Q1: The SOW currently requests for standalone systems. Please clarify if it will be standalone or if it will be centralized to the box on the fourth floor. How will the network be provided to each room?

A: Each system will be independent for the standalone systems.

Q2: Who will run the conduit? Will the conduit be already installed? Should we quote as if there is existing cable, piping, and wire or do these need to be included in the SOW?

A: Conduit will be supplied by our current Contractor. The cabling will not.

Q3: HES‐1006, do you want them to be fail safe or fail secure? This will need to be picked in advance.

A: Please provide clarity on Fail Safe and Fail Secure.

Q4: The POP is 12 months. If this is phased, can we invoice for after completion of each phase and one invoice for equipment?

A: The equipment orders can be on (1) invoice. The Contractor can invoice after each standalone systems is independently installed and testing is completed i.e. there are (4) standalone systems to install so a total of (4) different invoices.

Q5: Will all the door frames for all the rooms be replaced? If not, will the existing strikes be used or do you want us to replace it with a new, like‐model? If so, what model(s) are installed on the doors?

A: Yes, we are getting new doors and frames.

Q6: Will anything be tied to Advantor Intrusion Detection System?

A: No

Q7: Will the readers be installed in the existing cutouts or will new cutouts need to be made?

A: The card readers will be surfaced mounted.

Rev. 21 August 2020