Attach_4-AS_form_3000.pdf
PDF 502 KB Posted
- Attached to
- CSC-14711 Repair Drainage Building 20
- Solicitation number
- SP4702-14-R-0004
About this file
RFP SP470214R0004 ATTACHMENT 4 AF Form 3000
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P0003AT1.docx | DOCX document | |
| P0003.pdf | ||
| P0003AT2.pdf | ||
| P0002AT1.pdf | ||
| SF_30.pdf | ||
| P0001AT2.pdf | ||
| P0001AT1.pdf | ||
| P0001.pdf | ||
| 14R0004.pdf | ||
| Attach_3-Bid_Sheet_-_Bldg20_ramp_repair.xlsx | XLSX spreadsheet | |
| Attach_2-drawings_bldg_20_repair.pdf | ||
| Attach_1-OH140002_2_14_14_WD.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MATERIAL APPROVAL SUBMITTAL
(See Instructions on Reverse)
FORM APPROVED
BUREAU OR BUDGET NO. 22-0252
TO: (Contracting Officer)
FROM: (Contractor) DATE
CONTRACT NUMBER SUBMISSION NUMBER SUBMITTAL
NEW RESUBMITTAL
PREVIOUS SUBMISSION NUMBER PROJECT NUMBER
TO BE COMPLETED BY CONTRACTOR FOR GOVERNMENT USE ONLY
ITEM
NO.
SPECIFICATION SECTION/PARA
NO./DRAWING NO.
DESCRIPTION OF MATERIAL
(Include Type, Model Number, Catalog Number, Mfg., Etc.)
APPROVED
DIS-
APPROVED
SEE
REVERSE
INITIAL
TYPED OR PRINTED NAME AND GRADE/RANK
SIGNATURE DATE
FOR GOVERNMENT USE ONLY
TO: (Base Civil Engineering Officer)
For Evaluation and Action.
TYPED OR PRINTED NAME AND GRADE/RANK SIGNATURE DATE
TO: (AF Contracting Officer)
Recommended Approval
Disapproval as Indicated Above and Subject to Any Applicable Comments on the Reverse Side.
TO: (Contractor)
Approved Disapproved as Indicated Above and Subject to Any Applicable Comments on the Reverse Side. Request Resubmittal on Disapproved Items Within __________ Days of Date Shown Below.
AF FORM 3000 REPLACES AFP1 FORM 1, JUL 87. WHICH WILL BE USED UNTIL EXHAUSTED.
Attachment 4
COMMENTS
(Number to Correspond with Applicable Item Number on Reverse)
INSTRUCTIONS TO CONTRACTORS
1. The term "material" is defined as articles, supplies, raw materials, equipment, parts, components and end items that are to be incorporated into the work required by the contract.
2. This form is to be used by Contractors for submitting Shop Drawings, Equipment Data, Manufacturer's Literature and Certificates and Samples of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 4 copies, signed and provided to the Contracting Officer with appropriate attachments.
3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to item(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of this form.
4. Requests submitted shall be numbered consecutively, by contract, in the space entitled "Submission No." This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmission will be indicated in the appropriate block and the insertion of previous submission number and date in addition to a new submission number. A single submission should be used for all work of a section of the specifications but in NO instance should the submission include work for more than one (1) contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.
5. This Material Approval Submittal is not valid unless it is signed by the Contracting Officer. This approval is required as called for by the Contracting Officer under the terms of this contract.
Attachment 4
File details come from the government source that posted it. Updated .