Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

CSC-14716, Replace Chillers, Bldg 20A

The plans and specifications for the subject project shall be changed in accordance with the information listed below:

1. Section 01 50 03, paragraph 1.5: Specifications shall be amended to allow contractors to bid on this work if they are qualified to install chillers and piping systems in any state in the United States of America, not just in the State of Ohio. This paragraph shall also be amended to include the following statement: The centrifugal water chillers being replaced under this contract are highly specialized items that are critical elements of providing a productive and comfortable environment for over 4,000 personnel. Contractors shall provide data required in this paragraph and subparagraphs which reflect that the contractor has successfully executed multiple similar or larger projects (both in scope and impact) to this project.

2. Performance points: Drawing 4-551, Sheet 3, “Centrifugal Water Chillers Schedule”, note 1 (NPLV) shall be replaced with the following chart. The contractor shall be required to meet or exceed the listed efficiency for EACH data point. All points shall be calculated at “Zero Tolerance” conditions.

Required minimum chiller efficiency:

Chilled Water Condenser Water Load (tons)

GPM Max.

pressure drop

Entering water temp (deg F)

Leaving water temp (deg F)

GPM Max.

pressure drop

Entering water temp (deg F)

Leaving water temp (deg F)

Efficiency (kW/ton)

670.0 1072 20’ 59.00 44.0 2010 30” 85.0 95.0 0.543

502.5 1072 20’ 55.25 44.0 2010 30” 75.0 82.5 0.464

335.0 1072 20’ 51.50 44.0 2010 30’ 65.0 70.0 0.437

Evaporator Fouling Factor: 0.00010 Condenser Fouling Factor: 0.00025

3. Drawing 4-551, Sheet 3: Contractor shall replace the existing 4160 volt 3 phase electric starters that service Chillers# 2 & #3 (labeled as Starter WC-FCP-2 & Starter WC-FCP-3) with new starters. Contractor shall remove and replace the starters in conjunction with the schedule for replacement of the chiller, which is that the work shall be scheduled such that only one chiller is out of service at any one time. Contractor shall expand the 4” concrete housekeeping pad if necessary to allow for any physical size difference between the original and new starter housing.

Starter replacement shall be performed in addition to all other work specified on this sheet. The new starters shall be compatible with the new contractor-supplied chiller. Refer to chiller manufacturer specifications for exact motor starter requirements. Starters shall at a minimum be of the “soft start” type, and be fully compatible with existing building control system, with no further upgrades or modifications required by the government in order for the starter to accept and utilize signals and information to/from the starter and building control system.

SP4702-14-R-0016, Amendment 1

SF 30
CSC-14716 Change Order #1 5Aug14
topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: P00001
Code[0]: SP4702
Code[1]:
AccountingData[0]:
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]:
Description[0]: The purpose of this Amendment make revisions / clarifications to the specifications within the solicitation and drawings. Please see page two of this amendment for those changes.
FacilityCode[0]:
Code[2]:
IssuedBy[0]: DLA Contracting Services Office - Columbus

P.O Box 3990 Columbus, OH 43218-3990

NameandAddress[0]:
AdministeredBy[0]:
ContractIDCode[0]:
ReqNumber[0]:
AmendmentNo[1]: SP4702-14-R-0016
ModificationNo[0]:
ProjectNo[0]: CSC-14716
Page[0]: 1
Pages[0]: 2
EffectiveDate[0]: 08/08/2014
Dated9B[0]: 07/14/2014
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
CheckBox11[0]: 1
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: 1
Extended[0]: Off
NotExtended[0]: 1
DateSigned[0]:
DateSigned[1]:
Copies[0]:
CopiesReturned[0]: 1