Summary

This is a Statement of Work (SOW) for a Preventive Maintenance Service Contract for the fuel management system at the U.S. Consulate General in Merida, Mexico. The contract is a firm fixed price agreement payable in Mexican Pesos for a 12-month base period with four one-year options to renew, plus a potential six-month extension. The contractor must provide two preventive maintenance services annually, with pricing for the base year and each option year to be filled in by bidders. The contract includes all labor, materials, tools, testing equipment, and consumable supplies (filters, belts, hoses, oils, chemicals, grease, sealants) required to maintain the fuel systems in operational condition. The scope covers fuel storage tanks (both underground and day tanks), fuel pumps (submersible units), fuel polishers, fire pump fuel storage tanks, control panels, and monitoring equipment across multiple locations within the consulate compound and related buildings.

The contractor must perform manufacturer-recommended preventive maintenance tasks on all specified equipment, submit a maintenance checklist for COR approval prior to work commencement, and provide signed checklists after each service visit. Repairs and hardware replacements are excluded from the contract and must be separately quoted for government approval; electronic or electrical part replacements also require prior COR approval. Key requirements include maintaining trained and certified technicians, providing all necessary safety equipment and Material Safety Data Sheets, properly disposing of hazardous materials with proof of authorized disposal, maintaining minimum insurance coverage ($10,000 personal injury/$100,000 cumulative property damage and workers' compensation), and complying with strict security protocols including background clearances, access controls, standards of conduct, and handling of classified and sensitive but unclassified information. Personnel must be pre-approved with security vetting, biographic data, and police clearances submitted within 10 days of award. Performance is measured against a quality assurance standard of no more than one customer complaint per month, and invoices must be accompanied by signed maintenance checklists for payment processing within 30 business days.

View the file

Other files

File Type Posted
SF1449 Fuel System.pdf PDF
Cover Fuel Management System.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Preventive Maintenance Service Contract Scope of Work for Fuel Management System at

United States Consulate General Merida, Mexico

TABLE OF CONTENTS

1.DESCRIPTION
2.PRICING
3.NOTICE TO PROCEED
4.EQUIPMENT AND PERFORMANCE REQUIREMENTS
5.HOURS OF PERFORMANCE
6.ACCESS TO GOVERNMENT BUILDINGS AND STANDARDS OF CONDUCT
7.SCHEDULED PREVENTIVE MAINTENANCE
8.PERSONNEL, TOOLS, CONSUMABLE MATERIALS AND SUPPLIES
9.SOFTWARE, LICENSES AND PASSWORDS
10.DELIVERABLES
11.INSURANCE REQUIREMENTS
12.LOCAL LAW REGISTRATION
13.QUALITY ASSURANCE PLAN (QAP)
14.TRANSITIONS/CONTACTS
15.SUBMISSION OF INVOICES

Attachment A. Additional Security Requirements for Fuel Management System in Secure Areas Scope of Work

1.0 DESCRIPTION

The US Consulate General in Merida, Mexico requires preventive maintenance services for their fuel systems. These services shall result in all systems being serviced under this agreement being in good operational condition when activated.

1.1. TYPE OF CONTRACT

This is a firm fixed price contract payable entirely in Mexican Pesos. Prices for all Contract Line Item Numbers (CLIN) shall include proper disposal of toxic substances as per Item 8.3 where applicable. No additional sums will be payable for any escalation in the cost of materials, equipment or labor, or because of the contractor's failure to properly estimate or accurately predict the cost or difficulty of achieving the results required. The contract price will not be adjusted due to fluctuations in currency exchange rates.

1.2. PERIOD OF PERFORMANCE

The performance period of this contract is from the star date in the Notice to Proceed and continuing for 12 months, with four (4), one-year options to renew. The initial period of performance includes any transition period authorized under the contract.

The Contracting Officer may also extend this contract for an additional six (6) months, if required by the Government, in accordance with the FAR clause 52.217-8 Option to Extend Services, in Section 2 of this contract.

2.0 PRICING

The rates below include all costs associated with providing preventive maintenance services in accordance with the attached scope of work, and the manufacturer’s warranty including materials, labor, insurance (see FAR 52.228-4 and 52.228-5), overhead, profit and GST (if applicable).

2.1. Base Year. The Contractor shall provide the services shown below for the base period of the contract and continuing for a period of 12 months.

CLIN
Description
Unit of Measure
No. of services/Year
Unit Price
Total per year ($)
001
Preventive Maintenance to Fuel Management, as stated under the Performance Work Statement
Ea
2
$
$

VAT

Total Price

2.2. Option Year 1. The Contractor shall provide the services shown below for Option Year 1 of the contract, and continuing for a period of 12 months.

CLIN
Description
Unit of Measure
No. of services/Year
Unit Price
Total per year ($)
101
Preventive Maintenance to Fuel Management, as stated under the Performance Work Statement
Ea
2
$
$

VAT

Total Price

2.3. Option Year 2. The Contractor shall provide the services shown below for Option Year 2 of the contract, and continuing for a period of 12 months.

CLIN
Description
Unit of Measure
No. of services/Year
Unit Price
Total per year ($)
201
Preventive Maintenance to Fuel Management, as stated under the Performance Work Statement
Ea
2
$
$

VAT

Total Price

2.4. Option Year 3. The Contractor shall provide the services shown below for Option Year 3 of the contract, and continuing for a period of 12 months

CLIN
Description
Unit of Measure
No. of services/Year
Unit Price
Total per year ($)
301
Preventive Maintenance to Fuel Management, as stated under the Performance Work Statement
Ea
2
$
$

VAT

Total Price

2.5. Option Year 4. The Contractor shall provide the services shown below for Option Year 4 of the contract, and continuing for a period of 12 months

CLIN
Description
Unit of Measure
No. of services/Year
Unit Price
Total per year ($)
401
Preventive Maintenance to Fuel Management, as stated under the Performance Work Statement
Ea
2
$
$

VAT

Total Price

2.6. Total for all five years: Base Year$__________
Option Year 1$__________
Option Year 2$__________
Option Year 3$__________
Option Year 4$__________
TOTAL$__________

2.7 Repair option. Repairs are NOT included under this agreement (see 7.1.3) and are to be done outside this contract. As stated in 7.1.3 any necessary repairs or parts will be submitted for approval and then billed against a separate PO. The Contractor is not approved to do any additional work without approval.

3.0 NOTICE TO PROCEED

After Contract award and submission of acceptable insurance certificates and copies of all applicable licenses and permits, the Contracting Officer will issue a Notice to Proceed. The Notice to Proceed will establish a date (a minimum of ten (10) days from date of Contract award unless the Contractor agrees to an earlier date) on which performance shall start.

DESCRIPTION/SPECIFICATION/WORK STATEMENT

4.0 EQUIPMENT AND PERFORMANCE REQUIREMENTS

4.1. The American Consulate in Merida requires the Contractor to maintain the following systems in a safe, reliable and efficient operating condition. Please see equipment list included in Exhibit A for a more detailed description.

1) Fuel Pumps, Fuel Storage Tanks, Control Panels

4.2. The Contractor shall provide all necessary managerial, administrative and direct labor personnel, as well as all transportation, equipment, tools, supplies and materials required to perform inspection, maintenance, and component replacement as required to maintain the systems in accordance with this work statement. Under this Contract the Contractor shall provide:

· The services of trained and qualified technicians to inspect, adjust, and perform scheduled preventive maintenance; and provide consumable materials.

4.3. Performance Standards

All work in this agreement shall be completed in a professional and timely manner. Those working on the equipment should be certified and the quality of work should reflect that. The Contractor shall schedule all preventive maintenance work with the site Facility Manager to avoid disrupting the business operation of the Consulate.

5.0 HOURS OF PERFORMANCE

5.1. The Contractor shall maintain work schedules. The schedules shall take into consideration the hours that the staff can effectively perform their services without placing a burden on the security personnel of the Post. The Contractor shall deliver standard services between the hours of 7:30 AM and 4:30 PM Monday through Friday. No work shall be performed on US Government and local holidays.

6.0 ACCESS TO GOVERNMENT BUILDINGS AND STANDARDS OF CONDUCT

6.1 General. The Contractor shall designate a representative who shall supervise the Contractor’s technicians and be the Contractor’s liaison with the American Embassy. The Contractor’s employees shall be on-site only for contractual duties and not for any other business or purpose. Contractor employees shall have access to the equipment and equipment areas and will be escorted by Embassy personnel.

6.2 Personnel Security. The Government reserves the right to deny access to U.S.-owned and U.S.-operated facilities to any individual. The Contractor shall provide the names, biographic data and police clearance on all Contractor personnel who shall be used on this Contract prior to their utilization. Submission of information shall be made within 10 days of award of contract. No technician will be allowed on site without prior authorization.

6.2.1 Vehicles. Contractor vehicles will not be permitted inside the consulate compound without prior approval. If you need to have vehicle access please submit your vehicle information (Make, Model, License Plate #) along with a written justification as to why access is necessary. This should be submitted to the Facility Manager at least one (1) week prior to the visit.

6.2.2 Identity Cards

The government shall issue identity cards to Contractor personnel, after they are approved. Contractor personnel shall display identity card(s) on the uniform at all times while providing services under this contract. These identity cards are the property of the US Government. The Contractor is responsible for their return at the end of the contract, when an employee leaves Contractor service, or at the request of the Government. The Government reserves the right to deny access to U.S.-owned and U.S.-operated facilities to any individual.

6. 3 Security Clearances. Security clearances are a requirement for performance on this contract for the NOB generator room, as there will be access to classified information or areas.

Classified Packages & Mail Classified packages / mail shall NOT be sent via the U.S. Postal Service.

Delivery by Courier: Contractors and subcontractors authorized to send Classified packages to the Department shall provide delivery of packages, by appropriately Cleared Contractor, via approved hand-carry methods in accordance with NISPOM 5-410 and 5-411.

All Classified hand-carry deliveries from the Contractor to DOS shall be made between the hours 8:00 AM and 3:00 PM during business days. The contractor shall advise the intended recipient of the materials and estimated time of arrival a minimum of 72 hours prior to dispatching the package by courier.

Address for Classified Packages / Mail to be sent by Courier to Post:

To: FM, US Consulate Merida, Mexico

SUPERVISOR, POUCH, AND MAIL BRANCH

A/LM/PMP/DPM/CPM, ROOM B-437

2201 C ST NW

WASHINGTON, DC 20520-0437

6.3.1 The Contractor must comply with all of the following requirements relating to the protection of U.S. Consulate in Merida, Mexico diplomatic personnel, property and compound project information and cooperate fully in all security matters Sensitive But Unclassified (SBU) and information that may arise relating to this contract.

Contractor personnel may also be exposed to various documents and signs, including Post notices, event schedules, Department of State regulations and conversations or announcements relating to the operation of the U. S. Consulate Merida and diplomatic personnel. This information should not be shared with anyone not employed by or falling under the protection of the Consulate.

Contractor personnel may be exposed to various documents, such as blueprints, drawings, sketches, notes, surveys, reports, photographs, and specifications, received or generated in conjunction with this contract. These documents contain information associated with diplomatic facilities for the U.S. Department of State. These documents have been marked with the handling designations “Unclassified” or “Sensitive But Unclassified” and US Government warnings against reproduction and distribution. These documents require special handling and dissemination restrictions. All handling designations and warnings on original documents must be reproduced on subsequent copies.

The loss, compromise, or suspected compromise or loss of any SBU information, contract related information (personnel files, payroll information, etc.), any post or diplomatic facility related information (documents, notes, drawings, sketches, surveys, reports, exposed film, negatives, or photographs), or ANY information which may adversely affect the security interests of the United States, must be immediately brought to the attention of the Contracting Officer (CO) and Contracting Officer’s Representative (COR).

Photographs of any diplomatic overseas building or facility must be authorized in advance by the Regional Security Officer (RSO), who will establish any controls, limits, and/or restrictions as necessary. Exposed film depicting any Controlled Access Area and/or sensitive equipment must be developed in a U.S.- controlled environment by appropriately cleared personnel. No further dissemination, publication, duplication, or other use beyond that which was requested and approved is authorized without specific, advance approval from Diplomatic Security (DS). DS reserves the right to demand retention of all copies of said photographs and/or negatives, following fulfillment of the previously authorized usage.

All documents and records (including photographs) generated during the performance of work under this contract shall be for sole use of and shall become the exclusive property of the U.S. Government. No article, book, pamphlet, recording, broadcast, speech, television appearance, film or photograph concerning any aspect of the work performed under this contract shall be published or disseminated through any media, to include company or personal websites, without the prior written authorization of the Contracting Officer or the Regional Security Officer. These obligations do not cease upon the expiration or termination of this contract or at any other point in time. The Contract shall include the substance of this provision in all subcontracts hereunder.

6.4 Standards of Conduct

6.4.1 General. The Contractor shall maintain satisfactory standards of employee competency, conduct, cleanliness, appearance, and integrity and shall be responsible for taking such disciplinary action with respect to employees as may be necessary. Each Contractor employee shall adhere to standards of conduct that reflect credit on themselves, their employer, and the United States Government. The Government reserves the right to direct the Contractor to remove an employee from the worksite for failure to comply with the standards of conduct. The Contractor shall immediately replace such an employee to maintain continuity of services at no additional cost to the Government.

6.4.2 Neglect of Duties. Neglect of duties shall not be condoned. This includes sleeping while on duty, unreasonable delays or failures to carry out assigned tasks, conducting personal affairs during duty hours and refusing to render assistance or cooperate in upholding the integrity of the worksite security.

6.4.3 Disorderly Conduct. The Contractor shall not condone disorderly conduct, use of abusive or offensive language, quarreling, and intimidation by words, actions, or fighting. Also included is participation in disruptive activities that interfere with normal and efficient Government operations.

6.4.4 Intoxicants and Narcotics. The Contractor shall not allow its employees while on duty to possess, sell, consume, or be under the influence of intoxicants, drugs or substances which produce similar effects.

6.4.5 Criminal Actions. Contractor employees may be subject to criminal actions as allowed by law in certain circumstances. These circumstances include but are not limited to the following actions: falsification or unlawful concealment, removal, mutilation, or destruction of any official documents or records or concealment of material facts by willful omission from official documents or records; unauthorized use of Government property, theft, vandalism, or immoral conduct; unethical or improper use of official authority or credentials; security violations; organizing or participating in gambling in any form; and misuse of weapons.

6.4.6 Key Control. The Contractor will not be issued any keys. The keys will checked out by Consulate staff on the day of service requirements.

6.4.7 Notice to the Government of Labor Disputes. The Contractor shall inform the COR of any actual or potential labor dispute that is delaying or threatening to delay the timely performance of this contract.

7.0 SCHEDULED PREVENTIVE MAINTENANCE

7.1. General

7.1.1. The Contractor shall perform preventive maintenance as outlined in Exhibit A - STATEMENT OF WORK. The objective of scheduled preventive maintenance is to eliminate system malfunction, breakdown and deterioration when units are activated/running.

7.1.2. The Contractor shall inventory, supply and replace expendable parts (eg, filters, belts, hoses, gaskets) that have become worn down due to wear and tear. The Contractor shall maintain a supply of expendable and common parts on site so that these are readily available for normal maintenance to include: hoses, belts, oil, chemicals, coolant, filters (Air, Fuel, Oil), grease, sealant, thermostat, fuses; in addition to the appropriate tools, testing equipment, safety shoes and apparel for technicians, personal protective equipment (hands, hearing, eye protection), MSDS, cleaning material and oil spill containment kits. The contractor should inventory the supply after each visit and order replacement supplies and have them delivered to post.

7.1.3. Exclusion. This contract does NOT include repair of equipment and replacement of hardware (e.g. bearings, pistons, piston rings, crankshaft, gears.) Hardware replacements will be separately priced out by the Contractor for the Government’s approval and acceptance. The Government has the option to accept or reject the Contractor’s quote for parts and reserves the right to obtain similar spare parts from other competitive sources. If required by the Government, the Contractor shall utilize Government-purchased spare parts, if awarded the work. Such repairs/replacements will be accomplished by a separate purchase order. However, this exclusion does not apply if the repair is to correct damage caused by Contractor negligence.

7.1.4. Replacement/repair of any electronic or electrical parts must be approved by the COR prior to installation of the part. If the Contractor proceeds to replace any electronic or electrical parts without COR approval, the Contractor shall de-install the parts at no cost to the Government.

7.2 Checklist Approval

The Contractor shall submit to the COR a schedule and description of preventive maintenance tasks which the Contractor plans to provide. The Contractor shall prepare this schedule and task description in a checklist format for the COR’s approval prior to contract work commencement.

7.2.1. The Contractor shall provide trained technicians to perform the service at frequencies stated in Exhibit A and on the equipment called out in this SOW. The technician shall sign off on every item of the checklist and leave a copy of this signed checklist with the COR or the COR's designate after the maintenance visit.

7.2.2. It is the responsibility of the Contractor to perform all manufacturers’ recommended preventive maintenance as well as preventive maintenance recommended by the manufacture technical manuals for the respective equipment.

8.0 PERSONNEL, TOOLS, CONSUMABLE MATERIALS AND SUPPLIES

The Contractor shall provide trained technicians with the appropriate tools and testing equipment for scheduled maintenance, safety inspection, and safety testing as required by this Contract. The Contractor shall provide all of the necessary materials and supplies to maintain, service, inspect and test all the systems to be maintained.

8.1 Contractor furnished materials will include but not limited to appropriate tools, testing equipment, safety shoes and apparel for technicians, hands, hearing and eye protection, MSDS, cleaning material and oil spill containment kit. Expendable/consumable items (e.g. hoses, belts, oil, chemicals, coolant, filters (Air, Fuel, Oil), generator starting batteries, grease, sealant, thermostat, fuse), will be maintained in the onsite inventory. See 7.1.2.

8.2 Repairs. Repairs are not included in this contract. See Item 7.1.3. Exclusions.

8.3 Disposal of used oil, fuel, battery and other toxic substances. The Contractor is responsible for proper disposal of toxic/hazardous substances. All material shall be disposed of according to Government and Local law. After proper disposal the contractor must show proof of authorized disposal of these toxic/hazardous substances.

9.0 SOFTWARE, LICENSES AND PASSWORDS

Copies of all software and licenses needed to control or to adjust the communications module shall be given to the Consulate upon completion of the work.

10. DELIVERABLES

Provide a typewritten report to Post Facilities Manager containing following:

a) System information (make, model, all device types).

b) Pass/Fail of each feature and type of component tested. If a device fails, note device type, address, and location within Post.

c) Any comments on system (or device) condition pertaining to service life and dependability.

d) Full printout of test from system printer

Description
QTY
Delivery Date
Deliver to
Registration in SAM
1
Date of proposal submission
CO
Certificate of Insurance
1
10 days after contract award
CO
List of Personnel & Security Forms
1
10 days after contract award
COR
Maintenance Plan
1
10 days after award
COR
Maintenances and activity log
1
Every two months
COR
PM Checklist
1
Every two months
COR
Invoice / Payment Request
1
Upon completion of each service
Invoice Section

11.0 INSURANCE REQUIREMENTS

11.1 Personal Injury, Property Loss or Damage (Liability). The Contractor assumes absolute responsibility and liability for any and all personal injuries or death and property damage or losses suffered due to negligence of the Contractor’s personnel in the performance of this Contract.

The Contractor’s assumption of absolute liability is independent of any insurance policies.

11.2 Insurance. The Contractor, at its own expense, shall provide and maintain during the entire period of performance of this Contract, whatever insurance is legally necessary. The Contractor shall carry the following minimum insurance:

Public Liability Insurance

Property Damage$10,000
Cumulative:$100,000

Workers’ Compensation and Employer’s Liability

11.3 Worker's Compensation Insurance. The Contractor agrees to provide all employees with worker's compensation benefits as required under local laws (see FAR 52.228-4 “Worker’s Compensation and War-Hazard Insurance Overseas”).

12.0 LOCAL LAW REGISTRATION

If the local law or decree requires that one or both parties to the contract register the contract with the designated authorities to insure compliance with this law or decree, the entire burden of this registration shall rest upon the Contractor. Any local or other taxes which may be assessed against the Contract shall be payable by the Contractor without Government reimbursement.

13.0 QUALITY ASSURANCE PLAN (QAP).

13.1 Plan. This plan is designed to provide an effective surveillance method to promote effective Contractor performance. The QAP provides a method for the Contracting Officer's Representative (COR) to monitor Contractor performance, advise the Contractor of unsatisfactory performance, and notify the Contracting Officer of continued unsatisfactory performance. The Contractor, not the Government, is responsible for management and quality control to meet the terms of the Contract. The role of the Government is to conduct quality assurance to ensure that Contract standards are achieved.

Performance Objective
PWS Para
Performance Threshold

Services.

Performs all services set forth in the performance work statement (PWS)

1 thru 12
All required services are performed and no more than one (1) customer complaint is received per service.

13.2 Surveillance. The COR will receive and document all complaints from Government personnel regarding the services provided. If appropriate, the COR will send the complaints to the Contractor for corrective action.

13.3 Standard. The performance standard is that the Government receives no more than one (1) customer complaint per month. The COR shall notify the Contracting Officer of the complaints so that the Contracting Officer may take appropriate action to enforce the inspection clause (FAR 52.212-4, Contract Terms and Conditions-Commercial Items), if any of the services exceed the standard.

13.4. Procedures.

13.4.1 If any Government personnel observe unacceptable services, either incomplete work or required services not being performed, they should immediately contact the COR.

13.4.2 The COR will complete appropriate documentation to record the complaint.

13.4.3 If the COR determines the complaint is invalid, the COR will advise the complainant. The COR will retain the annotated copy of the written complaint for his/her files.

13.4.4 If the COR determines the complaint is valid, the COR will inform the Contractor and give the Contractor additional time to correct the defect, if additional time is available. The COR shall determine how much time is reasonable.

13.4.5 The COR shall, as a minimum, orally notify the Contractor of any valid complaints.

13.4.6 If the Contractor disagrees with the complaint after investigation of the site and challenges the validity of the complaint, the Contractor will notify the COR. The COR will review the matter to determine the validity of the complaint.

13.4.7 The COR will consider complaints as resolved unless notified otherwise by the complainant.

13.4.8. Repeat customer complaints are not permitted for any services. If a repeat customer complaint is received for the same deficiency during the service period, the COR will contact the Contracting Officer for appropriate action under the Inspection clause.

14. TRANSITIONS/CONTACTS

Within 30 days after contract award, the Contracting Officer may ask the contractor to develop a plan for preparing the contractor to assume all responsibilities for preventive maintenance services. The plan shall establish the projected period for completion of all clearances of contractor personnel, and the projected start date for performance of all services required under this contract. The plan shall assign priority to the selection of all supervisors to be used under the contract.

14.1 On site contact. The following are the designated contact personnel between the US Consulate Meridaand the Contractor

Facility Manager: Andrea Beery BeeryAJ@state.gov
Jaime Guillermo (COR): Guillermo JJ@state.gov
Luis Gallardo(A/COR) GallardoLA@state.gov

15. SUBMISSION OF INVOICES

The Contractor shall submit an invoice after each preventive maintenance service has been performed. Invoices must be accompanied by a signed copy of the Maintenance Checklist for the work performed including parts replacement and break down calls, if any. No invoice for preventive maintenance services will be considered for payment unless accompanied by the relevant documentation.

The Contractor should expect payment 30 business days after completion of service or 30 days after receipt of invoice at the American Consulate payment office, whichever is later. Invoices shall be submitted on dedicated portal: ILMS Vendor Portal

Attachment A:

Additional Security Requirements for Fuel Management Systems PMSC in Secure Areas

1.General
1.1.This Purchase Order includes security provisions that are contained in the attached DD Form 254, Contract Security Classification Specification, issued by the Bureau of Diplomatic Security, DS/IS/IND. Contractor must maintain a Secret Facility Clearance issued by Defense Counterintelligence and Security Agency (DCSA) for period of performance.

1.2. Public Release of Information

There shall be no press release of information or photographs, to include on company websites, concerning any aspect of the design, construction, or other services relating to this contract, or other documents resulting there from, without the written prior approval of the Contracting Officer. The contractor shall include the substance of this provision in all subcontracts hereunder.

2.Personnel Requirements
2.1.Personnel Clearances

Contractor personnel requiring unescorted access to CAA spaces at overseas posts, or access to classified information domestically or overseas, shall possess SECRET personnel security clearances issued by DCSA prior to contract performance.

2.2. Visit Authorization Requests

Visit Authorization Requests (VARs) for all cleared personnel performing on this task at DOS locations, domestically and overseas, are to be sent via e-mail to DSINDOBOVARS@state.gov (with the DS/IS/IND POC copied). A VAR is valid for 12 months; an updated VAR is required 30 days prior to the current VAR expiring.

2.3. Country Clearance for Travel to Post/Site

The Contractor must submit to the COR a Country Clearance Request (CCR) for all Contractor and all subcontractor employees visiting the site short term (less than one month) or deploying to the site long-term (in excess of one month). CCRs shall be submitted for both cleared and uncleared personnel. The Contractor shall submit CCRs in the format required by the COR. Submission of specified form will result in official notification to the Regional Security Officer (RSO) of contractor personnel arriving at Post, dates of visit or duration of stay, purpose of visit or employee’s position with Contractor, security clearance level, and passport or other identifying information. CCRs shall be submitted to COR and the VARs to DS/IS/IND at least 14 business days prior to site arrival date. Admission to Post by the RSO and appropriate badging for access are dependent upon receipt of Country Clearance Requests and VARs prior to arrival.

2.4. Standards of Conduct

Contractor personnel assigned to the contract shall observe appropriate standards of conduct and other appropriate Departmental regulations, as well as any special standards of conduct promulgated by the local embassy/post to govern U.S. Government personnel. Non-adherence to the provisions of the above may subject Contractor personnel to removal at the Contractor’s expense.

2.5. Removal of Individual Contractor Employees for Cause

A determination to remove a Contractor employee from Post, or from contract performance at a domestic facility, due to misconduct or unsuitability may involve, but is not limited to, the following types of misconduct or delinquency that may be documented by the Regional Security Officer or DS/IS/IND:

a.Notoriously disgraceful conduct, to include the frequenting of prostitutes, engaging in public or promiscuous sexual relations, spousal abuse, neglect or abuse of children, manufacturing or distributing pornography, entering into debts the employee could not pay, or making use of one’s position or immunity to profit or to provide favor to another or to create the impression of gaining or giving an improper favor.
b.Failure to report notoriously disgraceful conduct and/or non-compliance of other employees (DoS, Contractor or foreign national) in accordance with existing Post and Department of State policies and regulations.
c.Neglect of duty, unsatisfactory performance, unreasonable delays or failure to carry out assigned tasks, conducting personal affairs during official time, refusing to render assistance/cooperate in upholding the integrity of the objectives of this contract.
d.Falsification or unlawful concealment, removal, mutilation or destruction of any document or record, or concealment of material facts by willful omissions from documents or records. Improper use of credentials, badges or official papers.
e.Disorderly conduct, use of abusive or offensive language, quarreling, intimidation by words or actions, or fighting. Participation in disruptive activities that interfere with the normal efficient operations of the worksite.
f.Theft, vandalism, immoral conduct, or any other criminal action under U.S. or host country law.
g.Selling, consuming or being under the influence of drugs, or other illegal substances that produce similar effects.
h.Abuse of alcohol.
i.Any evidence that would indicate that the individual is guilty of security violations including black market dealings, currency manipulation, violations of the post contact policy regarding criteria country nationals, espionage or treason.
j.Noncompliance with post security and reporting policies.
3.Briefing and Reporting Requirements
3.1.Security Briefings

All U.S. citizens will be required to attend Contractor-provided initial, pre-deployment, and continuing security awareness briefings regarding policies and procedures for the protection of classified, SBU and unclassified information, and the contractual security requirements contained in this Attachment to the DD Form 254. Contractor shall maintain a copy of signed briefing acknowledgements for each employee performing on the contract

Upon arrival at an overseas Post/Site, all American personnel will be required to attend initial and subsequent periodic security briefings by the RSO, or designee. All personnel must attend a debriefing by the RSO, or designee. Additional debriefing may be requested by Diplomatic Security, either at post/site prior to departure and/or at the Contractor's location.

3.2. Personal (Unofficial) Travel Outside of the Project Country Cleared contractor personnel must report all unofficial travel to the RSO one week prior to departure. RSO will arrange appropriate travel briefing/debriefing through the RSO when the itinerary includes transit through or visit to a Prohibited Countries List country. Domestically, contractors should report unofficial travel which includes transit through or visit to a Prohibited Countries List country to DS/IS/IND.

3.3. Suspicious Contact Reports (SCRs)

Any contact with host or third country nationals that seems suspicious (such as undue curiosity as to the purpose of presence in country, requests for information regarding the project or project personnel), or attempts to establish suspicious recurring contact beyond routine professional or personal services, shall be reported immediately to the RSO. Reporting of suspicious contacts requires filing a DS-1887 form, which can be obtained from the RSO. When completed, the form should be returned to the RSO for any necessary investigative action and for submission to Diplomatic Security’s Counterintelligence Division (DS/CI). Additionally, the company FSO shall submit a Suspicious Contact Report to the DCSA Industrial Security Representative (in accordance with the NIPSOM) and DS/IS/IND.

3.4. Reporting of Suspicious Incidents Occurring at Off-site Locations or During Travel to/from the Project Site Avoid discussing project and post activities while not on the site, to include in hotel rooms, restaurants and all other public places. Report any suspicious or actual incidents, any contact with the local authorities, or undue attention or surveillance of project personnel or the project site.

3.5. Foreign Contact Reporting

All contractors at the project site must adhere to the foreign contact reporting requirements specific to each project site, as briefed by the RSO, which may include all unofficial contact with nationals from specific HUMINT threat countries, the reporting of close and continuing social contact with foreign nationals, cohabitation with foreign nationals, and non-project related personal business and/or financial relationships with any foreign nationals. Reporting of foreign contacts requires filing a DS-1887 form, which can be obtained from the RSO. When completed, the form should be returned to the RSO for any necessary investigative action and for submission to Diplomatic Security’s Counterintelligence Division (DS/CI). If investigative action results in information of which the contractor should be aware, the reporting contractor will be briefed by the RSO.

3.6. Reporting Marriage, Intent to Marry, Cohabitation or Other Continuing Bonds of Affection with Foreign Nationals Cleared contractor personnel working at DoS locations must report marriage, impending marriage, cohabitation and other continuing bonds of affection with foreign nationals to the RSO and DS/IS/IND, in accordance with 12 FAM 270.

3.7. Reporting Adverse Financial Situation and Certain Arrests Cleared contractor personnel working on DoS contracts must report to DS/IS/IND, through their Facility Security Officer, wage garnishments, credit judgments, repossessions, tax liens, bankruptcies, and/or intentions to file for bankruptcy. Cleared contractors must also report adverse involvement with law enforcement agencies to include: Arrests, other than minor traffic violations, for which a fine or forfeiture of $150 or more was imposed; or arrests for “driving under the influence” or “driving while intoxicated.” Arrests must be reported in a timely fashion (i.e., within 72 hours). Reporting must not be delayed pending the conclusion of any judicial action. Contractors arrested or detained overseas for reasons listed above, or for any reason, must report to RSO and DS/IS/IND.

3.8. Dual Citizenship

Cleared contractors contemplating applying for citizenship with a foreign country must report this fact to their Contracting Officer’s Representative (COR) and DS/IS/IND when any act is initiated in furtherance of obtaining foreign citizenship.

4.Subcontracting Requirements
4.1.DD Forms 254 for Subcontractors

The prime Contractor must request a DD Form 254 for all cleared subcontractors performing on this contract. Requests for DD Forms 254 must be forwarded via e-mail to DS_IND_OBOTeam@state.gov, prior to Subcontractor (or prospective subcontractor) access to any classified information or deployment to the site. DD Forms 254 issued by DS/IS/IND will be forwarded to the prime contractor for distribution to subcontractors. Contractors are not authorized to issue their own subcontractor DD Forms 254.

5.Handling/Marking Requirements - Classified & Sensitive But Unclassified (SBU)
5.1.Security Classification Guide

All documents, such as blueprints, drawings, sketches, notes, surveys, reports, photographs, exposed film, negatives, specifications, scopes of work, lists of Government Furnished Equipment and any other material received or generated in conjunction with this task, shall be classified, marked and handled in accordance with the Security Classification Guide (SCG) for Design and Construction of Overseas Facilities dated July 2018, which identifies the specific types of information associated with diplomatic construction projects, and the level of classification for such information.

5.2. Protection of Classified and SBU Information

The Contractor and all Subcontractors must comply with all Department of State (DOS) and Department of Defense (DOD) requirements relating to the protection of classified and Sensitive But Unclassified (SBU) information and cooperate fully in all security matters that may arise relating to this contract.

The loss, compromise, or suspected compromise or loss of any classified information (documents, notes, drawings, sketches, surveys, reports, exposed film, negatives, or photographs) or ANY information which may adversely affect the security interests of the United States, must be immediately brought to the attention of the Contracting Officer, the DoS COR listed on the reciprocal DD 254 and DS/IS/IND, point of contact listed at the bottom of Item 13 of the reciprocal DD Form 254.

5.3. Disposition and Retention of Task/Project Information

All classified and SBU material, including copies and reproductions and classified information stored on approved IS (Information Systems) and classified or SBU electronic media, received or generated in the performance of this task, shall be returned to the CO upon completion of the project unless the material has been destroyed or retention of the material is authorized in accordance with the National Industrial Security Program Operating Manual (NISPOM). Retention authority for classified material can be requested from DS/IS/IND, which shall coordinate an approval letter with the CO. Classified and SBU material shall be returned or destroyed within 120 days after final delivery of project drawings and specifications and any other services; or 120 days after completion or termination of the project.

5.4. Project Generated Information at Contractor’s Facility – Disposal/Destruction Plan The Contractor FSO shall develop a waste paper disposal/destruction plan for all task related paper documents and drawings generated at their facility. Waste paper includes any DoS, OBO, contract or project documentation related to contract personnel matters, working papers, contract deliverables, submittals, correspondence, schedules, warranty and equipment manuals, any drawings regardless of sensitivity and all other task related paper. All paper produced in Contractor and subcontractors’ offices relating to this contract shall be collected separately from refuse, garbage and material, and disposed of in accordance with the plan. Contractor shall provide appropriate means of disposal for both Sensitive But Unclassified and classified information. Sensitive But Unclassified information must be destroyed by crosscut shredder (residue must be 1/32 inch width by ½ inch length or smaller), burned beyond reconstruction, or disintegrated, just as classified information is required to be destroyed. Task related waste paper may not be put into commercial trash containers for removal.

5.5. Project Related Classified Working Papers, As-Builts and other Classified Generated at Post Contractors are not authorized to hand-carry classified material overseas. Classified information required for use at Post will be provided by the OBO COR. Any classified information to be generated electronically at Post must be generated in DoS secure spaces on secure computers, coordinated with RSO. Project related classified material generated while at the Post must be delivered to the RSO for transmission to OBO by classified Diplomatic Pouch or authorized DoS courier. Secure fax or DoS Classified LAN (CLAN) can be utilized when coordinated with the COR. All classified materials given to the RSO for transmission must be appropriately marked with appropriate classification markings (unclassified, SBU, SBU/NOFORN, Confidential or Secret), government warnings against reproduction and distribution and bear the proper name of the site/project. Unmarked submittals shall be returned to the prime for classification and marking prior to transmission. Upon delivery of the classified material to OBO, the OBO COR will arrange for the return of the classified material to the contractor’s cleared facility via appropriate means.

All project related working papers and drawings to be removed from the Post shall be reviewed by RSO or designated Contractor document security manager one (1) day prior to departure, to ensure that classified material has not been generated and is not hand-carried back to Contractor facility.

Only SBU and unclassified project documentation may be hand-carried back to contractor facility for storage/disposal. Contractor shall maintain positive, personal control over documentation at all times.

5.6. Photographs

Photographs of any diplomatic overseas building or facility must be authorized in advance by the DoS Regional Security Officer (RSO), or DoS COR, who will establish any controls, limits, and/or restrictions as necessary. Exposed film depicting any Controlled Access Area and/or sensitive equipment must be developed in a U.S.- controlled environment. The contractor shall submit all CAA photographs taken by digital cameras and stored on electronic media to the RSO or COR for review. Written approval for removal from the site must be obtained by the Government reviewer. Any photographs or storage media (memory cards) determined to be classified shall be turned over to the RSO to forward via classified Diplomatic Pouch. No further dissemination, publication, duplication, or other use beyond that which was requested and approved is authorized without specific, advance approval from DS. DS reserves the right to demand retention of all copies of said photographs and/or negatives, following fulfillment of the previously authorized usage.

6.Transmission Requirements for SBU
6.1.Transmission of Sensitive But Unclassified (SBU)

SBU information via the Internet is prohibited, in accordance with the Security Classification Guide (SCG) for Design and Construction of Facilities Overseas, dated Brie. SBU information can be transmitted via ProjNet, mail, GSA Schedule 48 commercial carriers or fax, as outlined in the SCG, or hand-carried by authorized contractor personnel. When it is deemed necessary to take personal or contractor-owned laptops, Personal Digital Assistants (PDAs), smart phones (such as BlackBerrys), cell phones, digital cameras or any other electronic processing media outside a cleared facility, or overseas, to process or store any DoS project information (on or off the site), the following guidelines must be adhered to:

a.The device must have its hard drive encrypted using any product on the IT CCB list, or any NIST approved product. (NIST approved products can be found at http://csrc.nist.gov/groups/STM/cmvp/validation.html)
b.An overwrite utility software must be used to remove all previous data in the following manner: A first overwrite pass using the number '1'; A second overwrite pass using the number '0'; and a third overwrite pass using ANY character.
c.Transmission/storage of classified information on laptops, PDAs, smart phones or digital cameras is not authorized.
d.Electronic media which contains DoS project information MUST be hand-carried at all times, both domestically and overseas. This equipment shall NOT be checked with luggage. It must remain in the carrier’s possession at all times. Any loss or compromise of electronic media containing project information must be reported to DS/IS/IND immediately.

6.2. Separate Packaging of Electronic Media and Hardcopy Material The Contractor and any associated subcontractors will package all paper documents and drawings separately from electronic media, regardless of its classification. Specifically, electronic media (such as CDs) will be transported in electronic media packages that contain no other hard copies of any kind, beyond that of transfer/receipt documentation. Paper drawings and documents will be packaged separately.

6.3. Double-Wrapping and Addressing of Packages

For all shipping methods, the prime contractor and any associated subcontractors will ensure that all project documentation, regardless of classification, is double-wrapped with both layers addressed properly and labeled with the sender’s address. Document tracking receipts should be packaged inside the inner wrapping with the materials the receipt describes. No indication of the classification or sensitivity should appear on the outer wrapper. Unclassified and SBU packages addressed to overseas facilities or sites may not have the words “blueprints” or “drawings” displayed on the outer wrapper.

6.4. Packaging Heavy Materials in Appropriate Containers

In applying the above double-wrapping and addressing procedures, items sent via US mail or commercial carrier weighing more than one (1) pound shall be double wrapped and then the package shall be enclosed within an appropriately sized double-walled box or, for rolled drawings, a manufactured mailing tube. Unclassified and SBU packages addressed to overseas facilities or sites may not have the words “blueprints” or “drawings” displayed on the outer wrapper.

Exhibit B - STATEMENT OF WORK

I. GENERAL INFORMATION:

The US Consulate General in Merida, Mexico requires preventive maintenance services for their fuel systems. These services shall result in all systems being serviced under this agreement being in good, operational condition when activated.

II. PROJECT REQUIREMENTS:

DESCRIPTION OF EQUIPMENT *:
*Please see attachment at the end of this sheet for more details

1) Fuel Pumps, Fuel Storage Day Tank, Panel Control - NOB, Level 1

2) Fuel Pumps, Fuel Storage Day Tanks, Panel Control - UTL-A Building

3) Fuel Polisher - UTL-A Building

4) Fire Pump Fuel Storage Tank - UTL-A Building, Fire Pump Room

5) Underground Storage Diesel Tanks - Compound

6) Remote Annunciators - Post One, SCAC Service Patio

III. GENERAL REQUIREMENTS:

The Contractor under this SOW will be responsible for labor, tools, and materials required to carry out all preventive maintenance as outlined in this SOW. Embassy staff has service manuals for the Fuel System on site

IV. SCOPE OF WORK - FUEL SYSTEM PREVENTIVE MAINTENANCE

Contractor shall provide all materials, supervision, labor, tools and equipment to perform preventive maintenance. All personnel working in the vicinity shall wear and /or use safety protection while all work is performed. Any questions or injuries shall be brought to the attention of the Post Occupation Safety and Health Officer (POSHO). Material Safety Data Sheets (MSDS) shall be provided by the Contractor for all HAZMAT materials. Copies will be provided to the COR for approval.

If any discrepancies are found with the generator system that are not covered under this scope of work then the contractor must provide the following:

1. Detailed report noting the discrepancy found.

2. Bill of Materials (BOM) to include component name, quantity, part #, and price for any repair material required and material lead time.

3. Price quote for repair labor.

At a minimum, the following work must be done:

Fuel Storage Tanks

Annual:

· Check floats and leveling devices in tank. Check float adjustment with depth level indicators.

· Clean breather vents, conservation vents, and flame arrestors where appropriate.

· Check for signs of tank leakage.

· Verify all locking devices in place.

· Validate operation of automatic controls including leak and level detection.

· Test to demonstrate proper function of line leak detector.

· Line tightness test for pressurized piping

· Line tightness test for suction piping

Fuel Pumps, All Pumps (UST and Day Tanks) Annual:

· Inspect electrical wiring for damage.

· Verify pump is pumping at capacity by measuring the time required to transfer a specific volume of fuel.

· Measure and record voltage at the pump and actual current draw and compare to nameplate readings.

Panel Control

Annual:

· Leak sensors should be visually inspected for fouling or clogging at least every 12 months.

· Contractor is to clean sensors if possible. The Contractor should provide the Facility Manager a list of sensors that are damaged or excessively dirty.

Fuel Polisher:

Semi-Annual:

· Inspect, clean, test, adjust fuel polisher.

· Replace all fuel filters.

Annual:

· Inspect, clean, test, adjust fuel polisher.

· Replace all fuel filters.

Semi-Annual:

· Console should be tested every six months.

· Power down unit, count to 5 then power back up and check for errors.

· The inventory probe readings should be compared against stick measurements every six months.

U.S. Consulate General Merida,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .