SOW Attachment 5 TRN.xlsx

XLSX spreadsheet 155 KB Posted

Attached to
Next Generation Credential Authentication Technology (CAT2) Federal contract opportunity
Solicitation number
70T04022R7672N007
Issued by
Department of Homeland Security Transportation Security Administration

About this file

This document provides instructions for submitting Test Readiness Requests (TRNs) to the Transportation Security Administration (TSA) regarding security screening equipment testing. TRNs must be submitted using the template provided at least seven business days before the requested test date. Required documents to submit include a completed TRN form, test procedures, a CIL worksheet, and any other necessary documents. The TRN will be reviewed by TSA for accuracy and added to the testing schedule. Contact information is provided for questions.

The second document is a Request for Proposal (RFP) from the TSA to provide Next Generation Credential Authentication Technology (CAT2) systems, design, manufacturing, testing, maintenance, installation, program management, training, engineering support, delivery, and logistics services. Responses for access to pre-award sensitive security information are due September 1, 2022. Questions regarding the RFP are due September 9, 2022. Phase 1 proposals must be submitted by September 30, 2022. The NAICS code is 334511 with a small business size standard of 1,250 employees.

View the file

Other files for this federal contract opportunity

Other files attached to Next Generation Credential Authentication Technology (CAT2), newest first.
File Type Posted
Amendment 0005 70T04022R7672N007 SF30.pdf PDF
RFP 70T04022R7672N007 Attachment 01 Amendment 0005.pdf PDF
Amendment 0004 70T04022R7672N007 SF30.pdf PDF
RFP 70T04022R7672N007 Attachment 01 Amendment 0004.pdf PDF
RFP 70T04022R7672N007 Attachment 02 Amendment 0003.pdf PDF
Amendment 0003 Attachment E - Labor Categories and Qualifications.pdf PDF
Amendment 0003 SOW Attachment 8B Sensitive Systems Policy Directive.pdf PDF
Amendment 0003 SOW Attachment 8C Information Technology Security.pdf PDF
Amendment 0003 Attachment B - Price Evaluation Template.xlsx XLSX spreadsheet
Amendment 0003 70T04022R7672N007 SF30.pdf PDF
70T04022R7672N007 Questions and Answers Attachment 01 Amendment 0003.pdf PDF
Amendment 0003 SOW Attachment 8a -DHS 4300A ITSSP SS Policy Directive.pdf PDF
Amendment 0003 Attachment A - Self-Certification Matrix.xlsx XLSX spreadsheet
Amendment 0003 SOW Attachment 17 TSA APL 2022.pdf PDF
RFP 70T04022R7672N007_Attachment 01_Amendment 0002.pdf PDF
Amendment 0002 70T04022R7672N007 SF30.pdf PDF
Amendment 0001 70T04022R7672N007 SF30.pdf PDF
RFP 70T04022R7672N007_Attachment 01_Amendment 0001.pdf PDF
SOW Attachment 13 GPM ISOP VS 2.pdf PDF
Attachment C - Subcontracting Plan Template.pdf PDF
SOW Attachment 15 DHS Minimum Standards for Drivers Licenses and Identification Cards.pdf PDF
REQUEST FOR PROPOSAL 70T04022R7672N007.pdf PDF
Attachment D - Non-Disclosure Agreement.pdf PDF
Attachment E - Labor Categories and Qualifications.pdf PDF
Attachment A - Self-Certification Matrix.xlsx XLSX spreadsheet
Attachment B - Price Evaluation Template.xlsx XLSX spreadsheet
SOW Attachment 10 Contractor Shipping and Receiving Report.pdf PDF
SOW Attachment 11 - Contractor Shipping and Receiving Report Extension.pdf PDF
SOW Attachment 14 The Real ID Act of 2005.pdf PDF
SOW Attachment 16 AAMVA DL ID Standards.pdf PDF
SOW Attachment 6 TSA RMA Metrics Terms and Definitions.pdf PDF
SOW Attachment 6a SLA Performance Metrics.pdf PDF
SOW Attachment 7 Airport Operational Hours.pdf PDF
SOW Attachment 9 TSA APM Configuration Management Plan.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Please use the form in the "TRN Template" tab when submitting any Test Readiness Request (TRN) to the TSA. The form has some pre-populated information meant to display a sample of what it looks like. Users must delete or change all of the information as applicable.

TRNs must be submitted by the OEM to the applicable TSA PMO representative for the designated technology at least seven (7) business days prior to the requested test date and time.

When submitting TRNs, please include the following documents:

* Completed TRN form.

* Test Procedures (word document version), if a new version is being used.

* CIL Worksheet - most current version (excel document version).

* Any other documents required for testing, as applicable.

If ATSA requires any additional documents, a request will be made within 24 hours after submission of the TRN.

The TRN shall be submitted to the designated TSA PMO representative following the specific instructions provided in the "ATR Guidelines" tab. Failure to follow these instructions may result in the TRN being rejected.

The date in the subject line represents the test date.

When resubmitting a TRN due to any information change (date, time, etc), please type the reason for change atop of the email body. For example:

* DATE CHANGE

* TRN CANCELLED

After a TRN is submitted to the designated TSA PMO representative, that person will review the TRN for accuracy and then submit it to ATSA via the ATR mailbox at least five (5) business days prior to the test date and time shown on the TRN. The OEM should be included on CC line of the PMO TRN submission.

Upon receipt of the TRN, ATSA and their testing representative will review the TRN. Within 24 hours of receiving the TRN submittal email, an ATSA testing representative will use Reply All to notify the sender that either additional information is needed or the TRN has been accepted and the testing activity has been added to the ATSA testing schedule.

If you have any questions about submitting a TRN, please contact Alex Fraguada at alex.fraguada@tsa.dhs.gov.

ATR Mailbox Guidelines

TRN Template

Test Readines Notification (TRN)v9 05.19.22
Test Equipment Informatrion
Use indiviual TRNs per week of testing
Program
Model Name
Serial Number
Serial Number
Serial Number
Equipment Setup
Notes
Test Event Information
Date
Time
LocationInclude Airport Code, Terminal, Checkpoint [Bagroom Designation for EDS], Lane
Test Type
Procedures Version
Reason for Test
Notes
Test Representatives Information
NameEmailPhone Number
TSA AT LeadNameEmailPhone Number
TSA PMO POC
OEM
Notes

Representatives List

TeamEquipmentNameEmailPhone NumberTeamEquipmentNameEmailPhone Number
ATSAAll Checkpoint & EDS FAT/SAT/ORTAlex Fraguadaalex.fraguada@tsa.dhs.gov214-957-6492PMOEMDDaniel Ballewdaniel.ballew@tsa.dhs.gov301-481-3305
ATSAAll Checkpoint & EDS FAT/SAT/ORTMervin Turnermervin.turner@tsa.dhs.gov571-447-0071PMOAITDavid Bryantdavid.b.bryant@tsa.dhs.gov571-227-5420
ATSAAll iSATEdwin MartinezEdwin.Martinez2@tsa.dhs.gov202-525-0238PMOAnalogic BaseSam Carrasquillosamuel.carrasquillo571-227-2835
ATSAAll iSATRich StoneRichard.Stone@tsa.dhs.gov571-970-8098PMOAnalogic MidSam Carrasquillosamuel.carrasquillo571-227-2835
PMOAnalogic FullSam Carrasquillosamuel.carrasquillo571-227-2835
PMOCPSSEddie ConroyCT-Hive@tsa.dhs.gov571-227-3155
PMOEDS Smiths/LeidosAlyssa Wilsonalyssa.wilson@tsa.dhs.gov571-227-5727
PMOEDS Reveal/Smiths 5800Diane Reiddiane.reid@tsa.dhs.gov571-227-2293
PMOCATAngela Matosangela.matos@tsa.dhs.gov571-227-5759
PMOAT-CTJoe Piattjoseph.e.piatt@tsa.dhs.gov571-227-5229
PMOAT2/ATU/RapiscanBill Joneswilliam.jones@tsa.dhs.gov202-281-5266
PMOETDJeffrey Delaneyjeffrey.delaney@tsa.dhs.gov571-227-4229

QLR Template

Quick Look Reportv4 - 12/21/21
Overall Test ResultConditional Pass - See notes below for conditions
Test Equipment Informatrion
ProgramTSA
Model NameIDSS Mid-Size Detect 1000
Serial Number13
Equipment Setupentire system will be available
Notes
Test Event Information
Date12/9/21
Start Time10:00 AMEnd Time4:00pm
LocationCVG
Test TypeOperational Readiness Testing (ORT)
Procedures Version1000D100010 Rev K
Reason for Testupgrade to the mid-size configuration
Notes
Test Results Summary
ConfigurationIssues Found
SafetyPass
SecurityPass
EfficiencyPass
Procedures CorrectnessIssues Found
Test Representatives Information
NameEmailPhone Number
ATSAAlex Fraguadaalex.fraguada@tsa.dhs.gov214-957-6492
Program OfficePatricia McCormickPatricia.Mccormick@tsa.dhs.gov571-329-2519
OEMDoug Andrewsdandrews@idsscorp.net508-613-6026
Notes
The procedures need some work. Many items in the MCIL could not be verified. The list needs to be revised. See documents for details.
Approving Official Signature

Requirements

TRNQLRNotes
Test Event InformationDateXX
TimeXX
LocationXXInclude Name of the facility, address, and other information as needed.
Test TypeXXFAT/SAT/ORT/iSAT
Test Procedures Version
Reason for TestXNew Install/Upgrade/Relocated/Others
Test Reps Info
(POCs receiving the QLR)ATSA Rep (for the tech being tested)XXATSA POC for the technology
PMO Rep (for the tech being tested)XXPMO POC for the technology
OEM RepXXOEM POC responsible for the test
TesterXATSS personnel conducting the test (N/A when feds execute)
Test Equipment InfoTSA ProgramXXTSA Program responsible for the equipment (CPSS, Donor, etc)
Model Name/NumberXXUse TSA naming
Serial NumberXX
Equipment SetupXXSystem configuration for/during testing
TSA BarcodeXXWhen applicable. Use main component barcode
Test Results SummaryConfigurationXPass/Fail/
SafetyX
SecurityX
EfficiencyX
Procedure CorrectnessX
Test DispositionXConditional Pass can only be assigned by an ATSA rep
SignatureXdigital signature
NotesXXSpecific issues encountered. Deviations from the procedures.

Drop Down Menus

Test TypeTest ResultOverll Test ResultProgram
Factory Acceptance Testing (FAT)PassPassTSA
Site Acceptance Testing (SAT)FailFailDonor
Operational Readiness Testing (ORT)Issues FoundConditional Pass - See notes below for conditions
integrated Factory Acceptance Testing (iSAT)

image1.emf image2.emf

File details come from the government source that posted it. Updated .