(11)_Attachment_K_Project_Specifications_and_Submittals.pdf
PDF 18 MB Posted
- Attached to
- Building 81 Renovation Federal contract opportunity
- Solicitation number
- SP3300-16-B-0012
- Issued by
- Defense Logistics Agency Distribution
About this file
Attachment 11 to IFB
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912HP-15-D-0004
SPECIFICATIONS
Volume 1 - Divisions 00 - 12
June 3, 2016
This page was intentionally left blank for duplex printing.
Building 81 Renovation JUNE 2016 Defense Distribution Center Susquehanna, New Cumberland, PA
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 31 00 AVAILABLE PROJECT INFORMATION
00 31 02 LEED CHECKLIST
00 43 22 UNIT PRICES
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 40.00 20 ENVIRONMENTAL MANAGEMENT
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.10 20 QUALITY CONTROL FOR MINOR CONSTRUCTION
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 62 35 RECYCLED / RECOVERED MATERIALS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 42 51 CARPET REMOVAL AND RECLAMATION
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
02 85 00.00 20 MOLD REMEDIATION
DIVISION 03 - CONCRETE
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
03 45 00 PRECAST ARCHITECTURAL CONCRETE
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 13 53 ELASTOMERIC SHEET WATERPROOFING
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
PROJECT TABLE OF CONTENTS Page 1
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 14 00 WOOD DOORS
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 05 61 COMMON WORK RESULTS FOR FLOORING PREPARATION
09 22 00 SUPPORTS FOR GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING BASE AND TRANSITIONS
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 10.00 10 MECHANICAL SIGNAGE
10 14 20.00 10 FIRE PROTECTION SYSTEM SIGNAGE
10 44 16 FIRE EXTINGUISHERS
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 23.01 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER
BUILDING CONTROL SYSTEMS
23 11 25 FACILITY GAS PIPING
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 52 00 HEATING BOILERS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
PROJECT TABLE OF CONTENTS Page 2
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM
27 05 29.00 10 PROTECTIVE DISTRIBUTION SYSTEM (PDS) FOR SIPRNET
COMMUNICATION SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 16 01.00 10 SMALL INTRUSION DETECTION SYSTEM
28 20 01.00 10 ELECTRONIC SECURITY SYSTEM
28 31 49 CARBON MONOXIDE DETECTORS
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 31 16.13 CHEMICAL TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 10 00 BITUMINOUS CONCRETE PAVEMENT
32 11 23 AGGREGATE BASE COURSE
32 12 10 BITUMINOUS TACK AND PRIME COATS
32 16 13 CONCRETE SIDEWALKS AND CURBS
32 17 23.00 20 PAVEMENT MARKINGS
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 11 00 WATER DISTRIBUTION
33 40 00 STORM DRAINAGE UTILITIES
33 46 13 FOUNDATION DRAINAGE SYSTEM
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 3
CERTIFICATIONS
00 01 05 - 1
SECTION 00 01 05
I hereby certify that the architectural portions of work included in these plans and specifications, except as otherwise indicated by other registered professionals, have been prepared by me or under my direct supervision, and that I have coordinated the architectural portions with those portions sealed by other registered professionals.
Greg B. Cockmon, AIA, Architect Principal
CROMWELL ARCHITECTS
ENGINEERS, INC.
Architects Engineers 101 S. Spring Street Little Rock, Arkansas
03 June 2016 Date
I hereby certify that the civil portions of work included in these plans and specifications, except as otherwise indicated, have been prepared by me, or under my direct supervision.
John Petersen, PE Civil Engineer
CROMWELL ARCHITECTS
ENGINEERS, INC.
Architects Engineers 101 S. Spring Street Little Rock, Arkansas
I hereby certify that fire protection portions of work included in these plans and specifications, except as otherwise
Brian Gerdwagen, FPE Fire Protection Engineer
CROMWELL ARCHITECTS
ENGINEERS, INC.
Architects Engineers 101 S. Spring Street Little Rock, Arkansas
00 01 05 - 2
I hereby certify that the mechanical portions of work included in these plans and specifications, except as otherwise
Robert L. Seay, PE, Mechanical Engineer Principal
CROMWELL ARCHITECTS
ENGINEERS, INC.
Architects Engineers 101 S. Spring Street Little Rock, Arkansas
I hereby certify that the electrical portions of work included in these plans and specifications, except as otherwise
Brent L. Hamling, PE Electrical Engineer
CROMWELL ARCHITECTS
ENGINEERS, INC.
Architects Engineers 101 S. Spring Street Little Rock, Arkansas
00 01 05 - 1
I hereby certify that the communication portions of work included in these plans and specifications, except as otherwise
Donnie Jones, PE, RCDD Electrical Engineer
Donnie Jones, PE, MLE, RCDD, LEED AP Principal Quality Consulting Engineers, PLLC HUBZone Certified Small Business 6277-600 Carolina Commons Drive, #350 Indian Land SC 29707
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 31 00
AVAILABLE PROJECT INFORMATION
PART 1 GENERAL
1.1 Existing Conditions
-- End of Section Table of Contents --
DOCUMENT 00 31 00 Page 1
SECTION 00 31 00
AVAILABLE PROJECT INFORMATION
PART 1 GENERAL
1.1 Existing Conditions
Certain information relating to existing surface and subsurface conditions and structures is available to bidders for information and coordination.
A. Asbestos Management Plan dated December 5, 2014.
1. Building 81 Floor Layout Attachment Level 0 and Level 1 (Room Numbers).
2. Building 81 Floor Layout Attachment Level 2 and Level R (Room Numbers).
For convenience, a copy of each follows the end of this Section.
-- End of Section --
DOCUMENT 00 31 00 Page 2
12/5/2014Defense Distribution Center, Susquehanna ‐ 2014 Asbestos Management Plan
Appendix A ‐ Table A.1
Confirmed/Assumed ACM
Building: 00081
HM ID: M00081.004.A ‐ (004.A) 9" x 9" Floor Tile, Checkerboard Pattern, Green/Gray Material Category: Misc.
How Identified as ACM: Sampled
Material Location Material Quanity Material Condition Recommended Response Action Room, ID
Level 0, Room 1014, Corridor 1,027 S.F. Good Include in O&M Program R00081.0.1014
Level 0, Room 1088, Storage 437 S.F. Good Include in O&M Program R00081.0.1088
Level 0, Room 1004, Office 248 S.F. Good Include in O&M Program R00081.0.1004
Level 0, Room 1002, Office 1,024 S.F. Good Include in O&M Program R00081.0.1002
Level 0, Room 1001, Vault 103 S.F. Good Include in O&M Program R00081.0.1001
Level 0, Room 1003, Office 32 S.F. Good Include in O&M Program R00081.0.1003
Level 1, Room 1045, Office 273 S.F. Good Include in O&M Program R00081.1.1045
Level 1, Room 1085, Storage Room 104 S.F. Good Include in O&M Program R00081.1.1085
Level 1, Room 1039, Office 224 S.F. Good Include in O&M Program R00081.1.1039
Level 1, Room 1038, Conference Room 322 S.F. Good Include in O&M Program R00081.1.1038
Level 1, Room 1083, Telephone Communications 225 S.F. Good Include in O&M Program R00081.1.1083
Level 1, Room 1025, Office 4,714 S.F. Good Include in O&M Program R00081.1.1025
Level 1, Room 1082, File Room 312 S.F. Good Include in O&M Program R00081.1.1082
Level 1, Room 1040, Office 224 S.F. Good Include in O&M Program R00081.1.1040
Level 1, Room 1046, Office 8,387 S.F. Good Include in O&M Program R00081.1.1046
Level 1, Room 1044, Office 224 S.F. Good Include in O&M Program R00081.1.1044
Level 1, Room 1043, Office 392 S.F. Good Include in O&M Program R00081.1.1043
Level 1, Room 1042, Office 392 S.F. Good Include in O&M Program R00081.1.1042
Level 1, Room 1036, Janitor Room 28 S.F. Good Include in O&M Program R00081.1.1036
A-180
Confirmed/Assumed ACM
Building: 00081
HM ID: M00081.004.A ‐ (004.A) 9" x 9" Floor Tile, Checkerboard Pattern, Green/Gray Material Category: Misc.
How Identified as ACM: Sampled
Material Location Material Quanity Material Condition Recommended Response Action Room, ID
Level 1, Room 1081, Supply Room 55 S.F. Good Include in O&M Program R00081.1.1081
Level 1, Room 1023, Office 308 S.F. Good Include in O&M Program R00081.1.1023
Level 1, Room 1027, Office 240 S.F. Good Include in O&M Program R00081.1.1027
Level 1, Room 1033, Office 224 S.F. Good Include in O&M Program R00081.1.1033
Level 1, Room 1034, Corridor 264 S.F. Good Include in O&M Program R00081.1.1034
Level 1, Room 1024, Office 352 S.F. Good Include in O&M Program R00081.1.1024
Level 1, Room 1022, Office 249 S.F. Good Include in O&M Program R00081.1.1022
Level 1, Room 1020, Office 176 S.F. Good Include in O&M Program R00081.1.1020
Level 1, Room 1019, Break Room/Hall 250 S.F. Good Include in O&M Program R00081.1.1019
Level 1, Room 1018, Office 240 S.F. Good Include in O&M Program R00081.1.1018
Level 1, Room 1017, Office 150 S.F. Good Include in O&M Program R00081.1.1017
Level 1, Room 1016, Office 176 S.F. Good Include in O&M Program R00081.1.1016
Level 1, Room 1037, Office 140 S.F. Good Include in O&M Program R00081.1.1037
Level 1, Room 1026, Stairwell 64 S.F. Good Include in O&M Program R00081.1.1026
Level 2, Room 1055, Projection Room 150 S.F. Good Include in O&M Program R00081.2.1055
Level 2, Room 1048, Conference Room 220 S.F. Good Include in O&M Program R00081.2.1048
Level 2, Room 1049, Office 273 S.F. Good Include in O&M Program R00081.2.1049
Level 2, Room 1050, Office 208 S.F. Good Include in O&M Program R00081.2.1050
Level 2, Room 1051, Office 364 S.F. Good Include in O&M Program R00081.2.1051
A-181
Confirmed/Assumed ACM
Building: 00081
HM ID: M00081.004.A ‐ (004.A) 9" x 9" Floor Tile, Checkerboard Pattern, Green/Gray Material Category: Misc.
How Identified as ACM: Sampled
Material Location Material Quanity Material Condition Recommended Response Action Room, ID
Level 2, Room 1052, Office 364 S.F. Good Include in O&M Program R00081.2.1052
Level 2, Room 1084, Office 424 S.F. Good Include in O&M Program R00081.2.1084
Level 2, Room 1053, Office 208 S.F. Good Include in O&M Program R00081.2.1053
Level 2, Room 1086, Storage Closet 45 S.F. Good Include in O&M Program R00081.2.1086
Level 2, Room 1054, Office 8,095 S.F. Good Include in O&M Program R00081.2.1054
Level 2, Room 1066, Telecommunication Room 112 S.F. Good Include in O&M Program R00081.2.1066
Level 2, Room 1064, Office 4,731 S.F. Good Include in O&M Program R00081.2.1064
Level 2, Room 1063, Office 220 S.F. Good Include in O&M Program R00081.2.1063
Level 2, Room 1062, Conference Room 117 S.F. Good Include in O&M Program R00081.2.1062
Level 2, Room 1061, Office 220 S.F. Good Include in O&M Program R00081.2.1061
Level 2, Room 1060, Conference Room 130 S.F. Good Include in O&M Program R00081.2.1060
Level 2, Room 1058, Janitor Closet 4 S.F. Good Include in O&M Program R00081.2.1058
Level 2, Room 1056, Conference Room 724 S.F. Good Include in O&M Program R00081.2.1056
Level 2, Room 1087, VIP Room 186 S.F. Good Include in O&M Program R00081.2.1087
HM ID: M00081.004.B ‐ (004.B) Floor Tile Mastic, Black Material Category: Misc.
How Identified as ACM: Sampled
Material Location Material Quanity Material Condition Recommended Response Action Room, ID
Level 0, Room 1001, Vault 103 S.F. Good Include in O&M Program R00081.0.1001
Level 0, Room 1002, Office 1,024 S.F. Good Include in O&M Program R00081.0.1002
A-182
Confirmed/Assumed ACM
Building: 00081
HM ID: M00081.004.B ‐ (004.B) Floor Tile Mastic, Black Material Category: Misc.
How Identified as ACM: Sampled
Material Location Material Quanity Material Condition Recommended Response Action Room, ID
Level 0, Room 1003, Office 32 S.F. Good Include in O&M Program R00081.0.1003
Level 0, Room 1004, Office 248 S.F. Good Include in O&M Program R00081.0.1004
Level 0, Room 1014, Corridor 1,027 S.F. Good Include in O&M Program R00081.0.1014
Level 0, Room 1088, Storage 437 S.F. Good Include in O&M Program R00081.0.1088
Level 1, Room 1022, Office 249 S.F. Good Include in O&M Program R00081.1.1022
Level 1, Room 1037, Office 140 S.F. Good Include in O&M Program R00081.1.1037
Level 1, Room 1019, Break Room/Hall 250 S.F. Good Include in O&M Program R00081.1.1019
Level 1, Room 1045, Office 273 S.F. Good Include in O&M Program R00081.1.1045
Level 1, Room 1046, Office 8,387 S.F. Good Include in O&M Program R00081.1.1046
Level 1, Room 1081, Supply Room 55 S.F. Good Include in O&M Program R00081.1.1081
Level 1, Room 1082, File Room 312 S.F. Good Include in O&M Program R00081.1.1082
Level 1, Room 1083, Telephone Communications 225 S.F. Good Include in O&M Program R00081.1.1083
Level 1, Room 1085, Storage Room 104 S.F. Good Include in O&M Program R00081.1.1085
Level 1, Room 1043, Office 392 S.F. Good Include in O&M Program R00081.1.1043
Level 1, Room 1042, Office 392 S.F. Good Include in O&M Program R00081.1.1042
Level 1, Room 1040, Office 224 S.F. Good Include in O&M Program R00081.1.1040
Level 1, Room 1038, Conference Room 322 S.F. Good Include in O&M Program R00081.1.1038
Level 1, Room 1044, Office 224 S.F. Good Include in O&M Program R00081.1.1044
Level 1, Room 1025, Office 4,714 S.F. Good Include in O&M Program R00081.1.1025
A-183
Confirmed/Assumed ACM
Building: 00081
HM ID: M00081.004.B ‐ (004.B) Floor Tile Mastic, Black Material Category: Misc.
How Identified as ACM: Sampled
Material Location Material Quanity Material Condition Recommended Response Action Room, ID
Level 1, Room 1017, Office 150 S.F. Good Include in O&M Program R00081.1.1017
Level 1, Room 1018, Office 240 S.F. Good Include in O&M Program R00081.1.1018
Level 1, Room 1020, Office 176 S.F. Good Include in O&M Program R00081.1.1020
Level 1, Room 1016, Office 176 S.F. Good Include in O&M Program R00081.1.1016
Level 1, Room 1039, Office 224 S.F. Good Include in O&M Program R00081.1.1039
Level 1, Room 1024, Office 352 S.F. Good Include in O&M Program R00081.1.1024
Level 1, Room 1036, Janitor Room 28 S.F. Good Include in O&M Program R00081.1.1036
Level 1, Room 1026, Stairwell 64 S.F. Good Include in O&M Program R00081.1.1026
Level 1, Room 1027, Office 240 S.F. Good Include in O&M Program R00081.1.1027
Level 1, Room 1033, Office 224 S.F. Good Include in O&M Program R00081.1.1033
Level 1, Room 1034, Corridor 264 S.F. Good Include in O&M Program R00081.1.1034
Level 1, Room 1023, Office 308 S.F. Good Include in O&M Program R00081.1.1023
Level 2, Room 1053, Office 208 S.F. Good Include in O&M Program R00081.2.1053
Level 2, Room 1056, Conference Room 724 S.F. Good Include in O&M Program R00081.2.1056
Level 2, Room 1055, Projection Room 150 S.F. Good Include in O&M Program R00081.2.1055
Level 2, Room 1058, Janitor Closet 4 S.F. Good Include in O&M Program R00081.2.1058
Level 2, Room 1060, Conference Room 130 S.F. Good Include in O&M Program R00081.2.1060
Level 2, Room 1061, Office 220 S.F. Good Include in O&M Program R00081.2.1061
Level 2, Room 1062, Conference Room 117 S.F. Good Include in O&M Program R00081.2.1062
A-184
Confirmed/Assumed ACM
Building: 00081
HM ID: M00081.004.B ‐ (004.B) Floor Tile Mastic, Black Material Category: Misc.
How Identified as ACM: Sampled
Material Location Material Quanity Material Condition Recommended Response Action Room, ID
Level 2, Room 1063, Office 220 S.F. Good Include in O&M Program R00081.2.1063
Level 2, Room 1064, Office 4,731 S.F. Good Include in O&M Program R00081.2.1064
Level 2, Room 1066, Telecommunication Room 112 S.F. Good Include in O&M Program R00081.2.1066
Level 2, Room 1051, Office 364 S.F. Good Include in O&M Program R00081.2.1051
Level 2, Room 1086, Storage Closet 45 S.F. Good Include in O&M Program R00081.2.1086
Level 2, Room 1052, Office 364 S.F. Good Include in O&M Program R00081.2.1052
Level 2, Room 1087, VIP Room 186 S.F. Good Include in O&M Program R00081.2.1087
Level 2, Room 1084, Office 424 S.F. Good Include in O&M Program R00081.2.1084
Level 2, Room 1054, Office 8,095 S.F. Good Include in O&M Program R00081.2.1054
Level 2, Room 1049, Office 273 S.F. Good Include in O&M Program R00081.2.1049
Level 2, Room 1048, Conference Room 220 S.F. Good Include in O&M Program R00081.2.1048
Level 2, Room 1050, Office 208 S.F. Good Include in O&M Program R00081.2.1050
HM ID: M00081.008.A ‐ (008.A) 9" x 9" Floor Tile, Checkerboard Pattern, Beige/Lt. Brown Material Category: Misc.
How Identified as ACM: Sampled
Material Location Material Quanity Material Condition Recommended Response Action Room, ID
Level 0, Room 1008, Conference Room 600 S.F. Good Include in O&M Program R00081.0.1008
Level 0, Room 1007, Dining Room 840 S.F. Good Include in O&M Program R00081.0.1007
A-185
Confirmed/Assumed ACM
Building: 00081
HM ID: M00081.013.A ‐ (013.A) Resilient Sheet Flooring, Tan, Under Existing Finishes Material Category: Misc.
How Identified as ACM: Sampled
Material Location Material Quanity Material Condition Recommended Response Action Room, ID
Level 1, Room 1029, Lobby 905 S.F. Good Include in O&M Program R00081.1.1029
Level 1, Room 1031, Exit Door 40 S.F. Good Include in O&M Program R00081.1.1031
HM ID: M00081.019.A ‐ (019.A) 12" x 12" Floor Tile, Gray, Black Streaks Material Category: Misc.
How Identified as ACM: Assumed ACM
Material Location Material Quanity Material Condition Recommended Response Action Room, ID
Level 2, Room 1065, Kitchen 48 S.F. Good R00081.2.1065
Level 2, Room 1068, Coffee Room 54 S.F. Good R00081.2.1068
Level 2, Room 1069, Restroom 40 S.F. Good R00081.2.1069
HM ID: M00081.019.B ‐ (019.B) Floor Tile Mastic, Black Material Category: Misc.
How Identified as ACM: Assumed ACM
Material Location Material Quanity Material Condition Recommended Response Action Room, ID
Level 2, Room 1068, Coffee Room 54 S.F. Good R00081.2.1068
Level 2, Room 1065, Kitchen 48 S.F. Good R00081.2.1065
Level 2, Room 1069, Restroom 40 S.F. Good R00081.2.1069
HM ID: M00081.021.A ‐ (021.A) Fire Doors, Hinged (Passage Door), Suspect Core Material Category: Misc.
How Identified as ACM: Assumed ACM
Material Location Material Quanity Material Condition Recommended Response Action Room, ID
Level 0, Room 1076, Stairwell 1 Each Good Include in O&M Program R00081.0.1076
A-186
Confirmed/Assumed ACM
Building: 00081
HM ID: M00081.021.A ‐ (021.A) Fire Doors, Hinged (Passage Door), Suspect Core Material Category: Misc.
How Identified as ACM: Assumed ACM
Material Location Material Quanity Material Condition Recommended Response Action Room, ID
Level 1, Room 1077, Stairwell 1 Each Good Include in O&M Program R00081.1.1077
Level 2, Room 1078, Stairwell 1 Each Good Include in O&M Program R00081.2.1078
HM ID: M00081.024.A ‐ (024.A) Roofing System Materials, Under Existing Finishes Material Category: Misc.
How Identified as ACM: Assumed ACM
Material Location Material Quanity Material Condition Recommended Response Action Room, ID
Level R, Room X000, Roof 24,798 S.F. Good Include in O&M Program R00081.R.X000
HM ID: M00081.025.A ‐ (025.A) Pipe Insulation, Gray Material Category: TSI
How Identified as ACM: Assumed ACM
Material Location Material Quanity Material Condition Recommended Response Action Room, ID
Level 0, Room 1088, Storage 5 L.F. Good Include in O&M Program R00081.0.1088
A-187
00 43 22 - 1
SECTION 00 43 22
UNIT PRICES FORM
FROM:
Contractor License No. ____________________(hereinafter called "Bidder")
TO: US Army Corps of Engineers, Charleston District(hereinafter called "Owner") Project Technical Point of Contact: Nancy Jenkins 69A Hagood Avenue Charleston, SC 294
RE: Architect Engineer Project No. 2015-239
1.1 UNIT PRICES
The Undersigned agrees that the following UNIT PRICES shall govern changes in the Work, whether they be ADDITIONS or DEDUCTIONS to the Contract Sum required during the course of the Work. Unit Prices shall be the same for Additions or Deductions. All Unit Prices shall be total installed costs including overhead, profit, geotechnical engineering and all other necessary costs. Proposing separate add and deduct unit prices shall subject this Bid Proposal to being rejected as "non-responsive."
ITEM & UNIT OF MEASURE ADDITION or DEDUCTION (Enter one price only)
A. ASBESTOS REMOVAL AND ABATEMENT:
1. Asbestos Removal-Floor Tile: Price per square foot in place. $
a. Area of Removal and Abatement (insert square footage). Square foot in place. __________
(sq.ft.)
B. ASBESTOS REMOVAL AND ABATEMENT:
1. Asbestos Removal-Ceiling Tile: Price per square foot in place. $
a. Area of Removal and Abatement (insert square footage). Square foot in place. __________
(sq.ft.)
C. ASBESTOS REMOVAL AND ABATEMENT:
1. Asbestos Removal-Pipe Insulation: Price per square foot in place. $
a. Area of Removal and Abatement (insert square footage). Square foot in place. __________
(sq.ft.)
00 43 22 - 2
Respectfully submitted:
Bidder:
By: Date:
Title:
Business Address:
SEAL
Telephone Number: ( ) If Bid is by a Corporation
END OF SECTION
LEED 2009 for New Construction and Major Renovations DLA Bldg 81
Project Checklist
6 2 18 Possible Points: 26 Y ? N Y ? N
Y Prereq 1 2 Credit 4 1 to 2 1 Credit 1 1 2 Credit 5 1 to 2
5 Credit 2 5 1 Credit 6 Rapidly Renewable Materials 1 1 Credit 3 Brownfield Redevelopment 1 1 Credit 7 1 6 Credit 4.1 6 1 Credit 4.2 1 10 1 4 Possible Points: 15
3 Credit 4.3 Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles 3 2 Credit 4.4 2 Y Prereq 1
1 Credit 5.1 Site Development—Protect or Restore Habitat 1 Y Prereq 2
1 Credit 5.2 Site Development—Maximize Open Space 1 1 Credit 1 1 1 Credit 6.1 Stormwater Design—Quantity Control 1 1 Credit 2 1 1 Credit 6.2 Stormwater Design—Quality Control 1 1 Credit 3.1 1
1 Credit 7.1 Heat Island Effect—Non-roof 1 1 Credit 3.2 1 1 Credit 7.2 1 1 Credit 4.1 1
1 Credit 8 Light Pollution Reduction 1 1 Credit 4.2 1 1 Credit 4.3 1
2 6 2 Possible Points: 10 1 Credit 4.4 1 1 Credit 5 1
Y Prereq 1 1 Credit 6.1 Controllability of Systems—Lighting 1 4 Credit 1 Water Efficient Landscaping 2 to 4 1 Credit 6.2 1
2 Credit 2 Innovative Wastewater Technologies 2 1 Credit 7.1 1 2 2 Credit 3 2 to 4 1 Credit 7.2 Thermal Comfort—Verification 1
1 Credit 8.1 1 10 9 16 Possible Points: 35 1 Credit 8.2 1
Y Prereq 1 3 3 Possible Points: 6 Y Prereq 2
Y Prereq 3 1 Credit 1.1 1 5 5 9 Credit 1 1 to 19 1 Credit 1.2 1
7 Credit 2 1 to 7 1 Credit 1.3 1 2 Credit 3 2 1 Credit 1.4 1
2 Credit 4 2 1 Credit 1.5 1 3 Credit 5 3 1 Credit 2 1
2 Credit 6 2 1 2 1 Possible Points: 4
7 5 2 Possible Points: 14 1 Credit 1.1 1
Y Prereq 1 1 Credit 1.2 1 1 2 Credit 1.1 1 to 3 1 Credit 1.3 1
1 Credit 1.2 Building Reuse—Maintain 50% of Interior Non-Structural Elements 1 1 Credit 1.4 1 1 1 Credit 2 1 to 2
1 1 Credit 3 1 to 2 39 28 43 Possible Points: 110
Regional Priority: EQc7.1 Thermal Comfort Regional Priority: WEc3 Water Use Reduction 40% Regional Priority: Specific Credit
Storage and Collection of Recyclables
Materials and Resources
Fundamental Commissioning of Building Energy Systems
Measurement and Verification
Construction Waste Management
Enhanced Commissioning On-Site Renewable Energy
Enhanced Refrigerant Management
Green Power
Optimize Energy Performance
Minimum Energy Performance Fundamental Refrigerant Management
Materials and Resources, Continued
Water Efficiency
Building Reuse—Maintain Existing Walls, Floors, and Roof
Alternative Transportation—Parking Capacity
Heat Island Effect—Roof
Recycled Content Regional Materials
Certified Wood
Alternative Transportation—Bicycle Storage and Changing Rooms
Sustainable Sites
Alternative Transportation—Public Transportation Access
Site Selection Development Density and Community Connectivity
Construction Activity Pollution Prevention
LEED Accredited Professional
Certified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Platinum 80 to 110
Construction IAQ Management Plan—During Construction
Outdoor Air Delivery Monitoring
Total
Energy and Atmosphere
Water Use Reduction—20% Reduction
Low-Emitting Materials—Composite Wood and Agrifiber Products Low-Emitting Materials—Flooring Systems
Indoor Chemical and Pollutant Source Control
Thermal Comfort—Design Controllability of Systems—Thermal Comfort
Water Use Reduction
Daylight and Views—Views Daylight and Views—Daylight
Materials Reuse
Indoor Environmental Quality
Minimum Indoor Air Quality Performance Environmental Tobacco Smoke (ETS) Control
Increased Ventilation
Regional Priority Credits
Innovation and Design Process
Low-Emitting Materials—Adhesives and Sealants Low-Emitting Materials—Paints and Coatings
Construction IAQ Management Plan—Before Occupancy
Innovation in Design: Green Cleaning Innovation in Design: 30% regional exemplary
Innovation in Design: Educational Program Innovation in Design: Low Mercury Florescent Lights
Innovation in Design: Specific Title
Regional Priority: EAc1 Optimize Energy 28%
Building 84 Renovation Project Defense Distribution Center, Susquehanna New Cumberland, PA
SECTION 01 11 00 – Summary of Work Page 1 of 11
SECTION 01 11 00
SUMMARY OF WORK
08/11
Table of Contents
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.3 SUBMITTALS
1.4 WORK COVERED BY CONTRACT DOCUMENTS
1.4.1 Project Description
1.4.2 Location
1.5 WORK RESCHEDULING
1.6 OCCUPANCY OF PREMISES
1.7 EXISTING WORK
1.8 ON-SITE PERMITS
1.8.1 Utility Outage Requests and Utility Connection Requests
1.8.2 Digging, Welding, and Burning Permits
1.9 LOCATION OF UNDERGROUND UTILITIES
1.9.1 Notification Prior to Excavation
1.10 FIRE WATCH
1.11 CONSTRUCTION CONSTRAINTS
1.11.1 Operations Requirements:
1.11.2 Contractor’s Working Hours:
1.11.3 Contractor Request:
1.11.4 Window Demo/Replacement:
1.11.5 Heating System Demo/Install:
1.11.6 Transporter Enclosures Renovations
1.11.7 Battery Room Ventilation System Demo/Install
1.11.8 Electric Demo/Install:
1.11.9 Fire Protection and Fire Alarm Systems Demo/Installation:
1.12 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT
1.13 SALVAGE MATERIAL AND EQUIPMENT
PART 2 PRODUCTS
PART 3 EXECUTION
SECTION 01 11 00 – Summary of Work Page 2 of 11
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM E2114 (2008) Standard Terminology for Sustainability Relative to the
Performance of Buildings
GREEN BUILDING INITIATIVE (GBI)
Green Globes (2004) Green Globes(™) US Green Building Rating System
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
Energy Star (1992; R 2006) Energy Star Energy Efficiency Labeling System
U.S. GREEN BUILDING COUNCIL (USGBC)
LEED NC (2009) Leadership in Energy and Environmental Design(tm) New
Construction Rating System
1.2 DEFINITIONS
Definitions pertaining to sustainable development are as defined in ASTM E2114, Section 01 57 19.00 20, TEMPORARY ENVIRONMENTAL CONTROLS, and as specified.
a. "Environmentally preferable products" have a lesser or reduced effect on the environment in comparison to conventional products and services. This comparison may consider raw materials acquisition, production, manufacturing, packaging, distribution, reuse, operation, maintenance, or disposal of the product.
b. "Indoor environmental quality" is the physical characteristics of the building interior that impact occupants, including air quality, illumination, acoustics, occupant control, thermal comfort, daylighting, and views.
c. "Operational performance" is the functional behavior of the building as a whole or of the building components.
d. "Sustainability" is the balance of environmental, economic, and societal considerations.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. The following shall be submitted in accordance with Section 01 33 00, SUBMITTAL PROCEDURES:
SECTION 01 11 00 – Summary of Work Page 3 of 11
SD-01 Preconstruction Submittals Construction Sequence; G
1.4 WORK COVERED BY CONTRACT DOCUMENTS
1.4.1 Project Description
Renovation of Building 84, which includes but is not limited to the following.
Repair exterior of the building by repainting the exterior CMU walls, downspouts, doors and frames, and associated exterior accessories providing a uniform and aesthetic appearance.
Replace existing warehouse windows with translucent panels and louvers, or CMU infill.
Install a new high speed roll-up doors on east and west end of the building. Repair existing steam heat system and piping within the warehouse and Administration Annex areas by replacement. These repairs include replacement of the following:
a. Unit Heaters
b. Piping
c. Ventilation Units and Ductwork
d. Building Automation System, etc.
e. Steam system conversion to hot water to all of Building 84
The Warehouse and Administration Areas shall remain fully operational during construction.
New exhaust fans will replace existing units at the same locations. New air rotation units will be installed in all bays.
Update the electrical system so that the entire building is served by a single, new, centrally located electrical service and associated electrical gear. The new service entrance gear shall re-feed all existing service entrance gear, metering, transformers, distribution panel boards, etc. as required to maintain complete and usable system. The new service entrance gear shall also be used to feed new electrical distribution gear associated with the additional building upgrades. Remove/replace obsolete electrical gear currently installed within the building.
Repair existing fire protection piping and heads by replacement. These repairs include removal of existing fire protection piping and heads, and installation of new ESFR sprinkler system. Construct new exterior sprinkler control riser enclosures. Remove existing fire alarm panels and install new fire alarm panels.
Repair battery room exhaust fans by replacement. Provide new hydrogen monitoring system to provide alarm signal in the event of high hydrogen content.
1.4.2 Location
The work shall be located at Defense Distribution Center, Susquehanna in New Cumberland, PA. Refer to the Contract Drawings for specific location(s) on site for the work and construction lay-down areas.
SECTION 01 11 00 – Summary of Work Page 4 of 11
1.5 WORK RESCHEDULING
Normal duty hours for work shall be from 0700 to 1530, Monday through Friday excluding all federal holidays. Requests for work off hours shall require written approval from the Contracting Officer Representative (COR) no less than 15 working days in advance of the proposed work period.
1.6 OCCUPANCY OF PREMISES
The Work in Building 81 cannot begin until DLA Distribution staff relocates to the new HQ Facility (430).
Before work is started, the Contractor shall prepare and submit a Construction Sequence to the COR detailing the sequence of procedures, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways required to successfully execute the work. This sequence shall be provided in writing and shall be approved by the COR prior to the start of any work. See Section 01 32 01.00 10, PROJECT SCHEDULE for further details.
1.7 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been damaged or altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
1.8 ON-SITE PERMITS
1.8.1 Utility Outage Requests and Utility Connection Requests
Work shall be scheduled to hold outages to a minimum.
Requests for utility outages and connections shall be made in writing to the COR at least 15 working days in advance of the time required. Each request shall state the system involved, area involved, approximate duration of outage, and the nature of work involved.
1.8.2 Digging, Welding, and Burning Permits
ACTIVITY SUBMISSION DATE SUBMISSION FORM
Digging / Excavation 10 working days prior to work Dig Permit COR will supply when requested.
Confined Space Entry Daily (12 hours maximum) Confined Space Entry Permit
SECTION 01 11 00 – Summary of Work Page 5 of 11
Hot Work Daily Hot Work Permit
Issued by Fire Department when requested.
Utility Outage 15 working days N/A
Permits shall be posted at a conspicuous location in the construction area. Burning of trash or rubbish is not permitted on project site.
1.9 LOCATION OF UNDERGROUND UTILITIES
Contractor is responsible for requesting existing underground utilities be located prior to beginning work. Contractor is also responsible for verifying the elevations of existing piping, utilities, and any type of underground or encased obstruction not indicated to be relocated or removed but indicated or discovered during scanning in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made. See Section 01 78 00, CLOSEOUT SUBMITTALS for additional information.
1.9.1 Notification Prior to Excavation
Contact PA One Call to have publicly (Utility Company) owned underground utilities located and also submit a Dig Permit through the COR to have privately (Government) owned underground utilities located. Contractor is responsible for maintaining markings provided by both PA One Call and Dig Permit once utilities are marked and throughout construction.
Notify the COR to request a Dig Permit at least 10 working days prior to starting excavation work. Damage to existing marked utilities shall be repaired at the contractor’s expense.
1.10 FIRE WATCH
Provide a qualified person to perform Fire Watch duties when required by NFPA or the Contract Documents. This person shall maintain an active identification badge allowing unescorted access to all areas of Building 84 at all times. Hours and frequency of patrols shall be coordinated with the COR at the beginning of construction.
1.11 CONSTRUCTION CONSTRAINTS
Building 85 must remain fully operational during construction. The following construction phasing requirements and work restrictions were provided by DLA. Contractor shall include a Phasing Schedule for approval by COR prior to start of work. Refer to Section 01 32 01.00 10
PROJECT SCHEDULE.
1.11.1 Operations Requirements:
The Contractor shall adhere to the following operational requirements and constraints:
1.11.1.1 Operations will remain fully functional for the project duration.
a. Construction shall not adversely affect Operations.
SECTION 01 11 00 – Summary of Work Page 6 of 11
b. Access to contractor blocked storage areas shall be provided within two (2) hours of a request being submitted by the government.
c. No more than three (3) bays for major work activities may be worked on simultaneously during the project (two (2) bays for concurrent mechanical and electrical work, and one
(1) other bay for fire protection work). Small incidental work may be requested in other bays than those three (3) bays thru the COR but must be approved by the government.
Permission to expand work activities to additional bays MAY be granted but should not be expected as a foregone conclusion.
d. Storage materiel must be moved by Operations. When stored materiel must be moved for construction, the Contractor must schedule a move request thru the COR, see Contractor Request paragraph below.
e. Operation’s has two (2) packaging areas in the building. One shall always remain fully operational during the project.
f. Interior aisles must remain readily accessible to MHE traffic during construction.
g. Exterior docks must remain readily accessible to MHE traffic during construction.
h. Protect existing equipment, stored materiel, and existing facility during construction.
i. During renovation efforts on the transporter stations, only one transporter enclosure will be taken out of service at a time. In addition, the transporter located on the west side of the building is to be renovated first.
j. During construction of the new mechanical room, a temporary alternate method of egress from the dock in the vicinity of the mechanical room is to be provided.
1.11.2 Contractor’s Working Hours:
Comply with the following working hour requirements:
a. Normal Working Hours: 0700 thru 1500.
b. Potential lead and asbestos abatement activities and handling of hazardous materials must be performed on second and third shifts (1530 thru 0530 hours).
c. Scheduled power outages/service switch over shall occur on Sundays only.
1.11.3 Contractor Request:
Procedure for Contractor requests necessary for construction activities shall be as follows:
a. Barricading floor areas and doors must be scheduled and pre-approved by the government through the COR. All requests shall be submitted 24 hours in advance to setting up a barricade/caution tape.
b. Small incidental (daily) stored materiel moves (for construction access) must be requested 24 hours in advance of construction activities through the COR.
SECTION 01 11 00 – Summary of Work Page 7 of 11
c. Removal of stored materiel for installation of fire suppression systems:
(1) Materiel stored on the top shelf of existing racking will be moved one (1) bay at a time by the government prior to starting the fire protection work (remaining storage on lower shelves will not be moved). The Government is only capable of moving one bay (top rack only) of storage at a time based on available alternative storage space.
(2) The Contractor shall submit materiel move requests to the COR. For moves that require less than a full bay of materiel to be moved (a maximum of two (2) rows equivalent), 14 days advanced notice shall be provided to the COR. For materiel moves that exceed this quantity up to a full bay, a minimum of 30 calendar days shall be provided to the COR to affect the relocation of this much materiel.
1.11.4 Window Demo/Replacement:
Proceed as follows:
a. Removal of existing windows and installation of new window/louvers on north side of building shall occur one (1) bay at a time until all five (5) bays are completed. This work will not be scheduled or completed during the winter months (November through April).
1.11.5 Heating System Demo/Install:
a. Temporary heating shall be provided if heating system is not fully operational and commissioned by October 15, 2016. Contractor shall maintain the temperature inside the building's exterior walls between 55 to 60 degrees F from October 15th, 2016 continuously through May 15th, 2017. Energy required for heating the building will be provided by the Contractor.
b. Not more than two (2) bays may be worked on simultaneously.
c. Construction of the new mechanical room located on the northwest dock area shall not impede traffic or trucks being utilized for materiel transfers. Most materiel transfers will be accomplished at transporter areas, however, there will be trucks being unloaded at other north dock locations at times. Coordinate construction vehicle access and construction material laydown area (for mechanical room only) with the COR. Any damage to pavement (asphalt or concrete) or damage to grass areas not in the contractor’s area of work shall be repaired at the Contractor’s expense.
1.11.6 Transporter Enclosures Renovations
The Contractor shall perform prescribed transporter renovations as follows:
a. Transporters are conveyor systems used for the transport of materiel from the warehouse to active combat units around the world. As such, a minimum of two of these enclosures must remain operational at all times.
b. These conveyor systems are enclosed to protect materiel from inclement weather. These enclosures are in need of repair by replacement of various components of the enclosure.
SECTION 01 11 00 – Summary of Work Page 8 of 11
In some cases it will be necessary to support conveyor systems while renovations to enclosures are being made as the conveyors are supported by the enclosure itself. Confirm the slope of conveyors and their configuration prior to the start of work on an enclosure to assure that the conveyor system is returned to operations in the same condition as when renovations began.
c. Provide signs and barriers at transporter conveyor loading point within the warehouse to assure that conveyors are not loaded or used during renovation.
1.11.7 Battery Room Ventilation System Demo/Install
a. A minimum of one (1) exhaust fan shall remain operational in the battery charging room at all times. There are a total of three (3) fans being replaced in this area.
1.11.8 Electric Demo/Install:
a. Not more than two (2) bays may be worked on simultaneously.
b. Building shall maintain full power for the duration of the project with the exception of scheduled power outages. Schedule and coordinate power outages through the COR.
c. Power outages/service switchovers shall be scheduled for Sundays only.
d. Scheduled outages shall last no longer than six (6) hours per scheduled event.
e. Outdoor/Medium voltage work (demolition or proposed new work) that will require de-energization of the 12.47 KV electrical circuit feeding the building will need to be coordinated/scheduled through the COR. Request must be submitted a minimum of three
(3) weeks in advance of the proposed outage.
f. Utility Crossing “U” Avenue - one lane of traffic shall be kept open at all times for thru traffic along “U” Avenue. Both lanes shall be available when the Contractor is not working or on site. Contractor shall provide traffic control while engaged in construction activities associated with running power crossing the road.
g. Government shall receive a (48) hour notice prior to traffic pattern changes being implemented.
1.11.9 Fire Protection and Fire Alarm Systems Demo/Installation:
a. Contractor shall be permitted to work in only one (1) bay at a time.
b. If any portion of the sprinkler system is not fully functional (impaired), a 24 hour a day fire watch will be required for that portion of the facility by the Contractor until the system is returned to a fully functional status.
c. An entire bay shall be completed and fully functional before work in another bay may begin.
1.12 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT
SECTION 01 11 00 – Summary of Work Page 9 of 11
Unless otherwise notified by the Contracting Officer, the Contractor, with his own forces, shall transport all Government furnished equipment / materials described in the Contract Documents. The equipment/materials will be transported from the Government storage area to the work site indicated in the Contract Documents.
Government will provide the following equipment for Contractor-Installation:
a. New pole-mounted transformer for street lighting.
1.13 SALVAGE MATERIAL AND EQUIPMENT
Materials and equipment to be salvaged as identified by the contract documents shall remain the property of the Government. The salvaged property shall be segregated, itemized, delivered, and off-loaded at the Government designated storage area located on the Defense Distribution Center Susquehanna site.
Contractor shall maintain property control records for material or equipment designated as salvage. Contractor's system of property control may be used if approved by the Contracting Officer. Contractor shall be responsible for storage and protection of salvaged materials and equipment until receipt and acceptance of salvage material by the COR. Salvaged material under the Contractor’s control that is damaged prior to turnover to the Government shall be replaced by the Contractor at Contractor’s expense. Salvage material shall be documented on Form DD 250 and DD250C (continuation if necessary). A copy of this form is attached and shall be made electronically available by the COR. Instructions for the proper preparation of this form can be found at the following link, Part 4:
http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/DFARSApxF.htm
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not used http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/DFARSApxF.htm�
SECTION 01 11 00 – Summary of Work Page 10 of 11
SECTION 01 11 00 – Summary of Work Page 11 of 11
01 14 00 – Work Restrictions Page 1 of 11
SECTION 01 14 00
WORK RESTRICTIONS
11/11
Table of Contents
GENERAL ............................................................................................................................ 2 PART 1
1.1 REFERENCES
1.2 SUBMITTALS
1.3 SPECIAL SCHEDULING REQUIREMENTS
1.3.1 Materials, Equipment, and Personnel
1.3.2 Active Facility
1.3.3 Construction Interruptions
1.3.4 Scheduling Interruptions
1.3.5 Wartime Interruption
1.4 CONTRACTOR ACCESS AND USE OF PREMISES
1.4.1 Activity Regulations
1.4.2 Working Hours
1.4.3 Work Outside Regular Hours
1.4.4 Occupied and Existing Buildings
1.4.5 Utility Cutovers and Interruptions
1.4.6 Refinished Roadwork
PRODUCTS .......................................................................................................................... 8 PART 2
EXECUTION ........................................................................................................................ 8 PART 3
01 14 00 – Work Restrictions Page 2 of 11
SECTION 01 14 00
WORK RESTRICTIONS
GENERAL PART 1
1.1 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
Defense Logistics Agency
DLA Physical Security Manual
Defense Distribution Center Susquehanna – Installation Access Policy
Defense Distribution Center Susquehanna – Image Capturing Device Policy
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a
"G" designation are for information only. The following shall be submitted in accordance with
Section 01 33 00, SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel; G
Completed Contractor and Visitor Badge Request Form – (Short Form); G
DDSP Security Information – (Long Form); G
Camera Pass Request Form; G
1.3 SPECIAL SCHEDULING REQUIREMENTS
1.3.1 Materials, Equipment, and Personnel
Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.
1.3.2 Active Facility
The activity at the facility under construction will remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.
1.3.3 Construction Interruptions
Permission to interrupt any active roads, railroads, and/or parking areas must be requested in writing a minimum of 15 working days prior to the desired date of interruption. In addition, work that will impact existing employee workspaces or material storage areas, etc. shall require a file:///C:/Users/ysp5927/Specifications/Masters/UFGS/prntdata/01%2033%2000.doc
01 14 00 – Work Restrictions Page 3 of 11 minimum additional advance notification not less than (15) working days in advance of the proposed activities. Coordinate all activities through the Contracting Officer Representative
(COR).
1.3.4 Scheduling Interruptions
The work under this Contract requires special attention to the scheduling of activities within the building. This facility functions primarily as a storage facility for thousands of parts. Access to these parts by Government employees during construction is critical as many of these items are required for our armed forces to function properly. The Contractor shall identify on the
Construction Schedule each factor which constitutes a potential interruption to operations. The
COR and Contractor shall work with operations personnel to coordinate these interruptions so as to affect minimal impact to the mission.
1.3.5 Wartime Interruption
In the event that the United States becomes engaged in a war, operations may require unobstructed access to the warehouse for an extended period of time. If this occurs, it will be necessary to suspend the project until such time as operations is no longer requires this level of access.
1.4 CONTRACTOR ACCESS AND USE OF PREMISES
1.4.1 Activity Regulations
Ensure that Contractor personnel employed on this project become familiar with and obey
Installation regulations including Safety, Fire, Traffic, and Security Regulations. Keep within the limits of the work and avenues of ingress and egress. To minimize traffic congestion, delivery of materials should be outside of peak traffic hours which are 0630 to 0800 and after
1530 unless otherwise approved by the Contracting Officer (KO). Wear Hard Hats, Safety
Shoes, Reflective Vests, and Eye Protection at all times in designated areas.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .