| File | Type | Posted |
|---|---|---|
| SP470216R00060002.pdf | ||
| WSHP_15_Technical_Data_Sheet.pdf | ||
| HZ2A_N_0411.pdf | ||
| HZ2A_N_0301.pdf | ||
| HZ2A_N_0302.pdf | ||
| HZ2M_N_0301.pdf | ||
| HZ2A_N_0104.pdf | ||
| SP470216R00060001.pdf | ||
| Atch___2_Scope_of_Work.pdf | ||
| Atch___1_16R0006_SECTION_L_ _M.pdf | ||
| Atch___4_DOL_Wage_Rate_Determination.pdf | ||
| SP470216R0006.pdf | ||
| Atch___3_CSC-15750_FINAL_DRAWING_SET_revised.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
CONSTRUCTION COST ESTIMATE
PROJECT NO. CSC-15750 DRAWING NO. 7-713 DATE:
PROJECT TITLE: UPS ADDITIONS TO BLDG 58
ARCHITECT/ENGINEER: ESTIMATOR:
PRELIMINARY DESIGN FINAL DESIGN X OTHER
| ITEM | QUANTITY | MATERIAL | LABOR | EQUIP COST | TOTAL COST | ||||||
| NO. OF UNITS | UNIT OF MEASURE | PER UNIT | TOTAL | UNIT MANHOUR | TOTAL MANHOURS | RATE PER HOUR | TOTAL | UNIT RATE | TOTAL | ||
| ELECTRICAL COST | |||||||||||
| 120/208V, 3P, 4W, 150A MCB, 42 CKT PANELBOARD | EA | ||||||||||
| 30A, 2P CIRCUIT BREAKER | EA | ||||||||||
| 30A, 1P CIRCUIT BREAKER | EA | ||||||||||
| 20A, 1P CIRCUIT BREAKER | EA | ||||||||||
| 40kW STANDBY UPS SYSTEM | EA | ||||||||||
| UPS SYSTEM ADDITIONAL 1YR WARRANTY | EA | ||||||||||
| SIEMENS 175A CIRCUIT BREAKER | EA | ||||||||||
| #2/0 THHN WIRE | CLF | ||||||||||
| #1/0 THHN WIRE | CLF | ||||||||||
| #10 THHN WIRE | CLF | ||||||||||
| #12 THHN WIRE | CLF | ||||||||||
| #6 GROUND WIRE | CLF | ||||||||||
| #12 MC CABLE | CLF | ||||||||||
| 2" EMT CONDUIT (INCLUDES ALL BENDS, COUPLINGS, TERMINATIONS, ETC…) | LF | ||||||||||
| 1" EMT CONDUIT (INCLUDES ALL BENDS, COUPLINGS, TERMINATIONS, ETC…) | LF | ||||||||||
| 3/4" EMT CONDUIT (INCLUDES ALL BENDS, COUPLINGS, TERMINATIONS, ETC…) | LF | ||||||||||
| 20A DUPLEX OUTLET (INCLUDES BOX & COVER PLATE) | EA | ||||||||||
| 20A QUADRAPLEX OUTLET (INCLUDES BOX & COVER PLATE) | EA | ||||||||||
| 4" SQUARE JUNCTION BOX | EA | ||||||||||
| ADDITIONAL GENERAL ELECTRICIAL LABOR |
| MECHANICAL COST | |
| RE-INSTALLATION OF SUSPENDED CEILING | SF |
| RE-INSTALLATION OF CEILING TILES | SF |
| WATER SOURCE HEAT PUMP DEMOLITION | EA |
| DUCTWORK DEMOLITION | LBS |
| DIFFUSER/GRILL DEMOLITION | EA |
| PIPE DEMOLITION | LF |
| WATER SOURCE HEAT PUMP BALANCING | EA |
| DIFFUSER/GRILL BALANCING | EA |
| WATER SOURCE HEAT PUMP | EA |
| 10" DIA. DUCT | LF |
| 12" DIA. DUCT | LF |
| 14" DIA. DUCT | LF |
| RECTANGULAR DUCT | LBS |
| 10" FLEX DUCT | LF |
| 12" FLEX DUCT | LF |
| DUCT INSULATION | SF |
| DUCT LINER | SF |
| DIFFUSERS | EA |
| RETURN GRILL | EA |
| VOLUME DAMPER | EA |
| SMOKE DAMPER | EA |
| 1" PIPE, SCH 40 | LF |
| PIPE INSULATION | LF |
| CONTROL VALVE | EA |
| BALL VALVE | EA |
| CONTROL WORK | LS |
| THERMOMETERS | EA |
| SUBTOTAL |
| OH |
| PROFIT |
| BOND |
| TOTAL |
| Attachment # 5 | Source Selection Infromation See FAR 2.101 and 3.104 |
| For Official Use Only | Page &P of &N |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .