About this file
This document contains a statement of work and federal contract opportunity for the renovation of Building 15 at the USDA Agricultural Research Service Subtropical Horticulture Research Center in Miami, Florida. The statement of work requires contractors to provide all labor, materials, and services to repair the sloped and flat portions of the roof, replace windows and exterior doors, install a new HVAC system and electrical work, refinish floors, update insulation and plumbing, replace fencing, and provide new appliances. Additional specifications include pressure washing and painting exteriors, repairing interior walls and ceilings, replacing kitchen cabinets and fixtures, and installing a washer/dryer partition. The solicitation is a combined synopsis posted to obtain quotes with a firm fixed price for the renovation work. Quotes must be submitted electronically by August 5, 2022 to be eligible for award of a contract by the USDA Agricultural Research Service. The NAICS code is 236220 and the small business size standard is $39.5 million.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12405B22Q0214.pdf | ||
| SOW Repair B15 - Miami FL updated.docx | DOCX document | |
| SOW Tree Trimming hf.docx | DOCX document | |
| Clauses and Provisions.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work USDA, Agricultural Research Service
United States Department of Agriculture Agricultural Research Service
STATEMENT OF WORK
REPAIR B15
Subtropical Horticulture Research Center 13601 Old Cutler Road Miami, Florida 33158
Prepared by Everett Wilson June 26, 2022
| Version 2.8, Page - |
| Page 10 of 10 |
Scope of Work The contractor shall provide all professional services necessary to repair damage to B15 located at the USDA, ARS, Subtropical Horticulture Research Center, 13601 Old Cutler Road, Miami, Florida 33158, and provide a detailed proposal with a cost breakdown for the project.
The contractor shall include all services and field labor, equipment, materials, testing and personal protective equipment necessary to perform the work. No Government equipment will be available for use by the contractor.
Base Bid The contractor shall provide a detailed proposal and cost breakdown for the entire project as specified in this statement of work. All proposals shall be in unlocked MS Word format, and all cost proposals shall be detailed in unlocked MS Excel format with formulas working.
Site Visit Contractors are encouraged to visit the site and be escorted by a government representative to confirm locations, dimensions, and conditions of the project before a bid is submitted. The site visit shall be for the purpose of observing firsthand any conditions relevant to the completion of this project. No consideration will be given to claims based on lack of knowledge of existing conditions, except where contract documents make definite provisions for adjustment in cost or extension due to existing conditions not readily foreseeable.
Contractor must be registered in System for Award Management, (SAM), prior to submitting a bid. Registration can be completed at www.sam.gov/portal/public/SAM
Codes and Standards Applicable Codes and Standards apply and are not limited to the following
| ANSI - | American National Standards Institute. |
| ASME - | American Society of Mechanical Engineers. |
| NEC - | National Electrical Code, NFPA 72. |
| OSHA - | Occupational Safety and Health Administration |
| ADA – | Americans with Disabilities Act |
All work must meet ARS 242.1M “ARS Facilities Design Standards” for the defined scope of this project in addition to meeting all Local, State and Federal codes, and latest International Building Code (IBC).
Project Summary The project consists of the following elements:
Repair Sloped Portion of Roof
Remove existing roof system down to deck.
Replace rotten wood decking then prepare/clean roof sections.
Furnish, install and seal 3x3 drip edge, valleys, vents, and flashings. Seal all flashing penetrations.
Install new #30 ASTM base sheet and securely fasten mechanically.
Apply fire resistant roof deck protection.
Install 16 in aluminum (0.032”) standing seam metal roof (white).
All roof components and installation procedures will specifically meet all wind loading requirements for the city of Miami, the County, and the State of Florida. Strictest codes will apply and be met.
Repair Flat Portion of Roof
Seal flashing penetrations.
Install fire resistant TPO underlayment as well as ¼” insulation properly adhered to deck.
Install single ply 60 mil TPO membrane.
Seal all laps/seams with heat weld.
All roof components and installation procedures will specifically meet all wind loading requirements for the city of Miami, the County, and the State of Florida. Strictest codes will apply and be met.
Replace Windows
Remove existing windows, replace with similar colonial style, single hung with energy efficient glass provide Ufactor of 0.64 of or higher.
Replace Exterior Doors
Remove existing doors replace with impact resistant metal doors with steel frames. Include locksets & deadbolts with one set of keys for both doors as specified by Lab Personnel.
Install self-closing screen door at main entrance porch.
Replace existing screens at side windows.
Install new HVAC System
Remove existing window AC units and install new Energy Star rated efficient central HVAC system (SEER 16 or higher) and fiberglass ducts that Include up to 10 ceiling openings, thermostat, water pump, concrete slab for exterior unit, refrigeration/drain lines and covers.
Provide commissioning report.
Ceilings, Walls & Paint
Exterior: pressure wash, repair where needed, scrape loose paint and repair soffit where needed, paint soffit with primer and two coats of paint. Color to be selected by Lab Personnel.
Repair interior stucco ceilings in all rooms showing damage. Remove existing stucco in room and install 1/2 in drywall.
Close opening behind existing water heater, finish interior exterior to match existing adjacent wall.
Scrape all interior peeling paint.
Paint all interior walls with primer and 2 coats of Sherwin Williams (SW) ProMar200 or equivalent low VOC paint. Color to be selected by Lab Personnel.
Paint all interior trim and wood doors with SW or equivalent semi-gloss. Color to be selected by Lab Personnel.
Paint metal doors with rust resistant primer and exterior paint. Color to be selected by Lab Personnel.
Install new 5/8 in drywall and metal stud frame wall partition for washer dryer enclosure in Florida room. Install wood bifold door and paint color that’s selected by Lab Personnel.
Paint Kitchen cabinets and interior doors, replace handles and pulls, repair existing damage. Color to be selected by Lab Personnel.
Resurface existing floor
Remove existing floor cover over original clay tile (carpet & linoleum).
Resurface original clay tile floor by polishing and sealing.
Reinstall similar clay tile in all areas if flooring under carpet or linoleum not usable for resurfacing to match.
Insulation
Remove existing attic insulation. Install new R30 blown in insulation
Plumbing
Remove all existing plumbing fixtures, kitchen sink & faucet, bathroom vanity and toilet, bathtub, valves & heads.
Replace all fixtures and valves with new, name brand fixtures, valves, and hoses, provide spec sheets for client approval prior to installation.
Provide new 37” bathroom vanity with sink, solid wood doors, stone top with backsplash Colors TBD. Includes new valves, plumbing and faucet.
Install new acrylic bathtub to match existing .
Electrical
Repair electrical riser.
Modify electrical panel as required to accept HVAC and appliances.
Install dimmable, recessed LED lights with 5000K color rendition in all ceilings requiring repairs.
Install new bathroom exhaust fan Energy star with timer. Coordinate with roofer to install new vent.
Replace exterior lights with LED matching units.
Replace all electrical outlets, switches and covers.
Remove unused or not to code circuits, replace not to code circuits with new up to code circuits if circuit is still required.
Appliances
Remove existing appliances, provide, and install new, name brand, Energy Star appliances, spec sheets to be approved by client prior to installation.
Minimum base specifications for equipment as follows:
| Fridge 17.5 cu ft Top freezer, stainless steel |
| Range- 30 in w/ self-cleaning oven, free standing, stainless steel |
| Washer/Dryer center 3.8/5.8 cu ft |
| 1000 W over the range microwave 1.7 cu ft., 300CFM, stainless steel |
| Dishwasher- 24 in stainless 50dBA |
Exterior Chain Link Fence
Provide shop drawings and specifications for fence to be used for repair/replacement.
Remove and dispose of existing chain link fence, posts, and concrete footings.
Replace with new 48in galvanized 2 in, 11 ga diamond fence with top rail posts set in 36 in min x 10 in 3000 psi concrete bases.
Include two swing openings-4 ft gate and 12 ft double gate incl self-closing child safety hinges/latches, drop cane.
The facility will be occupied during construction activities. All work shall be scheduled in advance and coordinated with the facility representative to minimize the disruption to daily operations and research programs.
Utilization of Bio-Based Products The contractor shall utilize products and material based from bio- based materials as applicable, (e.g. bio-based greases; bio-based hydraulic fluids, bio-based absorbents), to the maximum extent possible without jeopardizing the intended end use of detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to the applicable Federal Specifications and Standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR). Products can be found at: www.biopreferred.gov
Safety The contractor will submit a Site Safety Specific Plan (SSSP)/Accident Prevention Plan in industry recognizable format to the Contracting Officer within 14 days of contract award. The Government shall review the SSSP prior to the start any construction activities.
Safety and health matters, as they relate to the work, are the exclusive responsibility of the contractor. The contractor shall furnish, erect, and maintain barricades, warning lights, signs, guards, or take other precautions that may be required by law or local authorities for the protection and security of the grounds, facilities, and personnel. Contractor shall coordinate with Lab Personnel and strictly always follow all Covid related precautions and procedures.
Contractor Requirements The contractor shall provide a complete and functional installation, including all labor, supervision, tools, materials, equipment, apparatus, transportation, rigging and other equipment and services necessary to accomplish the work in accordance with the intent and meaning of this statement of work.
The project work shall be performed per the following guidelines:
1) Contractor will verify all dimensions and existing site conditions prior to beginning work.
2) The contractor shall always be responsible for protecting his work and ensuring the safety of his crew and ARS employees.
3) Contractor shall remove and dispose of all construction related materials from all work areas daily and remove these waste materials from the site on a weekly basis.
4) Contractor is required to manage the project and consult with the Government prior to beginning all work phases.
5) Contractor shall perform work in a manner that minimizes the impact to daily operations of the facility and its workers. The building will be occupied during construction work.
6) Contractor will provide daily reports of work performed to the AO and weekly status updates to the EPM.
7) Contractor must have a superintendent on the jobsite when crews are performing the installation work.
8) Contactor will provide their own restroom facility.
9) Contractor to include commissioning of the new HVAC system.
All work is to be performed according with building codes, ordinances and laws of the Authority having jurisdiction on the project. When the requirements of the building codes, ordinances, and laws conflict with any other part of the building codes, ordinances and laws, the most restrictive requirement shall prevail. The Contractor is responsible for obtaining all permits and construction approvals necessary to successfully complete the project.
Documentation Requirements
Material Submittals The contractor shall submit for approval all documents/samples necessary to ensure requirements of project will be satisfied. Electronic submittals on all equipment and materials used on this project shall be submitted to the EPM, AO, and CO noted in this document. All applicable products will have the Miami Dade Notice of Acceptance highlighted or otherwise noted.
Pre-Construction Submittals Prior to construction activities beginning the following submittals must be provided to the AO and EPM for approval.
1. Project Schedule (including daily work start/stop time)
2. Site Specific Safety Plan (SSSP) / Accident Prevention Plan
3. List of contract personnel of the general and subcontractors
General Requirements
Damage to Property:
The Contractor shall protect the work, the site, and all existing property and structures within the limits of the construction activities or that may be affected thereby until acceptance of the work. Any damage to property shall be repaired to pre-damaged condition to the satisfaction of the AO.
Inspection and Acceptance A government representative shall inspect and approve the work performed on this project. The Contractor shall schedule inspection a minimum of 2 days in advance with the AO.
Period of Performance The completion of this project shall not exceed 135 days from date of notice to proceed. A request for time extension must be submitted to the Contracting Specialist in writing. Each request must include specific and detailed reasons in support of the schedule alteration.
Work Hours:
Contractor work hours shall be Monday through Friday, 7:00 A.M. to 4:30 P.M. except on Government holidays. Any changes to work schedule shall be submitted to Contacting Officer for written approval prior to schedule change.
Guaranty The contractor shall provide and submit a single guarantee stating that all portions of the work are in accordance with Contract requirements. Guarantee all work against faulty and improper material and workmanship for a period not less than ten (10) years from date of final acceptance by the USDA, except where manufacturer guarantees or warranties are for longer terms. The contractor shall correct any deficiencies which occur during the guarantee period within 24 hours after notification.
Project Contacts
Contracting Officer (CO):
TBD
Engineering Project Manager (EPM):
Everett Wilson
| 3500 Main Street, #5121 | everett.wilson@usda.gov |
| Houston, TX 77002 | Phone: 720-618-0703 |
Administrative Officer (AO):
Karla Agurto
| 13601 Old Cutler Road | Karla.agurto@usda.gov |
| Miami, Florida 33158 | Phone: 786-573-7058 |
Real Property Specialist (RPS) Erica Jones
| 141 Experiment Station Road | Erica.jones@usda.gov |
| Stoneville, MS 38776 | Phone: 662-686-5323 |
Area Safety and Health Manager (ASHM):
David Daniels
| 950 College Station Road | David.daniels@usda.gov |
| Athens, GA 30605 | Phone: 706-546-3311 |
Research Leader (RL) Dr. Ricardo Goenaga
| 2200 P.A. Campos Ave., Ste 201 | ricardo.goenaga@usda.gov |
| Mayaguez, Puerto Rico 00680 | Phone: 787-831-3435 |