This document provides an amendment to a solicitation and answers to contractor questions regarding a federal contract opportunity. The amendment extends the proposal submission date to June 25, 2020 for solicitation SP3300-20-R-5007 issued by the Defense Logistics Agency Distribution for a Consolidated Warehouse contract at the DLA Distribution Korea facility. The scope of work involves designing, installing, integrating, testing and making operational a new automated materials handling and storage/retrieval system for the 250,000 square foot, two story warehouse with a minimum 25 foot stack height. The amendment incorporates a revised supplies schedule, drawings, and provides answers to contractor questions on technical specifications and payment terms.

The answers clarify that the government will accept the contractor's proposed design solution and payment will be made upon government acceptance after installation and testing. Partial payments up to 70% are authorized for delivered materials and installed/functional systems. The amendment also establishes a not-to-exceed amount of $180,000 for any applicable taxes or duty fees assessed in Korea that would be reimbursed based on receipts.

View the file

Other files for this federal contract opportunity

Other files attached to Consolidated Warehouse DLA Distribution Korea, newest first.
File Type Posted
Amendment 0008 SP330020R5007.pdf PDF
Amendment 0007 SP330020R5007.pdf PDF
Amendment 0006 SP330020R5007.pdf PDF
Amendment 0005 - Drawing.zip ZIP file
Amendment 0005 SP330020R5007.pdf PDF
Amendment 0004 Attachment 3 - Schedule of Supplies.xlsx XLSX spreadsheet
Amendment 0004 Drawings.zip ZIP file
Amendment 0003 SP330020R5007.pdf PDF
Amendment 0003 Attachment 1 -- Statement of Work.pdf PDF
Amendment 0003 Attachment 3 - Schedule of Supplies.xlsx XLSX spreadsheet
Amendment 0002 SP330020R5007.pdf PDF
Amendment 0001 SP330020R5007.pdf PDF
Site Visit Attendance List - SP330020R5007.docx DOCX document
SP330020R5007 Site Visit Notes.pptx PPTX presentation
Attachment 2 - Drawings.zip ZIP file
Attachment 3 - Schedule of Supplies.xlsx XLSX spreadsheet
Attachment 4 - Past Performance Questionnaire.docx DOCX document
Exhibit 1 - CDRL.pdf PDF
Attachment 1 - Statement of Work.pdf PDF
RFP SP3300-20-R-5007.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

AMENDMENT 0004

SP3300-20-R-5007

Amendment 0004 is hereby incorporated into solicitation SP3300-20-R-5007.

Amendment 0004 is issued to:

I. Extend the date for the submission of proposals from 18 June 2020 to 25 June 2020.

On 23 June 2020, the contract specialist will initiate the process to have https://safe.apps.mil send out an automated email containing the web link necessary for the upload of offeror proposals.

II. Incorporate a revised Attachment 3 – Schedule of Supplies.

III. Incorporate Amendment 0004 – Drawings Zip File.

IV. Provide answers to contractor questions.

1. Question: There is uncertainty regarding the collection of potentially applicable taxes or duty fees by Korea. These added fees may be applied to in-bound shipments from private US manufacturers destined for a US Military site in Korea. It would be helpful if the Government make a determination regarding duty or any taxes or fees. We are not able to learn a clear answer on this subject from OCONUS freight forwarders and agents. These amounts could be hundreds of thousands of dollars.

1. Answer: The Government has established a separate CLIN for applicable taxes or duty fees assessed by Korea in a not-to-exceed (NTE) amount of $180,000. This is a Government provided amount. Vendors may not change this amount in their price proposal. Any taxes or duty fees assessed will require the vendor to provide payment receipts with their invoice for verification. Vendor will be reimbursed the actual costs based on the receipts. If these costs exceed the NTE amount on this CLIN, it is the vendor’s responsibility to notify the Government as soon as they are aware and an increase to the CLIN will be made.

2. Question: The payments clause currently cited in the solicitation requires all invoices to be based upon delivered materials. Since this project is in Korea, many of our suppliers are unwilling to extend credit beyond the traditional 30 days since delivery to Korea after production can require 75-90 additional days plus time unloading and inspecting at destination. Parallel to this, manufacturers are requiring down payments with our purchase orders. These amounts after often 50% upon order entry due to the custom nature of this equipment. Often 100% payment is required prior to OCONUS shipment. On a project of this size, financing of this equipment will be significant. There are other advance payments options that can allow the contractor to invoice for equipment at the time of order entry. Payments can also be issued for “Ship In Place” contract financing. We https://safe.apps.mil/ raise this issue prior to the opening date to ensure timeliness. We encourage the Government to consider alternate payment methods it may offer in the contract payments provisions other than a traditional invoice submittal after delivery.

2. Answer: The Government has considered this request, and determined that payment will only be made once the Government takes acceptance of the material. However, a revision to the Partial Payment language in the solicitation is stated below:

Partial Payments:

a. Partial Payments IAW Far 32.102(d) are authorized under this requirement as specified below:

Payment 1: Actual cost of materials delivered and accepted by the Contracting Officer Representative (COR) to be validated with supplier invoices. Payment 1 may be multiple payments. The Government understands that there will be multiple shipments of materials and agree that vendor may invoice as each shipment is delivered and accepted by the COR.

Payment 2: Installation of material and verification by the COR that the system is functional. The total value of the partial payments shall not exceed 70 percent of the total dollar of the purchase order.

b. All material and work covered by the partial payments shall, at the time of payment, become the sole property of the Government, but this shall not be construed as: (1) Relieving the contractor from the sole responsibility for all material and work upon which payments have been made for the restoration of any damaged work; or (2) Waiving the right to the Government to require the fulfillment of all the terms of the contract.

c. Final payment of the contract shall be made upon final acceptance of all deliverables by the Government and completion of final operational test.

The final payment shall be the total price less Payments 1 and 2.

3. Question: Could you please provide a drawing with building columns so we can make sure there are no obstructions or interferences with the equipment?

3. Answer: See drawing and png zip file (Amendment 0004 – Drawings).

4. Question: Could you please provide the Floor to floor dimension so we can determine the vertical travel required for the vertical lifts and the height of the spirals?

4. Answer: From the floor slab on the first floor to the underside of the floor slab on the second floor : 9900mm(FB: 900mm)

- From the floor slab on the first floor to the top of the floor slab on the second floor: 10200mm

- Floor thickness: 300mm

5. Question: Should the conveyor fed by the sorter diverts be zero pressure live roller accumulation?

5. Answer: The Government’s statement of work provides the overall system requirement’s specifications. Offeror shall engineer and design what will become a fully functional system. The offeror’s technical proposal should provide a complete narrative with supporting technical data to include catalog cuts, drawings, and other technical information to illustrate how the offeror understands the requirement and intends to provide a fully functioning system.

6. Question: What is the dock height where ALOC pallets are being unloaded?

6. Answer: Dock is nominal 1219.2mm high.

7. Question: What is the truck discharge height feeding the gravity 12” wide (3 lanes) conveyor for ALOC pallets?

7. Answer: The Government’s statement of work provides the overall system a fully functional system. The offeror’s technical proposal should provide a complete narrative with supporting technical data to include catalog cuts,

8. Question: Should the lift/turn tables be hydraulic scissor lift or is spring loaded gravity acceptable?

8. Answer: The Government’s statement of work provides the overall system a fully functional system. The offeror’s technical proposal should provide a complete narrative with supporting technical data to include catalog cuts,

9. Question: What is the maximum elevation of the ALOC pallet conveyor being loaded with RICO walkie?

9. Answer: The Government’s statement of work provides the overall system requirement’s specifications. Offeror shall engineer and design what will become a fully functional system. The offeror’s technical proposal should provide a complete narrative with supporting technical data to include catalog cuts,

10. Question: Does the oversized reject chute need to feed back into the descrambler, as shown on the drawing?

10. Answer: Yes.

11. Question: What is network latency from time of scan to receive a response from the host to divert on the sorter?

11. Answer: One second or less.

12. Question: Is the DAWS system and sorter labeled “Shipping Sorter” on the drawing included in CLIN0004? If so, what are the required specifications?

12. Answer: Yes. The Government’s statement of work provides the overall system a fully functional system. The offeror’s technical proposal should provide a complete narrative with supporting technical data to include catalog cuts,

13. Question: Is the sorter being fed by the descrambler included in CLIN0002?

13. Answer: Yes.

14. Question: Is a Tri-wall dumper part of the scope for CLIN0001? If so, what are the dimensions and max weight of the tri-walls that need to be dumped?

14. Answer: No.

15. Question: How is product fed onto the STOWS conveyor?

15. Answer: The Government’s statement of work provides the overall system a fully functional system. The offeror’s technical proposal should provide a complete narrative with supporting technical data to include catalog cuts,

16. Question: How is product fed onto the Issues conveyor line?

16. Answer: The Government’s statement of work provides the overall system a fully functional system. The offeror’s technical proposal should provide a complete narrative with supporting technical data to include catalog cuts, END OF AMENDMENT 0004

Amend 0001 SP330016B0016 for FBO
SP3300-15-R-5004 0003 page 1

Amend 0001 Page 2

IDCode:
Page: 1
Pages: 6
Text4: AMENDMENT/MODIFICATION NO.
AmendNo: 0004
ReqNo:
ProjNo:
IssCode: SP3300
IssuedBy: DLA Distribution

Acquisition Operations, J-7 Mifflin Avenue, Bldg 430 New Cumberland, PA 17070

AdmCode:
AdminBy: POC: Benjamin Bailey

717-770-5390 (P) Benjamin.Bailey@DLA.MIL

ContName:
ContStrt:
ContCnty:
ContSt:
ContZIP:
Code:
FacCode:
SolChgYs: Yes
SolChgNo: Off
SolAmdNo: SP3300-20-R-5007
AmendDate: 04/21/20
ModNo:
ModDate:
NoCopies: 1
Amended: Yes
OffrExt: Yes
OffrNoEx: Off
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript:

SEE CONTINUATION PAGE(S)