Attachment_2_Appendix_B_Diesel_Fuel_Specification.pdf

PDF 114 KB Posted

Attached to
Foreign Military Sales (Israel)
Solicitation number
SP060017R0700
Issued by

About this file

Attachment 2

View the file

Other files

File Type Posted
17R0700_-_SF30_Amendment_0003.pdf PDF
FMS_-_MFR_-_FAQ_17R0700.pdf PDF
17R0700_-_SF30_Amendment_0002.pdf PDF
17R0700_-_SF30_Amendment_0001.pdf PDF
17R0700_-_SF30_Amendment_0001.pdf PDF
Final_OSP.pdf PDF
Attachment_1_Appendix_A_Jet_Fuel_Specification.pdf PDF
DLA_Energy_19.3_Dec_2013.pdf PDF
Final_Solicitation.pdf PDF
Final-OSP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix B

Diesel Fuel Specification SP0600-17-R-0700

1. SCOPE

1.1 This document is based on European Specification EN590: September 2013 and specifies requirements for purchasing Diesel Fuel (Very Low Sulfur) for use in compression ignition engines.

2. SPECIFICATION REQUIREMENTS

2.1 The fuel supplied under this specification shall be distillated fuel refined from petroleum crude oil. The fuel shall be a straight run Diesel Gas-Oil and shall contain not more than 15% vol of any reformated or cracked components. The fuel shall not contain any bio-compounds or synthetic compounds and shall not be stored or carried in tanks or transferred through pipes used for bio-fuels or synthetic fuels, except in specific cased that shall be waived by DLA Energy and the GOI/MOD.

The Diesel Fuel shall meet the following requirements:

Parameter Unit Limits Test Method Workmanship - Clear & Bright Visually

Polycyclic aromatics ¹ %m/m 8 max. ASTM D6591 /IP 391 Sulfur content mg/kg 10 max. ASTM D2622 I IP 447 Cetane number - 51 min. ASTM D613 I IP 41 Cetane index - 46.0 min. ASTM D4737 I IP 380

Density @ l 5°C Kg/mm³ 820.0-845.0 ASTM Dl 298 I IP 160 Lubricity (HFRR) @ 60°C µm 460 max. ASTM D6079 I ISO 12156-1 I

IP 450

Flash point °C 55 min. ASTM D93/ IP 404 CFPP °C (-5) max. IP 309 I EN 116 Carbon residue (on 10% distillation residue)

%m/m

0.30 max. ASTM D4530/ IP 398

Oxidation stability mg/liter 25 max. ASTM D2274 I IP 388 Ash content %m/m 0.01 max. ASTM D482 I IP 4 Water content mg/kg 200 max. ASTM D6304 I IP 439 Copper strip corrosion (3 hr. @ 50°C)

- 1 max. ASTM D 130 /IP 154

Distillation:

%(v/v) recovered @ 250°C %(v/v) recovered @ 350°C 95% recovered @

%(v/v)

%(v/v)

°C

<65

85 min.

360 max.

ASTM D86 I IP 123

Total contamination mg/kg 24 max. EN 12662 I IP 440 Viscosity @ 40°C cSt 2.00-4.50 ASTM D445 I IP 71

Note: ¹ Polycyclic aromatics are defined as the total aromatic hydrocarbon content minus the mono-aromatic hydrocarbon content.

Appendix B SP0600-17-R-0700 Diesel Fuel Specification

3. ADDITIVES

3.1 The following additives shall not be added to the product:

3.1.1 Fuel System Icing Inhibitors (FSII)

3.1.2 Metal Deactivator

3.1.3 Dyes

3.1.4 Biocides

3.1.5 Methylcyclopentadienyl manganese tricarbonyl (MMT)

4. GENERAL REQUIREMENTS

4.1 The fuel furnished under this specification shall be supplied within three (3) months of its manufacture.

4.2 The fuel shall be transferred from the refinery to the seashore storage facilities and to the ocean tanker by pipeline intended for carrying DIESEL FUEL only. If such pipeline is unavailable, the intended pipeline shall be emptied and flushed with DIESEL FUEL before transferring the cargo through it.

4.3 The diesel fuel quantity produced for shipment to be transported by an ocean tanker shall be supplied from a single refinery (no more than one diesel fuel producer for each shipment).

5. QUALITY ASSURANCE

5.1 Inspection Lot – The inspection in each seashore storage tank shall conform to the requirements of this specification. Each shipment of fuel furnished under this specification shall be inspected separately by a U.S. government representative who may be accompanied by a GOI/MOD representative.

5.2 Shipment Inspection – Quality control procedures for each shipment of fuel furnished under this document shall be monitored by a U.S. government representative who may be accompanied by a GOI/MOD representative.

5.3 Quality control procedures for each shipment of fuel furnished under this document shall be in accordance with standard DLA Energy procedures in E-0001 E1 CONTRACTOR INSPECTION

RESPONSIBILITIES (SEP 2013).

5.4 The contractor shall provide the DLA Energy Quality Assurance Representative (QAR) with adequate facilities and the professional personnel necessary to perform these tests for the sampling procedures, at its own expense.

File details come from the government source that posted it. Updated .