DDEPARTMENT OF THE AIR FORCE

AIR FORCE RESEARCH LABORATORY

EGLIN AIR FORCE BASE FLORIDA

MEMORANDUM FOR: AFTC/PZIOA

FROM: AFRL/RWC

SUBJECT: ACS Statement of Work for AFRL Project F1TBAU0141A001 AFRL/RWC 4th Floor Renovation

1. This memorandum provides the Statement of Work (SOW) for the installation of Lenel access control systems (ACS) within the renovated space of Building 13/13A.

2. Scope of Work: AFRL/RWC is doing facility renovations to meet current security standards ICD-705 and will need to have Lenel access control systems updated. This will include four (1 updated with newer equipment, and 3 new systems) standalone Lenel systems.

a. Phase 1: Provide equipment and installation of Lenel systems supporting renovation of Rooms 389B, 480, and 487.

i. Room 389B:

One (1) LNL-2220 intelligent two door controller including all required power supplies Two (2) back up batteries Outer Mantrap Door- Proximity Card Reader- HES 1006 Electrified Mortise Strike

Inner Mantrap Door- Keypad Card Reader- HES 1006 Electrified Mortise Strike Provide and install a new, stand alone, Dell Precision workstation in Room 389B Provide Lenel software suite including all required 32ES licensing Program Lenel software to accept new controller and door configurations Test full system functionality Provide system training with the Lenel access control software Provide final system configuration and testing documentation

ii. Room 487:

One (1) LNL-2220 intelligent two door controller Three (3) LNL-1320 dual reader controllers Two (2) 6A power supplies Four (4) back up batteries

iii. Install an HID, PIV class card reader in each of the following locations including electrified locking hardware and all required cabling back to the controller:

Room 487C Outer Mantrap Door- Proximity Card Reader- HES 1006 Electrified Mortise Strike

Room 487A Open Office Entry Door- Keypad Card Reader- HES 1006 Electrified Mortise Strike

Room 487B Open Office Entry Door- Keypad Card Reader- HES 1006 Electrified Mortise Strike

Stairwell 401 Door- Keypad Card Reader- HES 9600 Electrified Rim Strike Room 480A Outer Mantrap Door- Proximity Card Reader- HES 1006 Electrified Mortise Strike

10 August 2020

Room 480B Office Entry Door- Keypad Card Reader- HES 1006 Electrified Mortise Strike

Room 480C Office Entry Door- Keypad Card Reader- HES 1006 Electrified Mortise Strike

Room 480E Entry Door- Keypad Card Reader- HES 1006 Electrified Mortise Strike

iv. Other provisions/installation requirements:

Provide and install a new, stand alone, Dell Precision workstation within room 487B Provide Lenel software suite including all required 32ES licensing Program Lenel software to accept the new controllers and door configurations Test full system functionality Provide system training with the Lenel access control software Provide final system configuration and testing documentation

b. Phase 2: Provide equipment and installation of Lenel systems supporting renovation of Rooms 483, 485, and 486.

i. Room 486a:

One (1) LNL-2220 intelligent two door controller including all required power supplies Two (2) back up batteries Room 486A Entry Door- Keypad Card Reader- HES 1006 Electrified Mortise Strike Provide and install a new, stand alone, Dell Precision workstation within room 486A Provide Lenel software suite including all required 32ES licensing Program Lenel software to accept the new controller and door configurations Test full system functionality Provide system training with the Lenel access control software Provide final system configuration and testing documentation

ii. Room 486c:

One (1) LNL-2220 intelligent two door controller including all required power supplies Two (2) back up batteries Room 486C Entry Door- Keypad Card Reader- HES 1006 Electrified Mortise Strike Provide and install a new, stand alone, Dell Precision workstation within room 486A Provide Lenel software suite including all required 32ES licensing Program Lenel software to accept the new controller and door configurations Test full system functionality Provide system training with the Lenel access control software Provide final system configuration and testing documentation

iii. Room 486d:

One (1) LNL-2220 intelligent two door controller including all required power supplies Three (3) LNL-1320 dual reader controllers Two (2) 6A power supplies Four (4) back up batteries

iv. Install an HID, PIV class card reader in each of the following locations including electrified locking hardware and all required cabling back to the controller:

Room 486D Outer Mantrap Door- Proximity Card Reader- HES 1006 Electrified

Room 486B Open Office Entry Door- Keypad Card Reader- HES 1006 Electrified

Room 483A Outer Mantrap Door- Proximity Card Reader- HES 9600 Electrified Rim Strike

Room 483C Office Entry Door- Keypad Card Reader- HES 9600 Electrified Rim Strike Room 483B Office Entry Door- Keypad Card Reader- HES 9600 Electrified Rim Strike Room 483D Entry Door- Keypad Card Reader- HES 1006 Electrified Mortise Strike Room 485 VTC Entry Door- Keypad Card Reader- HES 9600 Electrified Rim Strike West Corridor Entry Doors- Keypad Card Reader- Von Duprin Panic Bar Retro Kit Provide communications cabling from the Lenel controller in 486D to the Lenel enclosure in room 487C as well as four port switch Program the Lenel software in room 487B to accept the new controllers and door configurations from the 486, 483, and 485 areas Test full system functionality Provide final system configuration and testing documentation

3. Terms and Conditions:

a. Installation will be completed and fully functional by contract award date plus 12 months unless government delays prevent completion by this date.

b. Payment Terms: NET 30 after system is 100% tested and accepted by the government.

Attachment:

1. Building Schematics