SOW150.pdf

PDF 130 KB Posted

Attached to
Lakeview IRA - Kitchen Renovation
Solicitation number
2124863
Issued by
Warren County, New York

About this file

This is a Project Scope document from the New York State Office for People with Developmental Disabilities (OPWDD) for a Kitchen Renovation project at the Lakeview IRA facility located at 3660 Walker Rd, Perry, NY 14530. The project involves furnishing all labor and materials to complete a comprehensive kitchen renovation following blueprints and specifications by Peter Morse Architectural dated 5/9/2025. The work is to be completed within 90 days of award, with a mandatory site visit scheduled for Tuesday, August 19, 2025 at 11:30am, and is classified as a NYS Public Works project requiring prevailing wages.

The project requires the contractor to provide all materials, labor, disposal fees, and site clean-up, with the final job acceptance to be provided by the Maintenance Supervisor. The renovation will take place in an occupied residential facility, necessitating careful coordination with the House Director and Plant Superintendent. Key requirements include continuous work progress, strict safety protocols, securing tools and materials daily, and avoiding interference with the residence's normal functions. The bid price must encompass all project costs, and the contractor must adhere to specific guidelines regarding lawn and property damage, communication protocols, and resident safety.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT SCOPE

DESCRIPTION:

The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 90 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned and all materials secured at the end of each work day. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of Kitchen Renovation, before removal of equipment, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent.

SCOPE OF WORK includes, but is not necessarily limited to the following:

1. Furnish materials and labor to complete the Kitchen Renovation following the

Blueprints and Specifications as designed by: Peter Morse Architectural Dated:

5/9/2025.

GENERAL REQUIREMENTS:

1. Bid price is to include all materials, labor, disposal of materials fees and site clean-up.

Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor.

2. Work is to be done between the hours of TBD, Monday through Friday. Contractor is advised that this is an occupied home and may be occupied during these times.

3. All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each workday.

4. Any unforeseen conditions that may alter the established price are to be reported to the Plant Superintendent listed above immediately upon discovery.

5. Smoking is prohibited by contractors at all residential and program sites owned by

OPWDD.

6. Prior to the commencement of the work, there shall be a meeting with FLDDSO Operations and Maintenance staff to discuss specific safety requirements needed to be adhered to during the work period.

7. Safety Data Sheets as applicable will be provided to the Plant Superintendent prior to the start of work and a copy maintained at the property.

Facility:

Lakeview IRA 263-FLA-2302

Facility Address:

3660 Walker Rd, Perry, NY 14530

Point of Contact:

Jim Colon – Maintenance Supervisor 2

Contact Phone Number:

585-335-4119

Project Title:

Kitchen Renovation SCOPE: JC0104

Summary of Work:

Complete Kitchen Renovation

8. All applicable environmental testing associated with this work will be provided to the contractor prior to start of work.

SITE VISIT

A site visit is mandatory. The site visit date is scheduled for Tuesday, August 19, 2025 @ 11:30am at the project site. All prospective bidders are encouraged to attend.

A. Lawn Damage/Property Damage

• If the delivery of materials or any other work necessitates the contractor, his suppliers, or sub-contractors to drive on the lawn for ANY reason, the contractor shall be held responsible for the repair of the lawn.

• Personal vehicles are not to be parked on the grass.

• Any property damage caused by work performed is to be corrected to the condition existing prior to start of the job.

B. Continuity of Work/Communication/Scheduling

• Once the job has begun, it is to be worked on continuously until completed.

• If there are any delays, even if due to inclement weather, a Work Control Representative

MUST be contacted.

• Work must be completed within 90 days of receiving the purchase order.

C. House Safety

• The residence will be occupied during the job.

• The contractor must take all reasonable care to safeguard the residents and the staff.

• The contractor shall ensure all tools, materials and other items are picked up, removed or stored and are safely secured at the end of each workday.

• Any ladders, scaffolding or lifts used in conjunction with this job are to be stored to the satisfaction of the House Director at the end of the day.

• The work as indicated above shall be scheduled as not to interfered with other functions of the residence. All work performed as part of this job is to be coordinated with the House Director and Plant Superintendent listed above.

SCOPE OF WORK includes, but is not necessarily limited to the following:
1. Furnish materials and labor to complete the Kitchen Renovation following the Blueprints and Specifications as designed by: Peter Morse Architectural Dated: 5/9/2025.
1. Bid price is to include all materials, labor, disposal of materials fees and site clean-up. Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor.
2. Work is to be done between the hours of TBD, Monday through Friday. Contractor is advised that this is an occupied home and may be occupied during these times.
3. All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each workday.
4. Any unforeseen conditions that may alter the established price are to be reported to the Plant Superintendent listed above immediately upon discovery.
5. Smoking is prohibited by contractors at all residential and program sites owned by OPWDD.
6. Prior to the commencement of the work, there shall be a meeting with FLDDSO Operations and Maintenance staff to discuss specific safety requirements needed to be adhered to during the work period.
7. Safety Data Sheets as applicable will be provided to the Plant Superintendent prior to the start of work and a copy maintained at the property.
8. All applicable environmental testing associated with this work will be provided to the contractor prior to start of work.

SITE VISIT