HTTF_Layouts.pdf
PDF 1 MB Posted
- Attached to
- N2O Analyzers for CTTF & HTTF Federal contract opportunity
- Solicitation number
- SOL-CI-15-00039
About this file
Amendment 03 - HTTF Layout Drawing
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_SOL-CI-15-00039_Amd_000003.pdf | ||
| Amendment_03_-_Page_3.pdf | ||
| CTTF_Layout.pdf | ||
| Solicitation_Cover_Letter.doc | DOC document | |
| Sol_SOL-CI-15-00039_Amd_000002.pdf | ||
| Attachment_1.docx | DOCX document | |
| Page_3_plus_drawings.pdf | ||
| Sol_SOL-CI-15-00039_Amd_000001.pdf | ||
| Attachment_B_-_Technical_Evaluation.pdf | ||
| Sol_SOL-CI-15-00039.pdf | ||
| Attachment_D_-_Past_Performance_Questionnaire.docx | DOCX document | |
| Solicitation_Cover_Letter.pdf | ||
| Attachment_A_-_N2O_Analyzer_SOW_for_CTTF_HTF_Final2.pdf | ||
| Attachment_C_-_Proposal_Instructions.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCO3 Control Room Equipment Layout
Chassis Dyno
211034-401B01
DRAWN IN COMPLIANCE WITH ASME Y14.5M-1994
47519 Halyard Dr.
OF A PATENT OR THE REGISTRATION OF A UTILITY
D
C
B
A A
B
C
D
12345678
8 7 6 5 4 3 2 1
E
F
E
B
AVL Drawing Number
Layout_SCO3
Control Room
F
-4
B
Assembly Detail
Plymouth, MI 48170-2438
D
Date Created
R E V I S I O N S
N. Jenks
AVL Engineering Master
D Size
R E V
Revision
9/13/11 Meeting Updates
--NJ9/16/11
Approval By
SheetScale
B
MODEL OR DESIGN
NO. ECO DATE ENGR
Checked By
CHK
Drawn By
APPR
N/A
7/22/11
-NJ9/13/11A
Released B
COPYRIGHT © 2011 AVL, TSI
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE SOLE PROPERTY OF AVL. ANY
REPRODUCTION IN PART OR AS A WHOLE WITHOUT
THE WRITTEN PERMISSION OF AVL IS PROHIBITED.
ALL RIGHTS RESERVED IN THE EVENT OF A GRANT
Equipment Layout
EPA SCO3 TEST CELL
24 24 24 24
26 26
3 2
Test Cell Door
12 13
Test Cell Window EPA Supplied PC Tower
Dirty Tunnel
Control Room
Battery Cycler CellBattery Cycler Cell
Clean Tunnel
Electrical & Pneumatics troughOperator Desk
Battery Cell Operator Desk
A A
ID Name 1 iGem Vehicle
2 weather station
3 FEM I/O Cabinet
4 ICAL GNU EXT. GDU / NGU 63 STEPS
5 AMA i60 INNOVA
6 SCS-400AM Carbonyl/Aldehyde Sampler
7 AMA i60 R1 Raw Modal
8 AMA i60 D2 Bag/Dilute Modal Gas & Diesel
9 Heated Pre-Filter
TCU1 (gas tunnel) heated filter, heated line, heated probe
TCU2(diesel tunnel) heated filter, heated line, heated probe
12 PSS i60 DD PARTICULATE SAMPLER
13 PSS i60 DD PARTICULATE SAMPLER (background)
14 PSS i60 1 Main Stream Pump
15 PSS i60 2 Main Stream Pump
16 PSS i60 HEATED PF BOX
17 PSS i60 PF BOX (background)
18 CVS i60 MD EDC
19 CVS i60 MD CFV UNIT WITHOUT HE
20 CVS i60 MD BLOWER 60SM³
21 CVS i60 MD BLOWER NOISE PROTECTION HOOD
22 CVS i60 HD BAG-CONTROL CABINET
CVS i60 MD TAILPIPE PRESSURE CONTROL BLOWER
CVS I60 MD DILUTION AIR HEATER
CVS i60 MD TUNNEL HEATING POWER &
CONTROL BOXES (6 BOXES TOTAL)
25 CVS i60 MD DILUTION AIR MEASUREMENT
26 CVS i60 HD BAG-CONTROL CABINET INNOVA
27 DILUTION AIR CONDITIONER
28 VFD CABINET TAILPIPE PRESSURE CONTROL BLOWER
EPA SCO3 Test Cell Equipment
Analytical
Dilution Tunnel/CVS system
R
V B
211034-401B01
N/
D
C
B
A A
B
C
D
12345678
8 7 6 5 4 3 2 1
E
F
-4
B
Revision
9/13/11 Meeting Updates
Mezzanine
Date Created
R E V I S I O N S
N. Jenks
AVL Engineering Master
F
AVL Drawing Number
-NJ9/16/11B
Released
D Size
Approval By
Sheet
DRAWN IN COMPLIANCE WITH ASME Y14.5M-1994
B
MODEL OR DESIGN
NO. ECO DATE ENGR
Checked By
CHK
Drawn By
APPR
47519 Halyard Dr.
OF A PATENT OR THE REGISTRATION OF A UTILITY
A
7/22/11
-NJ9/13/11A
Scale
COPYRIGHT © 2011 AVL, TSI
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE SOLE PROPERTY OF AVL. ANY
REPRODUCTION IN PART OR AS A WHOLE WITHOUT
THE WRITTEN PERMISSION OF AVL IS PROHIBITED.
ALL RIGHTS RESERVED IN THE EVENT OF A GRANT
Equipment Layout
EPA SCO3 TEST CELL
SCO3 Mezzanine Equipment Layout
Connection (10" tube)
Chiller facility exhaust vent) (Customer to connect to
D.4 Ref Plane
AVL Supplied Blower Exhaust
Chiller
AV-900
Ductwork
6.4 Ref Plane
B B
76" Door
3 5
ID Name 1 iGem Vehicle
2 weather station
3 FEM I/O Cabinet
4 ICAL GNU EXT. GDU / NGU 63 STEPS
5 AMA i60 INNOVA
6 SCS-400AM Carbonyl/Aldehyde Sampler
7 AMA i60 R1 Raw Modal
8 AMA i60 D2 Bag/Dilute Modal Gas & Diesel
9 Heated Pre-Filter
TCU1 (gas tunnel) heated filter, heated line, heated probe
TCU2(diesel tunnel) heated filter, heated line, heated probe
12 PSS i60 DD PARTICULATE SAMPLER
13 PSS i60 DD PARTICULATE SAMPLER (background)
14 PSS i60 1 Main Stream Pump
15 PSS i60 2 Main Stream Pump
16 PSS i60 HEATED PF BOX
17 PSS i60 PF BOX (background)
18 CVS i60 MD EDC
19 CVS i60 MD CFV UNIT WITHOUT HE
20 CVS i60 MD BLOWER 60SM³
21 CVS i60 MD BLOWER NOISE PROTECTION HOOD
22 CVS i60 HD BAG-CONTROL CABINET
CVS i60 MD TAILPIPE PRESSURE CONTROL BLOWER
CVS I60 MD DILUTION AIR HEATER
CVS i60 MD TUNNEL HEATING POWER &
CONTROL BOXES (6 BOXES TOTAL)
25 CVS i60 MD DILUTION AIR MEASUREMENT
26 CVS i60 HD BAG-CONTROL CABINET INNOVA
27 DILUTION AIR CONDITIONER
28 VFD CABINET TAILPIPE PRESSURE CONTROL BLOWER
EPA SCO3 Test Cell Equipment
Analytical
211034-401B01
DRAWN IN COMPLIANCE WITH ASME Y14.5M-1994
47519 Halyard Dr.
OF A PATENT OR THE REGISTRATION OF A UTILITY
D
C
B
A A
B
C
D
12345678
8 7 6 5 4 3 2 1
E
F
Drawn By
AVL Drawing Number
Mezzanine
F
-4
B
Date Created
R E V I S I O N S
N. Jenks
AVL Engineering Master
D Size
R E V
Revision
9/13/11 Meeting Updates
--NJ9/16/11
B
Approval By
Scale
B
MODEL OR DESIGN
NO. ECO DATE ENGR
Checked By
CHK
Sheet
APPR
N/A
7/22/11
-NJ9/13/11A
Released B
COPYRIGHT © 2011 AVL, TSI
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE SOLE PROPERTY OF AVL. ANY
REPRODUCTION IN PART OR AS A WHOLE WITHOUT
THE WRITTEN PERMISSION OF AVL IS PROHIBITED.
ALL RIGHTS RESERVED IN THE EVENT OF A GRANT
Equipment Layout
EPA SCO3 TEST CELL
SCO3 Test Cell Wall View
D
D
Test Cell
Dyno Pit
Insulated Panel Ceiling
ID Name 1 iGem Vehicle
2 weather station
3 FEM I/O Cabinet
4 ICAL GNU EXT. GDU / NGU 63 STEPS
5 AMA i60 INNOVA
6 SCS-400AM Carbonyl/Aldehyde Sampler
7 AMA i60 R1 Raw Modal
8 AMA i60 D2 Bag/Dilute Modal Gas & Diesel
9 Heated Pre-Filter
TCU1 (gas tunnel) heated filter, heated line, heated probe
TCU2(diesel tunnel) heated filter, heated line, heated probe
12 PSS i60 DD PARTICULATE SAMPLER
13 PSS i60 DD PARTICULATE SAMPLER (background)
14 PSS i60 1 Main Stream Pump
15 PSS i60 2 Main Stream Pump
16 PSS i60 HEATED PF BOX
17 PSS i60 PF BOX (background)
18 CVS i60 MD EDC
19 CVS i60 MD CFV UNIT WITHOUT HE
20 CVS i60 MD BLOWER 60SM³
21 CVS i60 MD BLOWER NOISE PROTECTION HOOD
22 CVS i60 HD BAG-CONTROL CABINET
CVS i60 MD TAILPIPE PRESSURE CONTROL BLOWER
CVS I60 MD DILUTION AIR HEATER
CVS i60 MD TUNNEL HEATING POWER &
CONTROL BOXES (6 BOXES TOTAL)
25 CVS i60 MD DILUTION AIR MEASUREMENT
26 CVS i60 HD BAG-CONTROL CABINET INNOVA
27 DILUTION AIR CONDITIONER
28 VFD CABINET TAILPIPE PRESSURE CONTROL BLOWER
EPA SCO3 Test Cell Equipment
Analytical
SCO3 Equipment Layout South Wall View
E E
OF A PATENT OR THE REGISTRATION OF A UTILITY
F
-4
B
D
AVL Engineering Master
DRAWN IN COMPLIANCE WITH ASME Y14.5M-1994
Assembly Detail
47519 Halyard Dr.
Mezzanine
D
C
B
A A
B
C
D
12345678
8 7 6 5 4
F
Released
Revision
AVL Drawing Number
B
3 2 1
9/16/11 NJ - -
9/13/11 Meeting Updates
R
V
B
211034-401B01
A 9/13/11 NJ -
7/22/11
N. Jenks
R E V I S I O N S
Scale
Date Created
Size
Approval By
Sheet
Drawn By
B
MODEL OR DESIGN
NO.
D
ECO DATE ENGR CHK
Checked By
APPR
N/A
COPYRIGHT © 2011 AVL, TSI
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE SOLE PROPERTY OF AVL. ANY
REPRODUCTION IN PART OR AS A WHOLE WITHOUT
THE WRITTEN PERMISSION OF AVL IS PROHIBITED.
ALL RIGHTS RESERVED IN THE EVENT OF A GRANT
Equipment Layout
EPA SCO3 TEST CELL
G
G
7 5 26 26
Control Room
Mezzanine
Inside
13 12
EPA Supplied PC Tower
ID Name 1 iGem Vehicle
2 weather station
3 FEM I/O Cabinet
4 ICAL GNU EXT. GDU / NGU 63 STEPS
5 AMA i60 INNOVA
6 SCS-400AM Carbonyl/Aldehyde Sampler
7 AMA i60 R1 Raw Modal
8 AMA i60 D2 Bag/Dilute Modal Gas & Diesel
9 Heated Pre-Filter
TCU1 (gas tunnel) heated filter, heated line, heated probe
TCU2(diesel tunnel) heated filter, heated line, heated probe
12 PSS i60 DD PARTICULATE SAMPLER
13 PSS i60 DD PARTICULATE SAMPLER (background)
14 PSS i60 1 Main Stream Pump
15 PSS i60 2 Main Stream Pump
16 PSS i60 HEATED PF BOX
17 PSS i60 PF BOX (background)
18 CVS i60 MD EDC
19 CVS i60 MD CFV UNIT WITHOUT HE
20 CVS i60 MD BLOWER 60SM³
21 CVS i60 MD BLOWER NOISE PROTECTION HOOD
22 CVS i60 HD BAG-CONTROL CABINET
CVS i60 MD TAILPIPE PRESSURE CONTROL BLOWER
CVS I60 MD DILUTION AIR HEATER
CVS i60 MD TUNNEL HEATING POWER &
CONTROL BOXES (6 BOXES TOTAL)
25 CVS i60 MD DILUTION AIR MEASUREMENT
26 CVS i60 HD BAG-CONTROL CABINET INNOVA
27 DILUTION AIR CONDITIONER
28 VFD CABINET TAILPIPE PRESSURE CONTROL BLOWER
EPA SCO3 Test Cell Equipment
Analytical
File details come from the government source that posted it. Updated .