Attach_4-AS_form_3000.pdf

PDF 502 KB Posted

Attached to
CSC-14711 Repair Drainage Building 20
Solicitation number
SP4702-14-R-0004
Issued by

About this file

RFP SP470214R0004 ATTACHMENT 4 AF Form 3000

View the file

Other files

File Type Posted
P0003AT1.docx DOCX document
P0003.pdf PDF
P0003AT2.pdf PDF
P0002AT1.pdf PDF
SF_30.pdf PDF
P0001AT2.pdf PDF
P0001AT1.pdf PDF
P0001.pdf PDF
14R0004.pdf PDF
Attach_3-Bid_Sheet_-_Bldg20_ramp_repair.xlsx XLSX spreadsheet
Attach_2-drawings_bldg_20_repair.pdf PDF
Attach_1-OH140002_2_14_14_WD.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MATERIAL APPROVAL SUBMITTAL

(See Instructions on Reverse)

FORM APPROVED

BUREAU OR BUDGET NO. 22-0252

TO: (Contracting Officer)

FROM: (Contractor) DATE

CONTRACT NUMBER SUBMISSION NUMBER SUBMITTAL

NEW RESUBMITTAL

PREVIOUS SUBMISSION NUMBER PROJECT NUMBER

TO BE COMPLETED BY CONTRACTOR FOR GOVERNMENT USE ONLY

ITEM

NO.

SPECIFICATION SECTION/PARA

NO./DRAWING NO.

DESCRIPTION OF MATERIAL

(Include Type, Model Number, Catalog Number, Mfg., Etc.)

APPROVED

DIS-

APPROVED

SEE

REVERSE

INITIAL

TYPED OR PRINTED NAME AND GRADE/RANK

SIGNATURE DATE

FOR GOVERNMENT USE ONLY

TO: (Base Civil Engineering Officer)

For Evaluation and Action.

TYPED OR PRINTED NAME AND GRADE/RANK SIGNATURE DATE

TO: (AF Contracting Officer)

Recommended Approval

Disapproval as Indicated Above and Subject to Any Applicable Comments on the Reverse Side.

TO: (Contractor)

Approved Disapproved as Indicated Above and Subject to Any Applicable Comments on the Reverse Side. Request Resubmittal on Disapproved Items Within __________ Days of Date Shown Below.

AF FORM 3000 REPLACES AFP1 FORM 1, JUL 87. WHICH WILL BE USED UNTIL EXHAUSTED.

Attachment 4

COMMENTS

(Number to Correspond with Applicable Item Number on Reverse)

INSTRUCTIONS TO CONTRACTORS

1. The term "material" is defined as articles, supplies, raw materials, equipment, parts, components and end items that are to be incorporated into the work required by the contract.

2. This form is to be used by Contractors for submitting Shop Drawings, Equipment Data, Manufacturer's Literature and Certificates and Samples of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 4 copies, signed and provided to the Contracting Officer with appropriate attachments.

3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to item(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of this form.

4. Requests submitted shall be numbered consecutively, by contract, in the space entitled "Submission No." This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmission will be indicated in the appropriate block and the insertion of previous submission number and date in addition to a new submission number. A single submission should be used for all work of a section of the specifications but in NO instance should the submission include work for more than one (1) contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.

5. This Material Approval Submittal is not valid unless it is signed by the Contracting Officer. This approval is required as called for by the Contracting Officer under the terms of this contract.

Attachment 4

File details come from the government source that posted it. Updated .