06/12/2014 Division 01

Special Requirements

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

01011 SPECIAL REQUIREMENTS

SD-01 PRECONSTRUCTION SUBMITTALS

List of Schedule of Values 1.17.1 G List of Recycled Materials 2.1

SD-11 CLOSEOUT SUBMITTALS

Dollar Value/Content of Recycled Matl's 2.1 G

01140 WORK RESTRICTIONS

SD-01 PRECONSTRUCTION SUBMITTALS

Special Access Determination Form 1.4.1.5 G

01320 PROJECT SCHEDULE

SD-01 PRECONSTRUCTION SUBMITTALS

Construction Project Schedule 3.3 G

01330 SUBMITTAL PROCEDURES

SD-01 PRECONSTRUCTION SUBMITTALS

Submittal Register 1.11 G

01451 CONTRACTOR QUALITY CONTROL

SD-01 PRECONSTRUCTION SUBMITTALS

Contractor Quality Control Plan 3.2 G

01500 TEMPORARY CONSTRUCTION FACILITIES

SD-01 PRECONSTRUCTION SUBMITTALS

Site Plan 1.1.1 G

SUBMITTAL REGISTER CONTRACT NO.

TITLE AND LOCATION

DDSP Site Wide Sprinkler System Repairs - Division 1 General Requirements CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N

S P E C

S E C

DESCRIPTION OF ITEM SUBMITTED

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH REMARKS

P A R A G R A P H

N

L A S S I F I C A T I

N

G

V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

Special Requirements

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

SUBMITTAL REGISTER CONTRACT NO.

TITLE AND LOCATION

DDSP Site Wide Sprinkler System Repairs - Division 1 General Requirements CONTRACTOR

A C T I V I T Y

N

A N S M I T T A L

N

E C

S E

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH REMARKS

P A R A G R A P H

N

A S S I F I C A T I

V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

01525 SAFETY AND OCCUPATIONAL HEALTH REQTS.

SD-01 PRECONSTRUCTION SUBMITTALS

Accident Prevention Plan (APP) 1.6 G Activity Hazard Analysis (AHA) 1.7 G Occupant Protection Plan 1.6.6.2 G Site Demolition Plan 1.6.6.5 G Excavation Plan 1.6.6.6 G

SD-06 TEST REPORTS

Accident Reports 1.11.1 G Monthly Exposure Reports 1.11.3 G Regulatory Citations and Violations 1.4 G

SD-07 CERTIFICATES

Hot Work Permit 1.12 G

01575 TEMPORARY ENVIRONMENTAL CONTROLS

SD-01 PRECONSTRUCTION SUBMITTALS

Environmental Protection Plan 1.11 G Dirt and Dust Control Plan 1.4 G Preconstruction Survey 1.6.1 G

SD-06 TEST REPORTS

Laboratory Analysis 1.5 Regulatory Notification 1.6.5

SD-11 CLOSEOUT SUBMITTALS

Preconstruction Survey 1.6.1 G Solid Waste Disposal Report 1.6.7 Waste Determination Documentation 1.6.2 Disposal doc. for hazardous & regulatory waste 1.6.3 40 CFR employee training records 1.6.4 Regulatory Notification 1.6.5 Erosion and Sediment Control Reports 1.6.6 Hazardous Material Inventory Log 1.12 G

Special Requirements

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

SUBMITTAL REGISTER CONTRACT NO.

TITLE AND LOCATION

DDSP Site Wide Sprinkler System Repairs - Division 1 General Requirements CONTRACTOR

A C T I V I T Y

N

A N S M I T T A L

N

E C

S E

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH REMARKS

P A R A G R A P H

N

A S S I F I C A T I

V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

01780 PROJECT CLOSEOUT

SD-02 SHOP DRAWINGS

As-Built Drawings 1.2.1 G

SD-03 PRODUCT DATA

As-Built Record of Equipment and Matls. 1.2.2 G Warranty Management Plan 1.3.1 G Final Cleaning 1.7 G

SD-11 CLOSEOUT SUBMITTALS

Record Drawings 1.2.1 G

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

02076 MILLING OF B ITUMINOUS PAVEMENT SURFACE - NO SUBMITTALS

02100 SITE PREPARATION

SD-03 PRODUCT DATA

Barricade Fencing 2.1.2 G

02151 SHORING

SD-01 PRECONSTRUCTION SUBMITTALS

Shoring Plan 1.5.1 G

SD-02 SHOP DRAWINGS

Areas to be shored 1.5 G

02220 DEMOLITION

SD-01 PRECONSTRUCTION SUBMITTALS

Demolition Plan 1.11 G Notifications 1.6.1

SD-11 CLOSEOUT SUBMITTALS

Bills of Laden 3.5

02221 TRENCHING, BACKFILLING & COMPACTION

SD-03 PRODUCT DATA

Underground Warning Tape 2.1.9 G Temporary Barrier Fence 2.1.10 G

SD-06 TEST REPORTS

Aggregate Material Tests 1.5.2 G Compaction Density Tests 3.4.4 G

SD-07 CERTIFICATES

Aggregate Certificates 1.5.2 G Calibration of Equipment 1.4

02230 EXCAVATION, BACKFILLING & COMPACTION FOR PAVEMENTS

SD-06 TEST REPORTS

Aggregate Material Test 1.5.2 G Compaction Density Tests 3.4 G

SD-07 CERTIFICATES

Aggregate Certificates 1.5.2 G

T R A N S M I T T A L

N

E C

S E

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH REMARKS

P A R A G R A P H

N

A S S I F I C A T I

V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

SUBMITTAL REGISTER CONTRACT NO.

TITLE AND LOCATION

DDSP Task Order Construction Services - Division 2 Site Work CONTRACTOR

A C T I V I T Y

N

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

T R A N S M I T T A L

N

E C

S E

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH REMARKS

P A R A G R A P H

N

A S S I F I C A T I

V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

SUBMITTAL REGISTER CONTRACT NO.

TITLE AND LOCATION

DDSP Task Order Construction Services - Division 2 Site Work CONTRACTOR

A C T I V I T Y

N

02300 EARTHWORK

SD-01 PRECONSTRUCTION SUBMITTALS

Dewatering Work Plan 1.6 G Disp. of Unused (satisfactory or unsatisfactory) matl's 1.8 G Source of Borrow 1.9 G Qualifications of commercial testing lab 3.12 G

SD-06 TEST REPORTS

On-site and Off Site Borrow Materials 3.12 G

02480 SEEDING AND LANDSCAPING

SD-06 TEST REPORTS

Test Reports & Recommendations 3.2.2 G

SD-07 CERTIFICATES

Soil Supplement Product Certification 2.1 G Seed Certification 2.3.1 G Sod Certification 2.3.2 G

02500 PAVING AND SURFACING

SD-01 PRECONSTRUCTION SUBMITTALS

Testing Laboratory 1.4.3 G

SD-05 DESIGN DATA

Job Mix Formula 2.2.2 G ID-2 Binder Course 2.1.3.2 G ID-2 Wearing Course 2.1.3.3 G

BCBC 2.1.3.1 G

SD-06 TEST REPORTS

In-Place Density Testing 1.4.3.1.1 In-Place Thickness Testing 1.4.3.1.2

SD-07 CERTIFICATES

BCBC 2.1.3.1 G

Binder Course 2.1.3.2 G Wearing Course 2.1.3.2 G

AC-20 2.1.2.1 G

Subbase 2.1.1 G

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

T R A N S M I T T A L

N

E C

S E

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH REMARKS

P A R A G R A P H

N

A S S I F I C A T I

V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

SUBMITTAL REGISTER CONTRACT NO.

TITLE AND LOCATION

DDSP Task Order Construction Services - Division 2 Site Work CONTRACTOR

A C T I V I T Y

N

02713 WATER MAIN

SD-01 PRECONSTRUCTION SUBMITTALS

Waste Water Disposal Plan 1.7.2 G

SD-03 PRODUCT DATA

Ductile Iron Pipe 2.1.1 G Ductile Iron Pipe Fittings and Specialities 2.1.1 G Retainer Glands 2.1.1.5 G Isolation Joints 2.2.3 G Gate Valves 2.2.1 G Indicator Posts 2.2.6 G

SD-06 TEST REPORTS

Bacteriological Samples from Pipeline Disinfection 1.5.1.3 G

SD-07 CERTIFICATES

Pipes and Fittings 2.1 G Valves 2.2.1 G Indicator Posts 2.2.6 G Fire Supply Piping - Material and Test Certificate 3.8 G

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

07840 FIRE STOPPING

SD-02 SHOP DRAWINGS

Firestopping Materials 2.1 G

SD-07 CERTIFICATES

Firestopping Materials 2.1 G

Installer Qualifications 1.5 G

Inspection 3.3 G

07920 JOINT SEALANTS

SD-03 PRODUCT DATA

Sealants 2.1 G

Primers 2.2

Bond breakers 2.3

Backstops 2.4

SD-07 CERTIFICATES

Sealant 3.3.6

A C T I V I T Y

N

A N S M I T T A L

N

E C

S E

SUBMITTAL REGISTER CONTRACT NO.

TITLE AND LOCATION

DDSP Task Order Construction Services - Division 7 Thermal and Moisture Protection CONTRACTOR

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH REMARKS

P A R A G R A P H

N

A S S I F I C A T I

V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

00990 PAINTS AND COATINGS

SD-02 SHOP DRAWINGS

Piping identification 3.12 G

Color Selection 1.8 G

SD-03 PRODUCT DATA

Coating 2.1 G Manufacturer's technical data sheets 2.1 G

SD-04 SAMPLES

Color 1.8

SD-07 CERTIFICATES

Qualification Testing 1.3.1.2 G

SD-08 MANUFACTURER'S INSTRUCTIONS

Application instructions 3.8 G

Mixing 3.8.2 G

Manufacturer's Material Safety Data Sheets 1.6.2 G

SUBMITTAL REGISTER CONTRACT NO.

TITLE AND LOCATION

DDSP Site Wide Sprinkler System Repairs - Division 9 Finsihes CONTRACTOR

A C T I V I T Y

N

A N S M I T T A L

N

E C

S E

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH REMARKS

P A R A G R A P H

N

A S S I F I C A T I

V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

10450 FIRE SPRINKLER SYSTEM SIGNAGE

SD-03 PRODUCT DATA

Manufacturer's Descriptive Data / Catalog Cuts 2.3.1.1 G Installation 3.1 G

SD-04 SAMPLES

Standard Signage 2.3.1.1 G

CONTRACT NO.

TITLE AND LOCATION

DDSP Site Wide Sprinkler System Repairs - Division 10 Specialties CONTRACTOR

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH REMARKS

P A R A G R A P H

N

A S S I F I C A T I

V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

A C T I V I T Y

N

A N S M I T T A L

N

E C

S E

SUBMITTAL REGISTER

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

13851 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE

SD-02 SHOP DRAWINGS

Detail Drawings 1.3.8 G

SD-03 PRODUCT DATA

Notification Appliances 2.2 G

Testing 3.4 G

SD-06 TEST REPORTS

Testing 3.4 G

SD-07 CERTIFICATES

Equipment 1.3.6 G

Qualifications 1.3.7 G

SD-10 OPERATION AND MAINTENANCE DATA

Operating and Maintenance Instructions 2.2 G

13940 WET AND DRY PIPE SPRINKLER SYSTEMS

SD-02 SHOP DRAWINGS

As-Built Drawings 1.11 G

SD-03 PRODUCT DATA

Fire Protection Related Submittals 3.1 G

Gate Valves and Indicator Posts 2.4.14 G

Dry Pipe Valves 2.4.6 G

Valves 2.4.10 G

Water Motor Alarms 2.4.7 G

Quick Opening Device, Accelerator 2.4.8 G

Sprinkler heads 2.4.3 G

Cabinets and wrenches 2.4.5 G

Pipe hangers, supports 2.4.2 G

Flow switch 2.4.9 G

Valve Tamper Supervisory Switch 2.4.4 G

Supervisory Air System 2.7 G

Above-Ground sprinkler piping and fittings 2.4 G

Spare Parts 1.1

Preliminary Tests 3.7 G

Final Acceptance Test 3.8 G

SUBMITTAL REGISTER CONTRACT NO.

TITLE AND LOCATION

DDSP Site Wide Sprinkler System Repairs - Division 13 Special Construction CONTRACTOR

A C T I V I T Y

N

REMARKS

A R A G R A P H

N

A S S I F I C A T I

V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

T R A N S M I T T A L

N

E C

S E

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

SUBMITTAL REGISTER CONTRACT NO.

TITLE AND LOCATION

DDSP Site Wide Sprinkler System Repairs - Division 13 Special Construction CONTRACTOR

A C T I V I T Y

N

REMARKS

A R A G R A P H

N

A S S I F I C A T I

V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

T R A N S M I T T A L

N

E C

S E

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH

Fire Protection Specialist 1.7 G

Sprinkler System Installer 1.8 G

SD-06 TEST REPORTS

Preliminary Test Report 3.12 G

Final Acceptance Test Report 3.12 G

SD-07 CERTIFICATES

Inspection by Fire Protection Specialist 3.3

SD-10 OPERATION AND MAINTENANCE DATA

Operating and Maintenance Instructions 3.13 G

13950 FIRE SPRINKLER SYSTEM REPAIRS

SD-06 TEST REPORTS

Impairment Worksheets 3.4 G

SD-07 CERTIFICATES

Personnel Qualifications for sprinkler system mod 1.4.1 G

Personnel Qualifications for fire alarm system mod 1.4.1 G

Division 01, Spec Submittal Register
Div1
Division 02, Spec Submittal Register
Div2
Division 07, Spec Submittal Register
Div7
Division 09, Spec Submittal Register.xls