About this file
This Scope of Work document is issued by the Finger Lakes Developmental Disabilities Services Office (DDSO) under the New York State Office for People with Developmental Disabilities (OPWDD) for an ITO Temporary Egress project at the MDC IRA facility located at 620 Westfall Rd, Rochester, NY 14620. The project requires vendors to complete temporary egress work at the specified facility. A mandatory site visit is scheduled for Thursday, September 3, 2026, at 10:30 a.m., and vendors must attend in their entirety to verify knowledge of the work area prior to bid submission. Bids will not be accepted from vendors who do not attend the site visit or who arrive late. Vendors may request a bid invitation by submitting a written request on company letterhead referencing the project title and location, including a current email address and/or fax number, to Amy Gordillo-Torres at 585-461-8811 or FL.Purchasing@opwdd.ny.gov.
This is a New York State public works project requiring prevailing wage payment. All bidders must provide a valid New York State Department of Labor (NYSDOL) registration number and submit their Certificate of Registration with their bid submission; failure to provide these documents will result in bid disqualification. Prospective bidders are advised to register with NYSDOL promptly, as the registration review and certificate issuance process typically requires approximately three to four weeks. Advance notification of site visit attendance is not required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ.pdf | ||
| ITO Plans of Exits to have temp stone egress paths_for AFC 070126.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SCOPE
DESCRIPTION:
The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 30 days of award, unless modified below. This is a NYS Public Works project, and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned and all materials secured at the end of each workday. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of the Temporary Egress Stone Project, before removal of equipment, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent.
SCOPE OF WORK includes, but is not necessarily limited to the following:
All work to follow design set forward from NYS OPWDD Capitol Services.
1. Contractor to provide ½” Aggregate Base Coarse (Crush N Run) up to a 5” stone depth.
2. Contractor to apply 5” depth stone over reinforced geotextile fabric on finished grade elevation, ensuring a 5-foot path width.
3. Contractor will ensure 1/10 compact stone ramp at all exit doors.
4. After all stone is laid, mechanical tamping of all walkways will be conducted with all approved grades to be maintained.
GENERAL REQUIREMENTS:
1. Bid price is to include all materials, labor, disposal of materials fees and site clean-up.
Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor.
2. Work is to be done between the hours of 7:00am and 3:30pm, Monday through Friday.
Contractor advised that this is an active work zone and other contractors may be near or around work areas.
3. All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each workday.
4. Any unforeseen conditions that may alter the established price are to be reported to the Plant Superintendent listed above immediately upon discovery.
Facility:
Fingerlakes DDSO ITO
Facility Address:
620 West Fall Road, Rochester, NY 14620
Point of Contact:
Jeremy Bovenzi
Contact Phone Number:
(585)445-4192
Project Title:
ITO Temp Egress Pathways
Summary of Work:
Stone and tamped walkways
5. Smoking is prohibited by contractors at all residential and program sites owned by
OPWDD.
6. Prior to the commencement of the work, there shall be a meeting with FLDDSO Operations and Maintenance staff to discuss specific safety requirements needed to be adhered to during the work period.
7. Safety Data Sheets as applicable will be provided to the Plant Superintendent prior to the start of work and a copy maintained at the property.
8. All applicable environmental testing associated with this work will be provided to the contractor prior to start of work.
SITE VISIT
A site visit (Is) mandatory. The site visit date is scheduled for TBD at the project site.
A. Lawn Damage/Property Damage If the delivery of materials or any other work necessitates the contractor, his suppliers, or sub-contractors driving on the lawn for ANY reason, the contractor shall be held responsible for the repair of the lawn.
Personal vehicles are not to be parked on the grass.
Any property damage caused by work performed is to be corrected to the condition existing prior to start of the job.
B. Continuity of Work/Communication/Scheduling
Once the job has begun, it is to be worked on continuously until completed.
If there are any delays, even if due to inclement weather, a Work Control Representative
MUST be contacted.
Work must be completed within 30 days of receiving the purchase order.
C. House Safety The residence will be occupied during the job.
The contractor must take all reasonable care to safeguard the residents and the staff.
The contractor shall ensure all tools, materials and other items are picked up, removed or stored and are safely secured at the end of each workday.
Any ladders, scaffolding or lifts used in conjunction with this job are to be stored to the satisfaction of the House Director at the end of the day.
The work as indicated above shall be scheduled as not to interfered with other functions of the residence. All work performed as part of this job is to be coordinated with the House Director and Plant Superintendent listed above.