AMENDMENT 0002 - ANSWER TO CONTRACTOR SUBMITTED QUESTION
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001.pdf | ||
| DBA Wage Determination.pdf | ||
| Specifications1.pdf | ||
| 3695-Drawings-062409.pdf | ||
| SF25A | — | |
| Solicitation SP330010B5002.pdf | ||
| Security_Attachments_A_through_E | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT 10 CODE IPAGEl OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT I
2. AMENDMENTfMODIFICAITON NO.
3. EFFECTIVE DATE
22 Marc!l. 2010
4. REQUISITIONfPURCHASE REQ. NO. 15. PROJECT NO. {If applicble)
6. ISSUED BY CODE SP3100 7. ADMINISTERED BY (If other than Item 6) CODE
Angel D. Maldonado-Rodriquez Phone: 717 770 4074
I
DEFENSE DISTRIBUTION CENTER
ACQUISITION OPERATIONS
DDC ~7-AB. BLDG 404
NEW Cut-1BERLAND, PA 17070 5001
FAX: 717-770 7591
E-Mail: angel.maldonado@dla.mil
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Codel (Xl 9A. AMENDMENT OF SOLICIATION NO.
K SP3300-10-B-5002
9B. DATED ISEE ITEM 11)
02/22/10 lOA. MODIFICATION OF CONTRACT/ORDER NO.
lOB. DATED (SEE ITEM 111
CODE FACI LlTY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
Ii9 The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers o is extended, [if] is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submittec;
or Ic) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN iTEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM lOA.
B. THE ABOVE NUMBERED CONTRACT/ORDER is MODIFIED TO REFLECT THE ADMINiSTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43. '03Ib).
C. THIS SUPPLEMENTAL AGREE:MENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
K FAR 52.243-1 CHANGES - FIXED PR:CE (AUG 1987)
D. OTHER (Specify type of modification and authority)
[if] is required to sign this document and return
SEE PAGE 2 OF 2.
Except as provided herein all terms and conditions of the document referenced in Item 9A Of 10A, as heretofore changed, remains unchanged and in full force and effect
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B CONTRACTOR/OFFEROR
(Signature of person aut~,"ized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540·01-152·8070 STANDARD FORM 30 IREV. 10·83)
Previous edition unusable Prescribed by GSA FAR (48 CFR) 53.243
SP3300-10-B-S002
Amendment 0002
This amendment 0002 is hereby incorporated into Invitation for Bid (IFB) SP3300-10-B-S002 and shall become a part of any resultant contract.
1. The following is a response to a contractor's submitted question:
QUESTION 1: Can you get clarification for the fire alarm system? We received a model number, but I'm told without a written specification for it we have to make assumptions that may add cost to the project that may not be needed.
ANSWER 1: Contractors are not required to replace the existing panel, just run wires to it.
The DDC Engineer does not feel it is necessary to provide a written specification.
THE BID OPENING TIME WILL REMAIN AT 2:00 PM LOCAL TIME ON MARCH 24, 2010.