Solicitation 29 Apr 2020.pdf
PDF 637 KB Posted
- Attached to
- Replace Air Handling Units Federal contract opportunity
- Solicitation number
- 75D301-20-R-67856
About this file
This solicitation seeks proposals for replacing air handling units in Building 15 at the Centers for Disease Control and Prevention Roybal Campus in Atlanta, Georgia. The work includes removing approximately 21 air handling units, replacing fans and associated equipment, removing exhaust fans, installing variable frequency drives and new air handling units, converting laboratory air distribution and reheat controls, replacing variable air volume equipment and distribution devices, and integrating new automation controls. The estimated price range is between $5 million and $10 million. Interested vendors must submit signed non-disclosure agreements to receive specifications, drawings and a cost breakdown example. An organized site visit is scheduled for May 11, 2020 and requires advance registration by May 6 including signed non-disclosure agreements and visitor information. Proposals are due by June 13, 2020 and award is anticipated on August 4, 2020. The firm fixed-price contract term is 15 months from notice to proceed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment 0004 02 Jun 2020.pdf | ||
| Amendment 0004 Summary includes Q and A 46 - 54.pdf | ||
| Solicitation Amendment 0003 29 May 2020 pdf.pdf | ||
| Amendment 0003 Summary includes Q and A 3 - 45 pdf.pdf | ||
| Solicitation Amendment 0002 21 May 2020 pdf.pdf | ||
| Amendment 0002 Summary pdf.pdf | ||
| Amendment 0001 Summary includes Q and A 1 - 2.pdf | ||
| Section 01 32 33 Photographic Documentation.pdf | ||
| Solicitation Amendment 0001 15 May 2020.pdf | ||
| JA for Other Than Full Open Hood Patterson Dewar 3 edit2.pdf | ||
| 11 May 2020 Site Visit Attendee Lists.pdf | ||
| Site Visit List of Attendees.docx | DOCX document | |
| DoL 20.01.31 - GA20200126 - Dekalb Building.pdf | ||
| Non-Disclosure Agreement Exhibits I II.docx | DOCX document | |
| Solicitation Notice 29 April 2020.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
75D301-20-R-67856
2. TYPE OF SOLICITATION
SEALED BID (IFB)
X NEGOTIATED (RFP)
3. DATE ISSUED
05/01/2020
PAGE OF PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
75D30120C07203
5. REQUISITION/PURCHASE REQUEST NO.
HCAJSBC2-2020-42405
6. PROJECT NO.
P20151192
7. ISSUED BY CODE 8219 8. ADDRESS OFFER TO
Centers for Disease Control and Prevention (CDC)
Office of Acquisition Services (OAS)
2900 Woodcock Blvd, MS TCU-4
Atlanta, GA 30341-4004
Centers for Disease Control and Prevention
Attn: Jenny Matte
Email: pzy1@cdc.gov
9. FOR INFORMATION
CALL:
A. NAME
Jenny M Matte B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
(404) 498-3141
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
The Bid Specifications, Drawings, and other documents describing this requirement are referenced in Section J of this
Solicitation.
Project Title: Building 15 AHU Replacements
Project Number: 20151192 NAICS Code: 238220
Project Location: CDC Roybal Campus, Building 15, 1600 Clifton Road NE, Atlanta, GA 30333, Dekalb County
Contracting Officer: Jenny Matte Contracting Officer’s Representative (COR): Wes Bryan
Site Visit: An organized site visit has been scheduled for May 11, 2020 at 9:00 a.m. EST at CDC Roybal Campus, Building 15, 1600 Clifton Road NE, Atlanta, GA 30333. Signed Non-Disclosure Agreements are required prior to entry. See Section L for details.
Performance, Payment, and Bid Bonds are required.
11. The Contractor shall begin performance within 10 calendar days and complete it within 15 months after receiving award, X notice to proceed. This performance period is X mandatory, negotiable. (See .)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12B.)
X YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Emailed offers to perform the work required shall be received at the place specified in Item 8 by 1:00 pm EST 06/13/2020 (date).
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 120 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )
26. ADMINISTERED BY CODE 8219 27. PAYMENT WILL BE MADE BY
Centers for Disease Control and Prevention (CDC)
Office of Acquisition Services (OAS)
2900 Woodcock Blvd, MS TCU-4
Atlanta, GA 30341-4004
Centers for Disease Control and Prevention (FMO)
PO Box 15580 404-718-8100
Atlanta, GA 30333-0080
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all Items or perform all work, requisitions identified on this form and any continuation sheets for the consideration slated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN
(Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
Jenny M Matte
30B. SIGNATURE
30C. DATE
31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
STANDARD FORM 1442 BACK (REV. 4-85)
75D30120C07203
Section B - Supplies Or Services and Prices/Costs
ITEM SUPPLIES / SERVICES QTY / UNIT UNIT PRICE EXTENDED PRICE
0001 B15 AHU Replacement Base Contract
The Work of this project is to replace selected air handling units located in the south tower of Building 15 at the Roybal
Campus.
1 Lump Sum
Line(s) Of Accounting:
921041Y 320B 2020 75-75-X-0125-0
J404111101 9390ADR 320B 2020 75-
1822-0960 5640161101
9390DZZ 320B 2020 75-2024-0960
5640161101
There are no clauses/provisions included in this section.
Section C - Description/Specification/Work Statement
Section C - Description/Specification/Work Statement
C.1 Magnitude of Construction (FAR 36.204)
(a) Less than $25,000.
(b) Between $25,000 and $100,000.
(c) Between $100,000 and $250,000.
(d) Between $250,000 and $500,000.
(e) Between $500,000 and $1,000,000.
(f) Between $1,000,000 and $5,000,000.
(g) Between $5,000,000 and $10,000,000.
(h) More than $10,000,000.
The magnitude of construction is (g) Between $5,000,000 and $10,000,000.
C.2 Summary Statement of Work
Replace selected air handling units located in Building 15 on the CDC Roybal Campus located at
1600 Clifton Road NE Atlanta, Georgia 30333.
Period of Performance: 15 months from the issuance of the Notice to Proceed.
See Section J for List of Attachments.
C.3 Executive Order 13834
All applicable product and/or services provided under this award shall comply with sustainable
“Green Acquisition” and affirmative procurement guidance and goals.
Section D - Packaging And Marking
There are no clauses/provisions included in this section.
Section E - Inspection And Acceptance
FAR SOURCE TITLE AND DATE
52.246-12 Inspection of Construction (Aug 1996)
52.246-13 Inspection—Dismantling, Demolition, or Removal of Improvements (Aug 1996)
Section F - Deliveries Or Performance
F.1 FAR 52.211-10 Commencement, Prosecution, and Completion of Work, Alternate I
(Apr 1984)
The Contractor shall be required to (a) commence work under this contract within ten calendar days after the date the Contractor receives the Notice To Proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 15 months from issuance of the Notice To Proceed. The time stated for completion shall include final cleanup of the premises.
(End of clause)
F.2 FAR 52.211-12 Liquidated Damages - Construction (Sep 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the
Contractor shall pay liquidated damages to the Government in the amount of $180.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
Section G - Contract Administration Data
G.1 CDCA.G001 Invoice Submission for Construction (Mar 2006)
(a) The Contractor shall submit the original contract invoice/voucher or progress payment with appropriate financial information and required documentation to support the invoice payment amount to the address shown below:
The Centers for Disease Control and Prevention
Financial Management Office (FMO)
P.O. Box 15580
Atlanta, GA 30333
Or – The Contractor may submit the application for payment, original invoice/voucher or progress payment via facsimile or email:
Fax: 404-638-5324
Email: FMOAPINV@CDC.GOV
NOTE: Submit to only one (1) of the above locations. Progress Reports, submittal logs, daily reports, meeting minutes, blueprints and other schedule related documents are not required to be submitted to the Financial Management Office.
(b) The contractor shall submit 2 certified copies of the complete applicant for payment, invoice/voucher or progress payment package to the cognizant contracting office previously identified in this contract. These invoices/voucher copies shall be addressed to the attention of the Contracting Officer.
(c) The Contractor is , is not required to submit a copy of each invoice directly to the
COR concurrently with submission to the Contracting Officer.
(d) In accordance with 5 CFR part 1315 (Prompt Payment), CDC’s Financial Management
Office is the designated billing office for the purpose of determining the payment due date under FAR 32.904
(e) The Contractor shall include (as a minimum) the following information on each invoice:
(1) Contractor’s Name & Address
(2) Contractor’s Tax Identification Number (TIN)
(3) Contract Number and Task Order/Delivery Order Number, if Appropriate
(4) Invoice Number
(5) Invoice Date mailto:FMOAPINV@CDC.GOV
(6) Contract Line Item Number and Description of Item
(7) Original Contract Amount
(8) Amount of Modification (+ or -)
(9) Total Contract Amount to Date
(10) Total Amount Earned
(11) Less Previous Certificates for Payment
(12) Current Payment Due
(13) Name, title and telephone number of person to be notified in the event of a defective invoice
(14) Payment address, if different from the information in b.1 above.
(15) DUNS + 4 Number
(f) The certification required by Section I, FAR 52,232-5, Payments Under Fixed-Price
Construction Contracts, must be included with each payment request or payment will not be made.
(End of Clause)
G.2 CDC0_G008 Contracting Officer’s Representative (COR) (Jul 2017)
Performance of the work hereunder shall be subject to the technical directions of the designated
COR for this contract.
As used herein, technical directions are directions to the Contractor which fill in details, suggests possible lines of inquiry, or otherwise completes the general scope of work set forth herein.
These technical directions must be within the general scope of work, and may not alter the scope of work or cause changes of such a nature as to justify an adjustment in the stated contract price/cost, or any stated limitation thereof.
In the event that the Contractor believes full implementation of any of these directions may exceed the scope of the contract, he or she shall notify the originator of the technical direction and the Contracting Officer, immediately or as soon as possible, in a letter or e-mail separate of any required report(s). No technical direction, nor its fulfillment, shall alter or abrogate the rights and obligations fixed in this contract.
The Government COR is not authorized to change any of the terms and conditions of this contract. Contract changes shall be made only by the Contracting Officer by properly written modification(s) to the contract.
The Government will provide the Contractor with a copy of the COR delegation memorandum upon request.
G.3 CDCP_G009 Contracting Officer (Jul 1999)
(a) The Contracting Officer is the only individual who can legally commit the Government to the expenditure of public funds. No person other than the Contracting Officer can make any changes to the terms, conditions, general provisions, or other stipulations of this contract.
(b) No information, other than that which may be contained in an authorized modification to this contract, duly issued by the Contracting Officer, which may be received from any person employed by the United States Government, or otherwise, shall be considered grounds for deviation from any stipulation of this contract.
G.4 CDCP.G010 Contract Communications/Correspondence (Jul 1999)
The Contractor shall identify all correspondence, reports, and other data pertinent to this contract by imprinting thereon the contract number from Page 1 of the contract.
G.5 CDC0_G018 Payment by Electronic Funds Transfer (Feb 2018)
(a) The Government shall use electronic funds transfer to the maximum extent possible when making payments under this contract. FAR 52.232-33, Payment by Electronic Funds Transfer –
System for Award Management, in Section I, requires the contractor to designate in writing a financial institution for receipt of electronic funds transfer payments.
(b) In the case that EFT information is not within the System of Award Management, FAR
52.232-34 requires mandatory submission of Contractor’s EFT information directly to the office designated in this contract to receive that information (hereafter: “designated office”); see below.
The contractor shall submit the EFT information within the form titled “ACH
Vendor/Miscellaneous Payment Enrollment Form” to the address indicated below. Note: The form is either attached to this contract (see Section J, List of Attachments) or may be obtained by contacting the Contracting Officer or the CDC Office of Financial Resources at 678-475-4510.
(c) In cases where the contractor has previously provided such information, i.e., pursuant to a prior contract/order, and been enrolled in the program, the form is not required unless the designated financial institution has changed.
(d) The completed form shall be mailed after award, but no later than 14 calendar days before an invoice is submitted, to the following address:
The Centers for Disease Control and Prevention
Office of Financial Resources (OFR)
P.O. Box 15580
Atlanta, GA 30333
Or – Fax copy to: 404-638-5342
G.7 CDCA.G021 Applicable Davis-Bacon Wages (Jul 1999)
The attached General Decision No. GA20200126, dated 01/31/2020, specifies hourly rates of wages that shall be paid to laborers and mechanics employed or working at the site of the work, as defined in FAR 22.401. These rates have been determined by the Secretary of Labor in accordance with the provisions of the Davis-Bacon Act.
Section H - Special Contract Requirements
H.1 CDCA.H017 Availability and Use of Utility Services (Jul 1999)
In accordance with FAR 52.236-14, Availability and Use of Utility Services, the following utility services will be made available under the contract:
Water: Yes
Electricity: Yes
Gas: No
Restroom Access: Yes
Waste Disposal: No
H.2 CDCA_H018 Minimum Required Insurance (Jul 2017)
In accordance with FAR Clause 52.228-5, Insurance, Work on a Government Installation, and the requirements of FAR section 28.307-2, Liability, the Contractor shall furnish a certificate of insurance of the following types and minimum amounts which shall be obtained and maintained during the entire period of performance of this contract:
(a) Workman’s Compensation and Employees Liability Insurance - as specified by applicable statute, but not less than $100,000;
(b) General Liability Insurance - Bodily Injury Liability - $500,000 per occurrence;
(c) Automobile Liability Insurance - $200,000 per person, $500,000 per occurrence bodily injury; $20,000 per occurrence property damage.
NOTE: IF WORK UNDER THIS CONTRACT INCLUDES ASBESTOS ABATEMENT, THE
INSURANCE COVERAGE CERTIFICATE SHALL INCLUDE A STATEMENT THAT
CARRIER UNDERSTANDS THIS PROJECT INCLUDES ASBESTOS ABATEMENT
WORK.
H.3 CDC0_H022 Smoke Free Working Environment (May 2009)
In compliance with Department of Health and Human Services (DHHS) regulations, all contractor personnel performing work within CDC/NIOSH facilities shall observe the
CDC/NIOSH smoke-free working environment policy at all times. This policy prohibits smoking in all CDC/NIOSH buildings and in front of buildings which are open to the public.
This policy is also applicable to contractor personnel who do not work full-time within
CDC/NIOSH facilities, but are attending meetings within CDC/NIOSH facilities.
H.4 CDCA_H037 Observance of Legal Holidays and Administrative Leave (Government
Facilities Performance) (Feb 2011)
(a) Holidays - Government personnel observe the following listed days as holidays:
Washington's Birthday
Memorial Day
Independence Day
Labor Day
Veterans' Day
Thanksgiving Day
Christmas Day
New Year's Day
Columbus Day
Martin Luther King Day
Any other day designated by Federal Statute
Any other day designated by Executive Order
Any other day designated by Presidential proclamation
For purposes of contract performance, the Contractor shall observe the above holidays on the date observed by the Government. Observance of such days shall not be cause for an additional period of performance or entitlement to compensation except as otherwise set forth in the contract. No form of holiday or other premium compensation will be reimbursed; however, this does not preclude reimbursement for overtime work authorized in writing by the Contracting
Officer.
(b) Unscheduled Facility Closures
In the event Government facilities are closed due to inclement weather, potentially hazardous or unsafe conditions, or other special circumstances, contractor personnel assigned to work within those facilities are automatically dismissed. Notwithstanding the terms of this clause, the contractor shall comply with any specific contract terms that require a level of ongoing support for critical operations during times of facility closure. The contractor may also continue to provide support under a scheduled telework arrangement in accordance with the terms of the contract if the contract expressly authorizes telework in writing.
(c) Cost Impact
Accounting for costs associated with an unscheduled facility closure is unique to each contract and depends upon a number of factors such as:
i) Contract type, e.g. Fixed Price, Time and Materials, or Cost Reimbursement.
ii) Contractor's established management and accounting practices for unproductive time.
iii) The inclusion and applicability of other contract clauses.
iv) The ability of the contractor to mitigate costs by reassigning employees to work on other contracts, to work from a different facility, or to work remotely from home in accordance with contract telework provisions.
H.5 CDC0.H049 Non-Disclosure Agreement For Contractor And Contractor Employees
(May 2009)
(a) The contractor shall prepare and submit a Non-Disclosure Agreement (NDA) to the
Contracting Officer prior to access of government information or the commencement of work at CDC.
(b) The NDA made part of this clause, exhibit I and II, is required in service contracts where positions and/or functions proposed to be filled by contractor’s employees will have access to non-public and procurement-sensitive information. The NDA also requires contractor’s employees properly identify themselves as employees of a contractor when communicating or interacting with CDC employees, employees of other governmental entities (when communication or interaction relates to the contractor’s work with the CDC), and members of the public. The Federal Acquisition Regulation (FAR) 37.114 (c), states “All contractor personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public or
Congress that they are Government officials, unless, in the judgment of the agency, no harm can come from failing to identify themselves. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.”
(c) The Contractor shall inform employees of the identification requirements by which they must abide and monitor employee compliance with the identification requirements.
(d) During the contract performance period, the Contractor is responsible to ensure that all additional or replacement contractors’ employees sign an NDA and it is submitted to the
Contracting Officer prior to commencement of their work with the CDC.
(e) Contractor employees in designated positions or functions that have not signed the appropriate NDA shall not have access to any non-public, procurement sensitive information or participate in government meeting where sensitive information may be discussed.
(f) The Contractor shall prepare and maintain a current list of employees working under NDA's and submit to the Contracting Officer upon request during the contract period of performance. The list should at a minimum include contract number, employee’s name, position, date of hire and NDA requirement.
H.6 CDC37.0001 Non-Personal Services (Apr 2015)
(a) Personal services shall not be performed under this contract. Although the Government may provide sporadic or occasional instructions within the scope of the contract, the Contractor is responsible for control and supervision of its employees. If the Contractor (including its employees) believes any Government action or communication has been given that would create a personal services relationship between the Government and any Contractor employee, the
Contractor shall promptly notify the Contracting Officer of this communication or action.
(b) The contractor shall comply with, and ensure their employees and subcontractors comply with, CDC Policy titled “Identification of Contractors' Employees and Safeguarding Government
Information.” No Contractor employee shall hold him or herself out to be a Government employee, agent, or representative. No Contractor employee shall state orally or in writing at any time that he or she is acting on behalf of the Government. In all communications with third parties in connection with this contract, Contractor employees shall identify themselves as
Contractor employees and specify the name of the company for which they work. . The contractor is limited to performing the services identified in the contract statement of work and shall not interpret any communication with anyone as a permissible change in contract scope or as authorization to perform work not described in the contract. All contract changes will be incorporated by a modification signed by the Contracting Officer.
(c) The Contractor shall ensure that all of its employees and subcontractor employees working on this contract are informed of the substance of this clause. The Contractor agrees that this is a non-personal services contract; and that for all the purposes of the contract, the Contractor is not, nor shall it hold itself out to be an agent or partner of, or joint venture with, the Government.
The Contractor shall notify its employees that they shall neither supervise nor accept supervision from Government employees. The substance of this clause shall be included in all subcontracts at any tier.
(d) Nothing in this clause shall limit the Government's rights in any way under any other provision of the contract, including those related to the Government's right to inspect and accept or reject the services performed under this contract.
H.7 CDC42.0002 Evaluation of Contractor Performance Utilizing CPARS (Apr 2015)
In accordance with FAR 42.15, the Centers for Disease Control and Prevention (CDC) will review and evaluate contract performance. FAR 42.1502 and 42.1503 requires agencies to prepare evaluations of contractor performance and enter them into the Contractor Performance
Assessment Reporting System (CPARS). The CDC utilizes the Department of Defense (DOD) web-based CPARS to prepare and report these contractor performance evaluations. All information contained in these assessments may be used by the Government, within the limitations of FAR 42.15, for future source selections in accordance with FAR 15.304 where past performance is an evaluation factor.
The CPARS system requires a contractor representative to be assigned so that the contractor has appropriate input into the performance evaluation process. The CPARS contractor representative will be given access to CPARS and will be given the opportunity to concur or not-concur with performance evaluations before the evaluations are complete. The CPARS contractor representative will also have the opportunity to add comments to performance evaluations.
The assessment is not subject to the Disputes clause of the contract, nor is it subject to appeal beyond the review and comment procedures described in the guides on the CPARS website.
Refer to: www.cpars.gov for details and additional information related to CPARS, CPARS user access, how contract performance assessments are conducted, and how Contractors participate.
Access and training for all persons responsible for the preparation and review of performance assessments is also available at the CPARS website.
The contractor must provide the CDC contracting office with the name, e-mail address, and phone number of their designated CPARS representative who will be responsible for logging into CPARS and reviewing and commenting on performance evaluations. The contractor must maintain a current representative to serve as the contractor representative in CPARS. It is the contractor’s responsibility to notify the CDC contracting office, in writing (letter or email), when their CPARS representative information needs to be changed or updated. Failure to maintain current CPARS contractor representative information will result in the loss of an opportunity to review and comment on performance evaluations.
http://www.cpars.gov/
Section I - Contract Clauses
Clauses Incorporated By Reference
FAR SOURCE TITLE AND DATE
52.202-1 Definitions (Nov 2013)
52.203-3 Gratuities (Apr 1984)
52.203-5 Covenant Against Contingent Fees (May 2014)
52.203-6 Restrictions on Subcontractor Sales to the Government (Sept 2006)
52.203-7 Anti-Kickback Procedures (May 2014)
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (May
2014)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (May 2014)
52.203-12 Limitation on Payments to Influence Certain Federal Transactions (Oct 2010)
52.203-13 Contractor Code of Business Ethics and Conduct (Oct 2015)
52.203-14 Display of Hotline Poster(s) (Oct 2015)
52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of
Whistleblower Rights (Apr 2014)
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan
2017)
52.204-2 Security Requirements (Aug 1996), Alternate II (Apr 1984)
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (May 2011)
52.204-9 Personal Identity Verification of Contractor Personnel (Jan 2011)
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2018)
52.204-13 System for Award Management Maintenance (Oct 2018)
52.204-14 Service Contract Reporting Requirements (Oct 2016)
52.204-21 Basic Safeguarding of Covered Contractor Information Systems (Jun 2016)
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018)
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance
Services or Equipment (Aug 2019)
52.207-1 Notice of Standard Competition (May 2006)
52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Oct 2015)
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018)
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015)
52.210-1 Market Research (Apr 2011)
52.211-7 Alternatives to Government-Unique Standards (Nov 1999)
52.211-13 Time Extensions (Sept 2000)
52.215-2 Audit and Records—Negotiation (Oct 2010)
52.215-8 Order of Precedence—Uniform Contract Format (Oct 1997)
52.219-8 Utilization of Small Business Concerns (Oct 2018)
52.219-9 Small Business Subcontracting Plan (Mar 2020)
52.219-16 Liquidated Damages-Subcontracting Plan (Jan 1999)
52.219-28 Post-Award Small Business Program Rerepresentation (Jul 2013)
52.222-3 Convict Labor (Jun 2003)
52.222-4 Contract Work Hours and Safety Standards —Overtime Compensation (Mar 2018)
52.222-6 Construction Wage Rate Requirements (Aug 2018)
52.222-7 Withholding of Funds (May 2014)
52.222-8 Payroll and Basic Records (Aug 2018)
52.222-9 Apprentices and Trainees (Jul 2005)
52.222-10 Compliance with Copeland Act Requirements (Feb 1988)
52.222-11 Subcontracts (Labor Standards) (May 2014)
52.222-12 Contract Termination - Debarment (May 2014)
52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May
2014)
52.222-14 Disputes Concerning Labor Standards (Feb 1988)
52.222-15 Certification of Eligibility (May 2014)
52.222-21 Prohibition of Segregated Facilities (Apr 2015)
52.222-26 Equal Opportunity (Sept 2016)
52.222-27 Affirmative Action Compliance Requirements for Construction (Apr 2015)
52.222-30 Construction Wage Rate Requirements-Price Adjustment (None or Separately Specified
Method) (Aug 2018)
52.222-35 Equal Opportunity for Veterans (Oct 2015)
52.222-36 Equal Opportunity for Workers with Disabilities (Jul 2014)
52.222-37 Employment Reports on Veterans (Feb 2016)
52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010)
52.222-50 Combating Trafficking in Persons (Jan 2019)
52.222-54 Employment Eligibility Verification (Oct 2015)
52.222-55 Minimum Wages Under Executive Order 13658 (Dec 2015)
52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2017)
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
(Sept 2013)
52.223-3 Hazardous Material Identification and Material Safety Data (Jan 1997)
52.223-5 Pollution Prevention and Right-to-Know Information (May 2011)
52.223-6 Drug-Free Workplace (May 2001)
52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun
2016)
52.223-15 Energy Efficiency in Energy-Consuming Products (Dec 2007)
52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
(Aug 2018)
52.223-18 Encouraging Contractor Policies to Ban Text Messaging while Driving (Aug 2011)
52.225-9 Buy American – Construction Materials (May 2014)
52.225-13 Restrictions on Certain Foreign Purchases (Jun 2008)
52.227-1 Authorization and Consent (Dec 2007)
52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (Dec 2007)
52.227-4 Patent Indemnity - Construction Contracts (Dec 2007)
52.228-2 Additional Bond Security (Oct 1997)
52.228-5 Insurance—Work on a Government Installation (Jan 1997)
52.228-11 Pledges of Assets (Aug 2018)
52.228-12 Prospective Subcontractor Requests for Bonds (May 2014)
52.228-14 Irrevocable Letter of Credit (Nov 2014)
52.228-15 Performance and Payment Bonds—Construction (Oct 2010)
52.229-3 Federal, State, and Local Taxes (Feb 2013)
52.232-17 Interest (May 2014)
52.232-23 Assignment of Claims (May 2014)
52.232-33 Payment by Electronic Funds Transfer—System for Award Management (Oct 2018)
52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013)
52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013)
52.233-1 Disputes (May 2014)
52.233-3 Protest after Award (Aug 1996)
52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004)
52.236-2 Differing Site Conditions (Apr 1984)
52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984)
52.236-5 Material and Workmanship (Apr 1984)
52.236-6 Superintendence by the Contractor (Apr 1984)
52.236-7 Permits and Responsibilities (Nov 1991)
52.236-8 Other Contracts (Apr 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr
1984)
52.236-10 Operations and Storage Areas (Apr 1984)
52.236-11 Use and Possession Prior to Completion (Apr 1984)
52.236-12 Cleaning Up (Apr 1984)
52.236-13 Accident Prevention, Alternate I (Nov 1991)
52.236-14 Availability and Use of Utility Services (Apr 1984)
52.236-15 Schedules for Construction Contracts (Apr 1984)
52.236-17 Layout of Work (Apr 1984)
52.236-26 Preconstruction Conference (Feb 1995)
52.242-13 Bankruptcy (Jul 1995)
52.242-14 Suspension of Work (Apr 1984)
52.243-4 Changes (June 2007)
52.244-6 Subcontracts for Commercial Items (Aug 2019)
52.245-1 Government Property (Jan 2017)
52.246-21 Warranty of Construction (Mar 1994)
52.248-3 Value Engineering—Construction (Oct 2015)
52.249-2 Termination for Convenience of the Government (Fixed-Price)--Alternate I (Sep 1996)
52.249-10 Default (Fixed-Price Construction) (Apr 1984)
52.253-1 Computer Generated Forms (Jan 1991)
Section I Clauses Incorporated In Full Text
I.1 FAR 52.232-5 Payments under Fixed-Price Construction Contracts (May 2014)
(a) Payment of price. The Government shall pay the Contractor the contract price as provided in this contract.
(b) Progress payments. The Government shall make progress payments monthly as the work proceeds, or at more frequent intervals as determined by the Contracting Officer, on estimates of work accomplished which meets the standards of quality established under the contract, as approved by the Contracting Officer.
(1) The Contractor’s request for progress payments shall include the following substantiation:
(i) An itemization of the amounts requested, related to the various elements of work required by the contract covered by the payment requested.
(ii) A listing of the amount included for work performed by each subcontractor under the contract.
(iii) A listing of the total amount of each subcontract under the contract.
(iv) A listing of the amounts previously paid to each such subcontractor under the contract.
(v) Additional supporting data in a form and detail required by the Contracting Officer.
(2) In the preparation of estimates, the Contracting Officer may authorize material delivered on the site and preparatory work done to be taken into consideration. Material delivered to the Contractor at locations other than the site also may be taken into consideration if—
(i) Consideration is specifically authorized by this contract; and
(ii) The Contractor furnishes satisfactory evidence that it has acquired title to such material and that the material will be used to perform this contract.
(c) Contractor certification. Along with each request for progress payments, the Contractor shall furnish the following certification, or payment shall not be made: (However, if the Contractor elects to delete paragraph (c)(4) from the certification, the certification is still acceptable.)
I hereby certify, to the best of my knowledge and belief, that—
(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;
(2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;
(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and
(4) This certification is not to be construed as final acceptance of a subcontractor’s performance.
(Name)
(Title)
(Date)
(d) Refund of unearned amounts. If the Contractor, after making a certified request for progress payments, discovers that a portion or all of such request constitutes a payment for performance by the Contractor that fails to conform to the specifications, terms, and conditions of this contract
(hereinafter referred to as the “unearned amount”), the Contractor shall—
(1) Notify the Contracting Officer of such performance deficiency; and
(2) Be obligated to pay the Government an amount (computed by the Contracting Officer in the manner provided in paragraph (j) of this clause) equal to interest on the unearned amount from the 8th day after the date of receipt of the unearned amount until—
(i) The date the Contractor notifies the Contracting Officer that the performance deficiency has been corrected; or
(ii) The date the Contractor reduces the amount of any subsequent certified request for progress payments by an amount equal to the unearned amount.
(e) Retainage. If the Contracting Officer finds that satisfactory progress was achieved during any period for which a progress payment is to be made, the Contracting Officer shall authorize payment to be made in full. However, if satisfactory progress has not been made, the Contracting
Officer may retain a maximum of 10 percent of the amount of the payment until satisfactory progress is achieved. When the work is substantially complete, the Contracting Officer may retain from previously withheld funds and future progress payments that amount the Contracting
Officer considers adequate for protection of the Government and shall release to the Contractor all the remaining withheld funds. Also, on completion and acceptance of each separate building, public work, or other division of the contract, for which the price is stated separately in the contract, payment shall be made for the completed work without retention of a percentage.
(f) Title, liability, and reservation of rights. All material and work covered by progress payments made shall, at the time of payment, become the sole property of the Government, but this shall not be construed as—
(1) Relieving the Contractor from the sole responsibility for all material and work upon which payments have been made or the restoration of any damaged work; or
(2) Waiving the right of the Government to require the fulfillment of all of the terms of the contract.
(g) Reimbursement for bond premiums. In making these progress payments, the Government shall, upon request, reimburse the Contractor for the amount of premiums paid for performance and payment bonds (including coinsurance and reinsurance agreements, when required) after the
Contractor has furnished evidence of full payment to the surety. The retainage provisions in paragraph (e) of this clause shall not apply to that portion of progress payments attributable to bond premiums.
(h) Final payment. The Government shall pay the amount due the Contractor under this contract after—
(1) Completion and acceptance of all work;
(2) Presentation of a properly executed voucher; and
(3) Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release. A release may also be required of the assignee if the
Contractor’s claim to amounts payable under this contract has been assigned under the
Assignment of Claims Act of 1940 (31 U.S.C. 3727 and 41 U.S.C. 6305).
(i) Limitation because of undefinitized work. Notwithstanding any provision of this contract, progress payments shall not exceed 80 percent on work accomplished on undefinitized contract actions. A “contract action” is any action resulting in a contract, as defined in FAR Subpart 2.1, including contract modifications for additional supplies or services, but not including contract modifications that are within the scope and under the terms of the contract, such as contract modifications issued pursuant to the Changes clause, or funding and other administrative changes.
(j) Interest computation on unearned amounts. In accordance with 31 U.S.C. 3903(c)(1), the amount payable under paragraph (d)(2) of this clause shall be—
(1) Computed at the rate of average bond equivalent rates of 91-day Treasury bills auctioned at the most recent auction of such bills prior to the date the Contractor receives the unearned amount; and http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t29t32+1665+30++%2831%29%20%20AND%20%28%2831%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t41t42+2+13++%2841%29%20%20AND%20%28%2841%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%202_1.html#wp1145507 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t29t32+1665+30++%2831%29%20%20AND%20%28%2831%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20
(2) Deducted from the next available payment to the Contractor.
I.2 FAR 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN
2017)
Notwithstanding any other payment terms in this contract, the Government will make invoice payments under the terms and conditions specified in this clause. The Government considers payment as being made on the day a check is dated or the date of an electronic funds transfer. Definitions of pertinent terms are set forth in sections 2.101, 32.001, and 32.902 of the
Federal Acquisition Regulation. All days referred to in this clause are calendar days, unless otherwise specified. (However, see paragraph (a)(3) concerning payments due on Saturdays, Sundays, and legal holidays.)
(a) Invoice payments-
(1) Types of invoice payments. For purposes of this clause, there are several types of invoice payments that may occur under this contract, as follows:
(i) Progress payments, if provided for elsewhere in this contract, based on Contracting
Officer approval of the estimated amount and value of work or services performed, including payments for reaching milestones in any project.
(A) The due date for making such payments is 14 days after the designated billing office receives a proper payment request. If the designated billing office fails to annotate the payment request with the actual date of receipt at the time of receipt, the payment due date is the
14th day after the date of the Contractor’s payment request, provided the designated billing office receives a proper payment request and there is no disagreement over quantity, quality, or
Contractor compliance with contract requirements.
(B) The due date for payment of any amounts retained by the Contracting Officer in accordance with the clause at 52.232-5, Payments Under Fixed-Price Construction Contracts, is as specified in the contract or, if not specified, 30 days after approval by the Contracting Officer for release to the Contractor.
(ii) Final payments based on completion and acceptance of all work and presentation of release of all claims against the Government arising by virtue of the contract, and payments for partial deliveries that have been accepted by the Government (e.g., each separate building, public work, or other division of the contract for which the price is stated separately in the contract).
(A) The due date for making such payments is the later of the following two events:
(1) The 30th day after the designated billing office receives a proper invoice from the Contractor.
(2) The 30th day after Government acceptance of the work or services completed by the Contractor. For a final invoice when the payment amount is subject to contract settlement https://www.acquisition.gov/content/2101-definitions#i1125359 https://www.acquisition.gov/content/32001-definitions#i1083391 https://www.acquisition.gov/content/32902-definitions#i1081121 https://www.acquisition.gov/content/52232-5-payments-under-fixed-price-construction-contracts#i1049425 actions (e.g., release of claims), acceptance is deemed to occur on the effective date of the contract settlement.
(B)If the designated billing office fails to annotate the invoice with the date of actual receipt at the time of receipt, the invoice payment due date is the 30th day after the date of the Contractor’s invoice, provided the designated billing office receives a proper invoice and there is no disagreement over quantity, quality, or Contractor compliance with contract requirements.
(2) Contractor's invoice. The Contractor shall prepare and submit invoices to the designated billing office specified in the contract. A proper invoice must include the items listed in paragraphs (a)(2)(i) through (a)(2)(xi) of this clause. If the invoice does not comply with these requirements, the designated billing office must return it within 7 days after receipt, with the reasons why it is not a proper invoice. When computing any interest penalty owed the
Contractor, the Government will take into account if the Government notifies the Contractor of an improper invoice in an untimely manner.
(i) Name and address of the Contractor.
(ii) Invoice date and invoice number. (The Contractor should date invoices as close as possible to the date of mailing or transmission.)
(iii) Contract number or other authorization for work or services performed (including order number and line item number).
(iv) Description of work or services performed.
(v) Delivery and payment terms (e.g., discount for prompt payment terms).
(vi) Name and address of Contractor official to whom payment is to be sent (must be the same as that in the contract or in a proper notice of assignment).
(vii) Name (where practicable), title, phone number, and mailing address of person to notify in the event of a defective invoice.
(viii)For payments described in paragraph (a)(1)(i) of this clause, substantiation of the amounts requested and certification in accordance with the requirements of the clause at 52.232-
5, Payments Under Fixed-Price Construction Contracts.
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B)If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision (e.g., 52.232-38, Submission https://www.acquisition.gov/content/52232-5-payments-under-fixed-price-construction-contracts#i1049425 https://www.acquisition.gov/content/52232-5-payments-under-fixed-price-construction-contracts#i1049425 https://www.acquisition.gov/content/52232-38-submission-electronic-funds-transfer-information-offer#i1050821 of Electronic Funds Transfer Information with Offer), contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer-System for Award Management, or 52.232-34, Payment by
Electronic Funds Transfer-Other Than System for Award Management), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(xi) Any other information or documentation required by the contract.
(3) Interest penalty. The designated payment office will pay an interest penalty automatically, without request from the Contractor, if payment is not made by the due date and the conditions listed in paragraphs (a)(3)(i) through (a)(3)(iii) of this clause are met, if applicable. However, when the due date falls on a Saturday, Sunday, or legal holiday, the designated payment office may make payment on the following working day without incurring a late payment interest penalty.
(i) The designated billing office received a proper invoice.
(ii) The Government processed a receiving report or other Government documentation authorizing payment and there was no disagreement over quantity, quality, Contractor compliance with any contract term or condition, or requested progress payment amount.
(iii)In the case of a final invoice for any balance of funds due the Contractor for work or services performed, the amount was not subject to further contract settlement actions between the Government and the Contractor.
(4) Computing penalty amount. The Government will compute the interest penalty in accordance with the Office of Management and Budget prompt payment regulations at 5 CFR
Part 1315.
(i) For the sole purpose of computing an interest penalty that might be due the
Contractor for payments described in paragraph (a)(1)(ii) of this clause, Government acceptance or approval is deemed to occur constructively on the 7th day after the Contractor has completed the work or services in accordance with the terms and conditions of the contract. If actual acceptance or approval occurs within the constructive acceptance or approval period, the
Government will base the determination of an interest penalty on the actual date of acceptance or approval. Constructive acceptance or constructive approval requirements do not apply if there is a disagreement over quantity, quality, or Contractor compliance with a contract provision. These requirements also do not compel Government officials to accept work or services, approve
Contractor estimates, perform contract administration functions, or make payment prior to fulfilling their responsibilities.
(ii) The prompt payment regulations at 5 CFR1315.10(c) do not require the
Government to pay interest penalties if payment delays are due to disagreement between the
Government and the Contractor over the payment amount or other issues involving contract compliance, or on amounts temporarily withheld or retained in accordance with the terms of the contract. The Government and the Contractor shall resolve claims involving disputes, and any interest that may be payable in accordance with the clause at FAR 52.233-1, Disputes.
https://www.acquisition.gov/content/52232-33-payment-electronic-funds-transfer-system-award-management#i1050674…