SPE1C113R00030006.PDF
PDF 44 KB Posted
- Attached to
- Marine Corps All Weather Coats Federal contract opportunity
- Solicitation number
- SPE1C1-13-R-0003
About this file
Amendment 06
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPE1C113R00030003.PDF | ||
| SPE1C113R00030007.PDF | ||
| SPE1C113R00030005.PDF | ||
| SPE1C113R00030004.PDF | ||
| SPE1C113R00030001.PDF | ||
| SPE1C113R00030002.PDF | ||
| SF1449_SPE1C113R0003 1 .pdf | ||
| PGC_02850_tech_data.docx | DOCX document | |
| CR_PD_03-08.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
See Block 14
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SPE1C1 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
SPE1C113R0003
X
2013 MAR 25
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
12. ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By completing Items 8 and 15, and returning
DLA TROOP SUPPORT
C AND T SUPPLY CHAIN
700 ROBBINS AVENUE
PHILADELPHIA PA 19111-5096
15C. DATE SIGNED 16C. DATE SIGNED
D. OTHER (Specify type of modification and authority)
3. EFFECTIVE DATE
See Attached Continuation Sheet(s).
(X)
CHECK ONE
PAGE OF PAGES
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
The following change is hereby made to subject solicitation.
1. On page 20, Clause 52.246-9P44 Identification of Qualified Laboratory and Source Sampling (Jan 1997) is hereby removed.
2. The following clause is hereby added as a replacement:
52.246-9032 IDENTIFICATION OF QUALIFIED LABORATORY AND SOURCE SAMPLING (NOV 2011) DLAD
(a) The offeror or bidder shall indicate in paragraph (e) below the name and address of the laboratory or laboratories where components or end items will be tested during the course of any resultant contract. Any laboratory proposed by the Contractor is subject to the approval of the Contracting Officer.
(b) The Government quality assurance representative (QAR) will cut samples from a lot at the textile component source and send them for testing to the laboratory cited below. (The acceptability of each lot will be determined through the testing of these samples). In addition, the QAR will simultaneously cut samples from the same rolls of material and send them to the DLA Troop Support laboratory when advised by the DLA Troop Support textile technologist to do so. For end items, duplicate samples will be drawn. Source sampling procedures are detailed further in DLA Troop Support Manual, Quality Systems Requirements, 4155.3, which is incorporated by reference.
(c) The prime Contractor will notify the DLA Troop Support textile technologist (Paul Conrad at (215) 737-3240) in writing at least ten days in advance when lots are to be presented to allow Government witnessing of testing at the Contractor’s laboratory. If the Government intends to witness testing, a representative from the DLA Troop Support laboratory will notify the Contractor’s laboratory. In the absence of Government notification, testing should proceed as scheduled.
(d) Should the Contracting Officer withdraw approval of the laboratory proposed by the Contractor during the course of a contract, DLA Troop Support will perform the required testing for up to 30 calendar days from the date of approval withdrawal. The charge for testing will be the DLA Troop Support laboratory’s effective cost rate on the date of testing. The Contractor is responsible for securing the services of another laboratory during this period.
(e) Any change in the laboratory (or laboratories) specified below is prohibited unless approved in advance by the Contracting Officer.
Name and Address of Laboratory Component Identity* Name and Address of Component Source
* When a single lot of material requires testing by more than one laboratory for different characteristics, list the name of the secondary laboratory and the test characteristics below:
Name and Address of Laboratory Component Identity* Test Characteristics
(f) It is solely the prime Contractor's responsibility to schedule laboratory testing and to obtain test reports. The cost of laboratory testing shall also be borne by the prime Contractor.
(g) Shipments of component materials to the prime Contractor need not be deferred pending test results except when shade approval is required (see paragraph (h)). Cutting production lots without a passing laboratory test report on the corresponding samples is done at the Contractor's own risk.
(h) Shade evaluation is acceptance testing. Therefore, component lots may not be shipped to the prime Contractor until the DLA Troop Support laboratory accepts the shade of the material.
PAGE 2 OF 2 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SPE1C113R0003-0006
File details come from the government source that posted it. Updated .