HTTF_Layouts.pdf

PDF 1 MB Posted

Attached to
N2O Analyzers for CTTF & HTTF Federal contract opportunity
Solicitation number
SOL-CI-15-00039
Issued by
Environmental Protection Agency Cincinatti Procurement Operations Division

About this file

Amendment 03 - HTTF Layout Drawing

View the file

Other files for this federal contract opportunity

Other files attached to N2O Analyzers for CTTF & HTTF, newest first.
File Type Posted
Sol_SOL-CI-15-00039_Amd_000003.pdf PDF
Amendment_03_-_Page_3.pdf PDF
CTTF_Layout.pdf PDF
Solicitation_Cover_Letter.doc DOC document
Sol_SOL-CI-15-00039_Amd_000002.pdf PDF
Attachment_1.docx DOCX document
Page_3_plus_drawings.pdf PDF
Sol_SOL-CI-15-00039_Amd_000001.pdf PDF
Attachment_B_-_Technical_Evaluation.pdf PDF
Sol_SOL-CI-15-00039.pdf PDF
Attachment_D_-_Past_Performance_Questionnaire.docx DOCX document
Solicitation_Cover_Letter.pdf PDF
Attachment_A_-_N2O_Analyzer_SOW_for_CTTF_HTF_Final2.pdf PDF
Attachment_C_-_Proposal_Instructions.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCO3 Control Room Equipment Layout

Chassis Dyno

211034-401B01

DRAWN IN COMPLIANCE WITH ASME Y14.5M-1994

47519 Halyard Dr.

OF A PATENT OR THE REGISTRATION OF A UTILITY

D

C

B

A A

B

C

D

12345678

8 7 6 5 4 3 2 1

E

F

E

B

AVL Drawing Number

Layout_SCO3

Control Room

F

-4

B

Assembly Detail

Plymouth, MI 48170-2438

D

Date Created

R E V I S I O N S

N. Jenks

AVL Engineering Master

D Size

R E V

Revision

9/13/11 Meeting Updates

--NJ9/16/11

Approval By

SheetScale

B

MODEL OR DESIGN

NO. ECO DATE ENGR

Checked By

CHK

Drawn By

APPR

N/A

7/22/11

-NJ9/13/11A

Released B

COPYRIGHT © 2011 AVL, TSI

THE INFORMATION CONTAINED IN THIS

DRAWING IS THE SOLE PROPERTY OF AVL. ANY

REPRODUCTION IN PART OR AS A WHOLE WITHOUT

THE WRITTEN PERMISSION OF AVL IS PROHIBITED.

ALL RIGHTS RESERVED IN THE EVENT OF A GRANT

Equipment Layout

EPA SCO3 TEST CELL

24 24 24 24

26 26

3 2

Test Cell Door

12 13

Test Cell Window EPA Supplied PC Tower

Dirty Tunnel

Control Room

Battery Cycler CellBattery Cycler Cell

Clean Tunnel

Electrical & Pneumatics troughOperator Desk

Battery Cell Operator Desk

A A

ID Name 1 iGem Vehicle

2 weather station

3 FEM I/O Cabinet

4 ICAL GNU EXT. GDU / NGU 63 STEPS

5 AMA i60 INNOVA

6 SCS-400AM Carbonyl/Aldehyde Sampler

7 AMA i60 R1 Raw Modal

8 AMA i60 D2 Bag/Dilute Modal Gas & Diesel

9 Heated Pre-Filter

TCU1 (gas tunnel) heated filter, heated line, heated probe

TCU2(diesel tunnel) heated filter, heated line, heated probe

12 PSS i60 DD PARTICULATE SAMPLER

13 PSS i60 DD PARTICULATE SAMPLER (background)

14 PSS i60 1 Main Stream Pump

15 PSS i60 2 Main Stream Pump

16 PSS i60 HEATED PF BOX

17 PSS i60 PF BOX (background)

18 CVS i60 MD EDC

19 CVS i60 MD CFV UNIT WITHOUT HE

20 CVS i60 MD BLOWER 60SM³

21 CVS i60 MD BLOWER NOISE PROTECTION HOOD

22 CVS i60 HD BAG-CONTROL CABINET

CVS i60 MD TAILPIPE PRESSURE CONTROL BLOWER

CVS I60 MD DILUTION AIR HEATER

CVS i60 MD TUNNEL HEATING POWER &

CONTROL BOXES (6 BOXES TOTAL)

25 CVS i60 MD DILUTION AIR MEASUREMENT

26 CVS i60 HD BAG-CONTROL CABINET INNOVA

27 DILUTION AIR CONDITIONER

28 VFD CABINET TAILPIPE PRESSURE CONTROL BLOWER

EPA SCO3 Test Cell Equipment

Analytical

Dilution Tunnel/CVS system

R

V B

211034-401B01

N/

D

C

B

A A

B

C

D

12345678

8 7 6 5 4 3 2 1

E

F

-4

B

Revision

9/13/11 Meeting Updates

Mezzanine

Date Created

R E V I S I O N S

N. Jenks

AVL Engineering Master

F

AVL Drawing Number

-NJ9/16/11B

Released

D Size

Approval By

Sheet

DRAWN IN COMPLIANCE WITH ASME Y14.5M-1994

B

MODEL OR DESIGN

NO. ECO DATE ENGR

Checked By

CHK

Drawn By

APPR

47519 Halyard Dr.

OF A PATENT OR THE REGISTRATION OF A UTILITY

A

7/22/11

-NJ9/13/11A

Scale

COPYRIGHT © 2011 AVL, TSI

THE INFORMATION CONTAINED IN THIS

DRAWING IS THE SOLE PROPERTY OF AVL. ANY

REPRODUCTION IN PART OR AS A WHOLE WITHOUT

THE WRITTEN PERMISSION OF AVL IS PROHIBITED.

ALL RIGHTS RESERVED IN THE EVENT OF A GRANT

Equipment Layout

EPA SCO3 TEST CELL

SCO3 Mezzanine Equipment Layout

Connection (10" tube)

Chiller facility exhaust vent) (Customer to connect to

D.4 Ref Plane

AVL Supplied Blower Exhaust

Chiller

AV-900

Ductwork

6.4 Ref Plane

B B

76" Door

3 5

ID Name 1 iGem Vehicle

2 weather station

3 FEM I/O Cabinet

4 ICAL GNU EXT. GDU / NGU 63 STEPS

5 AMA i60 INNOVA

6 SCS-400AM Carbonyl/Aldehyde Sampler

7 AMA i60 R1 Raw Modal

8 AMA i60 D2 Bag/Dilute Modal Gas & Diesel

9 Heated Pre-Filter

TCU1 (gas tunnel) heated filter, heated line, heated probe

TCU2(diesel tunnel) heated filter, heated line, heated probe

12 PSS i60 DD PARTICULATE SAMPLER

13 PSS i60 DD PARTICULATE SAMPLER (background)

14 PSS i60 1 Main Stream Pump

15 PSS i60 2 Main Stream Pump

16 PSS i60 HEATED PF BOX

17 PSS i60 PF BOX (background)

18 CVS i60 MD EDC

19 CVS i60 MD CFV UNIT WITHOUT HE

20 CVS i60 MD BLOWER 60SM³

21 CVS i60 MD BLOWER NOISE PROTECTION HOOD

22 CVS i60 HD BAG-CONTROL CABINET

CVS i60 MD TAILPIPE PRESSURE CONTROL BLOWER

CVS I60 MD DILUTION AIR HEATER

CVS i60 MD TUNNEL HEATING POWER &

CONTROL BOXES (6 BOXES TOTAL)

25 CVS i60 MD DILUTION AIR MEASUREMENT

26 CVS i60 HD BAG-CONTROL CABINET INNOVA

27 DILUTION AIR CONDITIONER

28 VFD CABINET TAILPIPE PRESSURE CONTROL BLOWER

EPA SCO3 Test Cell Equipment

Analytical

211034-401B01

DRAWN IN COMPLIANCE WITH ASME Y14.5M-1994

47519 Halyard Dr.

OF A PATENT OR THE REGISTRATION OF A UTILITY

D

C

B

A A

B

C

D

12345678

8 7 6 5 4 3 2 1

E

F

Drawn By

AVL Drawing Number

Mezzanine

F

-4

B

Date Created

R E V I S I O N S

N. Jenks

AVL Engineering Master

D Size

R E V

Revision

9/13/11 Meeting Updates

--NJ9/16/11

B

Approval By

Scale

B

MODEL OR DESIGN

NO. ECO DATE ENGR

Checked By

CHK

Sheet

APPR

N/A

7/22/11

-NJ9/13/11A

Released B

COPYRIGHT © 2011 AVL, TSI

THE INFORMATION CONTAINED IN THIS

DRAWING IS THE SOLE PROPERTY OF AVL. ANY

REPRODUCTION IN PART OR AS A WHOLE WITHOUT

THE WRITTEN PERMISSION OF AVL IS PROHIBITED.

ALL RIGHTS RESERVED IN THE EVENT OF A GRANT

Equipment Layout

EPA SCO3 TEST CELL

SCO3 Test Cell Wall View

D

D

Test Cell

Dyno Pit

Insulated Panel Ceiling

ID Name 1 iGem Vehicle

2 weather station

3 FEM I/O Cabinet

4 ICAL GNU EXT. GDU / NGU 63 STEPS

5 AMA i60 INNOVA

6 SCS-400AM Carbonyl/Aldehyde Sampler

7 AMA i60 R1 Raw Modal

8 AMA i60 D2 Bag/Dilute Modal Gas & Diesel

9 Heated Pre-Filter

TCU1 (gas tunnel) heated filter, heated line, heated probe

TCU2(diesel tunnel) heated filter, heated line, heated probe

12 PSS i60 DD PARTICULATE SAMPLER

13 PSS i60 DD PARTICULATE SAMPLER (background)

14 PSS i60 1 Main Stream Pump

15 PSS i60 2 Main Stream Pump

16 PSS i60 HEATED PF BOX

17 PSS i60 PF BOX (background)

18 CVS i60 MD EDC

19 CVS i60 MD CFV UNIT WITHOUT HE

20 CVS i60 MD BLOWER 60SM³

21 CVS i60 MD BLOWER NOISE PROTECTION HOOD

22 CVS i60 HD BAG-CONTROL CABINET

CVS i60 MD TAILPIPE PRESSURE CONTROL BLOWER

CVS I60 MD DILUTION AIR HEATER

CVS i60 MD TUNNEL HEATING POWER &

CONTROL BOXES (6 BOXES TOTAL)

25 CVS i60 MD DILUTION AIR MEASUREMENT

26 CVS i60 HD BAG-CONTROL CABINET INNOVA

27 DILUTION AIR CONDITIONER

28 VFD CABINET TAILPIPE PRESSURE CONTROL BLOWER

EPA SCO3 Test Cell Equipment

Analytical

SCO3 Equipment Layout South Wall View

E E

OF A PATENT OR THE REGISTRATION OF A UTILITY

F

-4

B

D

AVL Engineering Master

DRAWN IN COMPLIANCE WITH ASME Y14.5M-1994

Assembly Detail

47519 Halyard Dr.

Mezzanine

D

C

B

A A

B

C

D

12345678

8 7 6 5 4

F

Released

Revision

AVL Drawing Number

B

3 2 1

9/16/11 NJ - -

9/13/11 Meeting Updates

R

V

B

211034-401B01

A 9/13/11 NJ -

7/22/11

N. Jenks

R E V I S I O N S

Scale

Date Created

Size

Approval By

Sheet

Drawn By

B

MODEL OR DESIGN

NO.

D

ECO DATE ENGR CHK

Checked By

APPR

N/A

COPYRIGHT © 2011 AVL, TSI

THE INFORMATION CONTAINED IN THIS

DRAWING IS THE SOLE PROPERTY OF AVL. ANY

REPRODUCTION IN PART OR AS A WHOLE WITHOUT

THE WRITTEN PERMISSION OF AVL IS PROHIBITED.

ALL RIGHTS RESERVED IN THE EVENT OF A GRANT

Equipment Layout

EPA SCO3 TEST CELL

G

G

7 5 26 26

Control Room

Mezzanine

Inside

13 12

EPA Supplied PC Tower

ID Name 1 iGem Vehicle

2 weather station

3 FEM I/O Cabinet

4 ICAL GNU EXT. GDU / NGU 63 STEPS

5 AMA i60 INNOVA

6 SCS-400AM Carbonyl/Aldehyde Sampler

7 AMA i60 R1 Raw Modal

8 AMA i60 D2 Bag/Dilute Modal Gas & Diesel

9 Heated Pre-Filter

TCU1 (gas tunnel) heated filter, heated line, heated probe

TCU2(diesel tunnel) heated filter, heated line, heated probe

12 PSS i60 DD PARTICULATE SAMPLER

13 PSS i60 DD PARTICULATE SAMPLER (background)

14 PSS i60 1 Main Stream Pump

15 PSS i60 2 Main Stream Pump

16 PSS i60 HEATED PF BOX

17 PSS i60 PF BOX (background)

18 CVS i60 MD EDC

19 CVS i60 MD CFV UNIT WITHOUT HE

20 CVS i60 MD BLOWER 60SM³

21 CVS i60 MD BLOWER NOISE PROTECTION HOOD

22 CVS i60 HD BAG-CONTROL CABINET

CVS i60 MD TAILPIPE PRESSURE CONTROL BLOWER

CVS I60 MD DILUTION AIR HEATER

CVS i60 MD TUNNEL HEATING POWER &

CONTROL BOXES (6 BOXES TOTAL)

25 CVS i60 MD DILUTION AIR MEASUREMENT

26 CVS i60 HD BAG-CONTROL CABINET INNOVA

27 DILUTION AIR CONDITIONER

28 VFD CABINET TAILPIPE PRESSURE CONTROL BLOWER

EPA SCO3 Test Cell Equipment

Analytical

File details come from the government source that posted it. Updated .