AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO.

See Block 14

4. REQUISITION/PURCHASE REQ. NO.

CSC 16705

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE SP4702 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE FACILITY CODE

SP470216R0021

X

2016 AUG 03

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX X is extended, is not extended.

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

12. ACCOUNTING AND APPROPRIATION DATA (If required)

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A NAME AND TITLE OF SIGNER (Type or print)

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

(a) By completing Items 8 and 15, and returning

DLA CONTRACTING SVCS OFF COLUMBUS

ATTN DCSO-C

P O BOX 3990

COLUMBUS OH 43218-3990

15C. DATE SIGNED 16C. DATE SIGNED

D. OTHER (Specify type of modification and authority)

23 AUGUST 16

3. EFFECTIVE DATE

Opening/Closing Date Changed to:

2016 AUG 03 / 2016 AUG 30

TIME 1:00 PM

See Attached Continuation Sheet(s).

(X)

CHECK ONE

PAGE OF PAGES

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

Amendment 0002 is issued as a result of the following:

A. To extend the Request for Proposal due date from 26 August 2016 until 30 August 2016 at 1:00PM.

B. To publish vendor questions and the Government’s responses that were received in regards to the site visit that was conducted on 15 August 2016. Questions and responses can be found below.

1. Is the Electrical Contractor allowed to use generator #1 to power ATS#1 during the shutdown?

Government’s Response: We are not sure what the contractor is referring to with generator #1 and ats #1.

There will be no use of government generators or ATS for this project. The existing generators will be locked out to prevent multiple power sources on a circuit.

2. The new switchgear will take approximately 24 to 26 weeks to arrive on site. Can the completion time be changed to reflect the delivery schedule?

Government’s Response: We have no issues with extending the date as needed.

3. In regards to the chillers, the work to replace the 4160V substation will not happen to March. Are the chillers off line or only one or two is operational? Or would all three need to be temporary connected.

Government’s Response: The system can operate on only 2 chillers. The project plan clearly dictates that only 1 chiller is to be brought offline at a time while connecting the temporary service and then again when being brought back on to normal power. All 3 chillers will need to have power during the duration of the project outside of the connection of temporary/normal power timeframes.

4. Please clarify the acronyms KVAC and KVAD.

Government’s Response: Kilo Volt Amperes Calculated and Demand.

5. Are subcontractors required to attend the VPP awareness training?

Government’s Response: Yes. It is a short video that everyone must watch and sign off on.

6. There are four electronic meters that are wall mounted. Three for the 4160V gear and one for the 480V gear. Are these required to be connected to the new gear.

Government’s Response: Yes, the meters are required to be hooked back up.

7. Disposal of the gear from the site is the contractor’s responsibility?

Government’s Response: Yes.

PAGE 2 OF 2 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: