RFQATTACH.SPE3SE19Q0488.0000.PDF

PDF 379 KB Posted

Attached to
Equipment IST Federal contract opportunity
Solicitation number
SPE3SE19Q0488
Issued by
Defense Logistics Agency Troop Support Subsistence

View the file

Other files for this federal contract opportunity

Other files attached to Equipment IST, newest first.
File Type Posted
SPE3SE19Q0488.PDF PDF
RFQATTACH.SPE3SE19Q0488.0001.PDF PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8.4’ W x 28’ L x 7’ H

1 20,000 BTU A/C UNIT

2 EXHAUST FAN, TWO (2)

3 SHORE POWER CONNECTION SUB STYLE ABLE TO SUPPORT 440V POWER FROM THE PEIR WITH STEP DOWN CONVERTER TO 220V/120V

4 1.5IN NON COLLAPSABLE 100' (foot) HOSE FOR POTABLE WATER SUPPLY

5 15 GALLON OR LOARGER WATER HEATER

6 4-120V OUTDOOR WEATHER PROOF ELECTRICAL OUTLETS TWO IN FRONT TWO IN BACK

7 SUBMERSIBLE PUMP FOR FOR PUMPING GRAY/WASTE WATER CAPABLE OF PUMPING TO AN EXTERIOR COLLECTION TANK W/ RESEVOIR TANK OF 50 GL

8 GENERATOR CAPABLE OF RUNNING ALL EQUIPMENT IN CASE OF POWER OUTAGE FOR EXTENDED PERIOD OF TIME (OFF OF PROPANE?)

9 CONCESSION WINDOW

10 LIGHTS INSIDE AND OUT

11 ACCESS STAIRS CAPABLE OF 400 LBS EACH STEP

12 MOBILE GALLEY FLOORING MUST BE ABLE TO WITH STAND SPILLE.MOISTURE, AND HEAT. SLIP RESISTANT, STAIN RESISTANT, AND BURN RESISTANT. MUST BE ABLE TO WITHSTAND PROLONGED OPERATIONS OF UP TO 45 DAYS

13 TOWING AND LIGHTING SYSTEM/ BRAKING AND SIGNAL ELECTRICAL WIRE HARNESS

14 OVERALL MOBILE STRUCTURE MUST BE ABLE TO WITHSTAND 45 DAYS OF USE WITHOUT MAINTANENCE BEING CONDUCTED.

15 INTERIOR FLOURESCENT LIGHTING FIXTURES 4 BULB FLUORESCENT LIGHTING FIXTURES ADEQUATE ENOUGH TO PROVIDE LIGHTING FOR SAFETY AND SECURITY INSIDE OF THE MOBILE GALLEY

16 LEVELING SYSTEM AND TOW HOOK. LEVELING SYSTEM MUST HAVE A BASE PLATE ABLE TO STABELIZE AND SUPPORT THE WEIGHT OF THE MOBILE GALLEY

17 INTERIOR SPACE MUST BE ADEQUATE FOR THREE PERSONNEL TO BE WORKING. AVERAGE SIZE OF WORKER IS 5'10" AND WEIGHING 190 POUNDS

18 MUST BE FULLY READY FOR OPERATIONS AND TOWING.

1 AQUEOUS POTATSSIUM BI-CARBINATE (APC) FIRE SUPRESSION SYSTEM WITH NITROGEN CHARGE SYSTEM/APC FLASK CONCEALING LOCKER WITH PULL SWITCH

2 DEEP FAT FRYER 20 QT

3 GAYLORD EXHAUST VENTILATION SYSTEM

4 STEAM KETTLE 10 GALLON

5 Undercounter Freezer -10°F: 48-3/8"W x 30-1/8"D x 29-3/4"H or simular

6 4 COMPARTMENT HOT WELL SERVING LINE WITH DRAIN LINE

7 3 COMPARTMENT DISHWASHING SINK WITH SPRAY NOZZLE AND DRAIN LINE

8 36" OR LARGER FLATTOP GRIDDLE

10 DUAL (VERTICAL STACKED) CONVECTION OVEN

11 ICE MACHINE

12 HAND WASHING SINK

13 HOBART FLOOR MOUNTED MIXER MODEL HL-300

14 AMPLE COUNTER TOP WORK SPACE

15 SHELVING FOR STORAGE

16 RETRACTABLE AWNING

17 DOUBLE DOOR REACH IN REFRIGERATOR 32" WX 32"D X72"H

28' Mobile Kitchen Trailer

EQUIPMENT

MOBILE GALLEY WISH LIST --------- EXHIBIT "A"

File details come from the government source that posted it.