About this file
This document contains an amendment to a solicitation for a consolidated warehouse system and answers to contractor questions. The amendment extends the proposal submission date to July 9, 2020 for solicitation SP3300-20-R-5007 issued by the Defense Logistics Agency Distribution. The scope of work includes design, installation, integration, testing and operations of a new automated material handling and storage/retrieval system for a two-story 250,000 square foot consolidated warehouse at DLA Distribution Korea. The requirement includes conveyors, singulators, sorters, palletizing equipment, controls and other material handling components to operate the system. The NAICS code is 333922 for material handling equipment manufacturing and the size standard is 500 employees.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
AMENDMENT 0006
SP3300-20-R-5007
Amendment 0006 is hereby incorporated into solicitation SP3300-20-R-5007.
Amendment 0006 is issued to:
I. Extend the date for the submission of proposals from 30 June 2020 to 09 July 2020. An offeror must have received a web link from the contract specialist for the DoD Safe website in order to submit a proposal. If the offeror has not already requested the web link (access code), please send an email to Ben Bailey at benjamin.bailey@dla.mil. On 07 July 2020, the contract specialist will initiate the process to have https://safe.apps.mil send out an automated email containing the web link necessary for the upload of offeror proposals.
II. Provide answers to contractor questions.
1. Question: Are non-US citizens able to get on-base, for example, if we use any South Korean subcontractors to perform work for us?
1. Answer: It is highly recommended that the contractor bring his own workforce to the jobsite. Korea does not have temp agencies where a contractor can go to get labors. All non-US citizens will require a SOFA designation and if Korean subcontractors are used, a memo must be signed by the DDDK Commander in order to sponsor. The Government cannot guarantee that the DDDK Commander would be willing to take on this responsibility. If the DDDK Commander were to agree to sponsor, there is still a significant amount of paper work that must be completed and approved. If the contract awardee wants to pursue Korean subcontractors, the required forms will be provided upon award. Please keep in mind that approval to use non-US citizens is not guaranteed and any delay in the review/approval process by the Government will not be a reason for the contractor to request an equitable adjustment for Government delay costs.
2. Question: The spec calls out a conveyor BF of 28” but the Max product length is 30”.
The singulator cannot guarantee correct orientation coming out. There’s a few ways to handle this. Increasing the width of the entire system, or adding an additional reject/recirc to the ACCORD singulator that is asked for.
2. Answer: The Government’s statement of work provides the overall system requirement’s specifications. Offeror shall engineer and design what will become a fully functional system. The offeror’s technical proposal should provide a complete narrative with supporting technical data to include catalog cuts, drawings, and other technical information to illustrate how the offeror understands the requirement and intends to provide a fully functioning system.
https://safe.apps.mil/
3. Question: What is the maximum elevation that the Walkie Lifts can drop off a 463L pallet?
3. Answer: The lifting height of the Walkie is determined by the empty height of the conveyor.
4. Question: The drawing shows a mixture of belt curves and MDR curves. Spec seems to state that MDR is acceptable everywhere. Is that the case?
4. Answer: The Government’s statement of work provides the overall system requirement’s specifications. Offeror shall engineer and design what will become a fully functional system. The offeror’s technical proposal should provide a complete narrative with supporting technical data to include catalog cuts, drawings, and other technical information to illustrate how the offeror understands the requirement and intends to provide a fully functioning system.
5. Question: At the shipping sorter, there seems to be a six sided tunnel with weight and dimensioning. Are the scan tunnels preceding each additional sorter (after descrambler and the STOWS sorters) 5 sided scan points or 6 sided scan points? At these scan points can the label we are reading for sortation be on the bottom?
5. Answer: The Government’s statement of work provides the overall system requirement’s specifications. Offeror shall engineer and design what will become a fully functional system. The offeror’s technical proposal should provide a complete narrative with supporting technical data to include catalog cuts, drawings, and other technical information to illustrate how the offeror understands the requirement and intends to provide a fully functioning system.
6. Question: Our experience shows that having the Mil standard 1348 label on top of the polybag/case is only an issue when you are planning to do an automatic print and apply.
So as not to cover it with the shipping label. Is there a print and apply not shown, is this future proofing or can we disregard this requirement?
6. Answer: There is no automated print and apply. Shipping labels will be placed manually at the issue workstation.
7. Question: The spec specifically calls out Ryson spirals. Can we use a Ryson equivalent?
7. Answer: Ryson or equivalent is acceptable. Ambaflex is an equivalent .
8. Question: Is there a target rate for the Pallet VRC?
8. Answer: Target rate is 10-12 per hour both direction.
9. Question: Do you know a breakdown of polybags to cartons so we can understand the product mix?
9. Answer: No. It is random.
10. Question: Is there any additional time allotted for quotation of this system, beyond the 30th?
10. Answer: Yes, see above.
11. Question: Since there is no automatic print and apply in the system, do we need to overhead scan and divert parcels with 1348 mil labels on top and oversized parcels after the metering belts from the singulator?
11. Answer: The Government’s statement of work provides the overall system requirement’s specifications. Offeror shall engineer and design what will become a fully functional system. The offeror’s technical proposal should provide a complete narrative with supporting technical data to include catalog cuts, drawings, and other technical information to illustrate how the offeror understands the requirement and intends to provide a fully functioning system.
12. Question: Also, do we need to weigh and dimension or just do a six sided scan before the Intralox sorters after the singulator on the first floor and second floor, or only weigh/dimension/6 sided scan before the shipping sorter on the first floor?
12. Answer: The only place the Government requires dimension and weight data (DAWS) is prior to the shipping sorter.
END OF AMENDMENT 0006
| Amend 0001 SP330016B0016 for FBO |
| SP3300-15-R-5004 0003 page 1 |
Amend 0001 Page 2
| IDCode: |
| Page: 1 |
| Pages: 4 |
| Text4: AMENDMENT/MODIFICATION NO. |
| AmendNo: 0006 |
| ReqNo: |
| ProjNo: |
| IssCode: SP3300 |
| IssuedBy: DLA Distribution |
Acquisition Operations, J-7 Mifflin Avenue, Bldg 430 New Cumberland, PA 17070
| AdmCode: |
| AdminBy: POC: Benjamin Bailey |
717-770-5390 (P) Benjamin.Bailey@DLA.MIL
| ContName: |
| ContStrt: |
| ContCnty: |
| ContSt: |
| ContZIP: |
| Code: |
| FacCode: |
| SolChgYs: Yes |
| SolChgNo: Off |
| SolAmdNo: SP3300-20-R-5007 |
| AmendDate: 04/21/20 |
| ModNo: |
| ModDate: |
| NoCopies: 1 |
| Amended: Yes |
| OffrExt: Yes |
| OffrNoEx: Off |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: |
SEE CONTINUATION PAGE(S)
| SignName: |
| SignTitl: |
| ContDate: |
| CoName: |
| CoTitle: |
| CODate: |
| Text1: 18 June 2020 |
| Text2: |
| Text3: |