SP4702-14-R-0016 _Amendment_4.pdf
PDF 827 KB Posted
- Attached to
- CSC-14716Replace Chillers, Building 20A
- Solicitation number
- SP4702-14-R-0016
- Issued by
-
Defense Logistics Agency Headquarters
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
CSC-14716, Replace Chillers, Bldg 20A 28 August 2014
The plans and specifications for the subject project shall be changed in accordance with the information listed below:
1. Performance points: Drawing 4-551, Sheet 3, “Centrifugal Water Chillers Schedule”, note 1 (NPLV) shall be replaced with the following chart. The contractor shall be required to meet or exceed the listed efficiency for EACH data point. All points shall be calculated at “Zero Tolerance” conditions.
Required minimum chiller efficiency:
Chilled Water Condenser Water Load (tons)
GPM Max.
pressure drop
Entering water temp (deg F)
Leaving water temp (deg F)
GPM Max.
pressure drop
Entering water temp (deg F)
Leaving water temp (deg F)
Efficiency (kW/ton)
670.0 1072 20’ 59.00 44.0 2010 30’ 85.0 95.0 0.568
502.5 1072 20’ 55.25 44.0 2010 30’ 75.0 82.5 0.492
335.0 1072 20’ 51.50 44.0 2010 30’ 65.0 70.0 0.469
Evaporator Fouling Factor: 0.00010 Condenser Fouling Factor: 0.00025
SP4702-14-R-0016, Amendment 4
| SF 30 |
| CSC-14716 Change Order #2 28Aug14 |
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: P00004 |
| Code[0]: SP4702 |
| Code[1]: |
| AccountingData[0]: |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: |
| Description[0]: The purpose of this Amendment extend the solicitation until 9/05/2014. This amendment also contains changes to the specifications. |
| FacilityCode[0]: |
| Code[2]: |
| IssuedBy[0]: DLA Contracting Services Office - Columbus |
P.O Box 3990 Columbus, OH 43218-3990
| NameandAddress[0]: |
| AdministeredBy[0]: |
| ContractIDCode[0]: |
| ReqNumber[0]: |
| AmendmentNo[1]: SP4702-14-R-0016 |
| ModificationNo[0]: |
| ProjectNo[0]: CSC-14716 |
| Page[0]: 1 |
| Pages[0]: 2 |
| EffectiveDate[0]: 08/28/2014 |
| Dated9B[0]: 07/14/2014 |
| Dated10B[0]: |
| CheckBox9[0]: 1 |
| CheckBox10[0]: Off |
| CheckBox11[0]: 1 |
| CheckBox13A[0]: Off |
| CheckBox13B[0]: Off |
| CheckBox13C[0]: Off |
| CheckBox13D[0]: Off |
| IsNot[0]: Off |
| Is[0]: 1 |
| Extended[0]: 1 |
| NotExtended[0]: Off |
| DateSigned[0]: |
| DateSigned[1]: |
| Copies[0]: |
| CopiesReturned[0]: 1 |
File details come from the government source that posted it. Updated .