SOW.pdf
PDF 3 MB Posted
- Attached to
- LAKE21-1165-BB IRRIGATION AND LANDSCAPE
- Solicitation number
- 140P8121R0012
About this file
This statement of work outlines requirements for a federal contract to replace irrigation systems and maintain landscaping at Lake Mead National Recreation Area housing facilities. The contract involves removing old irrigation components and installing new pressure vacuum breakers, anti-siphon valves, irrigation lines, sprinkler heads, and control boxes at 11 housing units. Additional work includes removing trees and stumps, installing new fencing, concrete work, and landscaping around the units. The performance period is 120 calendar days. The solicitation was issued by the National Park Service Pacific West Region to support maintenance at Lake Mead National Recreation Area.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Release of Claims.pdf | ||
| SF1442 Section A-M.pdf | ||
| B03 Wage Determination.pdf | ||
| Construction Invoice NPS 302 2 Invoice Payment Request.docx | DOCX document | |
| Price Schedule.pdf | ||
| Sol_140P8121R0012.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LAKE 225944 Page 1 of 33
LAKE MEAD NATIONAL RECREATION AREA
BOULDER CITY, NEVADA
Replace Irrigation and Maintain Landscaping in Park Housing Area
(Boulder Beach and Las Vegas Bay)
Contract Requirements
NATIONAL PARK SERVICE
March 15, 2021
LAKE 225944 Page 2 of 33
DIVISION 1 GENERAL REQUIREMENTS
SECTION 01110 SUMMARY OF WORK
1.1 DESCRIPTION
The project is located at Lake Mead National Recreation Area. The locations inside the park are Boulder Beach and Las Vegas Bay Housing Area.
The work covered by this contract consists of, but not limited to;
A. (IRRIGATION SYSTEM: LINES, HEADS, VALVES, TIMERS, AND PVB) Remove and dispose of existing old and outdated irrigation systems and replacing with all new components. This includes removing the irrigation control valves, control boxes, existing backflow devices, irrigation water lines, bubbler heads etc. The old system will need to be remove from the project site and legally dispose of them into a landfill or incinerator outside the park. The new system will be mostly above ground system. (beside the water lines going to each tree/brush) (Example - Pictures #1 and #2 in the specs) to have a better understanding.
1. The new pressure vacuum breaker (PVB) will be brass and will have two shut off valves on the device and union coupling on each end for replacement in the future.
(Picture #1 has an example) This new PVB is a testable device that will need to be tested/check annual by our Utility Branch here at Lake Mead. The PVB will need to be installed 12 inches minimum above the highest sprinkler head/bubbler head in use. This new PVB will need to have a control box over it. The control box will need to removal and secure in a way that the wind does not blow it away.) All pipes before and after the PVB will be insulated for below freezing temperatures.
(ONLY THE PIPES THAT ARE ABOVE GROUND)
2. All new irrigation lines leading out of the control box will be ¾ inch PVC (polyvinyl chloride pipe –color white – “schedule 40”). This includes all the fixing that will be used to connect the lines to together. This new line will need to be trench below the ground surface approximately 5 – 6 inches below grade. The new bubbler heads going to each tree/bush will have a ½ inch plastic riser coming out of the ground. The new riser will need to be approximately 4- 5 inches above the ground surface. The new bubbler heads will need to be adjustable to change the water flow to each tree/bush. (example will be in Picture #4 in the specs)
3. The new irrigation control valves will be above ground valves. (example in picture #1 in the specs) These valves will be above ground anti-siphon valves. Must be installed upright and no valve can be located downstream of the antisiphon valve.
The new anti-siphon must be at least 6 inches above the highest sprinkler/bubbler head. These new valves will need to have a control box over it. The control box will need to removal and secure in a way that the wind does not blow it away.
4. The new irrigation control timer will need to be an exterior timer. This timer will need to have an exterior cover plate to protect the control bottoms and screen from the sun UV rays. (example in picture #3) Contractor may use existing irrigation wire (if present) in the old box to wirer new timer. The outlet that is powering the timer will need to have an exterior outlet cover installed. The existing timer does not have this cover. (example #5 in specs)
*NOTE* All irrigation lines and trenches will be inspected by the Contracting Officer Representative (COR) before any lines, fixing, valves, bubbler heads etc. are cover with dirt material. The new irrigation system will be turn on and inspected by the COR of any leaks that might be present before backfilling. The contractor will need to schedule this walkthrough with the COR.
LAKE 225944 Page 3 of 33
B. (REMOVING TREES AND STUMPS) Removing existing and or dead trees around the housing area includes old stumps. The stumps will need to be removed completely or grind below the ground surface. (approximately 4 to 6 inches below grade) The vegetation and debris will need to be remove from the project site and legally dispose of them into a landfill or incinerator outside the park.
Contractor will use dirt material around the work area to back fill the hole to level ground.
C. (NEW CONCRETE PATIO) Removing old brick patio surface/sidewalk and install a new concrete patio and sidewalk. The concrete will be a brush finished patio. The new patio be sloped away from the housing foundation for drainage. The old bricks will need to be remove from the project site and legally dispose of them into a landfill or incinerator outside the park. The new concrete pad will be the same dimensions/measurements of the existing brick patio that is there now.
D. (REPAIRING/REPLACING FENCE) Replacing old chain link fence, poles, and the fence doors that are broken and or damage. Many of the fences in the housing area are broken, rusted though, not in line anymore. Doors are not closing properly due to the above. The existing fence is approximately 4 feet high.
E. (NEW LANDSCAPING MATERIAL) Removing old landscape materials (dirt and rocks approximately
¼ inch in size or smaller) and installing new landscape material. Only about 3-4 inches from the ground surface needs to be removed. New material will be 3/8 minus dirt material. (gold in color.
Match what existing color at Quarters #407 and Quarters #408) Weed barrier fabric will be installed before new dirt material is installed. New material will need to be at least 2 inches deep. The new landscape dirt will be slope/graded away from the housing foundation. The old material will need to be haul outside the park or can be used to help with the sloping around each of the houses before the new material is installed. Once the new 3/8 minus dirt materials is installed it will need to wet down with water and a plate compacter machine will be used to compact the new material together. Contractor may use the water spigots at each of the houses for the water supply. Each existing tree(s) will have a moat around the whole base of the tree. Contractor will have to remove any weeds, brushes, or vegetation that "may” grow from the schedule site visit to when the contractor receives the notice to proceed from the Contracting Officer.
F. (COMPACTING EXISTING YARD MATERIAL) Compacted existing yard material (3/8 minus) with compactor plate machine. The dirt material will need to be wet down with water before the machine is used. Contractor may use the water spigots at each of the houses for the water supply.
1.1A WORK TO BE DONE PER LOCATION
A. Quarters #402
1. Remove x2 old stumps. (approx. 20 inch and 16 inch in diameter)
2. Remove x3 big trees and their stumps (backyard)
3. Remove old irrigation system and dispose of it.
4. Install new irrigation system. Included new pressure vacuum breaker (PVB), new anti-siphon valves, irrigation lines, new sprinkler heads/bubblers, and x2 new control boxes (one over the anti-siphon valve and one over the PVB)
5. Install new control timer and outlet cover
6. Install weed barrier fabric and new 3/8 minus dirt material around the whole house.
Approximately 26 feet in front yard, approximately 20 feet in the back yard, approximately 40 feet on right side of house, and approximately 30 feet on left side of house. (Please see drawing below) Removing old landscape materials (dirt and rocks approximately ¼ inch in size or smaller) and installing new landscape material. Only about 3-4 inches from the ground surface needs to be removed.
New material will need to be wet down with water and a plate compacter machine will be used to compact the new material together.
LAKE 225944 Page 4 of 33
B. Quarters #403
1. Remove x2 old stumps. (Approx. 6 inches and 10 inches in diameter)
2. Remove old irrigation system and dispose of it.
3. Install new irrigation system. Included new pressure vacuum breaker (PVB), new anti-siphon valves, irrigation lines, new sprinkler heads/bubblers, and x2 new control boxes (one over the anti-siphon valves and one over the PVB.
4. Install new control timer and outlet cover
5. Install weed barrier fabric and new 3/8 minus dirt material around the whole house.
Approximately 40 feet in front yard, approximately 30 feet in the back yard, approximately 30 feet on right side of house, and approximately 25 feet on left side of house. (Please see drawing below) Removing old landscape materials (dirt and rocks approximately ¼ inch in size or smaller) and installing new landscape material. Only about 3-4 inches from the ground surface needs to be removed.
New material will need to be wet down with water and a plate compacter machine will be used to compact the new material together
C. Quarters #404
1. Remove x1 old stumps. (Approx. 10 inches in diameter)
2. Remove old irrigation system and dispose of it.
3. Install new irrigation system. Included new pressure vacuum breaker (PVB), new anti-siphon valves, irrigation lines, new sprinkler heads/bubblers, and x2 new control boxes (one over the anti-siphon valve and one over the PVB)
4. Install new control timer and outlet cover
5. Install weed barrier fabric and new 3/8 minus dirt material around the whole house.
Approximately 40 feet in front yard, approximately 18 feet in the back yard, approximately 29 feet on right side of house, and approximately 18 feet on left side of house. (Please see drawing below) Removing old landscape materials (dirt and rocks approximately ¼ inch in size or smaller) and installing new landscape material. Only about 3-4 inches from the ground surface needs to be removed.
New material will need to be wet down with water and a plate compacter machine will be used to compact the new material together.
6. Dug and reset the control box on the existing water shut off system. (Just past the water meter) The box is completely cover with dirt material
D. Quarters #405
1. Remove x5 old stumps. (Approx. 17 inches, 13 inches, 12 inches, 10 inches, 12 inches in diameter)
2. Remove old irrigation system and dispose of it.
3. Install new irrigation system. Included new pressure vacuum breaker (PVB), new anti-siphon valves, irrigation lines, new sprinkler heads/bubblers, and x2 new control boxes (one over the anti-siphon valve and one over the PVB)
4. Install new control timer and outlet cover
5. Install weed barrier fabric and new 3/8 minus dirt material around the whole house.
Approximately 39 feet in front yard, approximately 24 feet in the back yard, approximately 36 feet on right side of house, and approximately 21 feet on left side of house. (Please see drawing below) Removing old landscape materials (dirt and rocks approximately ¼ inch in size or smaller) and installing new landscape material. Only about 3-4 inches from the ground surface needs to be removed.
New material will need to be wet down with water and a plate compacter machine will be used to compact the new material together.
6. Remove and disposal old garden in the backyard. (See picture below)
7. Dug and reset the control box on the existing water shut off system. (Just past the water meter) The box is completely cover with dirt material.
E. Quarters #406
1. Remove x2 old stumps. (Approx. 8 inches and 10 inches in diameter)
2. Remove old irrigation system and dispose of it.
LAKE 225944 Page 5 of 33
3. Install new irrigation system. Included new pressure vacuum breaker (PVB), new anti-siphon valves, irrigation lines, new sprinkler heads/bubblers, and x2 new control boxes (one over the anti-siphon valve and one over the PVB)
4. Install new control timer and outlet cover
5. Install weed barrier fabric and new 3/8 minus dirt material around the whole house.
Approximately 30 feet in front yard, approximately 18 feet in the back yard, approximately 21 feet on right side of house, and approximately 35 feet on left side of house. (Please see drawing below) Removing old landscape materials (dirt and rocks approximately ¼ inch in size or smaller) and installing new landscape material. Only about 3-4 inches from the ground surface needs to be removed.
New material will need to be wet down with water and a plate compacter machine will be used to compact the new material together
F. Big Island in Boulder Beach Housing Area
1. Remove old irrigation below ground control valves and the existing PVB and dispose of it.
2. Install new irrigation system. Included new pressure vacuum breaker (PVB), new anti-siphon valves (x2), x1 new control box (over the new anti-siphon valves)
3. Install new control timer. (No drawing or layout to show for the area. The control timer for this location is on the exterior of the garage of quarters #406.) *Contractor may use existing wirer due that it’s under the street.
G. Quarters #407
1. Compacted existing yard material (3/8 minus) with compactor plate machine. The dirt material will need to be wet down with water before the machine is used.
Contractor may use the water spigots at each of the houses for the water supply.
2. Install new control timer and outlet cover. This house does not have existing control timer or wirer. Contractor will need to add wire to the timer. The new timer will be located under the shade structures between the house and the storage unit.
H. Quarters #408
1. Compacted existing yard material (3/8 minus) with compactor plate machine. The dirt material will need to be wet down with water before the machine is used.
Contractor may use the water spigots at each of the houses for the water supply.
2. Remove old PVB and install a new PVB. Will need to have a new control box over it.
3. Install new control timer and outlet cover. Existing timer is located in the water heater storage room. Contractor can use existing wirer.
I. Quarters #409
1. Remove x3 old stumps. (Approx. 64 inches, 6 inches, 8 inches and 33 inches in diameter)
2. Remove x2 dead trees and their stumps. (front of house)
3. Remove x10 dead brushes/trees (left side of house) including the approx. 57 linear feet of existing irrigation line.
4. Trim x1 limb hanging over carport structure of the house.
5. Repair fence (left side of the house), replace the man gate door in the backyard
(leading toward the lake), and replace the vehicle gate door leading to the front yard. (right and left supporting poles need to be replace. (approx. 35 linear feet)
6. Remove old irrigation system and dispose of it. (Inside and outside the fence)
7. Install new irrigation system which will be relocated near/next to the existing water meter control box. Included new pressure vacuum breaker (PVB), new anti-siphon valves, irrigation lines, new sprinkler heads/bubblers, and x2 new control boxes (one over the anti-siphon valve and one over the PVB)
8. Install new control timer and outlet cover. This house does not have existing control timer or wirer. Contractor will need to add wire to the timer. The new timer will be located in the carport. (where existing timer was in the past)
LAKE 225944 Page 6 of 33
9. Removing old brick patio surface and sidewalk located in the backyard and install a new concrete patio. Within the same square footage. x2 sidewalks (Approx. 13ft x 5ft) and x1 patio pad (Approx. 18ft x 15ft)
10. Remove all debris (leaf’s and vegetation out of the backyard that is stack up against the fence line)
J. Quarters #411
1. Remove old irrigation system and dispose of it. (Inside and outside the fence)
2. Install new irrigation system which will be relocated near/next to the existing water meter control box. Included new pressure vacuum breaker (PVB), new anti-siphon valves, irrigation lines, new sprinkler heads/bubblers, and x2 new control boxes (one over the anti-siphon valve and one over the PVB)
3. Remove x4 old stumps. (approx. 47 inches, 27 inches, 34 inches, and 30 inches diameter) – front and backyard
4. Install new control timer and outlet cover. Contractor will need to add wire to the timer due that the irrigation system is being relocated to the other side of the house. The existing timer is located in the carport.
5. Removing old brick patio surface and sidewalk located in the backyard and install a new concrete patio. Within the same square footage. x2 sidewalks (Approx. 10ft x 5ft) and x1 patio pad (Approx. 18ft x 15ft)
6. Repair fence line (left side of the house – approx. 35 linear fee), replace the man gate door in the backyard (leading toward the lake), and replace the vehicle gate door leading to the front yard, and replace man gate door on left side of house next to carport.
7. Trim x4 limb hanging over carport structure of the house and one limb handing over housing unit # 410)
8. Remove x4 dead trees and their stumps. (front of house)
K. Option Line #1 Quarters #501
1. Remove old irrigation system and dispose of it.
2. Install new irrigation system which will be located near/next to the existing water meter control box. Included new pressure vacuum breaker (PVB), new anti-siphon valves, irrigation lines, new sprinkler heads/bubblers, and x2 new control boxes (one over the anti-siphon valve and one over the PVB)
3. Remove x2 tall palm trees and their stumps (outside the fence)
4. Install new control timer and outlet cover. Contractor will need to add wire to the timer due that the irrigation system is being relocated to the other side of the house. The existing timer is located in the carport
5. Repair fence. replace the vehicle gate door in the backyard leading toward the front of the house, (Opening approx.10ft 3inch). x6 fences poles need to be replaced completely due to rust and no long in tac.
6.
L. Option Line #2 Big Island in Boulder Beach Housing Area
1. Remove x1 palm trees and its stump. (approx. 33 inches in diameter and 12 foot in height)
2. Remove x3 old stumps. (Approx. 19 inches, 25 inches, and 23 inches in diameter)
M. Option Line #3 Big Island in Boulder Beach Housing Area
1. Install weed barrier fabric and new 3/8 minus dirt material around the whole house.
(Approx. 10,408 sq ft) Removing old landscape materials (dirt and rocks approximately ¼ inch in size or smaller) and installing new landscape material.
Only about 3-4 inches from the ground surface needs to be removed. New material will need to be wet down with water and a plate compacter machine will be used to compact the new material together. *Contractors responsibility on any damage to existing irrigation water lines.
LAKE 225944 Page 7 of 33
2. Contractor will remove all “Brittlebush” off the island before the new materials is installed.
1.2 LOCATION
Las Vegas Bay and Boulder Beach Housing area. Below are the Lat/Long of each of the areas. (Best to copy and paste this into google)
A. Boulder Beach Housing Area: 36.044629, -114.814147
1. Quarters #402
2. Quarters #403
3. Quarters #404
4. Quarters #405
5. Quarters #406
6. Quarters #407
7. Quarters #408
8. Quarters #409
9. Quarters #410
10. Quarters #411
11. Big Island in Housing Area
B. Las Vegas Bay Housing Area: 36.118388, -114.870579
1. Quarters #501
1.3 PERFORMANCE PERIOD: The project schedule is based on calendar days from the period of performance (POP) start date.
The total performance period for this project is 120 calendar days.
1.4 FIELD VERIFICATION
A. The Contractor shall field verify all existing conditions affecting the work in this contract before ordering any materials, equipment or parts. The scheduling of field verification site visits shall be coordinated with the COR. *(Note that these measurements are estimates only. It is the contractor’s responsibility to ensure the accuracy of their measurements)
1.5 CONTRACTOR'S USE OF PREMISES
A. Contractor shall at all times conduct his operations to ensure the least inconvenience to our park tenants which are employees that work at Lake Mead National Recreation Area.
B. Preservation of Natural Features: Confine all operations to work limits of the project. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
C. Existing Utilities: Notify Contracting Officer and utility companies of proposed locations and times for interruption of existing utility service, if appropriate.
1. Contractor shall be responsible for locating and preventing damage to known utilities before starting any work or digging. If damage occurs, repair of the utility at no additional expense to the Government.
LAKE 225944 Page 8 of 33
D. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials according to the Department of Transportation.
E. Work Limits: The Contractor shall be confined to conduct his work to job site area and work limits as shown on drawings or approved by the Contracting Officer. Contractor shall be responsible to pay for rehabilitation work for any resource damage outside authorized work limits.
F. Care shall be taken to ensure that fuel, oil and other spills do not occur. If spills occur, cleanup will be completed at no additional expense to the Government.
1.6 DESIGNATED OFFICIALS
A. The NPS Contracting Officer's Representative (COR)/Inspector will be:
Bret Satowski, Housing Officer, Lake Mead NRA Telephone: 702-305-7267 E-mail: bret_satowski@nps.gov
B. The Contracting Officer (CO) will be: TBD
Telephone:
E-mail: @nps.gov
1.7 TIME OF CONDUCTING WORK
A. All work will be completed during the hours of 7:00 AM to 5:00 PM local time (Monday – Friday) due to the tenants that are living in the housing area. If the time needs to be changed the contractor will need to get approval from the Lake Mead Housing Program Manager and the Contraction Officer.
1.8 WORK/CONSTRUCTION SCHEDULE
A. The Contractor shall provide a work/construction schedule to the Contractor Officer Representative (COR) and the Contractor Officer (CO) before any work begins. This will give the tenants a heads up on when work is to begin around their house.
1.9 CLEANING JOB AFTER COMPLETED
A. All driveway, sidewalks, roads, patios, and or porches will be brushed off and/or power washed before leaving the job site.
END OF SECTION 01010
SECTION 01170 ACCIDENT PREVENTION
A. The work of this section consists of establishing an effective accident prevention program and providing a safe environment for all personnel and visitors.
B. The Contractor shall be responsible for establishing an effective accident prevention program that accounts for all phases of the work and the methods to ensure property protection and safety of the public, National Park Service personnel, and Contractor's employees.
LAKE 225944 Page 9 of 33
1.2 QUALITY ASSURANCE
A. Qualifications of Employees
1. Contractor shall ensure that employees are physically qualified to perform their assigned duties in a safe manner.
2. Contractor shall not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.
3. Coordination procedures. Contractor shall ensure that operators of vehicles, mobile equipment, hoisting equipment, and hazardous plant equipment shall be able to understand signs, signals, and operating instructions, and be capable of operating such equipment safely.
1.3 ACCIDENT REPORTING
A. Reportable Accidents: A reportable accident is defined as death, occupational disease, traumatic injury to employees or the public, property damage by accident in excess of $100, and fires. Within 7 days of a reportable accident, fill out and forward to the Contracting Officer a DI 134 form, which may be obtained from the Contracting Officer.
B. All Other Accidents: The Contractor shall report all other accidents to the Contracting Officer as soon as possible and assist the Contracting Officer and other officials as required in the investigation of the accident.
C. FIRST AID FACILITIES: Provide adequate facilities for the number of employees and the type of work being performed at the site.
D. PERSONNEL PROTECTIVE EQUIPMENT: Meet requirements of NIOSH and MSHA, where applicable, as well as ANSI.
1.5 EXECUTION
A. EMERGENCY INSTRUCTIONS: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.
B. Protective equipment
1. Contractor shall ensure that personal protective equipment is maintained in a serviceable condition.
2. Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation.
C. Hard hats and protective equipment areas
1. Hard hats shall be worn at all times in locations and conditions as required by OSHA.
2. It is the Contractor's responsibility to require all those working on or visiting the site to wear appropriate protective equipment at all times as required by OSHA.
D. Training
1. First Aid: Provide adequate training to ensure prompt and efficient first aid.
LAKE 225944 Page 10 of 33
2. Hazardous Material: Train and instruct each employee exposed to hazardous material in safe and approved methods of handling and storage. Hazardous materials are defined as explosive, flammable, poisonous, corrosive, oxidizing, irritating, or otherwise harmful substances that could cause death or injury.
END OF SECTION 01310
SECTION 01310 PROJECT MANAGEMENT AND COORDINATION
1.1 SUMMARY
A. This Section includes administrative provisions for coordinating operations on this project including, but not limited to the following:
1. Supervisory and administrative personnel.
2. Project meetings.
3. Coordination procedures.
1.2 SUPERVISORY AND ADMINISTRATIVE PERSONNEL
A. General: In addition to the project superintendent, the Contractor shall provide other supervisory and administrative personnel as required for proper work performance. This may include special personnel required for coordination of operations with subcontractors and material suppliers.
1.3 PROJECT MEETINGS
A. Submittals required prior to the Pre-performance meeting.
1. Letter designating the Project Superintendent.
2. Proposed work schedule.
3. Satisfactory evidence of liability insurance coverage and workman’s compensation for the Contactor.
4. Waste and recycling plan.
B. Pre-construction meeting: Once the contract is awarded, an initial orientation meeting will be scheduled for a time and date that is agreeable to the Government and Contractor and will be conducted over the phone.
Lake Mead personnel and Contracting Officer will be present to go over any specific requirements of the project with the Contractor and the Contractor’s supervisory and administrative team.
1. Agenda: Items to be discussed will include but not be limited to:
1. Park Rules and Regulations.
2. General correspondence procedures.
3. Payments to the Contractor.
4. Acceptance/rejection of work.
5. Subcontractors.
LAKE 225944 Page 11 of 33
6. Documents required under contract.
7. Local emergency phone number.
2. Once the start date has been established, the Contractor shall submit the proposed work schedule to the Government for approval.
1.5 PAYMENTS
A. All payments will be submitted online (IPP system)
END OF SECTION 01310
SECTION 01330 SUBMITTALS
A. The intent of this section is to explain submittal requirements before and during construction.
B. This section also includes the requirements for properly handling "Substitutions" and "Comparable Products" the Contractor submits as being "equal" to the product that has been specified.
C. The contractor will submit submittals to the COR for review on the Pressure Vacuum Breaker (PVB) and the anti-siphon valves.
1.2 MODIFFICATIONS
A. Any changes to this contract shall be in writing in accordance with FAR clause 52.212-4(c), Contract Terms and Conditions. The contractor should notify the Contracting Officer immediately.
SECTION 01570 TEMPORARY CONTROLS
A. This Section includes administrative and procedural requirements for providing temporary controls.
1.2 HOUSEKEEPING
A. Keep project site neat, orderly, and in a safe condition at all times.
B. Provide enough containers for collecting debris and materials to be recycled.
C. Keep volatile wastes in covered containers.
1.3 DISPOSAL
A. Unless otherwise specified, all removed material becomes the property of the Contractor and shall be disposed of outside the park.
B. Immediately remove hazardous rubbish from project site. Remove all debris from project site and legally dispose of them into a landfill or incinerator, private dumping areas outside the park. Do not burn or bury refuse inside the park.
LAKE 225944 Page 12 of 33
1.4 FIRE PROTECTION EQUIPMENT
A. Extinguisher shall have a minimum UL rating of 2-A: 10-B: C. (Should be on the job site at all times)
1.5 AIR AND WATER POLLUTION CONTROL
A. Take all necessary reasonable measures to reduce air and water pollution by any material or equipment used during construction.
B. Do not dispose of volatile wastes or oils in storm or sanitary drains.
C. Do not allow waste materials to be washed into streams or bodies of water.
1.6 WATER/RESTROOMS
A. Potable water is available on site. Make connections to existing facilities as needed. Facilities must be cleaned and maintained in a condition acceptable to the NPS.
C. Toilets: Restrooms are not available onsite. Contractors use the restroom facilities at the campground or picnic area which is not near the work site. Contractor may bring portable/mobile restroom on the work site. It’s the contractors responsible to maintain/clean their own restroom. Once work is complete, the contractor has 3 business to remove the unit off the job site and out of the park.
TRAFFIC CONTROLS
A. Traffic Controls: Erect and maintain barricades, lights, danger signals, and warning signs as required for a safe work area.
1. Protect existing site improvements, such as curbs, sidewalks, pavement, and utilities.
2. Maintain access for fire-fighting equipment and access to fire hydrants.
3. Illuminate barricades and obstructions at night.
4. Protect pedestrian traffic when needed.
5. Install Barrier Tape where directed by Contracting Officer.
6. Fence, barricade, or otherwise block off the immediate work area to prevent unauthorized entry.
B. Perform work in a manner that assures the safety and convenience of the public and protects the workers and property adjacent to the project.
1.8 SECURITY AND PROTECTION FACILITIES INSTALLATION
A. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
B. Cleaning of Equipment: The Contractor shall ensure that prior to moving on to the Project Area, all equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure that all equipment has been pressure washed and is free of exotic species prior to start-up of operations and moving of equipment to Project Area. Equipment shall be considered free of soil, seeds, and other debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools are not required.
C. If equipment is used, it will need to be inspected by ONE of the following Individuals. Please contact them to set up appointment before bringing equipment on the job site.
1. Kelley Wallace: Kelly_Wallace@nps.gov; (702) 293-8662 (Biologist)
LAKE 225944 Page 13 of 33
2. Clayton Merrill: Clayton_Merrill@nps.gov: (702) 293-8650 (Biological Science Technician)
3. Carrie Norman: Carrie_Norman@nps.gov: (702) 293-8734 (Biologist)
4. Bryan Moore: Bryan_Moore@nps.gov: (702)-249-6181 (Biologist)
END OF SECTION 01570
Specs.
Picture #1
Picture #2
Picture #3
Picture #4
Picture #5
PICTURES OF EACH OF THE HOUSING AREA
Quarters #402
Quarters#403
Quarters 404
Quarters 405
Quarters 406
Big Island in Boulder Beach Housing Area
Quarters# 407
Quarters #408
Quarters # 409
Quarters #411
Quarters #501
File details come from the government source that posted it. Updated .