Amendment_0007_SP330019Q5014.pdf

PDF 391 KB Posted

Attached to
Upgrade Receiving Conveyor Systems, Bldg. 499, DLA Distribution Red River, TX Federal contract opportunity
Solicitation number
SP3300-19-Q-5014
Issued by
Defense Logistics Agency Distribution

About this file

Amendment 0007 SP330019Q5014

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade Receiving Conveyor Systems, Bldg. 499, DLA Distribution Red River, TX, newest first.
File Type Posted
Award_Notice.pdf PDF
Amendment_0007_Attachment_3_-_Schedule_of_Supplies.xlsx XLSX spreadsheet
Amendment_0007_Attachment_1_-_Statement_of_Work.pdf PDF
Amendment_0006_SP330019Q5014.pdf PDF
Amendment_0006_Attachment_2e_-_Electrical_Schematics.pdf PDF
Amendment_0005_Attachment_3_-_Schedule_of_Supplies.xlsx XLSX spreadsheet
Amendment_0005_SP3300-19-Q-5014.pdf PDF
RFQ_-_Amendment_0005_SP3300-19-Q-5014.pdf PDF
Amendment_0005_Exhibit_1_-_Contract_Data_Requirements_List.pdf PDF
Amendment_0005_Attachment_1_-_Statement_of_Work.pdf PDF
Site_Visit_Attendance_List.pdf PDF
Amendment_0005_Attachment_6_-_Wage_Determination.pdf PDF
Amendment_0004_SP3300-19-Q-5014.pdf PDF
Amendment_0003_Attachment_1_-_Statement_of_Work.pdf PDF
Amendment_0003_SP3300-19-Q-5014.pdf PDF
DDRT_Bldg_499_Upgrade_Receiving_Conveyor_Systems_18_Apr_19_(19-2-2)_2013.dwg DWG drawing
Amendment_0003_Attachment_3_-_Schedule_of_Supplies.xlsx XLSX spreadsheet
DDRT_Bldg_499_Receiving_Conveyor_System_Existing_Conditions_18_Apr_19_(19-2-1)_2013.dwg DWG drawing
SP330019Q5014_A0002_for_review.pdf PDF
SP330019Q5014_A0001_PAGE_1.pdf PDF
DDRT_Bldg_499_Upgrade_Receiving_Conveyor_Systems_6_Apr_19_(19-2-2).dwg DWG drawing
A0001_-__REVISED_PDF_DRAWING_-_DDRT_Bldg_499_Upgrade_Receiving_Conveyor_Systems_6_Apr_19-2-2.pdf PDF
A0001_-_DDRT_Bldg._499_Upgrade_Receiving_Conveyor_Systems_SOW_6_Apr_19_rev1.pdf PDF
Attachment_2a_-_Drawings.pdf PDF
Attachment_2b_-_Drawings.pdf PDF
Attachment_4_-_Subcontracting_Plan_Template.pdf PDF
Attachment_3_-_Schedule_of_Supplies.xlsx XLSX spreadsheet
Attachment_2d_-_Drawings_AutoCAD.dwg DWG drawing
RFQ_SP330019Q5014.pdf PDF
Attachment_2c_-_Drawings_AutoCAD.dwg DWG drawing
Attachment_1_-_Statement_of_Work.pdf PDF
Attachment_5_-_Small_Business_Participation_Commitment_Document.pdf PDF
Exhibit_1_-_Contract_Data_Requirements_List.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

SP3300-19-Q-5014

AMENDMENT 0007

The purpose of this amendment is as follows:

1. Answer additional contractor questions.

2. Incorporate revised Amendment 0007 Attachment 1 – Statement of Work.

3. Incorporate revised Amendment 0007 Attachment 3 – Schedule of Supplies.

Question Answer

1. Ref. SOW Amendment 0005 Attachment 1

– SOW, CLIN 0001; earlier amendments list three (3) panel views, SOW Amendment 0005 notes twenty-three (23) panel views, and the Amendment 0005 Attachment 3 –Schedule of Supplies lists one (1) panel view. Question:

which one is it?

1. There are 3 panel views. Refer to revised SOW paragraph 1.4.1 and Schedule of Supplies.

2. Ref. SOW Amendment 0005 Attachment 1

– SOW, CLIN 0001; based on the Site Visit, there is only supposed to be 45’ of conveyor replaced with the remaining conveyor PMed.

However, if you add up all the conveyor associated with CLIN 0001, there is over 100’ of conveyor, not 75’ as listed in the SOW.

Please verify whether the requirement is 45’ or 75’?

2. The length is 75 ft. All that is required to be replaced is the 3 powered takeaway lines in in-check.

3. Ref. SOW Amendment 0005 Attachment 1

– SOW, CLIN 0002; the twenty (20) turntables are not listed in the SOW, but they are listed in the Amendment 0005 Attachment 3 – Schedule of Supplies. Are they required?

3. The twenty turntables are to be demoed and disposed of. They are not required to be reutilized. They have been removed from the Schedule of Supplies.

4. Ref. SOW Amendment 0005 Attachment 1

– SOW, CLIN 0002; the SOW states 470’ conveyor for the Inspection Lines and 180’ conveyor for the Out-Loading, but the government’s drawings show 570’ conveyor for the Inspection Lines and 80’ conveyor for the Out-Loading. Can the government clarify what the correct lengths?

4. The corrected quantity in revised SOW paragraph 1.4.2 is 580 ft. of Inspection lines and 80 ft. of out-loading lines.

5. Ref. SOW Amendment 0005 Attachment 1

– SOW, CLIN 0003; the SOW states 400’ conveyor for the Inspection Lines and 500’ conveyor for the Out-Loading, but the government’s drawings show different. Can the government clarify what the correct lengths?

5. Refer to revised SOW paragraph 1.4.3.

The corrected quantity for the powered out-loading conveyor is 470 ft.

SP3300-19-Q-5014

AMENDMENT 0007

6. Ref. SOW Amendment 0005 Attachment 1

– SOW; the Current Description of Operations in the SOW is very high level.

When combined with the pictures showing I/O, it becomes difficult to picture what needs to be integrated and controlled. Can the government provide a soft copy of the full, detailed Description of Operations?

Operations Manual?

6. The SOW is clear on the description of operations. There is no operation's manual available.

7. Can you provide the existing control drawings?

7. The panel control drawings were already provided. These are the only electrical control schematics that are available.

8. Will the Government consider extending the proposal due date?

8. No, the due date for the submission of quotations is 18 June 2019 at 1:00 PM EST.

END OF AMENDMENT 0007

Amend 0001 SP330016B0016 for FBO
SP3300-15-R-5004 0003 page 1

Amend 0001 Page 2

IDCode:
Page: 1
Pages: 3
Text4: AMENDMENT/MODIFICATION NO.
AmendNo: 0007
ReqNo:
ProjNo:
IssCode: SP3300
IssuedBy: DLA Distribution

Acquisition Operations, J-7 Mifflin Avenue, Bldg 430 New Cumberland, PA 17070

AdmCode:
AdminBy: POC: Benjamin Bailey

717-770-5390 (P) Benjamin.Bailey@DLA.MIL

ContName:
ContStrt:
ContCnty:
ContSt:
ContZIP:
Code:
FacCode:
SolChgYs: Yes
SolChgNo: Off
SolAmdNo: SP3300-19-Q-5014
AmendDate: 04/05/19
ModNo:
ModDate:
NoCopies: 1
Amended: Yes
OffrExt: Off
OffrNoEx: No
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript:

SEE CONTINUATION PAGE(S)

SignName:
SignTitl:
ContDate:
CoName:
CoTitle:
CODate:
Text1: June 10, 2019