This document is a Scope of Work for facility management services related to the removal and disposal of obsolete COVID-19 sanitation materials and equipment at the Bureau of Indian Affairs (BIA) Gamerco Facility, Building 320, located in Gamerco, New Mexico. The project is budgeted for Fiscal Year 2026 and addresses expired supplies that have been stored on-site since the 2019-2022 pandemic and remain in violation of applicable safety and environmental regulations.
The inventory consists of 42 pallets containing approximately 14,300 gallon poly-totes with 70% isopropyl alcohol (totaling +/- 4,200 gallons), 3,600 gallons of liquid or gel hand sanitizer (70-80% isopropyl alcohol content), 4,101 gallons of cleaning/disinfectant products, 0.02 gallons of hydrogen peroxide solution, and one pallet of PPE/medical products labeled for Chinle Comprehensive Healthcare Center, plus additional PPE items including disposable face masks, cloth masks, face shields, and protective gowns. The contractor must provide a disposal plan compliant with federal, state, and local regulations; remove and dismantle hand-sanitizer containers, PPE stockpiles, safety signage, wipe dispensers, physical barriers, and chemical disinfectants; collect, package, and label all waste per OSHA and EPA guidelines; dispose of chemical disinfectants as hazardous waste through certified companies; recycle materials such as metal stands and plexiglass when feasible; follow all OSHA safety protocols and use appropriate PPE; and leave the site clean and free of debris. Required deliverables include waste disposal and recycling documentation and a final completion report with photographs. The period of performance is 120 calendar days, with the contractor required to provide a schedule of start and end dates to the BIA prior to commencing work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
Navajo Regional Office Facility Management
Removal and Proper Disposal of Obsolete COVID-19 Sanitation
Materials and/or Equipment, Gamerco Facility, Building 320
Fiscal Year 2026
1. BACKGROUND
During the COVID-19 pandemic (2019–2022), the Navajo Nation requested and received approval to store COVID-19-related supplies, equipment, and materials at the Bureau of
Indian Affairs (BIA) Gamerco Building, Number 320. Despite multiple formal requests for removal, the stored items remain on-site. Many of these materials are now expired and are in violation of applicable safety and environmental regulations. Due to the potential risks associated with continued storage, the BIA Navajo Regional Office (NRO) conducted an inventory assessment in March 2025 to document the condition and quantity of the items. The resulting inventory, including photographic documentation, will be provided to the designated contractor for appropriate handling and disposal in accordance with federal, environmental, and safety compliance standards.
2. OBJECTIVE
The purpose of this project is to safely remove, handle, transport, and dispose of all outdated or unused COVID-19 sanitation equipment, and materials currently located onsite. This includes any types of disinfecting stations, signage, PPE supplies, cleaning chemicals, partitions, and any related hardware installed during the pandemic-response operations.
3. LOCATION
BIA Gamerco Facility is located in Gamerco, New Mexico, along the Highway 491, going towards Ya Ta Hey, New Mexico. Figure 1.1 shows the aerial view of the facilities and the location of the materials/supplies within the building.
Figure 1.1 shows the location of the BIA Gamerco Building
4. INVENTORY INFORMATION
Products Listing found onsite are the following:
• A total of forty-two (42) pallets were identified and inventoried for product type and quantity.
• A total of fourteen thousand, three hundred (14, 300) -gallon poly-totes with 70% isopropyl alcohol are present within the subject structure, totaling an estimated +/-
4,200 gallons of unused product.
• There is an estimated total of 3,600 gallons of liquid or gel hand sanitizer with between 70% to 80% isopropyl alcohol content within the subject structure in various container sizes.
• There is an estimated 4,101 gallons of liquid or liquid-foam cleaning/disinfectant products within the subject structure in various container sizes.
• There is an estimated 0.02 gallons of liquid hydrogen peroxide solution within the subject structure.
• There is one (1) pallet with non-liquid PPE/medical products that is labeled for the
Chinle Comprehensive Healthcare Center.
• There is a small amount of PPE products in select pallets that include disposable, face masks, cloth face masks, face shields, and protective gowns.
5. SCOPE OF WORK
The contractor’s responsibilities:
A. Site Assessment
Provide a disposal plan in accordance with federal, state, and local regulations by utilizing the provided inventory listing.
B. Removal of Equipment and Materials
Contractor shall remove, disconnect, or dismantle the following items, as applicable:
Hand-Sanitizer Containers, PPE Stockpiles (mask, gloves, face shields, gowns, etc.), COVID-19 safety signage and floor decals, if any, sanitizing wipe dispensers, if any, Physical barriers and/or plexiglass partitions, Storage containers, dispensers, or related hardware, if any, and unused/used chemical disinfectants or sanitation products
C. Handling and Disposal Requirements
• Collect, package, and label all waste materials in accordance with OSHA, EPA, and waste-management guidelines.
• Dispose of chemical disinfectants as hazardous or regulated waste to a certified disposal company.
• Recycle materials such as metal stands, plastic containers, ethanol-based products and plexiglass whenever feasible at a reputable recycling/recovery company
• Provide documentation or disposal manifest for all waste streams.
D. Health & Safety
• Follow all site safety protocols and OSHA requirements during removal activities
• Use appropriate PPE while handling chemicals or contaminated materials.
• Ensure sanitation stations, if any containing liquids are properly drained, sealed for proper transport.
E. Site Restoration
• Ensure the site is left clean and free of debris
• Notify the Facility Manager for final inspection upon completion.
6. DELIVERABLES
• Waste Disposal and Recycling documentation
• Final completion report with photos
7. SCHEDULE
Contractor will provide a schedule of start and end date to BIA prior to starting work and will submit a modified schedule if needed. The period of performance will be 120 Calendar days.