SOW 400 HZ Controller.docx

DOCX document 25 KB Posted

Attached to
STARTUP, TESTING, COMMISSION OF 400HZ MOTOR
Solicitation number
70Z04026Q60751Y00
Issued by

About this file

This is a Statement of Work (SOW) for startup, testing, and commissioning services of a 400 Hz motor controller system aboard the CGC Legare at the U.S. Coast Guard Yard in Baltimore, Maryland. The contractor must provide an Original Equipment Manufacturer (OEM) authorized and licensed technical representative for the Ward Leonard 400 Hz MG Set Controller to perform on-site disassembly, inspection, repair, modification, calibration, and reassembly of the equipment. Key service deliverables include providing manufacturer's proprietary system information, software, and tools; ensuring compliance with manufacturer procedures and standards; assisting with testing and commissioning for optimal performance; and delivering one day of on-site personnel training covering hands-on operation, operational theory, maintenance documentation, start-up procedures, settings and adjustments, and emergency procedures. The performance period requires completion by June 16, 2026, with services to be completed over multiple working days including travel time. The contractor must ensure the technical representative holds OEM certification and demonstrates this qualification on their resume.

The contractor is responsible for furnishing all equipment and services not explicitly provided by the government, including all personnel safety equipment meeting OSHA standards, compliance with 29 CFR 1915 shipyard industry standards, and adherence to U.S. Coast Guard Yard ISO 9001 and ISO 14001 standards. The government will provide material handling services, utilities (water, compressed air up to 200 amps at 480 volts, and electricity), and timely yard assistance. Security access via the RAPIDGate Program and/or Transportation Worker Identification Credentials (TWIC) is required for repeat access of seven or more days annually, with employee names and dates of birth to be submitted with the quotation. All contractors must comply with federal, state, and local environmental regulations and the yard's Environmental Management Systems, Storm Water Pollution Prevention Plan, and Spill Prevention Control and Counter Measure Plan. Points of contact include Thomas Maszczenski (Electric Shop) and LT Brian Bald (Ship Superintendent), with quotes due to Shellby.M.Hammond@uscg.mil by May 29, 2026 at 3:00 PM Eastern. Award will be made on a best value basis under FAR 13 simplified acquisition procedures for a firm fixed price purchase order.

View the file

Other files

File Type Posted
FAR Clause.pdf PDF
JOTFOC - 2126406Y61J6598004.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK PR 2126406Y61J6598004

POC: Electric Shop Thomas Maszczenski Cell: (443) 829-6730 Email: Thomas.J.Maszczenski@uscg.mil Ship Superintendent LT Brian Bald Cell: (937) 617-7904 Email: Brian.M.Bald@uscg.mil Location: USCG Yard, 2401 Hawkins Point Rd, Baltimore, MD 21226

GENERAL REQUIREMENTS: The work consists of providing services as required IAW the description below. Located at 2401 Hawkins Point Road Baltimore MD 21226, CGC Legare.

The Contractor must provide the services of an OEM authorized/ licensed Tech Rep for the Ward Leonard 400 Hz MG Set Controller to accomplish the following on site:

Provide manufacturer's proprietary system/ equipment information, software, and tools.

Assist with and ensure compliance with manufacturer's procedures and standards during disassembly, inspection, repair, modification, calibration, and reassembly of the equipment/system.

Assist with testing and commissioning to provide for optimum performance of the new 400 HZ Motor Controller.

Provide one day on-site training of the ship’s personnel for installed controller system. Training shall comprise operation and maintenance of the new equipment. The training must include at a minimum but is not limited to:

Hands on training Operational theory Review of maintenance documentation Review of start-up and operational procedures Settings and adjustments Emergency procedures

Ensure the Tech Rep is an OEM Certified Representative for the system/equipment stated above and demonstrated on their résumé.

POP: Services are Required to be complete by 06/16/2026. This is to accommodate multiple working days, with a travel day to The Yard and a travel day back home.

FAR 52.237-1 Site Visit: Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

Controlled Unclassified Information: JCP certification is required for United States (U.S.) or Canadian contractors who wish to obtain access to unclassified technical data disclosing militarily critical technology with military or space application that is under the control of, or in the possession of the U.S. Department of Defense (DOD) or the Canadian Department of National Defense (DND).

ORAL MODIFICATION: No oral statement of any person other than the contracting officer shall in any manner or degree, modify, or otherwise affect the terms of this contract.

ACCEPTANCE CRITERIA: Criteria evaluated for payment approval. The government will review work in its entirety prior to issuing invoice approval.

GOVERNMENT FURNISHED ITEMS AND SERVICES:

Services: The Government shall provide material handling services to load and unload Contractor machinery and for the set up of equipment. The Coast Guard Yard shall provide timely assistance as requested by the Contractor. The Contractor shall provide 48-hour notice to the Government when there is a need for material handling services.

Utilities: The Government will provide water, compressed air, and electricity for the Contractor as defined herein. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating in such a manner that precludes the waste of utilities, for example turning off the water faucets or valves after using the required amount to accomplish assigned work.

Compressed Air: The Government shall provide a source of compressed air for Contractor machinery. The Contractor shall be responsible for ensuring that their compressed air hookup connections are compatible with the Yard’s compressed air sources.

Electricity: The Government shall provide up to 200 amps and up to 480 volts of electrical services.

CONTRACTOR FURNISHED ITEMS, SERVICES AND RESPONSIBILITIES:

General: The Contractor shall furnish all equipment and services required to perform work under this SOW, other than those explicitly addressed in government furnished services.

The Contractor shall report to the designated work site on the date specified on the written notification by the Contracting Officer in the form of a signed order. No other individual has the authority to direct the Contractor to begin work, other than a warranted Contracting Officer. Pending Coast Guard Yard production schedules, services may be required on an intermittent basis within the period and quantity specified.

Contractor Equipment: vehicles and tanks which holds or can hold hazardous materials that is left on CG Yard premises must have the Contractor’s contact information placed in the driver’s side window indicating the Emergency Contact Number (answered 24/7/365) for the owner/operator of the vehicle. If a tank is left on the premises, the Emergency Contact Number (answered 24/7/365) for the owner/operator of the tank must be painted on the tank in a prominent location. The government will not assume liability for any vehicles/tanks left on CG YARD property. The COR/SS will coordinate the location with the Yard Environmental/Security/Materials Handling.

RAPID GATE SECURITY REQUIREMENTS: Effective September 1, 2016, all contractors and subcontractors performing on this contract/purchase order/task order must utilize the RAPIDGate Program and/or Transportation Worker Identification Credentials (TWIC) if repeat access to the CG Yard is required for seven (7) or more days annually. RAPIDGate manages the non-Common Access Credential (CAC) eligible vendor/contractor companies and their employees who require access to Coast Guard Yard, Baltimore. Vendor/contractor CAC eligibility has been restricted to only those who require physical access to Coast Guard Yard AND logical access to a DoD or DHS network or system.

Vendor/contractor companies that require repeat (7 or more days annually) access to the CG Yard, pay an annual company enrollment subscription to participate in the RAPIDGate Program and an annual employee registration subscription for each employee to participate in the program. The company enrollment fee is waived for sole proprietors. Vendor/contractor companies must be approved by a government sponsor at each DoD and DHS installation where their employees require access. Vendor/contractor employees who are registered, undergo initial and regular vetting and are issued a single credential, which is valid for perimeter access to those DoD and DHS installations where access privileges have been granted. All company enrollments are submitted via the web at www.rapidgate.com and managed by phone or email. Initial employee registrations take place at a Program Registration Kiosk, typically located at participating DoD and DHS Installation Pass & ID Offices. The CG Yard’s Registration Kiosk is located at 2401 Hawkins Point Road, Baltimore, MD 21226, BLDG. 144, Security [brick building adjacent to the main gate]. Credentials will be available for pick-up at BLDG. 144 fourteen (14) days after the employee’s initial registration. Costs incurred for delays at the gate due to the contractor’s failure to comply with this requirement or to provide qualified, authorized personnel will not be reimbursed by the Government. Your tenant sponsor is, the Yard POC or Ship Superintendent listed at the beginning of this document. This sponsor will need a list of individual employee names and DOB’s with your quotation. Any RAPIDGate program questions should be directed to: 1-877-727-4342

General: The Contractor will be required to follow 29 CFR 1915 (OSHA Shipyard Industry Standard), 16 CFR1303, 29 CFR 1910, 29 CFR 1915.1025, 29 CFR 1926.62, 15 U.S.C. 2601, while performing this work at the U.S. Coast Guard Yard.

Safety Equipment: The area where this work taking place requires hard hats, safety harnesses and safety glasses at all times. The Contractor will provide all required personnel safety equipment for their employees, including, but not limited to, safety helmet and safety glasses with side shields. All safety equipment shall meet OSHA standards. The Contractor shall follow all applicable OSHA guidelines and regulations. It is also required that all COVID safety practices are followed.

ISO Qualifications: Contractor shall comply with all the U.S. Coast Guard Yard International Organization for Standardization (ISO) 9001 Quality Management and ISO 14001 Environmental Management Systems. The Contractor may be periodically audited to ensure conformity to these standards. If the contractor fails to perform as specified, the contracting officer may direct that employees be replaced or suspend work.

EMERGENCY SERVICES: The U.S. Coast Guard Yard has 24-hour first aid, spill response and fire protection available. If necessary, the Contractor may call 410-636-3993 from non-Yard phones and extension 3000 from Yard phones for emergency situations. Injuries shall be reported immediately and followed up with a written report to the COR.

ENVIRONMENTAL PROTECTION REQUIREMENTS: All contractors working on CG Yard shall abide by all federal, state, and local environmental regulations as published by the Environmental Protection Agency, 40 CFR (series) and the following Yard Environmental plans/policies:

· CG Yard Environmental Management Systems (EMS)

· CG Yard Storm Water Pollution and Prevention Plan (SWPPP)

· CG Yard Spill Prevention Control and Counter Measure Plan (SPCC)

Transport and Disposal: All material removed from tanks shall be taken off CG Yard property immediately after cleaning operations are complete. Material shall be processed in accordance with Section 10.2.2 before leaving the Yard. Prior to removing material, the Government environmental dept. reserves the right to inspect the transport vehicle status of contents, to ensure accurate quantities being removed from the CG Yard.

The Contractor must properly remove and dispose of all materials in compliance with applicable Federal, state, and local environmental laws and regulations. Contractor assumes all responsibility and liability for the transport and proper disposal of materials and in particular the following requirements:

1. If a spill occurs, the CG Yard Environmental Branch shall be immediately notified and can be reached at (410) 636-3111. The Contractor must also report the spill to the USCG Yard Main Gate (410) 636-3993 or YARD extension 3000 IMMEDIATELY. A letter describing the incident shall be submitted within 24 hours after the spill. During a spill, the Contractor will receive direction from the Yard Incident Commander/ Firehouse / Environmental or YARD/Vessel OOD.

1. The Contractor MUST follow the USCG Yard Facilities Response Plan, when operating on USCG Yard property.

1. Written notification must be provided to the Environmental Protection Specialist Brandace Timbers 410-636-3775, brandace.t.timbers@uscg.mil of any activity that could potentially cause an environmental violation. Some examples of these activities are: any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment.

1. The Contractor will be solely responsible for the transportation and proper disposal of waste material. Contractor must submit disposal sites to CG Yard Environmental Department for site approvals and copies of Bill Of Lading or waste manifests. If Contractor elects to use dumpsters for holding or transportation of waste, dumpsters must be covered to prevent waste from becoming airborne.

Only the Yard Environmental Dept is authorized to sign hazardous waste manifest.

POC: LT Brian Bald 410-365-8457 CG Yard (937) 617-7904 2401 Hawkins Point Rd Baltimore, MD 21226

POC: Thomas Maszczenski (443) 829-6730 CG Yard (410) 686-3891 2401 Hawkins Point Rd Baltimore, MD 21226

File details come from the government source that posted it. Updated .