Amendment_0003_Attachment_1_-_Statement_of_Work.pdf
PDF 507 KB Posted
- Attached to
- Upgrade Receiving Conveyor Systems, Bldg. 499, DLA Distribution Red River, TX Federal contract opportunity
- Solicitation number
- SP3300-19-Q-5014
- Issued by
- Defense Logistics Agency Distribution
About this file
Amendment 0003 Attachment 1 - Statement of Work
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 0003 SP3300-19-Q-5014 Attachment 1 – Statement of Work
Statement of Work For
Upgrade Receiving Conveyor Systems, Bldg. 499
DLA Distribution Red River, TX
Revised 6 Apr 19 8 Mar 19
Prepared By:
DLA Installation Support for Distribution
DS-FDI; Bldg. 430 430 Mifflin Avenue, Suite 2227
New Cumberland, PA 17070-5008
TABLE OF CONTENTS
1.0 SCOPE -------------------------------------------------------------------------------- 3
1.1 SITE ----------------------------------------------------------------------------------- 3
1.2 SYSTEM LAYOUT AND FUNCTION ----------------------------------------- 3
1.3 REQUIRED SYSTEM THROUGHPUT ----------------------------------------- 5
1.4 CONTRACT LINE ITEMS -------------------------------------------------------- 6
2.0 APPICABLE SPECIFICATIONS, STANDARDS AND CODES ----------- 9
2.1 GOVERNMENT DOCUMENTS -------------------------------------------------- 9
2.2 STANDARDS AND CODES ------------------------------------------------------ 10
3.0 REQUIREMENTS ------------------------------------------------------------------- 11
3.1 GENERAL REQUIREMENTS ---------------------------------------------------- 11
3.2 EQUIPMENT SPECIFICATIONS ------------------------------------------------ 20
3.3 TRAINING ---------------------------------------------------------------------------- 51
3.4 ELECTRICAL ------------------------------------------------------------------------ 52
4.0 QUALITY ----------------------------------------------------------------------------- 53
4.1 LAYOUT ------------------------------------------------------------------------------ 53
4.2 SYSTEM MAINTENANCE ------------------------------------------------------- 53
4.3 SYSTEM CHECKOUT ------------------------------------------------------------ 54
4.4 INSPECTION AND TEST --------------------------------------------------------- 54
SECTION 1
1.0 SCOPE
This statement of work covers the necessary services, labor, material, equipment and control components required to repair and make operational the binnable receiving case conveyor and demolish and dispose and replace the existing bulk receiving pallet conveyor system in Bldg. 499, Zone 1 and replace, provide, install, test and make operational a new bulk receiving conveyor system in Bldg.
499, Zone 1.
1.1 SITE
The site of work is located at the DLA Distribution Depot Red River (DDRT), on the site of Red River Anny Depot. DDRT is located approximately 18 miles west of Texarkana, Texas on Interstate 30. The Contractor entrance to the depot is
0.3 miles south of exit 206 and 0.2 miles east on U.S. Hwy 82. The installation of the work is located in Bldg. 499, Zone 2. Bldg. 499 was built in 1995 and the building is 1000 ft. long by 640 ft. wide x 30 ft. clear stack height. The dimensions of zone 2 are 320 ft. wide x 380 ft. long.
1.2 SYSTEM LAYOUT AND FUNCTION
1.2.1 ORIGINAL BINNABLE RECEIVING CONVEYOR SYSTEM (REFER
TO DRAWING NO. 19-2-1)
. The function of the system is to receive and transport binnable material from the commercial truck receiving door in Bays A-E 24 of Bldg. 499 to the receiving inspection workstations for processing in Bays A-E 1-17 and then to storage in Bldg. 499 in zone 3 or 5. A large problem with the existing system is the inability to efficiently off-load commercial carriers, transport the material to the inspection stations, and then to storage. The existing system has been abandoned in place because the PLC is 25 years old, the totes which had a bar code on the side are no longer on-site and the panel view display has burnt out and is no longer commercial available. Also the raster scanning system at the workstations no longer functions because there is no bar code to read on the totepan. Under the original operating scenario, the extendaveyor system was used to off-load material in Bay A24 from floor loaded trucks. The material would be placed in totes with a barcode on the side that had the routing information for which type of receipt the material was and the inspection line destination. Material would travel from the extendaveyor to Bay A.5 17 where the raster scanner would read the barcode and if the material was for that line the material would divert to the inspection line. The material would then be inspected and then loaded onto the towline vehicle if the vehicle is to be stored in zones 3 or 5. If the material is an IFR (Issue from Receipt) the material would be placed on the middle take-away conveyor between each pair of inspection lines then the take-away conveyor would transport the material to the tilt tray sorter in zone 3. Material was also inducted via totepan at the in check stations at Bays A.5-B 21.5 - 23. The material would be placed in a tote with the bar code on the side of the tote and the raster scanners would read the bar code to activate the divert to the assigned inspection station in Bays A.5-E 17-19. The current operating scenario is that material is palletized at the receiving door if it is floor loaded, the transported to the receiving workstations by forklift.
1.2.2 BINNABLE RECEVING CONVEYOR SYSTEM FIX COVERED UNDER
THIS CONTRACT. (REFER TO DRAWING NO. 19-2-2)
The material will arrive in FedEx and UPS commercial carrier vans at Bay A 24.
The extendaveyor operator will place the material on the belt conveyor after a pre-printed bar code is placed in the material at the door which tells the system the inspection line destination in Bays A.5-E 17-18. The in-check stations are for material being received on pallets or triwalls from the overhead doors in Bays A.5
– E 24. The existing conveyors as shown in Bays A-B 21.5-23 in drawing no.
19-2-1 shall be demoed and replaced. The outer two conveyors will be gravity conveyor workstations for the in-check operators. The center conveyor will be the take away conveyor to load the material onto the main receiving belt conveyor which transporter the material to the inspection stations. At the in-check station the operator will place a preprinted bar code label on top of the material which will tell the overhead scanner in Bay A-18 the inspection line destination. The lines will be numbered 1-18 starting at the north most line being line number 1.
Lines 1-2 will be ESD (electronic static discharge) lines (parts are sensitive to static electricity). Lines 3-14 will be dedicated to returns. Lines 15-16 will be for new procurement and lines 17-18 will be for PPP&M. After the material is inspected and processed, the material will either be loaded on a towline cart for storage or on the middle takeaway line for IFRs between each pair of inspection lines for transportation to the tilt tray sorter in Zone 3 (200 series conveyor). The bar codes placed on the material at the in-check lines will be printed from the contractor provided printer from the software that is loaded on the contractor provided computer. This will be a stand-alone computer which is not tied to the DLA Network. The operator will pre-print a roll of the four type of barcodes so the bar code can be easily applied to the material at the in-check stations. Routing of material at the inspection lines shall be round robin going north to south for each of the four types of material. The controls system shall be upgraded to a Control Logix PLC System and the panel view system will be replaced. The line numbering of the different types of receipts will be programmed so that the lane assignment by receipt type can be easily changed by the operator. The chain diverts will be replace with powered ball or roller transfer for the powered take-away and the powered take-away line will be replace.
1.2.3 ORIGINAL BULK RECEIVING CONVEYOR SYSTEM. (REFER TO
DRAWING 19-2-1)
The Bulk Receiving Conveyor System/T-Car System is located in Bays B-E 18.5-
22. The existing system consists of twenty workstations, which consist of a combination of gravity roller conveyor at the load end (15 to 35 ft. long stepped for side forklift loading.) The gravity conveyors are for inspecting the pallets for receiving processing. The workstations are at the end of the gravity conveyor which transitions to 5 ft. of pallet conveyor follow by a turn table. The turntable is to have the ability to rotate the pallet if required. The turntable feeds the 10 ft.
long CDLR conveyor which feeds the T-Car. The operator hits the control at the turntable that releases the pallet to the CDLR and tells the T-car to either transport the material to the out-bound conveyor in Bay C.5-D.5 19 or the towline out-bound spur in the same bays.
1.2.4 NEW BULK RECEIVING CONVEYOR SYSTEM. (REFER TO
DRAWING 19-2-2)
The Bulk Receiving Conveyor System/T-Car System will still be located in Bays B.5-E 18.5-22. The new will system consists of nineteen workstations, which consist of powered accumulation pallet conveyor (APC) (15 to 35 ft. long stepped for side forklift loading.) The lines will be used from both returns and new procurement. The APC conveyors are for inspecting the pallets for receiving processing. The workstations will be at the end of the APC powered roller conveyor which transitions to 10 ft. sections of out-loading conveyor. The 5 ft.
CDLR conveyor and turntable will be eliminated. After the material is packed, the operator will hit a control which will release the material to feed the new 10 ft.
long APC conveyor which feeds the T-Car. The operator controls will tell the T-car to either transport the material to the out-bound conveyor in Bay C.5-D.5 21.5 or the towline out-bound spur in Bay C.5-D.5 18.
1.2.5 MAINTENANCE CONTRACT FOR ONE YEAR AFTER FINAL SYSTEM
ACCEPTANCE
If CLIN 0007 is awarded; the contractor shall perform preventative and correct maintenance on the system supplied under this contract for a period of one year after final acceptance. The contract shall perform a quarterly PM on the entire system and shall maintain less than one hour response time per break down from the time the contractor is notified. The contractor must also maintain 98% up time throughout the period of operation between 06:30 AM through 4:30 PM Monday through Friday.
1.3 REQUIRED SYSTEM THROUGHPUTS
The hours of operation of the system will be M-F 0700-1530. The system shall have the following capacities.
EXTENDAVEYOR RECEIVING SYSTEM:
Average hourly throughput: 250 cases Maximum hourly throughput: 300 cases
RECEIVING IN-CHECK STATIONS
RECEIVING INSPECTION STATIONS
IFR OUT-LOADING FOR ISSUE TO TILT TRAY SORTER
Average hourly throughput: 50 cases
Maximum hourly throughput: 100 cases
RECEIVING INSPECTION STATIONS
BULK RECEIVING STATIONS:
Average hourly throughput: 60 Pallets Maximum hourly throughput: 80 Pallets
TOWLINE INDUCTION FOR RECEIPTS FROM BULK RECEIVING LINES:
Average hourly throughput: 50 Pallets Maximum hourly throughput: 70 Pallets
OUT-LOADING IFRS FOR RECEIPTS FROM BULK RECEIVING LINES:
Average hourly throughput: 50 cases Maximum hourly throughput: 60 cases
1.4 CONTRACT LINE ITEMS
The offeror shall bid the system with separate prices for each contract line item.
Quantities specified are only estimates and shall be designed and verified by the contractor. The Government shall reserve the right to award each contract line item together or separately in order to match budget allocations with the maximum system capability. If the Government does not award all the contract line items during the initial award, the Government reserves the right to award each remaining CLINs up to 180 days from the initial contract award. CLIN number 0001, 002 and 0003 are the base bid.
CLINS 0004 through 0006 are optional CLINS. The performance period for CLINs 0001-0003 is 270 days. The performance period for CLIN 0004 and 0005 is 45 days for each CLIN. The performance period for CLIN 0006 is 120 days. The performance period for CLIN 0007 is 120 days.
1.4.1 CLIN NO. 0001
100 SERIES CONVEYOR UPGRADE
QTY DESCRIPTION
3 ea. Transfer Diverts 75 ft. 30 in. Accumulation Roller Conveyor 75 ft. Demo In-Check Conveyor 1 ea. PC and Printer
1 ea. Omni Directional Scanner 1 ea. Control Logix or Equivalent PLC for series 100, 200 and 300 conveyors with Government Laptop and PLC Software 3 ea. Panel View 1 Lot PLC Programming 1000 ea. Totepans 1 Lot PM Existing Receiving Case Conveyor Systems SERIES (100, 200 and
300 conveyors)
1.4.2 CLIN NO. 0002
RECEVING PALLET CONVEYOR SYSTEM REPLACEMENT/T-CAR
UPGRADE
QTY DESCRIPTION
470 ft. 48 Inch. Wide Accumulation Pallet Conveyor (Inspection Lines) 180 ft. 48 Inch Wide Accumulation Pallet Conveyor (Out-Loading) 20 ea. Turn Tables (GFE) Reconfiguration 1 ea. Control Logix or Equivalent and PLC Software (Pallet Conveyor) 1 ea. Control Logix or Equivalent PLC and PLC Software (T-Car) 1 ea. Replace Laser Positioning System (T-Car) 175 ft. Replace T-Car Electrical CAT Track 350 ft. Profile Grind T-Car Rail 2 ea. Panel Views 1 Lot LAN Cabling (6 Lines per workstation)
1.4.3 CLIN 0003 DEMO EXISTING SYSTEM
QTY DESCRIPTION
400 ft. 48 Inch. Wide Pallet Gravity Conveyor (Inspection Lines) 500 ft. 48 Inch Wide Chain Driver Live Roller Conveyor (Out-Loading) 20 ea Turntables 20 ea. Workstations 1 Lot Mezzanine
1.4.4 CLIN No 0004 BINNABLE RECEIVING WORKSTATION
REPLACEMENT
24 ea. 18 ea. Receiving Inspection Ergonomic Workstations and 6 ea.
Receiving In-check Ergonomic Workstations
1.4.5 CLIN No 0005 BULK RECEIVING CONVEYOR WORKSTATION
REPLACEMENT
QTY DESCRIPTION
19 ea. Ergonomic Workstations for Bulk Receiving Stations 1 Lot LAN Cabling
1.4.6 CLIN No 0006 TRANSPORTER DOCK
2 ea. Transporter docks
1.4.7 CLIN No 0007 REPLACE CHAIN DIVERTS AT RECEIVING
INSPECTION LINES
QTY DESCRIPTION
27 ea. Demo existing chain diverts at inspection station with powered wheel or roller divert, bridge the 5 ft. gap by installing a gravity conveyor for the 18 incoming inspection lines and install a powered conveyor for the 9 out-bound conveyor lines.
1.4.8 CLIN No 0008 1 YEAR MAINTENANCE CONTRACT
1 Yr. Preventative and Corrective Maintenance Contract for Entire System
SECTION 2
2.0 APPLICABLE SPECIFICATIONS, STANDARDS AND CODES
The following list of specifications, standards and codes shall apply to the work covered within this document. The offeror shall be responsible to ensure that all such applicable regulations are satisfied. Special attention shall be given to federal state and local requirements. The issue in effect of the following documents on the date of the solicitation forms a part of the specification to the extent specified herein:
2.1 GOVERNMENT DOCUMENTS
2.1.1 FEDERAL SPECIFICATIONS
NN-P-71 Pallets, Material Handling, Wood Stringer Construction, 2 way and 4 way (partial) TT-P-645 Primer, Paint, Zinc Chromate, Alkyd Type TT-E-489 Enamel, Alkyd, Gloss, Low Voc Content Aluminum W-F-408 Fittings for Conduit, Metal, Rigid (thick wall and thin wall
(EMT) type
2.1.2 MILITARY SPECIFICATIONS
MIL-C-83286 Polyurethane Paint MIL-P-514 Plates, Identification, Instrumentation, and Marking DOD-P-15328 Pretreatment Primer
2.1.3 FEDERAL STANDARDS
FED-STD-595 Federal Standard 595, A (9), Colors
2.1.4 OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)
STANDARDS
29 CFR 1910 Occupational Safety and Health Standards
2.1.5 U. S. ARMY CORPS OF ENGINEERS MANUAL
EM-385-1-1 General Safety Requirements
2.1.6 MILITARY STANDARDS
MIL-PRF-61002 Identification Marking of U.S. Military Property MIL-STD-248 Welding and Brazing Procedures and Performance MIL-STD-1474 Noise Limits for Army Material
2.1.7 DRAWINGS
DF-FDI 19-2-1 DDRT Bldg. 499 Existing Receiving Conveyor Systems DF-FDI 19-2-2 DDRT Bldg. 499 Receiving Conveyor Upgrade
2.2 STANDARDS AND CODES
Standards of the National Electrical Manufacturer’s Association (NEMA) American Welding Society Standards Code of the American Society of Mechanical Engineers Standards of the American Institute of Electrical Engineers American Society for Testing Materials (ASTM) Standards
ASTM 53
ASTM 120
American National Standards Institute (ANSI) B20.1 Safety Standards for Conveyors and Related Equipment B31.8 Gas Transmission and Distribution Piping Systems
National Fire Protection Association (NFPA) Publications National Electrical Code (NEC) Underwriters’ Laboratories, Inc., Publication Standards
ANSI/UL-558 - Standards for Safety for Internal Combustion Engine UL-583 - Standards for Safety Power Operated Industrial Trucks
American Iron and Steel Industrial Standards (AISI) Factory Mutual System (FM) Publications
SECTION 3
3.0 REQUIREMENTS
3.1 GENERAL REQUIREMENTS
The general requirements cited herein shall apply to any system or equipment proposed by the contractor. The final design of the system and the capability of the designed system to meet the firm performance requirements of this contract are the responsibility of the contractor Alternate equipment and system architecture may be proposed by the contractor provided all firm performance requirements specified in Sections 1.3 through 1.4 and 3.1 through 3.5 are satisfied by the proposed design. The contractor shall provide all equipment, material, control components, engineering and labor necessary to provide completely installed systems ready for operation. The system shall be tested by the contractor prior to performance testing by the Government. All equipment (each whole product with its integral software) shall be the manufacturer’s current, commercially designed and available or a commercial product that has been slightly modified to fit the proposed system. The commercial product must have proven, successful field application for at least two years immediately preceding the issue date of this solicitation. The field experience of each specific equipment product shall have been gained by an identical or previous model to the one being offered. The design of the specific equipment product offered must be fully defined. Also, any design changes during the two year period of field experience shall be identified by the offeror. These design changes must be minor and insignificant or be demonstrated reliable through commercial application.
Plastic piping for compressed air is prohibited except as a final carrier from solenoid to actuator. Pneumatic controls shall not be permitted.
3.1.1 MATERIALS AND OPERATING CONDITIONS
Unless otherwise specifically stated, all material shall be new and of the most suitable grade for the intended purpose. All parts shall be manufactured to such standards as will permit replacement or adjustment without modification to system components. All system equipment must be capable of operating in an industrial environment with temperatures from 50 to 100 degrees Fahrenheit and from 5 to 95 percent relative humidity (non-condensing). Dust and other airborne particle shall be filtered by a replaceable air filter. Electronic components will be equipped with cooling fan to protect the systems from heat damage.
3.1.2 TREATMENT AND PAINTING
All surfaces not yet painted but suitable for painting, with the exception of plated surfaces, shall be thoroughly cleaned to provide a clean, dry surface, free of all mill scale, oil grease, dirt, rust or other inhibiting material, and shall be painted with paint conforming to Federal Specification TT-E-489H, consisting of one coat of base primer conforming to Federal Specification TT-P-645B and one coat of enamel applied in accordance with standard commercial practices to assure complete coverage and durability of finish. An alternative painting process which will also be acceptable is an on-line metal cleaning process, then a blown dry or baked dry preparation prior to painting. The dry metal material is painted using an electrostatic spray paint process. The pre-wash cleaning process deposits an iron phosphate coating which is then covered with an alkyd baking enamel. The finish coat, when dry, shall be a smooth, even surface, free of runs, sags, drips or other defects. Color of the finish coat shall be the manufacturer’s standard commercial color.
3.1.3 STATE-OF-THE-ART COMPONENTS
The systems supplied by the contractor shall embody features that represent the current commercially available state-of-the-art products. Such features as plug-in electrical or electronic modules, solid state circuitry, trouble detection lights, and electronic diagnostic systems shall be utilized when practical to do so. Automatic or lifetime lubrication shall also be utilized where applicable.
3.1.4 MATERIAL TO BE HANDLED
Material to be handled consists of non-uniform packages of mixed stock. Cartons shall range in size from 6 inches long by 6 inches wide x 9 inches high to 30 inches long by 20 inches wide by 20 inches high and in weight from 5 pounds to 50 lbs. Material placed on the receiving conveyor system on the belt take-away system shall also include jiffy bags which are padded envelopes as small as 4 x 6 x .5 inches thick and weighing as little as .5 lbs, but they will be placed in totepans. Material which is lighter than 5 lbs. or smaller than 6” x 6” shall be placed in tote pans for the receiving case conveyor system. If CLIN 0007 is not exercised all material will be placed in totes because of the distance between the existing chain diverts at the receiving inspection lines. A two-inch overhang is permitted on all sides of a pallet making the maximum possible pallet dimensions 44 inches length by 52 inches wide. Pallet loads will range from four inches to 54 inches high. Pallet weights will range from 50 pounds to 2,500 lbs. Material on pallets may be stretch wrapped.
3.1.5 LUBRICATION AND ADJUSTMENT
All equipment shall be greased, oiled or lubricated and properly adjusted by the contractor when installing equipment to insure satisfactory operation. Lifetime lubrication shall be utilized wherever possible.
3.1.6 DIMENSIONS
Dimensions required to design and install equipment for use in facilities shall not be obtained from drawings, but shall be taken from measurement of the site location.
3.1.7 NOISE LEVELS
No single item of equipment shall produce an operating noise level in excess of 70 decibels within 4 feet of the equipment and no combination of operating elements of equipment shall exceed an 8 hour time weighted average sound level of 84 decibels measured on the A scale, when measured in accordance with section 1910.95 (“Occupational Noise Exposure”) of 29 CFR 1910 (OSHA Safety and Health Standards). Noise levels shall also be in compliance with
MIL-STD-1472.
3.1.8 ELECTRICAL POWER SOURCE
All electrical equipment shall be taken from the main electrical power distribution system in Bays C.5 –D.5 19 which is 480 volt, 3 phase, 60 Hz. All conduit, wire, electrical power distribution equipment, including transformers, and other electrical hardware, and labor necessary to provide power to the contractor installed equipment shall be contractor furnished and installed in accordance with the National Electrical Code (NEC), National Fire Protection Association (NFPA), and other applicable state and local codes. All wiring runs shall be enclosed in heavy walled rigid conduit or thin-wall electrical Metallic Tubing (EMT) with threaded fittings. Conduit runs shall not obstruct personnel, vehicle, or other material flow patterns. All electrical work shall be in accordance with the NEC. The contractor shall also remove all conduit from the old system that was removed.
3.1.9 SWITCHES AND CONTROLS
All start buttons, switches, selection buttons, and other control devices shall be marked with a permanent identifying label. All wires used in control circuits shall be identified at each junction or end with a wire number which corresponds to the number used in the contractor’s electrical control drawings specified in CDRL A002) of this document. Wiring terminal strips shall be used to the maximum extent practicable.
3.1.10 STANDARDIZATION OF COMPONENTS
Corresponding units and replaceable assemblies, subassemblies and parts in this specification shall be physically and functionally interchangeable as complete items without modification thereof or of other articles with which items are used.
Where dimensions, ratings and characteristics are not specified herein, the manufacturer’s published design limits shall be used to determine compliance with the foregoing.
3.1.11 FASTENERS
Unless otherwise specified, all threaded fasteners, washers and cotter pins required to fabricate the components of the system (except those designed to be in contact with oil in reservoirs) shall be plated to resist corrosion. All fasteners for similar applications shall be identical. If torch cutting or welding is required permits must be obtained per paragraph 3.1.16.1.7.
3.1.12 METAL FABRICATIONS
Metals used in the fabrication of components shall provide original quality surface finish and shall be free from kinks and hard bends. Metals having corroded or pitted surfaces are not acceptable. Metal straightening or forming shall be done by methods that will not cause weakening or injury to the material.
Burrs and sharp edges in holes and on sheets, plates and members shall be removed sufficiently to assure correct fits and to prevent loosening of fasteners and damage to components. Flame cutting with a tip suitable for the thickness of metal may be employed instead of shearing or sawing. Splatter and slag shall be removed and exposed cuts ground smooth. Heated metals shall be allowed to cool slowly, except in the performance of designed heat treatment and overheating shall be avoided in accordance with the recommendations of the metal manufacturer. All bends of a major character and all modular assembly fabrication shall be made with controlled means to ensure uniformity of size and shape.
3.1.12.1 WELDS
Welded joints shall be sound, thoroughly fused to the base metal, smooth, free from cracks, pits, holes, fissures, under cuts, rough projecting edges and sized to provide strength necessary to suit the intended purpose. All welds shall be smooth, continuous, with complete heat penetration and shall transmit stress without permanent deformation or failure when the equipment supplied is subjected to normal service and the testing in Section 4 of this statement of work.
The contractor’s welders, welding operators and welding procedures shall be qualified to meet the requirements of MIL-STD-248, the American Welding Society (AWS) Standards or American Society of Mechanical Engineers
(ASME).
3.1.12.2 BOLTED AND RIVETED CONNECTIONS
Holes in the sizes recommended in standard practice shall be accurately punched, drilled or formed and shall have burrs removed. Bolts, studs and cap screws shall be provided with washers or lock washers. Self-locking nuts are acceptable in lieu of standard nuts and lock washers. All fasteners shall be correctly tightened and shall have full engagement. Rivet heads shall be full, neatly made, concentric with rivet holes and in full contact with the surface of the member. Excessive upsetting of rivets to fill holes is not acceptable.
3.1.12.3 CASTINGS AND FORGINGS
Castings and forgings shall be of the best quality normally used in commercial practice and not produce any deleterious effects for the intended purpose.
3.1.12.4 MACHINE WORK
All parts shall be manufactured to gage through the use of correct jigs, fixtures, tape controlled machines or combination thereof.
3.1.13 FLOOR MOUNTING OF EQUIPMENT
All equipment shall be floor supported, except non-load bearing system components such as conduit, and shall be securely bolted to the concrete floor in accordance with Table 1.
Type Schedule Number of Bolts Required Diameter Length
IT hardware, tables, Electrical equipment and other components requiring light
Not less than one per support leg
5/16” 2”
Conveyors 30” or less from the floor to the top of the Conveying Surface
Not less than one per support leg
3/8” 3-1/2”
Conveyors greater than 30” from the floor the top of the conveying surface (Shall be ceiling hung)
Not less than one per support leg
½” 3-1/2”
Table 1
3.1.14 IDENTIFICATION MARKING
All equipment and major components shall have identification plates permanently attached. The information contained on the plates shall be as indicated herein and as specified in MIL-STD-130. Identification data shall include, as a minimum, contract number, manufacturer, serial number, model number and date of manufacture.
3.1.14.1 CONTROL IDENTIFICATION
Major items of electrical equipment and major components shall be permanently marked with an identification nameplate to identify the equipment by type or function and specific unit number as shown on the drawings and as required by NEC. All start buttons, selection buttons, switches and control devices shall each be marked with a permanent identification label. Hand lettering or marking is not acceptable.
3.1.15 SPECIAL PROVISIONS
3.1.15.1 INTERRUPTION OF WAREHOUSE OPERATIONS
The installation shall be phased to minimize downtime the warehouse operations shall not be curtailed nor suspended except as absolutely essential. Any required curtailment or suspension shall be coordinated with at least 5 days notice to the Government through the Contracting Officer’s Representative. Any interruption to warehouse operations greater than 15 minutes must be performed during non-duty hours (see paragraph 3.1.15.3).
3.1.15.2 INSTALLATION SEQUENCE
Installation of the conveyor systems shall be in the following order. If a CLIN is not exercised then the contractor shall move onto the next CLIN after the previous CLIN is completed:
a. Remove old PLC controls system for binnable conveyor system.
b. Remove old cases conveyor lines at receiving in-check.
c. Install new in in-check lines.
d. Install new PLC, panel view and new controls system for binnable receiving conveyor system.
e. Do preventative maintenance on entire receiving case conveyor system.
f. Remove north pallet receiving conveyor lines.
d. Replace the north pallet receiving lines.
e. Upgrade the controls, laser positioning system, PLC and programming on the
T-Car.
f. Remove south pallet receiving lines.
g. Replace south pallet receiving lines.
3.1.15.3 WORKING HOURS
Normal working hours are 0700 through 1600 Monday through Friday excluding federal holidays. The contractor may be allowed, under extenuating circumstances, to perform work outside of regular hours. Where work is desired to be performed other than during regular hours, the contractor shall request permission from the Contracting Officer’s Representative (COR) at least 24 hours in advance to allow for the necessary arrangements to be made.
3.1.15.4 REMOVAL OF WASTE AND DEBRIS
All on-site waste and debris, old conveyor, and conduit generated in performing this contract shall be disposed of off-site at contractor arrangement and expense.
The contractor shall comply with FAR 52-236-7. The contractor shall maintain the work site and premises in a clean and neat condition during the installation.
3.1.15.5 PENETRATION OF FIREWALLS
Firewalls may be penetrated for installation of electrical and communications cables and air lines pending inspection and approval by the Warner Robins Air Force Base Fire Department. Cables shall be enclosed in rigid conduit completely through the wall. The opening around the conduit/pipe shall be sealed with builder’s mortar and finished to original appearance.
3.1.15.6 WALL OPENINGS
The walls will be carefully cut to prevent undue damage. All permanent new openings shall be protected with masonry lintels and angle iron frames with steel jams. Head and sill members shall be not less than 2 inches by 2 inches by 5/16 inch angles and steel plate material shall be not less than ¼ inch in thickness.
Openings shall be finished in a neat, quality workmanship like manner and any damage resulting to the walls or floors or any part of the warehouse shall be repaired with material of a kind, texture and quality to match existing materials.
The contractor is required to obtain approval from the Contracting Officer’s Representative prior to making any permanent or temporary firewall or exterior wall openings other than those identified in this specification. The contractor is required to provide and install fire protection for all temporary or permanent openings made in the firewalls of the warehouses, including removal of fire doors.
All fire protection equipment planned for or used will be installed in accordance with NFPA codes. All contractor installed fire protection equipment shall be tested in accordance with the procedure found in paragraph 4.5.
3.1.16 SAFETY REQUIREMENTS
3.1.16.1 GENERAL REQUIREMENTS
3.1.16.1.1 These safety provisions are only general in nature and are not intended to be all inclusive. The contractor shall follow and will not be excused from following the safety requirements of EM 385-1-1, appropriate safety standards or other requirements established by DLA, National Electric Code, OSHA, National Fire Code or other established safety requirements.
3.1.16.1.2 It is the responsibility of the contractor to be aware of the safety requirements for personnel, equipment, buildings and materials. All protective coverings, shields, protective barriers, barricades, warning signs, etc., will be furnished and installed in accordance with ANSI and OSHA Standards by the contractor where a hazard or potential hazard exists. Twenty-four (24) hours prior to the planned installation of protective barriers and barricades, the contractor will coordinate with the COR for concurrence and approval. The removal of barricades and barriers will be accomplished by the contractor at the completion of the work in the area.
3.1.16.1.3 All protective equipment must be approved by the safety and health manager or his designated authority. The contractor shall notify the COR and get approval before commencing work.
3.1.16.1.4 The contractor must comply with all OSHA standards for the storage, handling and application of flammable paints and liquids, combustibles and other hazardous materials. This includes the use of ventilation, personal protective equipment, respiratory protection, monitoring for air contaminants and requirements to convey to workers the hazards associated with the operation.
3.1.16.1.5 The contractor shall submit current material safety data sheets for all materials to be used on the project. This includes new materials selected and substitute materials.
3.1.16.1.6 The equipment and the controls, including any modifications and installation of same, shall conform to the requirements of ANSI/ASME B20.1-1984, Safety Standards for Conveyors and Related Equipment.
3.1.16.1.7 No torch cutting or welding work of any description shall be permitted within the installation boundaries until the site of the proposed work has been inspected by the base fire department, and a permit has been issued. Permits must be obtained on a daily basis by contractor personnel coordinating the request through Mr. Billy Roberts, DDRT Safety, (903) 334-2641 and the Red River
Army Depot Fire Department and identifying the location and type of work to be done.
3.1.16.1.8 All edges shall be beveled, ground smooth, or otherwise shaped to preclude sharp edges. Protruding parts will be designed to eliminate any hazards that could cause personal injury and will be installed only after approval by the contracting officer or his designated representative. The equipment and the controls, including any modifications and installation of same, shall conform to the requirements of ANSI/ASME B20.1-1984, Safety Standards for Conveyors and Related Equipment.
3.1.16.1.9 MISHAP REPORTING
A copy of the report on each job connected injury, property damage, or motor vehicle mishap will be submitted to the facilities engineer and the safety and health office. This report may be made on either a contractor’s report form, a DLA Form 1591, mishap report, or SY 91a (motor vehicle). The estimated absence in days, if any, by employee due to injury and/or cost of property or vehicle damages shall be included.
3.1.16.2 INSTALLATION SAFETY PRACTICES
3.1.16.2.1 Personal protective equipment such as hard hats, safety glasses, safety shoes, etc., shall be worn in all areas and on all jobs as required by the safety and health office. All hard hat areas shall be indicated by contractor furnished signs.
Safety and health office personnel may inspect the work site at any time for compliance.
3.1.16.2.2 All contractor material shall be stored in a neat and stable manner so as to preclude leaning or falling stacks. Housekeeping will be maintained at a high level at all times. Scrap material, such as empty cartons, wood crates, etc., will be removed by the contractor at the end of each work day.
3.1.16.2.3 Smoking is prohibited except in designated areas.
3.1.16.2.4 Gasoline operated equipment used in the building will be kept to a minimum to preclude the build-up of carbon monoxide and other hazardous fumes. For welding, electric motor driven arc welders are preferred. If gasoline or diesel engine welders are used, the welder will be kept outside the building with welding cables run inside, or the engine exhaust will be ducted to outside the building subject to the safety and health manager’s approval.
3.1.16.2.5 Only a one (1) day supply of flammable, combustible, corrosive and other hazardous materials is to be kept at the job site. All other stock of hazardous materials shall be stored in accordance with applicable OSHA Standards at a location remote from the job site and approved by the Government.
3.1.16.2.6 Safety markings shall be in accordance with 29 CFR 1910.144 and 145. Location of safety equipment shall be designated by alternating green and white stripes on the floor.
3.1.16.3 FIRE PREVENTION
The use of all fire hydrants will be controlled by this center’s fire department. No unauthorized use of fire hydrants will be permitted. Fifteen feet clearance is required around all fire hydrants at all times. Fire aisles, building entrances and building exits will be kept clear of obstructions at all times. A 24-inch clearance will be maintained at firewalls at all times.
3.1.16.4 FLAME CUTTING AND WELDING PROCESSES
3.1.16.4.1 Welding, cutting or use of flame devices require prior approval of the Fire Chief and shall be performed in accordance with ANSI Z49.1 (1975). A welding screen shall be used whenever welding is being done. The contractor shall have on duty at such times and as required by the Warner Robins Air Force Base Fire Department Fire Chief when welding, cutting or using open flame devices, a fire watcher who shall be a qualified fire fighter with not less than three years consecutive experience.
3.1.16.4.2 “Hot tapping” or other cutting or welding on a flammable gas or liquid transmission or distribution utility pipeline shall be performed by a crew qualified to make hot taps. For a gas pipeline, see 841-28 in “Gas Transmission and Distribution Piping Systems,” ANSI B31.8 (1968).
3.1.16.4.3 At no time will contractor use or block installed fire equipment, valve houses, or post indicator valve unless authorized by the fire department.
3.1.17 CONTRACT DATA REQUIREMENTS
The contractor shall furnish contract data as required in DD Form 1423, Contract Data Requirements List, included with this specification. Contract data, outlined in Table 2, shall be prepared in accordance with this specification or data item descriptions attached thereto, and submitted in the quantities and at the times specified for approval.
Sequence Title DID ID. Number
A001 Installation Schedule DI-S-SAT1
A002 Layout Drawings DI-E-SAT2
A003 As-Built Drawings DI-E-SAT2
A004 Operating Manual DI-E-SAT1
A005 Maintenance Manual DI-E-SAT1
A006 Contractor Technical Representative List DI-E-SAT11
Sequence Title DID ID. Number
A007 Training Material and Schedules DI-E-SAT
A008 Power Requirements DI-P-SAT1
A009 Design Data Calculations DI-E-24040A
A010 Certificate of Compliance DI-E-SAT14
A011 Test Plan DI-T-SAT1
A012 Software Documentation Manual DI-S-SAT-2
Table 2
3.2 EQUIPMENT SPECIFICATIONS
All mechanical/electrical equipment and components shall properly be interfaced to ensure the package conveyor, and pallet conveyor, are capable of delivering material at the maximum rates specified in paragraph 1.3. All equipment supplied shall be designed and installed in compliance with seismic zone 2 requirements, providing a rigid/stable structure capable of handling all anticipated loads/stresses. All conveyors shall be sighted along centerlines and aligned +/- ¼ inch in the horizontal/vertical planes. Line shaft driven conveyor shall not be provided. Contractor shall ensure equipment design does not cause/result in build up of static electricity, and install protective devices as required. Penetrations of firewalls shall be accomplished in accordance with the requirements of paragraph
3.1.15.5 and 3.1.15.6.
3.2.1 CONTROL SYSTEMS FOR PACKAGE CONVEYOR
Package Conveyor Control System shall include applicable PLCs, keypads, sensors, scanners and actuators required to provide overall integrated routing/tracking of cases, totes throughout the Receiving Mechanization System.
All conveyor/equipment controls shall be electric (pneumatic controls are not acceptable). Contractor shall be responsible for design and installation of the entire package conveyor electrical system, including power feeder to motor control centers, connections to motors, and wiring of all controls. Power source is 480 volt, 3 phase, 60 Hz. All photocells shall be polarized with the exception of sick eyes. All photoeyes shall have screw off connections or plug in type for easy replacement and shall be guarded from impact by the operator. The new systems installed by the contractor shall be completely integrated with the existing conveyor system so that all the systems work concurrently together without interruption of material flow.
3.2.1.1 CONTROL PANELS AND MOTOR CONTROL CENTERS
All conveyor control panels and motor control centers shall be located adjacent to the applicable conveyor area. Control panels and motor control centers shall contain all control components/devices, motor starters and related equipment necessary for operation of conveyor re-circulation loops, spurs, and merges/diverts in specified modes.
3.2.1.2 OPERATOR CONTROL STATIONS
Personnel safety, ease of conveyor operation and package and pallet movement efficiency shall be primary considerations in design of package and pallet conveyor controls and location/configuration of various operator control stations.
Contractor shall submit locations of operator control stations for approval in conjunction with other design submittals. Control stations shall be protected against fork truck damage.
3.2.1.2.1 SUPERVISORY CONTROL STATIONS
Contractor shall provide supervisory control panels at major operating areas to monitor/control the entire package/tote and pallet conveyor systems. As a minimum, supervisory control panels shall include the following controls:
a. Jam/fault indicator lights and reset push buttons.
b. System Start/Stop push button with run light.
c. On/off selector switches for each conveyor or workstation.
d. Emergency Stop push button.
e. Queue full indicator lights.
f. Any other controls necessary for package and pallet conveyor operation.
3.2.1.2.2 MAINTENANCE CONTROL STATIONS
Each conveyor drive shall have an Auto/Off/Man selector switch. This selector switch shall be on Auto selection for normal operations. In Off position, the motor starter shall be disabled. The Man position shall be spring returned to off and shall be used for running or jogging the motor when system is in manual mode.
3.2.1.2.3 MOTOR STARTERS
Motor starters may be contained in IEC or NEMA 12 Motor Control Center Cabinets located for least cost installation and ease of maintenance. Master controls for conveyor system shall be completely enclosed in an electrically grounded metal enclosure consistent with good commercial practice. Operator control voltage shall not exceed 120 volts, single phase, 60 HZ. Push button/keyboard height shall be maintained at the 30 inches.
3.2.1.2.4 PANEL AND SWITCH DESIGN
Panel and switch construction shall meet all safety requirements for NEMA 12, oil tight panel board for interior and shall be securely installed, readily accessible and of sufficient capacity for the rated load. Surface preparation and finish application shall be as specified herein. Stainless steel shall not be painted.
Switches shall be of push-button type. Stop buttons shall readily identifiable.
Emergency stop push buttons shall be mushroom head, push-to-stop/pull-to-reset type and shall be labeled EMERGENCY STOP. There shall be no electrical device or other protrusions mounted above the floor to impede fork truck traffic or provide hazard.
3.2.1.2.5 PHOTOELECTRIC SWITCHES
Product sensing shall be via photo eyes. Photoelectric switches shall be located at points where conveyor control and/or status is required. Switches shall be able to operate under ambient temperature and humidity conditions indicated in this specification. Units shall be sealed to prevent damage due to moisture, vibration, shock and other environmental factors encountered on a conveying line. All switches shall be mounted securely to conveyor frame and not attached to guardrails. Switches shall be completely guarded to prevent inadvertent misalignment caused by personnel, conveyed material, or equipment incidental to contract.
3.2.1.2.6 MODES OF OPERATION
For control purposes, there shall be two modes of operation; a two position switch shall be provided at supervisory control stations to select the mode of operation.
A manual mode shall be provided for maintenance/diagnostics which will permit line-of sight control of all switches, actuators, motors, etc. An automatic mode shall be provided for normal operations, with capability of routing totes/packages and pallets to/from any accessible spur or workstation in the system based on a Push Button or Panel View input and/or PLC control. To prevent inadvertent excitation of motors, actuators, switches, etc., a change of state shall require positive flow of current. A positive signal must be used to change the state of any device. Any error condition which could result in damage to material, equipment, or personnel shall cause that portion of the system containing the error condition to shut down.
3.2.1.2.6.1 MANUAL MODE
Selection of this mode shall cause the PLC to execute a system shutdown. This mode shall permit operation of switches and actuators from the immediate area of the affected conveyor. Activation of switches and actuators shall be from the applicable control panel/station through the PLC. Purpose of this mode of operation shall be for diagnostics/maintenance purposes.
3.2.1.2.6.2 AUTOMATIC MODE
This mode shall permit routing of totes/packages and pallets to/from any accessible spur/workstation in the system based on Push Button or Panel View input and/or PLC control. Delivery of tote/package from its origin to destination shall be under ECS/PLC control. Purpose of this mode shall be for normal operations.
3.2.1.2.7 CONVEYOR INTERLOCKS
Several conveyors forming a transport series shall be electrically interlocked so that the conveyor farthest down stream shall start first, followed by the second, and so on in the sequence. Stopping of any conveyor shall stop those conveyors upstream. There shall be an adjustable time delay (approximately 2 seconds) between starting successive conveyors. Several conveyors of small horsepower in close proximity, such as powered curves and short section, may be group started without a separate time delay. This shall be limited to a maximum of 3 HP group.
3.2.1.2.8 JAM PROTECTION
Contractor shall provide sensors specifically designed to sense jams at all merges, diverts, and right angle transfers. When jams are detected, feeding conveyors shall stop and a red lantern located to be visible to operating personnel shall illuminate. Clearing of the jam shall require activation of a reset button to allow conveyor to restart. Controls shall also be provided to prevent entry of an item onto a conveyor or other item of equipment which is occupied, stopped, or otherwise not operationally ready to receive the item. Such controls shall automatically allow entry of product at such time as conveyor/equipment becomes operationally ready to receive it.
3.2.1.2.9 FULL LINE SENSORS
All workstations shall have equipment such as photo sensors in order to detect a full line condition. In addition to preventing more material from entering a workstation when it is full, a full line light shall be illuminated at the supervisory control panel.
3.2.1.2.10 ENERGY CONSERVATION
Contractor shall provide controls to deactivate any conveyor which has been running for more than three minutes without having conveyed any material, and automatically restart when necessary for operation. Certain conveyors may be excluded from this requirement based on Government/Contractor agreement regarding practicality of this feature for individual conveyors.
3.2.1.2.11 EMERGENCY CUTOFFS
All powered conveyors and associated equipment installed under this specification shall be equipped with cut-off switches actuated by cables which are easily accessible and easily visible from any point along both sides of conveyors, where accessible to personnel. Cut-off switches shall lock out upon actuation and equipment shall remain inoperable until the cutoff switch is reset. Cut-off switches shall be readily accessible to personnel to reset. Safety cables shall be highly visible red plastic covered steel, with a minimum diameter of 3/16 inch.
3.2.1.2.12 PROGRAMMABLE LOGIC CONTROLLERS
The contractor shall furnish and install Allen Bradley Programmable Control Logix Controllers (PLCs) to upgrade the existing SLC 150 PLCs and basic modules for receiving case conveyor series 100, 200 and 300 conveyor systems, the pallet receiving conveyor and T-Car System. All contractor supplied conveyors and all contractor furnished equipment for the controls upgrade must be compatible with the existing tote conveyor transportation systems/sortation systems and pallet conveyor systems. These new PLCs shall have sufficient inputs and outputs to accommodate all devices necessary. Memory capacity shall be sufficient to accommodate all programming steps necessary for all machine controls.