This scope of work document outlines the requirements for replacing 2,100 linear feet of wooden boardwalk at Mammoth Cave National Park in Kentucky. The project involves removing and replacing all wood decking, joists, surface barriers, handrails, and their components with new pressure-treated pine lumber. The contractor must inspect and potentially replace or reinforce existing beams and footings. All work must adhere to the International Building Code and the contractor must submit materials and safety plans for approval. The worksite is accessible, deliveries are restricted to the parking area, and the boardwalk will be closed during construction. The contractor must follow all National Park Service and park rules, work is limited to Monday through Friday daylight hours unless authorized, and smoking is prohibited onsite.
The related federal contract opportunity is solicitation number 140P5323R0045 issued by the National Park Service Southeast Region to replace the Sloan's Pond boardwalk at Mammoth Cave National Park.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q_A__0001.pdf | ||
| Sol_140P5323R0045_Amd_0001.pdf | ||
| Past_Performance_Quesionnaire_1_page.pdf | ||
| Sol_140P5323R0045.pdf | ||
| dba_ky20220040_14_pages.pdf | ||
| Price_Schedule_cc_1_page.pdf | ||
| Relevant_Prior_Experience_3_pages.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mammoth Cave National Park PIMS 217857 05 03 23 CAJ - 1
SCOPE OF WORK
Mammoth Cave National Park
(PMIS 217857)
Replace Sloan’s Pond Boardwalk
1. SUMMARY
a. The work to be accomplished is the cyclic maintenance, repair, and replacement of Sloan’s Crossing Pond Boardwalk located at Mammoth Cave National Park, Mammoth Cave, KY 42259.
2. LOCATION
a. Project Location: Mammoth Cave National Park, Sloan’s Crossing Pond
37°09’02.94” N 86°05’56.29” W
Mammoth Cave National Park PIMS 217857 05 03 23 CAJ - 2
3. SCOPE OF WORK
a. The work to be accomplished is the cyclic maintenance, repair, and replacement of
Sloan’s Crossing Pond Boardwalk located at Mammoth Cave National Park, Mammoth Cave, KY 42259. This project consists of replacing, “in-kind”, 2,100 linear feet of wooden boardwalk (board width is approximately 5 ft with a surface area of 11,000 square feet.
The Contractor is responsible for verifying all dimensions. ATTACHMENT A represents the current condition (as a whole) of the boardwalk. Details of work:
1) Provide materials and services to remove and replace all wood decking, joists, 2” x
4” surface wood barriers and handrails and their components with new pressure-treated pine wood. Any wood that has direct contact with the ground or freshwater must be treated with Tenino Copper Naphthenate to include cut ends. All decking boards must be installed with a 1/8” gap between boards to allow for proper spacing for ventilation and drainage, following industry best practices and manufacturer instructions. Fasten the decking boards securely using Type 316 stainless steel screws. Inspect the newly installed decking to ensure proper alignment and structural integrity. All decking components, with the exception of the beams, will be replaced with the exact size (length, width, and height/thickness) of those that are being replaced.
2) Existing beams and footings shall be reused. The contractor shall perform a thorough inspection of the existing beams and footings to confirm the structural integrity and suitability for continued use in this project. The assessment shall consist of a visual inspection (looking for wood decay, insect damage, cracking, deformation, water damage, swelling, mold growth and any other signs of deterioration that may compromise the beams’ structural soundness). The Contractor will also verify that all connections tight and are free of rust or other signs of corrosion. If the contractor determines that any existing beams or footings are not structurally sound, they must notify the Contracting Officer (CO) and the Contracting Officer’s Representative (COR) and provide recommendations for appropriate replacement materials and methods. If the Contractor finds that the existing beams and footings are structurally sound, they may be reused in the renovated structure. The contractor shall ensure that the reused beams are properly installed, aligned, and fastened to footings and decking, following the International Building Code (IBC) and industry best practices.
3) No changes to the layout of the existing boardwalk and piers.
4) All work associated with this project must adhere to the International Building Code
(IBC).
5) Provide submittals for all materials. Additionally, submit a job specific Safety Plan. All submittals must be approved before the Notice to Proceed is issued by the CO.
6) It is highly encouraged that the Contractor conduct a site visit prior to starting this project.
4. CONTRACTOR USE OF SITE
a. General: Contractor shall have full use of worksite for work operations (see ATTACHMENT A). Do not disturb portions of the project site beyond areas in which the work is indicated.
Mammoth Cave National Park PIMS 217857 05 03 23 CAJ - 3
b. Limit site disturbance, including earthwork and clearing of vegetation, to; 10 feet beyond surface walkways, patios, surface parking, and utilities less than 12 inches in diameter;
15 feet beyond primary roadway curbs and main utility branch trenches; and 25 feet beyond areas with permeable surfaces (such as pervious paving areas, storm water detention facilities, and fields) that require additional staging areas in order to limit compaction in the constructed area.
c. Confine deliveries and storage of materials to the parking lot at the entrance of Sloan’s Crossing Pond. The Contractor is liable for any damages to Federal property. The Contractor is solely responsible for the security of any equipment or materials left at the worksite unintended. The Contractor is responsible for keeping all areas clean and free of any hazards while off the worksite.
d. The Contractor shall limit parking to the parking lot at the entrance of Sloan’s Crossing Pond.
e. Preservation of Natural Features: Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government. Provide temporary barriers to protect existing trees and plants and root zones. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with COR or CO and remove agreed-on roots and branches that interfere with construction. Do not fasten ropes, cables, or guys to existing trees.
Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.
f. Driveways, Roadways and Entrances: Keep main roadways, and entrances clear and available to Government employees and emergency vehicles at all times. Do not use main roadways or entrances for parking or storage of materials. The visitor parking area at Sloan’s Pond will be used for any storage or parking vehicles as stated in paragraph 4c.
g. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
h. Hauling Restrictions: Comply with legal load restrictions in hauling of materials. Load restrictions on park roads are identical to State load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment.
5. PUBLIC USE OF SITE
a. The Sloan’s Crossing Pond will be closed to the public during the project.
6. CONDUCT OF OPERATIONS
a. Contractor shall conduct his operations in conformance with rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by Park Superintendent.
Mammoth Cave National Park PIMS 217857 05 03 23 CAJ - 4
b. Work on Saturdays, Sundays, Federal holidays or at night may not be performed unless stated in the Work Restrictions below or without prior consent from the CO. Submit requests three (3) business days in advance of the work to the CO or COR for approval.
c. No signs or advertisements (except those specified herein) shall be displayed on the worksite or within the park unless approved by the CO or COR.
7. WORK RESTRICTIONS
a. On-Site Work Hours: Work shall be generally performed during normal business working hours of 8 a.m. to 5 p.m., Monday through Friday, except when otherwise indicated.
b. Existing Utilities: Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.
If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.
c. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by
Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements and notify CO or COR not less than three (3) business days in advance of proposed utility interruptions. Do not proceed with utility interruptions without CO or COR’s written permission.
d. Smoking is not permitted within building or within 25 feet of entrances, operable windows, or outdoor air intakes. All cigarette butts must be picked up and disposed of by the Contractor.
END OF SECTION
Mammoth Cave National Park PIMS 217857 05 03 23 CAJ - 5
ATTACHMENT A
OVERVIEW OF WORKSITE
Mammoth Cave National Park PIMS 217857 05 03 23 CAJ - 6
Mammoth Cave National Park PIMS 217857 05 03 23 CAJ - 7
| 1. SUMMARY |
| a. The work to be accomplished is the cyclic maintenance, repair, and replacement of Sloan’s Crossing Pond Boardwalk located at Mammoth Cave National Park, Mammoth Cave, KY 42259. |
| 2. LOCATION |
| a. Project Location: Mammoth Cave National Park, Sloan’s Crossing Pond |
| 3. SCOPE OF WORK |
| a. The work to be accomplished is the cyclic maintenance, repair, and replacement of Sloan’s Crossing Pond Boardwalk located at Mammoth Cave National Park, Mammoth Cave, KY 42259. This project consists of replacing, “in-kind”, 2,100 linear feet of woo... |
| 1) Provide materials and services to remove and replace all wood decking, joists, 2” x 4” surface wood barriers and handrails and their components with new pressure-treated pine wood. Any wood that has direct contact with the ground or freshwater mus... |
| 2) Existing beams and footings shall be reused. The contractor shall perform a thorough inspection of the existing beams and footings to confirm the structural integrity and suitability for continued use in this project. The assessment shall consist o... |
| 3) No changes to the layout of the existing boardwalk and piers. |
| 4) All work associated with this project must adhere to the International Building Code (IBC). |
| 5) Provide submittals for all materials. Additionally, submit a job specific Safety Plan. All submittals must be approved before the Notice to Proceed is issued by the CO. |
| 6) It is highly encouraged that the Contractor conduct a site visit prior to starting this project. |
| 4. CONTRACTOR USE OF SITE |
| a. General: Contractor shall have full use of worksite for work operations (see ATTACHMENT A). Do not disturb portions of the project site beyond areas in which the work is indicated. |
| b. Limit site disturbance, including earthwork and clearing of vegetation, to; 10 feet beyond surface walkways, patios, surface parking, and utilities less than 12 inches in diameter; 15 feet beyond primary roadway curbs and main utility branch trench... |
| c. Confine deliveries and storage of materials to the parking lot at the entrance of Sloan’s Crossing Pond. The Contractor is liable for any damages to Federal property. The Contractor is solely responsible for the security of any equipment or materia... |
| d. The Contractor shall limit parking to the parking lot at the entrance of Sloan’s Crossing Pond. |
| e. Preservation of Natural Features: Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government. Provide temporary barriers to protect existing trees and p... |
| f. Driveways, Roadways and Entrances: Keep main roadways, and entrances clear and available to Government employees and emergency vehicles at all times. Do not use main roadways or entrances for parking or storage of materials. The visitor parking are... |
| g. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site. |
h. Hauling Restrictions: Comply with legal load restrictions in hauling of materials. Load restrictions on park roads are identical to State load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information r...
| 5. PUBLIC USE OF SITE |
| a. The Sloan’s Crossing Pond will be closed to the public during the project. |
| 6. CONDUCT OF OPERATIONS |
| a. Contractor shall conduct his operations in conformance with rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by Park Superintendent. |
| b. Work on Saturdays, Sundays, Federal holidays or at night may not be performed unless stated in the Work Restrictions below or without prior consent from the CO. Submit requests three (3) business days in advance of the work to the CO or COR for app... |
| c. No signs or advertisements (except those specified herein) shall be displayed on the worksite or within the park unless approved by the CO or COR. |
| 7. WORK RESTRICTIONS |
| a. On-Site Work Hours: Work shall be generally performed during normal business working hours of 8 a.m. to 5 p.m., Monday through Friday, except when otherwise indicated. |
| b. Existing Utilities: Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government. If damage occurs to an unknown utility, repair utility. An equit... |
| c. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirem... |
| d. Smoking is not permitted within building or within 25 feet of entrances, operable windows, or outdoor air intakes. All cigarette butts must be picked up and disposed of by the Contractor. |
| END OF SECTION |
| aTTACHMENT A |
| OVERVIEW OF WORKSITE |
File details come from the government source that posted it. Updated .