Sol_140P4221Q0055.pdf

PDF 317 KB Posted

Attached to
RICH/MAWA ALARM MONITORING-TESTING
Solicitation number
140P4221Q0055
Issued by

View the file

Other files

File Type Posted
Sol_140P4221Q0055_Amd_0002.pdf PDF
140P4221Q0055_Revision_0001.pdf PDF
Sol_140P4221Q0055_Amd_0001.pdf PDF
A04_Scope_of_Work_REVISION_0001.pdf PDF
References_Worksheet.doc DOC document
Pricing_Worksheet.xlsx XLSX spreadsheet
B03_Wage_Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

PNC

Philadelphia PA 19107

South/Philadelphia MABO Northeast Regional Contracting National Park Service

DOI, NPS, NERO & NER SOUTH MABO

0009060115 CODE 16. ADMINISTERED BYCODE

X

X

X

561621

SIZE STANDARD:

% FOR:SET ASIDE:UNRESTRICTED ORPNC

RFPIFB

10. THIS ACQUISITION ISCODE

RFQ

14. METHOD OF SOLICITATION

13b. RATING

NAICS:

SMALL BUSINESS

07/30/2021 1700 ES

07/09/2021

2675281420Tomica Cooper (No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

140P4221Q0055

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

1 32 0040527023OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1234 Market Street, 20th Floor

TELEPHONE NO.

17a. CONTRACTOR/

Richmond VA 23223 3215 E. Broad Street NPS, Richmond NBP

15. DELIVER TO

Philadelphia PA 19107 1234 Market Street, 20th Floor South/Philadelphia MABO Northeast Regional Contracting National Park Service

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

$22.00

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

11.

SEE SCHEDULEX

12. DISCOUNT TERMS

THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

8(A)

DOI, NPS, NERO & NER SOUTH MABO

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

Firm Fixed Price solicitation for Alarm Monitoring and Annual Maintenance of Fire and Intrusion Alarms Systems at Richmond National Battlefield and Maggie Walker National Historic Site. This solicitation will be set aside for small businesses.

Legacy Doc #: NPS Period of Performance: 08/15/2021 to 08/14/2022 Continued ...

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

XX

DATED

Jody Auerbach

. YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

OFFER

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT:

REF.

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER

37. CHECK NUMBER

FINALPARTIAL

36. PAYMENT

FINALPARTIAL

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER33. SHIP NUMBER

COMPLETE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)

42b. RECEIVED AT (Location)

42a. RECEIVED BY (Print)

41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

STANDARD FORM 1449 (REV. 2/2012) BACK

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

00010 Base Alarm Monitoring and Maintenance

IT Approval Num: 3447

Product/Service Code: H263

Product/Service Description: EQUIPMENT AND

MATERIALS TESTING- ALARM, SIGNAL, AND SECURITY

DETECTION SYSTEMS

Delivery: 08/14/2022

00020 Base Year Emergency Service Call NTE

IT Approval Num: 3447

Product/Service Code: H263

Product/Service Description: EQUIPMENT AND

MATERIALS TESTING- ALARM, SIGNAL, AND SECURITY

DETECTION SYSTEMS

Delivery: 08/14/2022

Base Year Emergency Service Calls:

6 calls per year with a total not-to-exceed effort of 8 man hours for a total of 48 hours per year.

Continued ...

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32 2 of

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 32

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P4221Q0055

00030 Base Materials NTE $ 200.00

IT Approval Num: 3447

Product/Service Code: H263

Product/Service Description: EQUIPMENT AND

MATERIALS TESTING- ALARM, SIGNAL, AND SECURITY

DETECTION SYSTEMS

Delivery: 08/14/2022

00040 Option Year 1 - Alarm Monitoring and Maintenance

IT Approval Num: 3447

(Option Line Item)

08/14/2022

Product/Service Code: H263

Product/Service Description: EQUIPMENT AND

MATERIALS TESTING- ALARM, SIGNAL, AND SECURITY

DETECTION SYSTEMS

Period of Performance: 08/15/2022 to 08/14/2023

00050 Option Year 1 - Emergency Service Call NTE

IT Approval Num: 3447

(Option Line Item)

08/14/2022

Product/Service Code: H263

Product/Service Description: EQUIPMENT AND

MATERIALS TESTING- ALARM, SIGNAL, AND SECURITY

DETECTION SYSTEMS

Period of Performance: 08/15/2022 to 08/14/2023

Option Year 1 - Emergency Service Calls:

6 calls per year with a total not-to-exceed effort of 8 man hours for a total of 48 hours per year.

00060 Option Year 1 - Materials NTE $ 200.00

IT Approval Num: 3447

(Option Line Item)

08/14/2022

Product/Service Code: H263

Product/Service Description: EQUIPMENT AND

MATERIALS TESTING- ALARM, SIGNAL, AND SECURITY

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

4 32

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P4221Q0055

DETECTION SYSTEMS

Period of Performance: 08/15/2022 to 08/14/2023

00070 Option Year 2 - Alarm Monitoring and Maintenance

IT Approval Num: 3447

(Option Line Item)

08/14/2023

Product/Service Code: H263

Product/Service Description: EQUIPMENT AND

MATERIALS TESTING- ALARM, SIGNAL, AND SECURITY

DETECTION SYSTEMS

Period of Performance: 08/15/2023 to 08/14/2024

00080 Option Year 2 - Emergency Service Call NTE

IT Approval Num: 3447

(Option Line Item)

08/14/2023

Product/Service Code: H263

Product/Service Description: EQUIPMENT AND

MATERIALS TESTING- ALARM, SIGNAL, AND SECURITY

DETECTION SYSTEMS

Period of Performance: 08/15/2023 to 08/14/2024

Option Year 2 - Emergency Service Calls:

6 calls per year with a total not-to-exceed effort of 8 man hours for a total of 48 hours per year.

00090 Option Year 2 - Materials NTE $ 200.00

IT Approval Num: 3447

(Option Line Item)

08/14/2023

Product/Service Code: H263

Product/Service Description: EQUIPMENT AND

MATERIALS TESTING- ALARM, SIGNAL, AND SECURITY

DETECTION SYSTEMS

Period of Performance: 08/15/2023 to 08/14/2024

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Part II – Commercial Contract Clauses)

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. (JAN 2017)

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (May 2011)

52.204-13 System for Award Management Maintenance. (OCT 2018)

52.204-19 Incorporation by Reference of Representations and Certifications. (DEC 2014)

52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities. (JUL 2018)

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2019)

52.212-4 Contract Terms and Conditions - Commercial Items. (OCT 2018)

52.232-18 Availability of Funds (Apr 1984)

52.232-39 Unenforceability of Unauthorized Obligations. (JUN 2013)

52.232-40 Providing Accelerated Payments to Small Business Subcontractors. (DEC 2013)

52.233-1 Disputes. (MAY 2014)

52.233-3 Protest After Award. (AUG 1996)

52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004)

52.237-2 Protection of Government Buildings, Equipment, and Vegetation. (APR 1984)

52.252-6 Authorized Deviations in Clauses (NOV 2020)

52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders - Commercial Items. (FEB 2021)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).

(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

[ ] (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jun 2020), with Alternate I (OCT 1995) (41 U.S.C. 4704 and 10 U.S.C.

2402).

[ ] (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Jun 2020) (41 U.S.C. 3509).

[ ] (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L.

111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

[X] (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (Pub. L. 109-282) (31 U.S.C. 6101 note).

(5) (Reserved)

[ ] (6) 52.204-14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).

[ ] (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub. L. 111-117, section 743 of Div.

C).

[X] (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment.

(Jun 2020) (31 U.S.C. 6101 note).

[ ] (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) (41 U.S.C. 2313).

[ ] (10) (Reserved)

[ ] (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole Source Award (MAR 2020) (15 U.S.C. 657a).

[ ] (ii) Alternate I (MAR 2020) of 52.219-3.

[ ] (12)(i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (MAR 2020) (if the quoter elects to waive the preference, it shall so indicate in its quote) (15 U.S.C. 657a).

[ ] (ii) Alternate I (MAR 2020) of 52.219-4.

[ ] (13) (Reserved)

[X] (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).

[ ] (ii) Alternate I (MAR 2020).

[ ] (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (MAR 2020) (15 U.S.C. 644).

[ ] (ii) Alternate I (MAR 2020) 52.219-7.

[ ] (16) 52.219-8, Utilization of Small Business Concerns (OCT 2018) (15 U.S.C. 637(d)(2) and (3)).

[ ] (17)(i) 52.219-9, Small Business Subcontracting Plan (Jun 2020) (15 U.S.C. 637(d)(4)).

[ ] (ii) Alternate I (NOV 2016) of 52.219-9.

[ ] (iii) Alternate II (NOV 2016) of 52.219-9.

[ ] (iv) Alternate III (Jun 2020) of 52.219-9.

[ ] (v) Alternate IV (Jun 2020) of 52.219-9.

[X] (18) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).

[ ] (19) 52.219-14, Limitations on Subcontracting (MAR 2020) (15 U.S.C. 637(a)(14)).

[ ] (20) 52.219-16, Liquidated Damages-Subcontracting Plan (JAN 1999) (15 U.S.C. 637(d)(4)(F)(i)).

[ ] (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (MAR 2020) (15 U.S.C. 657f).

[X] (22)(i) 52.219-28, Post-Award Small Business Program Rerepresentation (NOV 2020) (15 U.S.C. 632(a)(2)).

[ ] (ii) Alternate I (MAR 2020) of 52.219-28.

[ ] (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business (EDWOSB) Concerns (MAR 2020) (15 U.S.C. 637(m)).

[ ] (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women- Owned Small Business Program (MAR 2020) (15 U.S.C. 637(m)). 52.219-30 (March 2020) [(JUN 2020) (DEVIATION)]

[ ] (25) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).

[ ] (26) 52.219-33, Nonmanufacturer Rule (MAR 2020) (15 U.S.C. 637(a)(17)).

[X] (27) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).

[X] (28) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (JAN 2020) (E.O. 13126).

[X] (29) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

[X] (30)(i) 52.222-26, Equal Opportunity (SEP 2016) (E.O. 11246).

[ ] (ii) Alternate I (FEB 1999) of 52.222-26.

[ ] (31)(i) 52.222-35, Equal Opportunity for Veterans (Jun 2020) (38 U.S.C. 4212).

[ ] (ii) Alternate I (JUL 2014) of 52.222-35.

[X] (32)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).

[ ] (ii) Alternate I (JUL 2014) of 52.222-36.

[ ] (33) 52.222-37, Employment Reports on Veterans (Jun 2020) (38 U.S.C. 4212).

[ ] (34) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496).

[X] (35)(i) 52.222-50, Combating Trafficking in Persons (OCT 2020) (22 U.S.C. chapter 78 and E.O. 13627).

[ ] (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

[ ] (36) 52.222-54, Employment Eligibility Verification (OCT 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

[ ] (37)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (MAY 2008) (42 U.S.C. 6962(c)(3)(A)(ii)).

(Not applicable to the acquisition of commercially available off-the-shelf items.)

[ ] (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

[ ] (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693).

[ ] (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016) (E.O. 13693).

[ ] (40)(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).

[ ] (ii) Alternate I (OCT 2015) of 52.223-13.

[ ] (41)(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).

(ii) Alternate I (JUN 2014) of 52.223-14.

[ ] (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020) (42 U.S.C. 8259b).

[ ] (43)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).

[ ] (ii) Alternate I (JUN 2014) of 52.223-16.

[X] (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Jun 2020) (E.O. 13513).

[ ] (45) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).

[ ] (46) 52.223-21, Foams (JUN 2016) (E.O. 13693).

[ ] (47)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).

[ ] (ii) Alternate I (JAN 2017) of 52.224-3.

[X] (48) 52.225-1, Buy American-Supplies (JAN 2021) (41 U.S.C. chapter 83).

[X] (49)(i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (JAN 2021) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C.

2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

[X] (ii) Alternate I (JAN 2021) of 52.225-3.

[ ] (iii) Alternate II (JAN 2021) of 52.225-3.

[ ] (iv) Alternate III (JAN 2021) of 52.225-3.

[ ] (50) 52.225-5, Trade Agreements (OCT 2019) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

[X] (51) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

[ ] (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (OCT 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

[ ] (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (NOV 2007) (42 U.S.C. 5150).

[ ] (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (NOV 2007) (42 U.S.C. 5150).

[ ](55) 52.229-12, Tax on Certain Foreign Procurements (JUN 2020).

[ ] (56) 52.232-29, Terms for Financing of Purchases of Commercial Items (FEB 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

[ ] (57) 52.232-30, Installment Payments for Commercial Items (JAN 2017) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

[X] (58) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (OCT 2018) (31 U.S.C. 3332).

[ ] (59) 52.232-34, Payment by Electronic Funds Transfer - Other than System for Award Management (JUL 2013) (31 U.S.C. 3332).

[ ] (60) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).

[ ] (61) 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).

[ ] (62) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C. 637(d)(13)).

[ ] (63)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).

[ ] (ii) Alternate I (APR 2003) of 52.247-64.

[ ] (iii) Alternate II (FEB 2006) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

[X] (1) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).

[X] (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

[ ] (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts) (AUG 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

[ ] (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (MAY 2014) (29 U.S.C 206 and 41 U.S.C.

chapter 67).

[ ] (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (MAY 2014) (41 U.S.C. chapter 67).

[ ] (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (MAY 2014) (41 U.S.C. chapter 67).

[X] (7) 52.222-55, Minimum Wages Under Executive Order 13658 (NOV 2020).

[X] (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).

[ ] (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Jun 2020) (42 U.S.C. 1792).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and Records-Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) of this paragraph in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause-

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (JUN 2020) (41 U.S.C. 3509).

(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) (Section 1634 of Pub. L. 115-91).

(iv) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).

(v) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C.637(d)(2) and (3)), in all subcontracts that quote further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219-8 in lower tier subcontracts that quote subcontracting opportunities.

(vi) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

(vii) 52.222-26, Equal Opportunity (SEP 2015) (E.O. 11246).

(viii) 52.222-35, Equal Opportunity for Veterans (Jun 2020) (38 U.S.C. 4212).

(ix) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C. 793).

(x) 52.222-37, Employment Reports on Veterans (Jun 2020) (38 U.S.C. 4212).

(xii) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(xii) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).

(xiii) [ ] (A) 52.222-50, Combating Trafficking in Persons (JAN 2019) (22 U.S.C. chapter 78 and E.O. 13627).

[ ] (B) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

(xiv) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (MAY 2014) (41 U.S.C. chapter 67).

(xv) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (MAY 2014) (41 U.S.C. chapter 67).

(xvi) 52.222-54, Employment Eligibility Verification (OCT 2015) (E. O. 12989).

(xvii) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015).

(xviii) 52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).

(xix)(A) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).

(B) Alternate I (JAN 2017) of 52.224-3.

(xx) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note)

(xxi) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Jun 2020) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.

(xxii) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).

Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the Contractor May include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its obligations.

(End Clause)

Alternate I (Feb 2000). As prescribed in 12.301(b)(4)(i), delete paragraph (d) from the basic clause, redesignate paragraph (e) as paragraph (d), and revise the reference to “paragraphs (a), (b), (c), or (d) of this clause” in the redesignated paragraph (d) to read “paragraphs (a), (b), and (c) of this clause”.

Alternate II. (Jun 2020) As prescribed in 12.301(b)(4)(ii), substitute the following paragraphs (d)(1) and (e)(1) for paragraphs (d)(1) and (e)(1) of the basic clause as follows:

(d)(1) The Comptroller General of the United States, an appropriate Inspector General appointed under section 3 or 8 G of the Inspector General Act of 1978 (5 U.S.C. App.), or an authorized representative of either of the foregoing officials shall have access to and right to—

(i) Examine any of the Contractor’s or any subcontractors’ records that pertain to, and involve transactions relating to, this contract; and

(ii) Interview any officer or employee regarding such transactions.

(e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), and (c), of this clause, the Contractor is not required to flow down any FAR clause in a subcontract for commercial items, other than—

(i) Paragraph (d) of this clause. This paragraph flows down to all subcontracts, except the authority of the Inspector General under paragraph (d)(1)(ii) does not flow down; and

(ii) Those clauses listed in this paragraph (e)(1). Unless otherwise indicated below, the extent of the flow down shall be as required by the clause-

(A) 52.203-13, Contractor Code of Business Ethics and Conduct (Jun 2020) (41 U.S.C. 3509).

(B) 52.203-15, Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111- 5).

(C) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).

(D) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Aug 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).

(E) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that quote further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219-8 in lower tier subcontracts that quote subcontracting opportunities.

(F) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

(G) 52.222-26, Equal Opportunity (Sep 2016) (E.O. 11246).

(H) 52.222-35, Equal Opportunity for Veterans (Jun 2020) (38 U.S.C. 4212).

(I) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C. 793).

(J) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(K) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C.chapter 67).

(L) ___(1) 52.222-50, Combating Trafficking in Persons (Jan 2019) (22 U.S.C. chapter 78 and E.O 13627).

___(2) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O 13627).

(M) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).

(N) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).

(O) 52.222-54, Employment Eligibility Verification (Oct 2015) (Executive Order 12989).

(P) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015).

(Q) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2017) (E.O. 13706).

(R)(1) 52.224-3, Privacy Training (Jan 2017) (5 U.S.C. 552a).

(2) Alternate I (Jan 2017) of 52.224-3.

(S) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

(T) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (Jun 2020) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.

(U) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64 .

satisfy its contractual obligations.

(End of clause)

52.217-8 Option To Extend Services. (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 60 days.

(End of clause)

52.217-9 Option To Extend the Term of the Contract. (MAR 2000)

a) The Government may extend the term of this contract by written notice to the Contractor within 30 days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.

b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed (66 months) or (5 years, 6 months).

52.228-5 Insurance - Work on a Government Installation. (JAN 1997)

(a) The Contractor shall, at its own expense, provide and maintain during the entire performance of this contract, at least the kinds and minimum amounts of insurance required in the schedule or elsewhere in the contract.

(b) Before commencing work under this contract, the Contractor shall notify the Contracting Officer in writing that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective (1) for such period as the laws of the State in which this contract is to be performed prescribe, or (2) until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.

(c) The Contractor shall insert the substance of this clause, including this paragraph (c), in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in the Schedule or elsewhere in the contract. The Contractor shall maintain a copy of all subcontractors' proofs of required insurance, and shall make copies available to the Contracting Officer upon request.

(End of clause)

52.252-2 Clauses Incorporated by Reference. (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://acquisition.gov

(End of clause) https://acquisition.gov/

AUTHORITIES AND DELEGATIONS (SEPT 2011)

Authorities and Delegations (SEP 2011)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum.

The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.

(End of clause)

1452.228-70 Liability Insurance (JUL 1996)

(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:

$200,000.00 each person*

$500,000.00 each occurrence*

$20,000.00 property damage*

(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed.

The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.

*These amounts to be set by the Contracting Officer.

(End of clause)

DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (April 2013)

Payment requests must be submitted electronically through the U. S. Department of the Treasury’s Invoice Processing Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice: Purchase order number, contract line item number(s), invoice number and amount.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3-5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866)973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its quote or quotation.

(End of clause)

Part III- Contract Document, Exhibits, and Attachments

SCOPE OF WORK

FOR MONITORING, MAINTENANCE AND TESTING

OF FIRE AND INTRUSION ALARM SYSTEMS

AT RICHMOND NATIONAL BATTLEFIELD PARK

AND MAGGIE L. WALKER NATIONAL HISTORIC SITE

PART 1 – GENERAL INFORMATION

1.1 An alarm monitoring, testing and maintenance service agreement is required for fire and intrusion alarm systems at Richmond National Battlefield Park (RICH) and Maggie L. Walker National Historic Site (MAWA). The period of performance from the date of award and each performance period will be twelve (12) months. The proposed award will include a base period and two option periods. The option periods will be exercised at the discretion of the government.

1.2 Location: The alarm systems are located at facilities in the City of Richmond, Hanover, and Henrico, Counties, VA.

1.3 Regular Working Hours: Regular working hours at the parks are from 8:30 a.m. to 5:00 p.m., Monday through Friday, excluding federal holidays. All work shall be scheduled during regular working Hours.

1.4 Notification: The Contractor shall notify the Contracting Officer (CO) and the Contracting Officers Representative (COR) whom serves as the single point of contact, refer to Part 6 of this document, at least 48 hours in advance for all work in occupied housing units or other facilities located within the park.

1.5 Work Restrictions: MANDATORY 48-hour notification to the CO and the COR for entry into occupied government housing and any other security sensitive areas, these areas will be identified at the pre-construction meeting.

1.6 Waste Disposal: The Contractor shall properly dispose of solid waste materials offsite.

PART 2 – FIRE AND INTRUSION ALARMS MONITORING

2.1 Description of Work: The contractor shall provide the necessary equipment, supervision, and staff to monitor multiple fire and intrusion alarm systems, conduct annual testing, identify system deficiencies and the develop cost estimates for repairs, and for the potential completion of repairs as a modification to the contract.

2.2 Qualifications and Experience:

Contractor must own and maintain their monitoring station, which must be UL approved and employ certified service technicians.

Contractor must be an authorized “Ademco”, “Honeywell” and “Radionics/Bosch” dealer and employ certified technicians for systems, providing proof of certification with the price quote. Further, contractor must provide proof of “Incipient” fire alarm protection system repair experience at time of submission of quote.

https://www.ipp.gov/

Selected contractor will have at least three years’ experience in monitoring and servicing Ademco/Honeywell and Radionics/Bosch systems/equipment.

2.3 Alarm Monitoring:

Monitoring station must have the capabilities to arm, disarm, bypass, change codes, and reprogram control panels remotely from the monitoring station (where equipment is capable) upon request from the Contracting Officer’s Technical Representative

(COTR).

24-hour monitoring and immediate notice of all alarms will be made to the individuals and agencies listed on the “Call Out List”.

This list will be provided to the contractor.

Enhanced monitoring capabilities will be maintained to permit the monitoring station to provide the specific sensor and specific building that has been activated to the individuals and agencies listed on the Call Out List.

2.4 Deliverables: Opening and closing reports, which includes monthly status reports, will be provided to the COTR on request.

2.5 Programming: Initial programming, inspection and monitoring connections must be compatible with present systems and completed prior to October 1 of a new fiscal year or the first day of transition when newly awarded. System(s) will be programmed with each user having a separate and unique pin number, which includes, twice annually, changes/updates to users pins at no additional charge.

2.6 Contractor will provide, at the time of their quote a list of three references for similar monitoring and maintenance service previously performed on Ademco/Honeywell and Radionics/Bosch equipment. Additional information regarding Incipient and FCI/DMP experience or goals will be provided by the government.

2.7 Contractor will ensure access to alarm system(s) upon expiration of termination of this service contract without additional cost to the Government. Access will include all programming information remaining in place including zone information, employee pass codes, alarm panels including default lock codes, and will ensure the systems report as a local alarm at the time of expiration/termination. The only programming information that will be removed is the current contractor’s receiving account numbers, receiver telephone numbers, and remote lock out codes.

2.8 The government requires electronic submission of all invoices via IPP.gov. Invoice(s) must itemize charges per park site so that the park and service being billed is easily identified as covered by the contract.

PART 3 – FIRE ALARM SYSTEM INSPECTION, TESTING AND MAINTENANCE SERVICES

3.1 Description of Work: The contractor shall provide the necessary equipment, supervision and staff to perform inspection and testing of various fire detection and life safety systems and components in accordance with applicable sections of the National Fire Protection Association (NFPA) codes and standards; the identification of system deficiencies and the development of cost estimates for repairs; and the possible completion of repairs as a modification to the contract. Service includes inspection, testing, and preventative maintenance of all fire detection devices including alarm panels, smoke detectors, heat detectors, and alerting devices such as strobe lights, sirens, and alarm bells.

3.2 Qualifications and Experience: The Contractor shall be qualified in the inspection, testing and repair related to their field of experience.

The Contractor shall have continuously performed inspection and testing in their field of experience in the State of Virginia for the past five (5) years. The Contractor shall be factory trained and currently certified for the applicable system and shall provide documentation of this certification to the CO. All documentation shall be provided prior to commencing work under this contract.

3.3 Reference Codes and Standards: Current NFPA codes and standards apply to this scope of work. The Contractor shall adhere to the latest version of the NFPA codes and standards for the inspection, testing, and repair of specified fire detection systems.

3.4 Inspection and Testing of Fire Detection Systems: The work shall be completed by qualified personnel as outlined in Section 3.2. This work shall be based on the minimum annual requirements as outlines in the applicable NFPA requirements for the type of system installed and the frequency of inspection from Table 3.2. Within 30 days of receiving the delivery order the Contractor shall submit to the CO a proposed work schedule for each Fire Suppression System. The Contractor shall complete and submit inspection forms (which cover the minimum requirements of the NFPA forms) and any pertinent NFPA testing forms for each system within 14 days.

3.5 Identify System Deficiencies: The Contractor shall identify the deficiencies in each system. Each deficiency shall include the applicable code and/or standard citation(s) that warrant the repair, and shall be identified as “minor”, “essential” or “critical” (posting an imminent hazard or threat to employees, visitors, or the resource). Repairs deemed to be “critical” shall immediately be brought to the attention of the CO/COR.

3.6 Develop Cost Estimates: The Contractor shall develop Class C cost estimate to remedy the deficiencies and complete the repairs. In addition to fire protection related costs, the cost estimate shall include any patching, painting, clean-up, or other trade work necessary to complete the work and provide a fully inspected system.

3.7 Deliverables: The Contractor shall complete and submit the following deliverable in a timely fashion (not to exceed 10 calendar days) to the CO.

Annual Inspection Forms for each fire protection system (refer to Table 3.2.)

Class C cost estimate (Refer to Section 3.4)

PART 4 – EMERGENCY SERVICE CALLS

4.1 Emergency Service Calls: The contractor shall be required to respond to emergency service calls within twelve (12) hours from the time the call for service is received. The scope of an Emergency Service Call includes all efforts necessary to respond to and fix the problem.

They are limited to a total effort not to exceed 8 man-hours of labor and a material cost of $200.00. On average, the park requires six (6) Emergency Service Calls per year.

4.2 Labor Rate: It may be determined that a minor repair is necessary that is not covered in the Annual Maintenance Service and exceeds the scope of an Emergency Service Call. When this is the case, the contractor shall provide a detailed estimate for the work to include all labor and material to make the repair. All associated costs must be included in the estimate under the labor and material line items for a total cost to make the repair complete and ready for use. The labor rate quoted by the contractor shall be all inclusive to include payroll taxes, mark-ups, and any burdens.

4.3 Material: It may be determined that a minor repair is necessary that is not covered in the Annual Maintenance Service and exceeds the scope of an Emergency Service Call. When this is the case, the contractor shall provide a detailed estimate for the work to include all labor and material to make the repair. All associated costs must be included in the estimate under the labor and material line items for a total cost to make the repair complete and ready for use. The material price shall be based on the cost incurred by the contractor from the supplier plus any Fixed Burden Rate. The Fixed Burden Rate is defined as a factor adjustment for any direct or indirect costs associated with providing the material including any mark-up included. An example of how to quote material is given in the Exhibit Line Item No.

(ELIN) Schedule.

PART 5 – GOVERNMENT FURNISHED MATERIALS AND SERVICES

5.1 Materials: The NPS will furnish the following materials in support of this contract:

Contact information (“Call-out list”) for notifications in the case of alarm activations.

Construction or as-built drawings of facilities, if available.

Photos of the facilities and/or fire protection systems, upon request.

5.2 Services: The NPS will furnish the following materials in support of this contract:

Provides additional background information, if necessary.

Furnish additional government materials upon request.

Review and approve vendor product submittals.

PART 6 – NPS ROLES AND CONTACT INFORMATION

6.1 Regional Fire Protection Engineer/Authority Having Jurisdiction (AHJ) approves technical aspects of the work and advises parks on NFPA requirements: Vincent Esposito, National Park Service, Northeast Region, 200 Chestnut…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .