SP0600-10-R-0231 Amendment 0002 Questions and Answers and updated INT-B1.05-2

View the file

Other files

File Type Posted
Amendment 0001.pdf PDF
Attachment 3 Subcontractor.pdf PDF
SP0600-10-R-0231 OSP.pdf PDF
Attachment 2 —
Solicitation SP0600-10-R-0231.pdf PDF
OSP- SP0600-10-R-0231 3 attachments.pdf PDF
Solicitation SP0600-10-R-0231.pdf PDF
OSP- SP0600-10-R-0231 3 attachments.pdf PDF
Solicitation SP0600-10-R-0231.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

K

PAGE OF PAGES

1 8

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

4. REQUISITION/PURCHASE REQ. NO.

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE SP0600 7. ADMINISTERED BY (If other than Item 6) CODE

DLA-E-PEB/ DIANA KNIGHT

DEFENSE LOGISTICS AGENCY ENERGY

8725 JOHN J. KINGMAN RD.,

SUITE 4950

FORT BELVOIR, VA 22060-6222

Diana.Knight@dla.mil

(703) 767-9538

P.P.: 1.6J

8. NAME AND ADDRESS OF CONTRACTOR (NO., street,city,county,State,and ZIP Code) (ü) 9A. AMENDMENT OF SOLICITATION NO.

X SP0600-10-R-0231

9B. DATED (SEE ITEM 11)

9 JUL 2010

10A. MODIFICATION OF CONTRACT/ORDER NO.

BIDDER CODE: CAGE CODE: DUNS: 10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[X] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [] is extended, [ X ] is not extended

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment;(b) By acknowledging receipt of this amendment on each copy of the offer submitted; or(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE

RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office appropriation date, etc.) SET FORTH

IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER Specify type of modification and authority)

E. IMPORTANT: Contractor [ ] is not, [ X ] is required to sign this document and return 1 copy to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

1. Offerors must acknowledge receipt of this amendment by filling out block 8 above and signing and dating blocks

15A., 15B., and 15C. below, and returning this document to DESC.

2. See page 2.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

AYBIKE ARSLAN, CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN: 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

SP0600-10-R-0231, Amendment 0002

A. DLA-Energy has received the following questions concerning this solicitation:

1. Is the solicited requirement for the transportation of DLA-Energy owned fuel, or is the fuel to be supplied too? Can you please explain what the term means “this fuel is not capitalized” as stated in DLA-Energy internal instruction INT-B1.05-2?

* DLA-Energy has requirements for Contractors to provide the fuel at the delivery locations. The term “this fuel is not capitalized” means that DLA-Energy does not own the fuel.

2. What is the fuel storage pick-up point for the delivery to the FOB(s) of Marmel, Kunduz, Maimana and Spann?

* The offeror is responsible for deciding where to locate their intermediate fuel storage locations.

3. The special notes state that the CLINS 110-90, 111-90, 112-90, 113-90 shall be sourced from Western or Northern supply routes to Afghanistan. Do you mean that the origin of the JP8 or TS1(IAW amendment 0001) has to be from those countries or do you mean that we have to use those areas to enter into Afghanistan? I have the same question for CLIN 107-90.

* The CLINS located in the Northern region of Afghanistan, CLINS: 110-90 (Marmel), 111-90 (Spann), 112- 90 (Kunduz) and 113-90 (Maimana) which are all North of the Salang Pass need to be sourced/ transported from the North through the Hariton border crossing. Fuel can be sourced as far away as the Mediterranean Basin. Due to logistics concerning and associated with the Salang Pass, locations South of the Pass, CLIN:

107-90 (Fenty), are required to be transported through the Torkham border crossing.

4. Does DLA-Energy require potential Offerors to offer on all CLINS (locations)?

* No, the Offeror does not have to make offers on all the CLINS in the solicitation.

5. Is DLA-Energy more inclined to make award to the Offeror who has offered on all the CLINS than the Offeror who has offered on only one CLIN?

* DLA-Energy will award contracts to the Contractor(s) that offer the best value to the U.S. Government for each CLIN. A Contractor does not have to make offers on all the CLINS.

6. Does supply from North/South need to be supported by commitment letters like from Pakistan OMC’s issue letters or does DLA-Energy want to see firm contracts from trader or refinery? If both are acceptable, does one have more weight than the other?

* DLA-Energy requires commitment letters which confirm that the subcontractor will provide the product or transportation. If there is already a contract in place then that would be acceptable, too. DLA-Energy does not expect a Contractor to make a contract before a DLA-Energy Contract is awarded to the Contractor. A commitment letter and a current contract both have the same weight.

7. Is storage facility necessary other than border of Hariton/ Targundi, for example, middle of the border and destination?

* DLA-Energy cannot determine where the storage facilities should be located. DLA-Energy expects the Contractor to know where to place the storage facilities to ensure that the fuel can always be provided when there is a requirement.

8. Can two parties offer jointly?

* DLA- Energy awards a contract to one entity. So, if the two (2) parties represented one company then they could make one offer. If the two (2) parties were separate companies than one or both could make an offer and the awarded party would be the Contractor and the secondary Company would be the subcontractor. The U.S.

Government can make payments to one Company per contract only.

9. Will past performance of both parties be taken into assessment?

* DLA-Energy is primarily concerned with the Contractor that is seeking the contract. The Contractor will be responsible for its subcontractor’s performance. If the Contractor has never transported fuel for example, then it will need to list its subcontractors experience on the Contractor Performance Data Sheet.

10. How should the DUNS and CAGE codes be mentioned on the first page of the OSP?

* The Offeror must submit a signed copy of the first page (SF Form 1449) of the Master Solicitation. A signature is required in block 30a. Additionally, on that form in block 17a there is a spot for the DUNS number.

The CAGE code can be put next to the DUNS number or in the “Facility” code box.

11. Can DLA-Energy make payments to separate accounts. For instance, can CLINS 1 & 2 be paid in one account and CLIN 3, be paid in another?

* No, a Contractor awarded three CLINS would have one contract with DLA-Energy and therefore, all payments would go to one account only. It would be up to the Contractor to move money within the bank to any other accounts.

12. Can a subcontractor be the transporter only or can the subcontractor deal with the refinery or fuel procurement trader?

* A Contractor can set up its logistics operation any way that it would like to do so. DLA-Energy is only concerned with ensuring that the fuel will be provided when and where it is requested. Once a contract is awarded then it is the Contractor’s responsibility to ensure that the fuel is provided when and where there is a requirement.

13. For the Contractor Subcontractor Data Sheet (attachment 3), is it necessary to submit the required information for all subcontractors or just those subcontractors who will be providing services inside Afghanistan?

* The subcontractors who will be providing services inside Afghanistan only.

14. Is it possible to do the economic price adjustment for FOB Fenty based on the OGRA (Oil and Gas Regulatory Authority under the Pakistan Government’s Ministry of Petroleum) instead of PLATTS?

* Yes, any fuel sourced in Pakistan can use the OGRA for 7 June 2010.

15. Please stipulate exactly what is required by DLA-Energy when submitting an offer.

* The standard form 1449 which is the first page of the Master Solicitation. Fill in blocks 12, 17 and sign block 30a, fill in blocks 30b and 30c.

- All amendments which have been sent out with this Solicitation, we currently have two (2) amendments and they must be signed in block 15a, and filled in at blocks 15b and 15c.

- Send back the whole OSP package with everything filled in that needs to be. Make sure that you include all the attachments (3).

16. Can the fuel be delivered FOB origin vice FOB destination?

* No, this Solicitation has a requirement for fuel to be supplied FOB destination.

17. In the Solicitation, it is stated that the fuel for FOB Fenty (CLIN 107-90) must be sourced from Pakistan.

Does that mean the fuel must be from a Pakistani refinery or does it mean that the fuel must be transported through Pakistan?

* Fuel for FOB Fenty may be sourced from a refinery in Pakistan, or it may be imported and transported through Pakistan. The fuel is to enter Afghanistan via the Torkham border crossing.

18. Please confirm that Russian grade Jet A1, with additives (Def Stan 91-91 compliant – GOST 52050) is acceptable fuel for RC- North.

* The Solicitation is for JP-8 and TS-1(with additives in accordance with Amendment 0001) so, in order to offer on Jet A1, an Offeror will need to request an “exception” in their Offer Submission Package. DLA- Energy’s Quality Assurance will review the proposed exception and determine if the fuel will meet DLA- Energy’s solicited requirement. Please ensure that the exception to use Jet A-1 includes the additive requirements stated in Amendment 0001.

19. In this solicitation, it states that submissions proposing Armed Private Security will not be considered. It is understood that such security companies would not be admitted to the bases for the downloading of the trucks during delivery. How are Contractors to secure the safety of the trucks from Hairatan to each FOB? Can you provide any more information on the level of security that will be provided to the Contractor(s) in Afghanistan?

* The U.S. Military will not provide security, and offers to use armed private security are not acceptable to the Government. Contractors are responsible for delivering the ordered requirements and are responsible for all associated risk of loss. A Contractor may take any other security provisions that it deems necessary, as long as it does not include the use of any weapons.

20. Do the tanker trucks within Afghanistan still require an epoxy lining?

* Yes, the epoxy lining is still a requirement for tanker trucks delivering fuel to the military in Afghanistan.

21. How does an offeror get a CAGE code and a bidder code?

* The bidder code will be assigned by DLA-Energy after the Offer Submission Package (OSP) is received. It is best to get a CAGE code and DUNS number before you submit your OSP.

On page 14 of the OSP, items (l) and (m) discuss the DUNS number and the Central Contractor Registration and how to register. When you register your Company in the Central Contractor Registration, a CAGE code will be provided, if you do not already have one.

Additionally at this DLA website link you can find out about the code and how to get one.

http://www.dlis.dla.mil/cagesearch/cage_faq.asp

22. Will there be an extension for submission?

* No, there is no extension planned for this Solicitation.

23. Please advise if DLA-Energy prefers JP8 or TS-1 with additives, to be delivered to FOB Fenty (CLIN:

107-90).

* DLA-Energy amended the requirement for the fuel in FOB Fenty to allow either product.

24. Please confirm projected quantity is for a two year period.

* No, it is not. This amendment revises the estimated fuel quantity and is for the 2 year period. Please see DLA-Energy INT-B1.05-2 and use this copy to make offers.

25. Will the contract include a provision for demurrage?

* No, there will be no demurrage paid on contracts resulting from this solicitation.

http://www.dlis.dla.mil/cagesearch/cage_faq.asp�

INT-B1.05-2 SUPPLIES TO BE FURNISHED (OVERSEAS PC&S) (PORTS INTERNET APPLICATION) (DESC MAY 2001)

(a) The supplies to be furnished during the period specified in the REQUIREMENTS clause, the delivery points, methods of delivery, and estimated quantities are shown below. The quantities shown are best estimates of required quantities only. Unless otherwise specified, the total quantity ordered and required to be delivered may be greater than or less than such quantities. The Government agrees to order from the Contractor and the Contractor shall, if ordered, deliver during the contract period all items awarded under this contract. The prices paid shall be the unit prices specified in subsequent price change modifications issued in accordance with the ECONOMIC PRICE ADJUSTMENT clause.

(b) In an emergency, oral orders may be issued but must be confirmed in writing via a PORTS-generated order within 24 hours or one business day. See the PAPERLESS ORDERING AND RECEIPT TRANSACTION SCREENS (PORTS) INTERNET APPLICATION clause.

(c) Offers shall not be submitted for quantities less than the estimated quantities specified below for each line item. Offers submitted for less than the estimated quantities will not be considered for award, except for items specifically designated as _N/A__-year requirements.

SUPPLIES, DELIVERY POINTS,

ITEMS AND METHOD OF DELIVERY ESTIMATED MULTI-YEAR

QUANTITY PRICE

107 FORWARD OPERATING BASE

(FOB) FENTY

U.S. ARMY

AFGHANISTAN

DELIVERY DODAAC: W91PS1

BILLING DODAAC: W91PS1

ORDERING OFFICE: DESC-ME: 813-827-1307

107-90 TURBINE FUEL, AVIATION (JP8) 52,000,000 USG $_____________

NSN: 9130-01-545-8464

TANK TRUCK (TT) INTO VARIOIUS TRUCKS/

BLADDERS. TANK TRUCKS MUST ARRIVE

AT THE BASE SEALED BY THE CONTRACTOR

WITH ALULOCK 2.0 MM CABLE SEAL OR

EQUIVALENT U.S. GOVERNMENT APROVED

SEAL. TRUCKS MUST BE ABLE TO CONNECT

TO A 4-INCH CAMLOCK.

FOB DESTINATION TO FOB FENTY

THIS FUEL IS NOT CAPITALIZED

110 FORWARD OPERATING BASE

(FOB) MARMEL

U.S. ARMY

AFGHANISTAN

DELIVERY DODAAC: W91PS1

BILLING DODAAC: W91PS1

ORDERING OFFICE: DESC-ME: 813-827-1307

110-90 TURBINE FUEL, AVIATION (JP8) 43,200,000 USG $_____________

NSN: 9130-01-031-5816

TANK TRUCK (TT) INTO VARIOIUS TRUCKS/

BLADDERS. TANK TRUCKS MUST ARRIVE

AT THE BASE SEALED BY THE CONTRACTOR

WITH ALULOCK 2.0 MM CABLE SEAL OR

EQUIVALENT U.S. GOVERNMENT APROVED

SEAL. TRUCKS MUST BE ABLE TO CONNECT

TO A 4-INCH CAMLOCK.

FOB DESTINATION TO FOB MARMEL

QUANTITY PRICE

111 FORWARD OPERATING BASE

(FOB) SPANN

U.S. ARMY

AFGHANISTAN

DELIVERY DODAAC: W91PS1

BILLING DODAAC: W91PS1

ORDERING OFFICE: DESC-ME: 813-827-1307

111-90 TURBINE FUEL, AVIATION (JP8) 20,880,000 USG $_____________

NSN: 9130-01-031-5816

TANK TRUCK (TT) INTO VARIOIUS TRUCKS/

BLADDERS. TANK TRUCKS MUST ARRIVE

AT THE BASE SEALED BY THE CONTRACTOR

WITH ALULOCK 2.0 MM CABLE SEAL OR

EQUIVALENT U.S. GOVERNMENT APROVED

SEAL. TRUCKS MUST BE ABLE TO CONNECT

TO A 4-INCH CAMLOCK.

FOB DESTINATION TO FOB SPANN

112 FORWARD OPERATING BASE

(FOB) KUNDUZ

U.S. ARMY

AFGHANISTAN

DELIVERY DODAAC: W91PS1

BILLING DODAAC: W91PS1

ORDERING OFFICE: DESC-ME: 813-827-1307

112-90 TURBINE FUEL, AVIATION (JP8) 22,320,000 USG $_____________

NSN: 9130-01-031-5816

TANK TRUCK (TT) INTO VARIOIUS TRUCKS/

BLADDERS. TANK TRUCKS MUST ARRIVE

AT THE BASE SEALED BY THE CONTRACTOR

WITH ALULOCK 2.0 MM CABLE SEAL OR

EQUIVALENT U.S. GOVERNMENT APROVED

SEAL. TRUCKS MUST BE ABLE TO CONNECT

TO A 4-INCH CAMLOCK.

FOB DESTINATION TO FOB KUNDUZ

QUANTITY PRICE

113 FORWARD OPERATING BASE

(FOB) MAIMANA

U.S. ARMY

AFGHANISTAN

DELIVERY DODAAC: W91PS1

BILLING DODAAC: W91PS1

ORDERING OFFICE: DESC-ME: 813-827-1307

113-90 TURBINE FUEL, AVIATION (JP8) 11,520,000 USG $_____________

NSN: 9130-01-031-5816

TANK TRUCK (TT) INTO VARIOIUS TRUCKS/

BLADDERS. TANK TRUCKS MUST ARRIVE

AT THE BASE SEALED BY THE CONTRACTOR

WITH ALULOCK 2.0 MM CABLE SEAL OR

EQUIVALENT U.S. GOVERNMENT APROVED

SEAL. TRUCKS MUST BE ABLE TO CONNECT

TO A 4-INCH CAMLOCK.

FOB DESTINATION TO FOB MAIMANA

SPECIAL NOTES

1. CLINS 110-90, 111-90, 112-90 and 113-90 shall be sourced from Western or Northern supply routes into Afghanistan.

2. CLIN 107-90 shall be sourced from Pakistan.

3. The contractor selected for award shall be ready to deliver fuel in accordance with the contract requirements by 5 November 2010.

4. Offerors please note: Offerors submitting proposals that include the use of Armed Private Security Companies will not be considered.

5. Trucks delivering JP8 shall be dedicated to jet fuel service and the trucks must have internal epoxy coating.

6. Force protection requirements are in full effect under this contract at all times. There may be waits outside the gates of all Forward Operating Bases (FOBs). This includes mandatory “cool down” periods of 24 hours or more. Alternating security measures may randomly affect wait times outside of the gates. Detention charges should be accounted for in the contract price and claims for detention will not be paid.