DEC 2014)

252.211-7008 USE OF GOVERNMENT-ASSIGNED SERIAL NUMBERS (SEP 2010)

252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)

252.243-7002 REQUEST FOR EQUITABLE ADJUSTMENTS

252.245-7001 TAGGING, LABELING, AND MARKING OF GOVERNMENT-FURNISHED

PROPERTY (APR 2012)

252.245-7002 REPORTING LOSS OF GOVERNMENT PROPERTY (APR 2012)

252.245-7003 CONTRACTOR PROPERTY MANAGEMENT SYSTEM ADMINISTRATION (APR

2012) 90

I-0001 I1.01-4 DEFINITIONS (CONT’D) (STORAGE) (DLA ENERGY JUNE 2009)

I-0002 I11.01-2 ADMINISTRATIVE COST OF TERMINATION FOR CAUSE – COMMERCIAL

ITEMS (DLA ENERGY FEB 1996)

I-0003 I102.02 FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT ACT -- PAYROLL

TAX ADJUSTMENT (DLA ENERGY JAN 2012)

I-0004 I116 RESPONSIBILITY FOR GOVERNMENT-OWNED PETROLEUM PRODUCTS (DLA

ENERGY JAN 2012)

I-0005 I116.01 LIABILITY FOR FUEL SPILLS (DLA ENERGY JAN 2012)

I-0006 I119.05 INVENTORY CONTROL RECORDS AND SYSTEMS OF RECORD (GOCO) (AIR

FORCE) (DLA ENERGY JUN 2009)

I-0007 I121 CUSTODY OF PETROLEUM PRODUCT (DLA ENERGY APR 1968)

I-0008 I122 USE OF FACILITIES (DLA ENERGY APR 2009)

I-0009 I123 TITLE TO FACILITIES (DLA ENERGY JUL 1991)

I-0010 I147 DEMURRAGE (DLA ENERGY NOV 1989)

I-0011 I180.02 ENVIRONMENTAL PROTECTION (STORAGE) (DLA ENERGY JAN 2012)

SECTION J – LIST OF ATTACHMENTS

ATTACHMENT I – OFFEROR SUBMISSION PACKAGE

ATTACHMENT II – WAGE DETERMINATION/COLLECTIVE BARGAINING AGREEMENT

ATTACHMENT III – PAST PERFORMANCE QUESTIONNAIRE

ATTACHMENT IV – JOINT VENTURE CONSENT FORM

ATTACHMENT V – PWS

ATTACHMENT VI – APPENDIX AF

ATTACHMENT VII - QASP

SECTION K - REPRESENTATIONS, CERTIFICATIONS AND STATEMENTS

52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985)

52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (Apr 2010)

52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (Jul 2013)

52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS – COMMERCIAL ITEMS (Mar

2015) 108

52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (Oct 2014)

252.247-7022 REPRESENTATION OF EXTENT OF TRANSPORTATION BY SEA (AUG 1992)

K-0001 K15 RELEASE OF PRICES (DLA ENERGY MAR 2009)

K-0002 K33.01 AUTHORIZED NEGOTIATORS (DLA ENERGY APR 2007)

K-0003 K150 WIDE AREA WORKFLOW (WAWF) SUPPLEMENTAL INVOICE SUBMISSION

(DLA ENERGY MAY 2014)

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

52.212-1 INSTRUCTIONS TO OFFERORS - COMMERCIAL ITEMS (JAN 2017)

ADDENDUM TO 52.212-1 – INSTRUCTIONS TO OFFERS – COMMERCIAL ITEMS (JAN 2017) 128

52.222-24 PREAWARD ON-SITE EQUAL OPPORTUNITY COMPLIANCE EVALUATION (Feb

1999) 134

52.233-2 SERVICE OF PROTEST (SEP 2006)

52.237-1 SITE VISIT (APR 1984)

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

252.209-7002 DISCLOSURE OF OWNERSHIP OR CONTROL BY A FOREIGN GOVERNMENT

(JUN 2010)

52.233-9001 DISPUTES - AGREEMENT TO USE ALTERNATIVE DISPUTE RESOLUTION (NOV

2011) 137

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

L-0001 L1.02 PROPOSAL ACCEPTANCE PERIOD (DLA ENERGY NOV 1991)

L-0002 L2.01-1 PROPOSAL PREPARATION INSTRUCTIONS AND PAST PERFORMANCE AND

SOCIOECONOMIC PLAN SUBMISSIONS (DLA ENERGY FEB 2015)

L-0004 L2.11-4 E-MAIL PROPOSALS (DLA ENERGY OCT 2010)

L-0005 L2.31 PROPOSAL FORMAT AND CONTENT (DLA ENERGY JAN 2012)

L-0008 L82 WAGE DETERMINATION (DLA ENERGY FEB 2009)

L-0009 L198 PREPROPOSAL CONFERENCE (SERVICES) (DLA ENERGY FEB 2009)

SECTION M - EVALUATION FACTORS FOR AWARD

52.212-2 EVALUATION - COMMERCIAL ITEMS (OCT 2014)

52.217-5 EVALUATION OF OPTIONS (Jul 1990)

M-0001 M72 EVALUATION OF OFFERS (EXCEPTIONS/DEVIATIONS) (DLA ENERGY APR

1997) 147

SECTION B – SUPPLIES OR SERVICES AND PRICES OR COSTS

B-0001 B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991)

The services to be furnished during the period specified herein and the unit prices are as follows:

*FUELS MANAGEMENT SERVICES – BASE PERIOD NOVEMBER 1, 2017 –

OCTOBER 31, 2021

FIRM FIXED PRICE (Pro-rated for part months)

Non-personal Services. Provide all supervision, personnel, equipment, transportation, material, and all else necessary to perform fuels management services at Vandenberg AFB, CA, in accordance with Attachment 1, Performance Work Statement (PWS).

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE TOTAL

0001 * 48 Months $_ $ (November 1, 2017 – October 31, 2021)

*FUELS MANAGEMENT SERVICES – OPTION PERIOD November 1, 2017 – OCTOBER 31, 2021 FIRM FIXED PRICE (Pro-rated for part months)

Non-personal Services. Provide all supervision, personnel, equipment, transportation, material, and all else necessary to perform fuels management services at Vandenberg, AFB, CA, in accordance with

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE TOTAL

0002 * 60 Months $_ $ (November 1, 2021 – October 31, 2026)

*FUELS MANAGEMENT SERVICES – BASE PERIOD NOVEMBER 1, 2021 –

OCTOBER 31, 2026 FIRM FIXED PRICE (Pro-rated for part months)

Non-personal Services. Provide all supervision, personnel, equipment, transportation, material, and all else necessary to perform fuels management services at Vandenberg, AFB, CA, in accordance with

SECTION C – DESCRIPTIONS/SPECIFICATIONS/STATEMENT OF WORK

PERFORMANCE WORK STATEMENT – SEE SECTION J

252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008)

a) At the time of each delivery of supplies or services under this contract, the Contractor shall prepare and furnish to the Government a material inspection and receiving report in the manner and to the extent required by Appendix F, Material Inspection and Receiving Report, of the Defense FAR Supplement.

(b) Contractor submission of the material inspection and receiving information required by Appendix F of the Defense FAR Supplement by using the Wide Area WorkFlow (WAWF) electronic form (see paragraph

(b) of the clause at 252.232-7003) fulfills the requirement for a material inspection and receiving report (DD Form 250). Two copies of the receiving report (paper copies of either the DD Form 250 or the WAWF report) shall be distributed with the shipment, in accordance with Appendix F, Part 4, F-401, Table 1, of the Defense FAR Supplement.

SECTION E – INSPECTION AND ACCEPTANCE

52.246-4 Inspection of Services Fixed-Price (Aug. 1996)

(a) Definition: “Services,” as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.

(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.

(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.

(d) If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.

(e) If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may --

(1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and

(2) Reduce the contract price to reflect the reduced value of the services performed.

(f) If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may --

(1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service; or

(2) Terminate the contract for default.

E-0001 ENERGY QAP E1.11-1 QUALITY CONTROL PLAN (GOCO)(AIR FORCE)(DLA ENERGY

APR 2007)

(a) Upon award, the Contractor shall prepare, in triplicate and in English, a Quality Control Plan (QCP). Prior to the first receipt of Government-owned product into the facility, two copies of the QCP shall be forwarded to the Contracting Officer and one copy to the assigned Quality Assurance Representative for approval.

(b) The QCP shall include the following quality control procedures employed by the Contractor:

(1) Receiving (both product and additives);

(2) Blending;

(3) Storage and handling;

(4) Loading and shipping;

(5) Calibration program for testing and measuring equipment in accordance with ISO 10012- 1, "Quality Assurance Requirements for Measuring Equipment, Part I." Equivalent local regulation, as appropriate, may be used as well. Whichever program used must include a section addressing meter proving (used to determine quantity) and must comply with the American Petroleum Institute Manual of Petroleum Measurement Standards, Chapters 4, 5, and 6, or equivalent foreign standard. For any item that requires calibration but is not covered by ASTM, API, or IP publications, the applicable manufacturer's recommended calibration method(s) outlined in the applicable industry publication shall be used if acceptable to the Government;

(6) Quantity measurement;

(7) Records and reports; and

(8) Corrective action procedures (to include, but not be limited to, procedures for notification of Quality Representative, actions to be taken on discovery of off-spec product during receipts/shipments, upgrading procedures for Contractor-caused contamination, leaks, etc.). The QCP shall also include an organizational chart of key personnel and their responsibilities and a schematic diagram of the facility with key inspection/activity points marked for each product handled.

(c) The QCP shall require that each Contractor employee be familiar with its content and shall state that it must be reviewed semiannually and revised as needed. Revision should occur when any change is made to the inspection system, when any corrective action needs to be incorporated due to quality problems, and as otherwise necessary. The Contractor shall sign and date each revision of the QCP.

E-0002 ENERGY QAP E22.01 QUALITY REPRESENTATIVE (DLA ENERGY JUL 1992)

The Quality Office assigned inspection responsibility under this contract is DLA Americas West.

E-0003 ENERGY QAP E28 CONTRACTOR INSPECTION RESPONSIBILITIES (STORAGE) (DLA

ENERGY DEC 2011)

(a) Inspection and tests by the Government of services, facilities, and equipment specified within this contract does not relieve the Contractor from responsibility to meet all requirements of the contract.

(b) The Contractor shall furnish personnel, facilities, and equipment on-site to accomplish the following routine tests and procedures. These on-site resources may be provided by Contractor personnel or by a commercial source action on behalf of the Contractor. The Quality Representative will not be responsible for performing any of these services for the Contractor.

(1) Sampling of storage tanks, shipments and receipts in accordance with ASTM D 4057, Standard Practice for Manual Sampling of Petroleum and Petroleum Products (API Manual of Petroleum Measurement Standards (MPMS), Chapter 8.1);

(2) Retaining of product composite samples from shipments and receipts as follows:

MINIMUM

METHOD OF SHIPMENT MINIMUM QUANTITY RETENTION PERIOD

Pipeline 20 liters 60 days

Tanker/Barge Parcel Composite 20 liters 90 days Each compartment 0.5 liters 90 days

Navy Fleet Oilers/Vessels 10 liters 60 days

Tank Truck/Car 1 liter 15 days

NOTE: After the minimum retention period, samples shall be tested for Appearance, Color (Visual), API Gravity/Density and Flash Point and, if found to be on-specification, shall be returned to like Government stock on-site. Sample containers may be reused if properly cleaned.

(3) Determining the presence of water in storage tanks, shipments and receipts. Ensure that accurate water cuts are obtained by means of a water indicating paste conforming to MIL-W-83779B. Two suggested sources are Stewart Hall Chemical Testmaster Water Indicating Paste or Sartomer Sar Gel Water Indicating Paste (see Note 2 below);

(4) Determining Density at 15 degrees Celsius or API gravity of products by ASTM D 1298 or ASTM D 4052 (see Note 2 below);

(5) Determining the temperature of products by the API MPMS, Chapter 7 (see Note 2 below);

(6) Determining the Appearance of applicable products using ASTM D 4176, Procedure 1 (see Note 2 below);

(7) Determining the visual color of products.

(8) Determining the Flash Point of applicable products using test methods cited in the appropriate product specification (see Note 2 below);

(9) Conversion of gross to net gallonage (liters);

(10) Determining the percentage (volume) of fuel system icing inhibitor (FSII) by means of a portable refractometer in accordance with ASTM D 5006. One suggested source is H.B. Industries, Inc., Glenview, IL 60025 (B/2 Anti-Icing Additive test kit) (see Note 2 below); and

(11) Determining the range of fuel electrical conductivity using ASTM D 2624. One suggested source for a conductivity meter is Emcee Electronics, Inc., Sarasota, FL 33581 (Model 1152) (see Note 2 below).

Note 1: All costs for providing the above tests and procedures shall be included in the monthly service charge. The only exception to the Contractor’s obligation to provide these services as part of the monthly service charge is when the tests described above are part of the higher order analysis (defined as the following categories: Composite Samples, Storage Tanks After Receipt, Interface Mixtures, Dormant Stocks and Individual Tests (including particulate contamination) found in the attachment to the solicitations entitled MINIMUM REQUIREMENTS FOR STORAGE SAMPLING AND TESTING. Provisions for providing higher order analyses are covered in the SAMPLING AND TESTING OF PETROLEUM PRODUCTS (STORAGE) contract provision.

Note 2: Upon request, the Contractor shall permit the Quality Representative unrestricted use of the equipment and ancillary supplies needed to perform this test/procedure on behalf of the Government.

(c) During the contract, the Contractor shall furnish representative samples of the product in each storage tank, shipment or receipt at the request of, and in the manner and to the place designated by, the Quality Representative. Sample size will be 2 gallons for gasoline-type fuels and one gallon or 10 gallons for jet diesel-type fuels. The number of samples to be furnished during any 12-month period shall not exceed eight times the number of tanks specified in the contract. Such samples shall be packed, marked, and shipped by the Contractor, shipping expense prepaid, in containers and shipping boxes furnished by the Contractor. Sample containers shall be epoxy coated on the interior. This requirement is in addition to sampling required elsewhere in this contract provision and the contract. All reasonable direct shipping costs associated with samples required by this paragraph shall be reimbursed upon request from the Contractor and such costs shall not be included in the monthly service charge. However, all other costs related to this requirement shall be included as part of the monthly service charge.

E-0004 ENERGY QAP E29 INITIAL ON-STATION INSPECTION (AARD) (DLA ENERGY MAR 1997)

(a) INSPECTION. The initial on-station inspection is for the sole benefit of the Government and the Government may partially or totally waive its right of inspection at its discretion. The date, time, and place of inspection may be changed by the mutual agreement of the parties.

(b) TIMEFRAME. Unless notified otherwise, all equipment shall be available for Government inspection at the installation where services are to be performed four calendar days prior to the start of the delivery period. No work may be performed on the equipment during the inspection period except as permitted by the Government. The Government will complete inspection of the Contractor's equipment no later than the calendar day preceding the date aircraft fuel delivery services are to commence.

(c) ENTRY. The Contractor is responsible for making necessary arrangements with the Commanding Officer of such installation or an authorized representative regarding entry into the installation.

(d) TANK INTERIORS. Equipment presented for inspection shall be vapor free.

(e) FILTRATION MEDIA. If requested by the Government, the Contractor shall be responsible for disassembling filtration units to facilitate the inspection. The Contractor shall present, at the time of the inspection, written certification attesting to the last date on which each filter element was changed and shall provide a historical record denoting pressure drip data for each filter element (if such certification and pressure drip data exists).

(f) CONTRACTOR REPRESENTATIVE. Representation by the Contractor at the inspection shall be limited to one individual except when additional personnel have been specifically authorized by the Government.

(g) DEFAULT. If the Contractor fails to make the equipment available on the date specified or otherwise mutually agreed upon, or if the inspection discloses that the equipment is not in conformance with contract requirements, the Government may terminate this contract for default.

(h) REINSPECTION. If the Government discovers equipment deficiencies during the initial inspection, the Government may, at its discretion, conduct a reinspection at the Contractor’s expense.

E-0005 ENERGY QAP E29.01 CONTRACT TURNOVER INSPECTION (DLA ENERGY MAR 2002)

The outgoing Contractor, during the last 10 working days of the contract, shall permit personnel of the successor Contractor access to all contacted facilities to observe operations. The successor Contractor shall, during the last 96 hours of the expiring contract, be provided assistance by the outgoing Contractor, DLA Energy representatives, and the Contracting Officer’s Representative in accomplishing a joint facilities turnover inspection. The inspection shall provide for a facilities walk-through and property inventory, product sampling and testing, and a complete product inventory. The successor Contractor agrees to protect and not disclose any inadvertently disclosed proprietary information of the outgoing Contractor discovered during the turnover period.

E-0007 ENERGY QAP E35 NONCONFORMING SUPPLIES AND SERVICES (DLA ENERGY DEC 2011)

(a) DEFINITION: As used in this contract provision:

Deviation is defined as a written authorization granted after contract award and prior to manufacture of an item, to depart from a particular performance or design requirement of a contract, specification, or referenced document, for a specific number of units or specific period of time, normally the duration of the contract.

Extraordinary situation means the matter cannot await resolution until the next DLA Energy business day (0800 to 1630 hours EST, Monday through Friday, Federal Holidays excluded).

Waiver is defined as a written authorization granted after contract award to accept a configuration item or other designated item which, during production or after having been submitted for inspection, is found to depart from specified requirements, but nevertheless is considered suitable for use “as is” or after repair by an approved method. Approval is on a case-by-case basis and is normally for a set period of time.

(b) The Government may, at its discretion, accept nonconforming supplies or services. In such cases, the Contractor must obtain a deviation or waiver from the Contracting Officer prior to acceptance.

(c) The following procedures shall be used to request a deviation or waiver.

(1) Requests for deviations and waivers shall be submitted by the Contractor to the Contracting Officer with a copy to the appropriate Inspection Office referenced in the LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS or QUALITY REPRESENTATIVE contract provision of this contract. Each request shall provide the following information: Contractor name; name and contact information of the contractor’s authorized negotiator; contract number; contract line item number and product nomenclature, clause or contract provision number, paragraph and subparagraph, as appropriate; the nature of the request; the reason for the request; the corrective action being taken by the Contractor to correct and prevent recurrence of the condition(s) causing the nonconformance; and an agreement to pay an equitable price reduction, estimated and proposed by DLA Energy, over and above the administrative fee, contingent on the impact of the specific circumstances on DLA Energy relative to approval of the deviation or waiver.

(2) In extraordinary situations, the Contractor may initially submit a verbal request for a waiver, but not a deviation, to the Contracting Officer. Written requests shall be submitted to the Contracting Officer by the next DLA Energy business day (0800 to 1630 hours EST, Monday through Friday, Federal Holidays excluded). If the Contracting Officer cannot be reached, the Duty Officer shall be contacted to provide the necessary information to the proper individuals as soon as possible. The Duty Officer's telephone number is (800) 286-7633 or (703) 767-8420.

(3) If a deviation or waiver is granted, the contract will be modified to accept the nonconforming supplies or services and to require the Contractor to provide an equitable price reduction or other adequate consideration commensurate with the deviation or waiver being granted. If the situation warrants, a deviation or waiver may be granted without prior agreement on price reduction or other consideration, subject to agreement by the Contractor, or its representative, to subsequent negotiation. Such an agreement, in addition to a brief description of the terms of the deviation or waiver, shall be documented on the shipping document or other appropriate correspondence. After negotiations, failure to agree on adequate consideration shall be a dispute concerning a question of fact within the meaning of the Disputes paragraph of the CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS contract provision of this contract.

(4) If a deviation or waiver is granted and the nonconforming supplies are accepted, then in no event will consideration be less than $500, which covers administrative costs, plus any additional cost of Government reinspection or retest, if necessary.

(5) If a deviation or waiver is granted modifying this contract, but the supplies accepted are subsequently determined to be in conformity with contract specifications, the Contractor shall still be obligated to pay the consideration originally agreed upon in support of the deviation or waiver. If, however, this consideration exceeds $1000, a second contract modification shall be issued reducing the Contractor's obligation to $1000 (the administrative cost of issuing the two required modifications), plus, if appropriate, any cost of Government reinspection or retest performed as a result of the deviation or waiver being granted.

(d) When notification of nonconforming supplies is received after the supplies have been accepted, and the Government determines not to exercise its right to reject or to require correction under the INSPECTION OF SUPPLIES – FIXED-PRICE, INSPECTION OF SERVICES – FIXED PRICE, or CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS contract provision, then in no event will consideration be less than $500 to cover administrative costs. This $500 fee is in addition to—

(1) Consideration commensurate with the extent of nonconforming supplies; and

(2) Cost of Government reinspection or retest, if necessary.

The administrative fee will apply to each claim letter issued for off-specification product delivered to an activity.

(e) Contractors shall be held responsible for payment of any fines or penalties imposed on a receiving activity by an environmental enforcement agency, resulting from the delivery of nonconforming supplies under a DLA Energy contract.

(f) Repeated tender of nonconforming supplies or services, including those with only minor defects, will be discouraged by appropriate actions, including, but not limited to, rejecting the supplies or services whenever feasible and documenting the Contractor's performance records.

SECTION F - DELIVERIES OR PERFORMANCE

52.242-15 STOP-WORK ORDER (AUG 1989)

(a) The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Within a period of 90 days after a stop-work is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the Contracting Officer shall either --

(1) Cancel the stop-work order; or

(2) Terminate the work covered by the order as provided in the Default, or the Termination for Convenience of the Government, clause of this contract.

(b) If a stop-work order issued under this clause is canceled or the period of the order or any extension thereof expires, the Contractor shall resume work. The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if --

(1) The stop-work order results in an increase in the time required for, or in the Contractor’s cost properly allocable to, the performance of any part of this contract; and

(2) The Contractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage; provided, that, if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon the claim submitted at any time before final payment under this contract.

(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.

(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.

F-0001 F1.05 GENERAL SHIPPING CONDITIONS (DLA ENERGY OCT 1997)

(a) The Contractor will prepare the inspection and shipment documents covering deliveries made from the terminal in accordance with instructions contained in the Documentation and Product Property Control Plan. Normally, the document will consist of DD Form 250 for tank car, tank truck, pipeline, and packaged shipments, and DD Form 250-1 and ullage/innage reports in the case of barge and tanker shipments. The Contractor will distribute the DD Forms 250 and the Quality Representative (QR) will distribute the DD Forms 250-1. When the QR is not present for release or shipment of product inspected at these facilities, and the Contractor's quality control program has been approved by the responsible Government Quality Office in accordance with paragraph 246.471 of the DOD FAR Supplement, the Contractor will insert the following certification on the inspector's copy of the shipping documents:

"I certify that the above supplies were (a) in the quantity indicated, (b) taken from Government-owned and approved stocks, and (c) loaded into inspected and approved containers. This shipment was released in accordance with paragraph 246.471-2 of the DoD FAR Supplement under authorization of (NAME and TITLE OF THE

AUTHORIZED REPRESENTATIVE OF THE CONTRACT ADMINISTRATION OFFICE)

in a letter dated (DATE OF AUTHORIZING LETTER). (SIGNATURE AND TITLE OF

CONTRACTOR'S DESIGNATED REPRESENTATIVE)."

(b) Shipment of products hereunder will be made only pursuant to a "release" furnished by the Product Property Administrator or his designated representative. The "release" will indicate the consignees who are authorized to issue "calls" or "orders" for shipment of product. Such "release" will be periodically furnished to the Contractor by the cognizant Product Property Administrator.

(c) Conveyances required for shipments shall be furnished or designated by the Government. The Contractor shall inspect all shipping conveyances prior to loading to insure that product loaded will not be lost or contaminated by the condition of the equipment. Tank truck inspection must be performed by qualified Contractor personnel. Delegation of this responsibility shall not be passed to the tank truck operator/driver. The tank truck operator/driver may be permitted to physically load the tank truck; however, the loading operation must be under the surveillance and direction of Contractor personnel. Equipment found to be unsatisfactory shall be reported as follows: (1) TANKERS AND BARGES. Report immediately by telephone to the QR; if not present, the master of the tanker or barge or to the carrier's agent or general office; (2) TANK CARS. Report to the QR and by wire (Government Rate, Collect) to Commander, Eastern Area, Military Traffic Management Command, ATTN: MTE-INR-O, Brooklyn, NY 11250. Any shortage or overage of tank cars shall be similarly reported; (3) TRANSPORT TRUCKS.

Contractor shall expeditiously report to the Traffic Manager of the appropriate Defense Fuel Region, Government QR, and to the carrier's terminal where equipment is domiciled.

(d) Except when loading barges or tankers, or making pipeline deliveries, strainers of 100 mesh or finer shall be utilized in loading aviation fuels and jet lubricating oil and 60 mesh or finer in the case of reciprocating engine oil. Strainers shall be located as near the loading point as practicable. Contractor shall furnish and periodically inspect and clean such strainers and repair same, if necessary, keeping a written record thereof.

(e) Contractor shall affix serially numbered seals to the dome covers of tank cars and all openings in the case of tank trucks in such a manner that entry could only be gained by breaking a seal. Such seals will be furnished by the Contractor. Seal numbers will be indicated on shipping documents.

(f) Placards, as required by 49 CFR 172.506 and 49 CFR 172.508, shall be furnished and affixed to all tank cars and tank trucks by Contractors unless placards are already affixed.

(g) FOR TANK CARS ONLY.

(1) If Government-owned or leased tank cars are furnished, the Contractor will maintain records showing each day a car is received or forwarded by car number and will furnish the information to the Defense Fuel Regional Office upon request.

(2) Bottom outlet gaskets and manway cover gaskets, when required due to deterioration or loss, shall be furnished and applied to tank cars by the Contractor.

(3) The Contractor shall (i) inspect empty Government-owned tank cars located on the Contractor's premises and (ii) ship tank cars located on the Contractor's premises to repair facilities as directed by the Government.

(h) Unless otherwise directed, the Contractor shall prepare and distribute Government bills of lading utilized in shipments. Such bills of lading, routing instructions, and transportation assistance will be furnished by the Defense Fuel Region placing orders.

(i) The Contractor shall comply with routing instructions furnished by the Government. Such instruction will include names, routes, route order numbers, and other pertinent information. The Contractor shall be responsible for scheduling of commercial transport trucks, trucks and trailer, and tank wagons to its plant in accordance with such routing instructions and consonant with the applicable order. The Contractor shall provide sufficient advance notice to carriers and schedule the carrier's equipment for loading. The Contractor shall reimburse the Government for any demurrage incurred as a result of improper scheduling.

(j) Custody of product shipped by pipeline, and risk of loss thereof, shall pass from the Contractor to the carrier when the product passes the flange connecting the Contractor's pipeline and the carrier's pipeline.

(k) Custody of product shipped by transport truck, and risk of loss thereof, shall pass from the Contractor to the carrier when the loaded transport truck is released for shipment by the Contractor.

(l) Custody of product shipped by tank car, and risk of loss thereof, shall pass from the Contractor to the carrier when the loaded tank car is picked up by the carrier.

(m) Custody of product delivered to tanker or barge, and risk f loss thereof, shall pass from the Contractor to the carrier when the fuel passes the vessel’s permanent hose connection.

(n) The Contractor shall be held accountable for demurrage charges arising from delay(s) in shipment by tank cars and transport trucks except when those delays are caused by reasons beyond the control and without the fault or negligence of the Contractor and its subcontractors.

(o) The following subparagraphs only apply to barges and tankers.

(1) SCHEDULED ARRIVAL DATE AND BASIC ALLOWED LAYTIME.

(i) Notice shall be furnished to the Contractor in advance of the date on which loading is to be made, which date is hereinafter referred to as the "Scheduled Arrival Date." Each notice will specify the quantity to be loaded, the cargo number, and name of the vessel and the scheduled loading date. For tankers, notice will also include the size of the vessel and the expected time of arrival. Notice of delivery will be furnished at least 72 hours in advance of the scheduled arrival date for tankers, and at least 48 hours in advance of the scheduled arrival date for barges. When anticipated vessel transit time to the loading point is less than 72/48 hours, the Government will provide the maximum notice practicable. Any change in the scheduled arrival date of less than 48 hours notice for barges and 72 hours notice for tankers will require verbal approval of the Contractor, confirmed in writing..

(ii) The Contractor shall provide as soon as possible, but within 3 hours after issue of notice of readiness to load from a barge and within 6 hours after the Contractor receives notice of readiness to load from a tanker, a reachable berth, free of cost to the Government, where the vessel can be safely moored and afloat with necessary access thereto PROVIDED, however --

(A) If the vessel is tendered for loading on a date earlier than the last agreed scheduled arrival date, the Government’s vessel shall be loaded as soon as possible in its proper turn with other vessels, and laytime shall not commence until the vessel moors alongside or, for barges, 3:00 A.M.

local time; for tankers, 6:00 A.M. local time, on the last agreed scheduled arrival date, whichever occurs first.

(B) If the vessel is tendered for loading later than 12:00 noon of the day following the last scheduled arrival date, the vessel shall be loaded in its proper turn with other vessels.

Laytime shall commence when the vessel moors alongside, provided a good faith effort is made by the Contractor to moor the vessel in its turn with other vessels as loading berths become available. If the vessel is not moored in its proper turn with other vessels, laytime will commence at 6:00 A.M. on the date the Government vessel’s turn occurred.

(iii) Laytime shall commence either (A) at the expiration of the notice period prescribed in subparagraph (ii) above, berth or no berth, or (B) immediately when the vessel moors alongside, with or without notice of readiness, whichever occurs first.

(iv) Laytime, once started, shall continue 24 hours per day, 7 days per week, without interruption, from its commencement until loading of the barge or tanker is completed and hoses have been removed.

(v) Unless otherwise provided in the Schedule, the Contractor shall be allowed and will complete unloading within laytime determined as follows:

(A) FOR BARGES: One hour for each 2,000 barrels of product to be loaded.

(B) FOR TANKERS: Thirty-six hours for load of full vessel cargo. When partial vessel cargoes are to be loaded, the 36 hours will be prorated based on quantities loaded by each supplier. The 36 hours includes allowances for routine events that occur in the loading process, such as cushioning and topping off of vessel tanks.

(vi) Hoses and loading arms for loading shall be furnished, connected, and disconnected by the Contractor.

(2) INCREASES TO BASIC ALLOWED LAYTIME.

(i) If, after laytime commences, the conditions or facilities of the barge or tanker to be loaded do not permit loading, basic allowed laytime shall be increased by the duration of the delay.

(ii) If the vessel is delayed in reaching its berth and the delay is caused by the fault of the vessel, basic allowed laytime shall be increased by the duration of the delay.

(iii) After laytime commences, when vessels are required to dock at anchorage due to vessel delays such as vessel inspection and inerting, laytime credit will be allowed for transit time from anchors away at anchorage until first line ashore berthing, not to exceed 2 hours.

(iv) If regulations of the owner or operator of the vessel prohibit loading at any time after laytime has commenced, time so lost shall be added to basic allowed laytime.

(v) If, for any reason, the Contractor is delayed in loading the barge or tanker because of actions of a Government representative, acting under the contract, that arise through no fault or negligence on the part of the Contractor or its subcontractors, basic allowed laytime shall be increased by the duration of the delay.

(vi) There will be no increase to basic allowed laytime (nor other reductions to any resulting demurrage time) for saved laytime arising out of other loadings/discharges.

(vii) Delays, after commencement of laytime, attributed to causes beyond the control and without the fault or negligence of the Contractor or the U.S. Government will result in increasing the basic allowed laytime by one half of the delay time.

(3) PAYMENT OF DEMURRAGE. For all hours of laytime which elapse in excess of the basic allowed laytime for loading provided for by paragraph (1) above, or as otherwise provided in the Schedule, the Contractor shall pay demurrage to the Government as follows:

(i) USS, USNS, OR TIME CHARTERED VESSELS. At the demurrage rate for the vessel loaded…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .