Solicitation W912DW23R0005 CJD Passenger and Freight Elevators Re-Bid 27Mar2023.pdf
PDF 1 MB Posted
- Attached to
- Chief Joseph Dam Powerhouse Passenger and Freight Elevator Replacement Federal contract opportunity
- Solicitation number
- W912DW23R0005
About this file
This solicitation requests proposals for the replacement of the hydraulic freight elevator and electric passenger elevator at the Chief Joseph Dam Powerhouse in Bridgeport, Washington. Key details include the full replacement of both elevators and upgrading machine rooms and shafts to current code. The freight elevator work includes replacing the hydraulic system, hoistway components, car features, and controls. The passenger elevator work involves replacing similar components along with the hoist motor and gearbox. Offerors must provide schedules, experience references, past performance questionnaires, and fixed prices for all line items. Submissions are due electronically by the specified date. The NAICS code is 333921 and small business size standard is 1,000 employees. This is an unrestricted solicitation from the Army Corps of Engineers seeking a low price technically acceptable best value award.
View the file
Other files for this federal contract opportunity
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912DW23R0005
Chief Joseph Dam Elevator Replacement, Bridgeport, WA. This action is Unrestricted.
GERALDINE L KEMP 206-764-6659
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
27-Mar-2023
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________730 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
(hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
206-764-6817FAX:TEL: 206-316-3168 TEL: FAX:
W912DW23R0005 77
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 01 10 - Table of Contents
TABLE OF CONTENTS
SECTION TITLE
SF1442 Construction Solicitation
00 10 00 Price Schedule
00 21 00 Instructions, Conditions and Notice to Offerors
00 21 16 Proposal Submission
00 22 00 Evaluation Criteria
00 45 00 Representations and Certifications and other Statements of Offerors, and Pre-Award Information
00 62 00 Corporate Certificate
00 72 00 Contract Clauses
00 73 00 Supplementary Conditions, which include the following:
a) Davis-Bacon General Wage Decision No. WA20230035 dated 2/03/2023
b) 00 73 00 - Index of Drawings
01 00 00 Technical Specifications
Section 00 10 00 - Solicitation
SECTION 00 10 00
PRICE SCHEDULE
FY22 CHIEF JOSEPH POWERHOUSE PASSENGER AND FREIGHT ELVATORS REPLACEMENT
CHIEF JOSEPHN DAM, BRIDGEPORT, WA
CLIN
DESCRIPTION
QUANTITY
UNIT
UNIT
PRICE
AMOUNT
Base Bid Items
Design Powerhouse Passenger Elevator
Job
N/A
Manufacture and Fabricate Powerhouse Passenger Elevator
Shop Test Powerhouse Passenger Elevator
Powerhouse Passenger Elevator Mobilization and Demobilization
1 Job N/A $__________
Removal and Disposal of Powerhouse Passenger Elevator
1 Job N/A $__________
Deliver and Install Powerhouse Passenger
On-site Powerhouse Passenger Elevator Testing
0008 O&M Powerhouse Passenger Elevator Training
1 Job N/A $__________
0009 Final Powerhouse Passenger Elevator Testing and Adjustment
1 Job N/A $__________
0010 Furnish As-built Drawings for the Powerhouse Passenger Elevator
$50,000
Furnish Operations and Maintenance (O&M) Manuals for the Powerhouse Passenger Elevator
Design Hydraulic Freight Elevator
Manufacture and Fabricate Hydraulic Freight Elevator
0014 Shop Test Hydraulic Freight Elevator 1 Job N/A $__________
Hydraulic Freight Elevator Mobilization and Demobilization
Removal and Disposal of Hydraulic Freight
Deliver and Install Hydraulic Freight
On-site Hydraulic Freight Elevator Testing
O&M Hydraulic Freight Elevator Training
Final Hydraulic Freight Elevator Testing and Adjustment
Furnish As-built Drawings for the Hydraulic Freight Elevator
Furnish Operations and Maintenance (O&M) Manuals for the Hydraulic Freight Elevator
TOTAL OF BASE BID ITEMS $______________________
Optional Bid Items
0200 Replace one (1) smoke detector 1 Job N/A $__________
0201 Replace up to five (5) smoke detectors 1 Job N/A $__________
0202 Replace up to ten (10) smoke detectors 1 Job N/A $__________
TOTAL OF OPTIONAL PRICE ITEMS $______________________
TOTAL OF BASE AND OPTIONAL PRICE ITEMS $______________________
Notes:
1. In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid. If the bidder shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.
2. Any bid price for items indicated above which are unbalanced as to price may be rejected as non-responsive.
An unbalanced bid is one which is based on price significantly less than cost for some work and price which is significantly overstated for other work.
3. 100% Design Projects cannot be altered, changed, or re-designed in any way. No alternate proposals will be accepted.
4. The dollar amount established in Contract Line Item Nos. 0010, 0011, 0021, and 0022 shall not be revised by the Offerors.
5. Award of optional items will be made in Clause 52.217-7 OPTION FOR INCREASED QUANTITY.
-- End of Document --
Section 00 21 00 - Instructions
INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFEROR
1. General Description of Work
2. Disclosure of the Magnitude of Construction
3. Copies of Solicitation Documents and Amendments
4. Offeror’s Questions and Comments
5. Small Business Size Standard / NAICS Code:
6. Proposal Expenses and Pre-Award Costs
7. Pre-Proposal Site Visit
8. Accuracy in Proposals
9. Proposal Submittals
10. Bid Guarantee
11. Subcontracting Plan
12. Solicitation Provisions
1. General Description of Work:
Contract Title: Chief Joseph Dam Elevator Replacements, Bridgeport, WA.
The Chief Joseph Dam and Powerhouse is a working facility and daily routines require frequent operations to be conducted. In addition, other equipment at the powerhouse must remain accessible for routine inspections, testing, and maintenance activities. Buildings will be occupied during performance of work.
The anticipated period of performance is 24 calendar months or 730 calendar days.
Full replacement of the Hydraulic Freight Elevator.
Installation of a new elevator system and equipment to replace the existing.
Bringing the freight elevator machine room up to code by enclosing the space in a
2-hour rated envelope matching that of the freight elevator shaft. Existing features to be replaced include, but are not limited to: the hydraulic pump, the oil heater/cooler, oil reservoir, frequency controller, hydraulic cylinder, hydraulic piston, borehole collar, hoist way cables, elevator car, elevator car safeties, elevator electrical system and wiring including all traveling elevator car power and communications cabling, disconnect switches, motor feeders elevator car lighting and all associated controls including controller cabinets.
The elevator car to be provided with new operating controls, communication devices, and new call stations at each floor landing. The existing heavy duty sidewall rails should be reused if possible.
The elevator machine room and shaft will be upgraded to meet current code compliance. The upgrade will include any repair needed for the hoist way walls and HVAC improvements.
Full replacement of the Powerhouse Passenger Elevator
Installation of a new elevator system and equipment to replace the existing.
Bringing the passenger elevator machine room up to code by replacing the wall separating the machine room from the staircase with a 2-hour rated wall.
Existing features to be replaced include, but are not limited to: the hoist motor; the hoist gear box, elevator brakes, hoist way ropes, wedge sockets and shackle rods, rope brake, rope deflector sheaves, speed governor, elevator car and counterweights guide rail shoes, elevator car safeties, counterweights and cable compensation chains, oil buffers for the elevator car and counterweights, elevator electrical system and wiring including all traveling elevator car power and communications cabling, disconnect switches, motor feeders elevator car lighting and all associated controls including controller cabinets.
The elevator car to be provided with new operating controls, handrails, communication devices, and new hall call stations at each floor landing.
The elevator machine room and shaft will be upgraded to meet current code compliance. The upgrade will include any repair needed for the hoist way walls and HVAC improvements, and elevator hoist way pressurization alternative (in lieu of required enclosed lobbies).
2. Disclosure of the Magnitude of Construction:
In accordance with DFARS 236.204(ii) “Disclosure of the Magnitude of Construction Projects,” the magnitude of the project is estimated between $1,000,000 and $5,000,000.
3. Copies of Solicitation Documents and Amendments:
Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY.
The solicitation opportunity will be posted to the U.S. Government’s Contract Opportunities website at: https://www.SAM.gov under Solicitation Number W912DW23R0005. All copies of the solicitation, amendments and associated documentation shall be obtain through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module at https://piee.eb.mil/
A list of interested vendors (potential offerors and sbucontractors) is available on the www.SAM.gov website (registration is required) withint he solicitation announcement.
NOTE: www.SAM.gov is the official U.S. Government website for Contract Opportunities. Procurement Integrated Enterprise Environment (PIEE) Solicitation Module https://piee.eb.mi is the site for retrieving solicitation supporting documentation and amendments as well as submitting proposals in response to the solicitation.
It shall be the contractor’s responsibility to check the websites for any amendments. The offeror shall submit in the proposal all requested information specified in this solicitation.
There will be no public opening of the proposals received as a result of this solicitation.
4. Offeror’s Questions and Comments:
Offeror Inquiry
I. Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet.
a. To submit and review bid inquiry items, offerors will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and then click continue.
b. From this page you may view all bidder inquiries or add inquiry.
c. Offerors will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
d. The Solicitation Number is: W912DW23R0005
e. The Bidder Inquiry Key is: 46CXYG-QBMW26
II. The Bidder Inquiry System will be unavailable for new inquires 3 business days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
III. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
IV. The call center operates weekdays from 8AM to 5PM U.S. Central
Time Zone (Chicago). The telephone number for the Call Center is
800-428-HELP.
V. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
5. Small Business Size Standard / NAICS Code:
See Section 00 45 00, Provision 52.204-8 for the NAICS code and small business size standard.
6. Proposal Expenses and Pre-Award Costs:
This Request for Proposals (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.
7. Pre-Proposal Site Visit:
A Pre-Proposal Conference and Site Visit will be conducted on 03 May 2023 from 9:00 AM to 12:00 PM local time at the Chief Joseph Dam, beginning at the Commons Building for introductions and a tailgate safety brief before proceeding to the powerhouse. The objective is to visit both elevators, machine rooms, and other points of interest.
Participants are required to bring hard hat, safety shoes, and safety vests.
RSVP is required as detailed below and attendance is by approval only. Approved participants will enter via the front gate, clear security, before proceeding to the Commons Building. More detailed instructions will be provided to approved attendees.
Due to COVID-19, social distancing will be strictly observed, and the gathering will remain outdoors.
Guidelines are as follows:
a. Each Offeror will be limited to two representatives, including all subs and partners, for each site visit.
b. Offerors are required to provide the complete information contained in the attached “Request for Visitation Authority (RVA)” form to both Ms. Geraldine Kemp and Ms. Mamie Brouwer, whose contact information follows these instructions, not later than 4:00 PM Pacific time on 21 April 2023 to be included on the site visit list. RVAs submitted after the deadline will not be accepted and substitutions after 21 April are not authorized.
c. In order to prevent any large gatherings, all participants must provide their own transportation to the Chief Joseph Dam Security Control Point for vehicle and participant clearance, proceed to the Resident Engineer Construction Office (adjacent to the Commons Building), and remain at their vehicles until the Government escorts everyone in "caravan" to the Powerhouse parking lot.
d. Once parked, all participants will remain at their vehicle until Government representatives form small sub-groups no more than six persons per sub-group to walk through the project site.
e. Attendance for each sub-group will be recorded by the Government rep for each group through verbal communication.
f. Masks and proof of vaccination is not required.
g. Social distancing (at least six feet distance) is encouraged, where possible.
h. Restroom facilities may not be readily available.
i. Any questions regarding the requirement arising during the site visit shall be submitted via ProjNet. See the Technical Questions section for details.
j. Personnel attending the site visit must bring government issued identification and personal protective equipment. All personnel must bring a US Coast Guard approved personal flotation device (PFD) for each representative attending the site visit.
The Government retains the right to cancel the site visit should Washington State and the Seattle District COVID19 posture regress to a more restrictive level.
The Corps of Engineers (COE) points of contact are Ms. Mamie Brouwer at Mamie.S.Brouwer@usace.army.mil or (206) 764-3577 and Ms. Geraldine Kemp at (206) 764-6659, Geraldine.L.Kemp@usace.army.mil.
OFFERORS ARE URGED AND EXPECTED to inspect the site where construction is to be performed and to satisfy themselves as to all general and local conditions which . In no event, will a failure to inspect the site constitute grounds for withdrawal of a bid after opening or for a claim after award of the contract.
may affect the cost of performance of the Contract, to the extent such information is reasonably obtainable.
Request for Visitation Authority (RVA)
1. Biographical Information:
Name:
US Citizen Driver’s License No.:
Date of Birth:
Place of Birth:
Nationality (Country):
Company Name:
Job Title:
Phone Number:
Email:
Supervisor POC (Name & Phone Number):
2. Non-US Citizen Biographical Information:
Biographical information (Last Name, First, Middle):
Passport No.:
*Color copy of the passport biopage is required.
*Color copy of the permanent resident green card is required for permanent US residents.
Date of birth:
Place of birth (City and Country):
Nationality:
Organization:
Title:
Phone Number:
Email:
Supervisor POC (Name & Phone Number):
8. Accuracy in Proposals:
Proposals must set forth full, accurate, and complete information as required by this RFP (including attachments). The penalty for making false statements is prescribed in 18 U.S.C. 1001.
9. Proposal Submittals
THE SOLICITATION PERIOD FOR THIS REQUEST FOR PROPOSAL WILL BE 30
CALENDAR DAYS.
Electronically transmit bid proposal submissions using the following link:
https://piee.eb.mil/
The Offeror shall submit its offer electronically through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module at https://piee.eb.mil/. When posting an offer, ensure electronic files are clearly identified with the solicitation number, company name, volume, section, and or/item. The minimum required naming format for files is as follows:
Solicitation Number_Company Name_Item
Offers will not be accepted if submitted by mail or hand carried and will not be evaluated. Offers sent through proprietary or third party File Transfer Protocol (FTP) sites or DoD SAFE will not be accepted.
The Offeror is responsible to confirm the offer has been received. All offers received after the exact time specified for receipt shall be treated as late submissions and will not be considered except under facts and circumstances allowed by the Federal Acquisition Regulation (FAR) and the solicitation.
For PIEE registration, training, and instructions for posting an offer, refer to the following links:
PIEE Registration_ https://piee.eb.mil/ Note: There are two vendor roles (Proposal Manager, Proposal View Only) for PIEE Solicitation Module.
The Proposal Manager role is required to submit an offer to a solicitation. Please be advised that when using the PIEE Solicitation Module, the user’s email address in PIEE must match the email address on file in SAM.gov.
PIEE Solicitation Module_ Training and instructions are accessible through PIEE – Web Based Training (WBT) at https://pieetraining.eb.mil/wbt/
(For instructions specific to posting an offer, select ‘Solicitation Module’ -- ‘Proposals (Offers)’ – ‘Posting Offer’)
For Frequently Asked Questions (FAQs) and additional training, go to the DoD Procurement Toolbox – eBusiness -- Solicitation Module at https://dodprocurementtoolbox.com/site-pages/solicitation-module
In the unlikely event the PIEE system and/or Solicitation Module is not operational, and the offeror is unable to access or use the system, the Offeror shall immediately notify the Contracting Officer Scott W.
Britt, scott.w.britt@usace.army.mil and Contracting Specialist Geraldine Kemp, Geraldine.L.Kemp@usace.army.mil . Notification must occur prior to the submission deadline and shall be in writing through authorized email identified in the solicitation. If an alternate method for offer submission is authorized via email due to system outages, the Offeror must obtain prior approval from the
Contracting Officer to use the alternate submission method.
Ensure all documentation submitted meets supported file extensions identified in PIEE FAQs. Narrative portions of the offer shall be in Adobe Acrobat Portable Document Format (PDF) searchable text format.
Embedded sound or video (e.g., MPEG) files are not authorized and shall not be included.
Primary Point of Contact:
Geraldine L. Kemp Contract Specialist, Seattle Army Corp of Engineers geraldine.l.kemp@usace.army.mil
10. Bid Guarantee:
The Standard Form (SF) 24, dated 08/2016, shall be used for the submission of your bid bond and can be obtained from https://www.gsa.gov/reference/forms#SF. Submit the bid bond via the PIEE Solicitation Module with your proposal.
Submit an electronic bid bond with your proposal. Bid Bonds (SF24) must be accompanied by a Power of Attorney containing an original or electronic signature from the surety, which must be affixed to the Power of Attorney after the Power of Attorney has been generated. Computer generated and signed Powers of Attorney will be accepted if accompanied by a certification from a current officer of the surety attesting to its authenticity and continuing validity.
NOTE: Digital scans, or photographed or otherwise reproduced images, of ink signatures are not considered acceptable "electronic signatures." If a required submitted document does not contain electronic signatures, you must submit original hard-copy documents.
11. Subcontracting Plan
Submission Requirements
If the Offeror proposing on this solicitation is a large business concern, in accordance with the definition as identified in FAR Clause 52.219-1, “SMALL BUSINESS PROGRAM REPRESENTATION”, upon notification that it is the apparent successful Offeror, the firm must submit a small business subcontracting plan in accordance with FAR Clause 52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN The goals established for small business, small disadvantaged business, woman-owned, veteran-owned service disabled and historically underutilized business zone (HUBZone), small business commitments are:
Small Business - 10% Small Disadvantaged Business - 3% Women-Owned Small Business - 3% Service-Disabled Veteran-Owned Small Business - 2% Veteran-Owned Small Business - 3% HUBZone Small Business - 1%
12. Solicitation Provisions
See the applicable Provisions for this Solicitation in Section 00 21 00 and Section 00 45 00.
MAGNITUDE OF CONSTRUCTION
The magnitude of construction is estimated to be between $1,000,000 and $5,000,000
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.215-1 Instructions to Offerors--Competitive Acquisition NOV 2021 52.215-2 Audit and Records--Negotiation JUN 2020 52.215-20 Requirements for Certified Cost or Pricing Data and Data
Other Than Certified Cost or Pricing Data
NOV 2021
252.204-7008 Compliance With Safeguarding Covered Defense Information Controls
OCT 2016
252.215-7008 Only One Offer JUL 2019 252.215-7010 Requirements for Certified Cost or Pricing Data and Data
Other Than Certified Cost or Pricing Data
JUL 2019
CLAUSES INCORPORATED BY FULL TEXT
52.215-20 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN
CERTIFIED COST OR PRICING DATA (NOV 2021)—ALTERNATE III (OCT 1997)
(a) Exceptions from cost or pricing data.
(1) In lieu of submitting cost or pricing data, offerors may submit a written request for exception by submitting the information described in the following subparagraphs. The Contracting Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted, and whether the price is fair and reasonable.
(i) Identification of the law or regulation establishing the price offered. If the price is controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.
(ii) Commercial product and commercial service exception. For a commercial product and commercial service exception, the offeror shall submit, at a minimum, information on prices at which the same item or similar items have previously been sold in the commercial market that is adequate for evaluating the reasonableness of the price for this acquisition. Such information may include--
(A) For catalog items, a copy of or identification of the catalog and its date, or the appropriate pages for the offered items, or a statement that the catalog is on file in the buying office to which the proposal is being submitted. Provide a copy or describe current discount policies and price lists (published or unpublished), e.g., wholesale, original equipment manufacturer, or reseller. Also explain the basis of each offered price and its relationship to the established catalog price, including how the proposed price relates to the price of recent sales in quantities similar to the proposed quantities;
(B) For market-priced items, the source and date or period of the market quotation or other basis for market price, the base amount, and applicable discounts. In addition, describe the nature of the market;
(C) For items included on an active Federal Supply Service Multiple Award Schedule contract, proof that an exception has been granted for the schedule item.
(2) The offeror grants the Contracting Officer or an authorized representative the right to examine, at any time before award, books, records, documents, or other directly pertinent records to verify any request for an exception under this provision, and the reasonableness of price. For items priced using catalog or market prices, or law or regulation , access does not extend to cost or profit information or other data relevant solely to the offeror's determination of the prices to be offered in the catalog or marketplace.
(b) Requirements for cost or pricing data. If the offeror is not granted an exception from the requirement to submit cost or pricing data, the following applies:
(1) The offeror shall prepare and submit cost or pricing data and supporting attachments in accordance with Table 15-2 of FAR 15.408.
(c) Submit the cost portion of the proposal via the following electronic media: Electronic Spreadsheet
As soon as practicable after agreement on price, but before contract award (except for unpriced actions such as letter contracts), the offeror shall submit a Certificate of Current Cost or Pricing Data, as prescribed by FAR 15.406-2.
(End of provision)
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed-Price contract resulting from this solicitation.
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
7.2% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Bridgeport, Douglas County, WA
(End of provision)
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $1,000,000.00, whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
Contracting Officer U.S. Army Corps of Engineers – Seattle District 4735 E. Marginal Way S., Building 1202 Seattle, WA 98134-2388
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
www.acquisition.gov
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
252.215-7012 REQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA (JAN 2018)
The Offeror shall submit the cost portion of the proposal via the following electronic media: Electronic Spreadsheet and PDF files via electronic mail.
Section 00 21 16 - Instructions to Proposers
Proposal Submission – Reference 00 21 16, Section - Proposal Submission Instructions, Fully Incorporated Below
Below is a summary of the key submittal requirements. 00 21 16 should be referenced for full details.
00 21 16, Section - PROPOSAL SUBMISSION INSTRUCTIONS
The proposal submission instructions are contained in Section 00 21 16 of the Request for Proposal (RFP). Section 00 21 16 of the solicitation contains specific information on what must be furnished with the proposal and identifies evaluation criteria that will be used in evaluating proposals received.
1. INTRODUCTION
1.1 Your firm is invited to submit a proposal in response to Request for Proposal (RFP) Number W912DW23R0005 for the project entitled “Chief Joseph Dam Passenger and Freight Elevators Replacement, Bridgeport, Washington”.
The Government intends to procure this requirement on a competitive basis in accordance with the provisions set forth in FAR Part 15 Contracting by Negotiations and within this Request for Proposal (RFP).
1.2. A firm fixed-price contract will be awarded to the Offeror submitting a proposal that (a) conforms to this Request for Proposal (RFP), (b) is considered to offer the best value to the Government in terms of the evaluation factors, including price, and (c) is determined to be in the best interest of the Government.
Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked.
2. GENERAL PROPOSAL REQUIREMENTS
2.1 Proposal Format
The proposal shall be organized into the following two volumes:
a. Volume 1: Technical Proposal, 1 electronic copy (defined in paragraph 3 of this Section)
b. Volume 2: Price Proposal, 1 electronic copy (defined in paragraph 3 of this Section)
2.2 Content – General
The submission shall be clearly indexed and logically assembled. Proposals must set forth full, accurate, and complete information as required by this RFP. Absence of information will be deemed as if no support for that criterion was provided. Offerors submitting proposals should limit submission to data essential for evaluation of proposals so that a minimum of time and money is expended in preparing information required by the Request for Proposal (RFP). Penalty for making false statements in proposals is prescribed in 18 U.S.C. 1001.
2.3 Table of Contents
A Table of Contents should be incorporated within all Volumes.
2.3 Page Numbering
All pages of each volume shall be appropriately identified with complete company name, date and RFP number in the header and/or footer.
3. ELECTRONIC PROPOSAL SUBMITTAL REQUIREMENTS
3.1 File format
The electronic proposal shall be Portable Document Format, filename extension: “.pdf” and suitable for viewing in Adobe Reader. Text must be searchable.
3.2 Number of files
The proposal contents shall be presented as a separate PDF file for each Volume – (1) Technical Proposal, (2) Price Proposal.
3.3 Method of submission
The electronic version of the proposals shall be submitted via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module at https://piee.eb.mil/ . See Section 00 21 00 for detailed instructions.
4. REQUIRED SECTIONS FOR SUBMITTAL
Proposals shall be organized as indicated below:
REQUIRED SECTIONS FOR VOLUME 1: TECHNICAL PROPOSAL
-Table of Contents
-Factor 1: Work Plan
Schedule Contractor Roles Narrative
-Factor 2: Experience
Subfactor 1: Electric Passenger Elevator Subfactor 2: Hydraulic Freight Elevator
-Factor 3: Past Performance
REQUIRED SECTIONS FOR VOLUME 2: PRICE PROPOSAL
-Table of Contents
-Factor 4: Price Proposal Tab 1: Cover Letter Tab 2: SF1442, Solicitation, Offer and Award Tab 3: Bid Schedule Tab 4: Representations and Certifications
5. DETAILED CONTENT REQUIREMENTS FOR VOLUME 1: TECHNICAL PROPOSAL
Technical Proposal, Volume 1: consists of three factors with sub-factors. This section shall be specific and complete, demonstrating a thorough understanding of the requirements. It shall include, where applicable, diagrams and/or charts. Repeating or restating the specifications without sufficient elaboration will be determined to show a lack of understanding of the requirement.
PAGE LIMITS:
Factor 1 – 15 pages. Signed letters of commitment and schedule network diagram do not count towards the page limit.
Factor 2 – 5 pages per submitted project per elevator type, no more than 30 pages total.
Factor 3 – 2 pages per submitted project. PPQ forms do not count towards the page limit.
Factor 1: Work Plan
Submission Requirements Offerors shall submit a work plan designating the work the Offeror will self-performing and any major work performed by a subcontractor, and a schedule in both PERT and GANTT clearly showing design, manufacturing, and installation of the major work portions presented below.
Electric Traction Passenger Elevator Design, Manufacturing, and Installation Hydraulic Freight Elevator Design, Manufacturing, and Installation Demolition and Disposal of the existing freight and Passenger Elevators
The factor evaluates the offeror’s understanding of the required scope of work, identifying the major tasks and outline all major work necessary to complete those tasks. The work plan will be separated into three sections 1) Schedule; 2) Contractor Roles; 3) Narrative. Offerors shall submit a work plan designating the work the Offeror will self-performing and any major work performed by a subcontractor. The major work portions are described below.
Installing a new hydraulic freight elevator upgrade for increased capacity in an existing shaft Installing a new electric traction passenger elevator in an existing shaft Design, manufacture, and installing two elevators within one 18-month construction period of performance.
Removing and demolishing the existing elevators.
Section 1 – Schedule.
Develop a project schedule for the entire project duration from contract award to contract closeout. The schedule showing both PERT and GANTT and formatted to 11- by 17-inch paper, when printed. This schedule is not included in the 50-page limit.
This DRAFT schedule shall be a high-level schedule demonstrating the Offeror’s understanding of the requirements in this solicitation. It should include the completion of all base-bid items of work and depict nodes and activities necessary to complete each phase of work (design, manufacture/fabrication, and installation) as described in the specification and correspond to the offeror’s discussion of critical path and assumptions. For proposal purposes only, the offeror should use Notice to Proceed plus ‘x days.’ The schedule shall include the technical content listed below in P6 Primavera PERT and GANTT or Microsoft Project network diagram. Schedules not in one of these two formats (e.g., document table or spreadsheet) will not be evaluated.
1. For each line or activity on the schedule, identify the tasks and milestones listed below.
a. Activity name and/or description and durations strictly reflecting the Monday through Thursday 10-hour days at Chief Joseph Dam
b. Start and finish milestones
c. Float in days
2. Show tasks in successor order with relationships (e.g., start to start and start to finish) to successor activities
3. Clearly identify critical path activities
4. The following milestones must be clearly represented on the schedule.
a. Notice to proceed
b. Beneficial occupancy
c. Existing elevator removal
d. Contract completion
5. The following phases or specific tasks must be represented on the schedule.
a. Design, including submittals preparation and Government submittals review (accounting for contract defined submittal review times; 30-days)
b. Manufacturing/Fabrication, including equipment procurement and delivery, identifying items with particularly long lead times
c. Installation, including testing and commissioning, and old elevator removal
d. Government personnel training
e. Preparation, submittal, and Government operation and maintenance manual and as-built drawings review.
Section 2 – Contractor Roles:
Identify whether the offeror will be self-performing, or sub-contracting the major sub-portions of work indicated below:
New elevator Design New elevator Manufacturing New elevator Installation
If the Offeror proposes a subcontractor for the design, manufacturing, and/or installation of the new freight or passenger elevator, the Offeror must submit a signed letter of commitment from the subcontractor. The letter of commitment must clearly identify the role of the subcontractor and what portion of the work they will be performing.
The work plan does not need to identify sub-contractors performing minor portions of the work such as: load testing, purchased items, or transportation to the job site.
If the Offeror proposes a joint venture for the design, manufacture, and/or installation of either new elevator, the Offeror must submit a joint venture agreement signed by all participating firms. The agreement must identify the role of each party.
Section 3 – Narrative:
The narrative must not exceed 15, single sided, 8.5- by 11-inch sized pages when printed. The narrative must include and/or address the technical content listed below.
A detailed narrative for accomplishing the work for each major tasks of work required by this RFP.
o New elevator design o New elevator components fabrication o New elevator shop assembly o New elevator shop testing o New elevator transportation to the Chief Joseph Dam project site o New elevator on-site installation and assembly o New elevator inspection and load testing o Existing elevator removal.
Address the likely risks and challenges completing design; manufacturing; and installation, certification, and cutover in the required contract period of performance and the Offeror’s plan for managing these risks.
Supporting discussion of the schedule Plan for managing subcontractors (if applicable).
Project descriptions are not required for subcontractors performing minor portions of the work, such as purchased items for installation or transportation to the job site. The Offeror must submit a signed letter of commitment from the subcontractor proposed for design, manufacturing, and/or installation of the elevators, and by elevator type if using a different subcontractor. The letter of commitment must clearly identify the role and work portion the subcontractor will be performing.
The Offeror must submit a joint venture agreement signed by all participating firms. The agreement must identify the role of each party if the Offeror proposes a joint venture for the installation, manufacture, and/or installation of the elevators.
Evaluation Method:
Experience will be rated on an “Acceptable” or “Unacceptable” basis.
Table 1. Technical Acceptable/Unacceptable Ratings Rating Description Acceptable Proposal clearly meets the minimum requirements of the solicitation Unacceptable Proposal does not meet the minimum requirements of the solicitation
Factor 2: Experience
Submission Requirements Offerors shall provide project information on relevant projects best demonstrating the breadth and depth of an Offeror’s and/or their Subcontractor’s relevant experience Designing, manufacturing, and installing freight and passenger elevators in existing shafts. Any subcontractor proposed must be identified and experience described in the submitted project information. Any subcontractors proposed for Factor 2 must be identified in Factor 1.
At least one, but no more than three, relevant projects are required for each Factor 2 subfactor. Only projects completed within seven (7) years from this RFP, or those currently active meeting the minimum completion specified in each subfactor, will be considered. If the proposal includes more than three projects for each sub-factor, only the first three projects, in the order they appear in the proposal, will be evaluated.
The projects submitted for each sub-factor do not have to be the same. The combined experience demonstrated by the submitted projects must cover the general relevancy requirements and the specific relevancy requirements of each subfactor. If the combined experience of the submitted projects does not meet the relevancy requirements listed for each sub-factor, the proposal will be rated unacceptable for that sub-factor.
The general relevancy requirements and definitions are as follows:
Submitted projects should involve the design, manufacture, and installation of new hydraulic freight and electric traction passenger elevators. All elevator definitions are per ASME A17.1.
The freight elevator experience submitted should have a load rating of 10,000 pounds or greater in an existing elevator concrete shaft.
The passenger elevator experience submitted should service five floors or higher in an existing elevator concrete shaft.
To be considered acceptable, the Offeror’s experience must be acceptable for both electric and hydraulic elevator design, manufacturing, and Installation.
The elevator for each project submitted should be custom designed or engineered to the specific installation.
Experience involving elevators that are considered “off-the-shelf” or “pre-engineered” items is considered not relevant. Submitted projects must involve installing hydraulic and electric traction elevators at dams or mass concrete structures, particularly at hydroelectric dams. For each project submitted, included the following information:
1. Project Title and Location
2. Dollar Value of Project
3. Construction Period (month/year start/end)
4. Customer point of contact (POC)
Include: Name, title, email address, and telephone number
5. Detailed Project Narrative
Provide a description of how the project is relevant. At a minimum, include information regarding the following:
1. Project description
2. Identify the firm or firms that performed work and the role and extent of work for each firm.
3. Include a detailed description of the elevator design, manufacturing, and installation experience involved with the project. Any engineering drawings and sketches must be accompanied by narrative explaining the drawings and sketches. If engineering drawings or sketches are submitted without narrative explaining the drawings and their significance, that project will not be evaluated.
4. Additional relevant project narrative requirements are listed in each sub-factor.
If submitted projects lack any of the required information listed above, they will be considered unresponsive and will not be evaluated. The above format is not required; however, not organizing submitted information in this order could result in relevant experience not considered.
SUBFACTOR 1: Passenger Elevators Submit relevant project information demonstrating experience designing, manufacturing, and installing a five-floor (minimum) electric traction passenger elevator in an existing shaft.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .