This addendum to a Request for Qualifications is issued by the Colorado Department of Community and Human Services, Division of Real Estate and Construction Management, for the Modernize SOB Restrooms project (2027-017M26). The project seeks an Architecture/Engineering (A/E) firm to modernize restroom facilities at the State Office Building in Denver, Colorado. As-built drawings and a Revit model are available for the selected firm to update and provide back to the State upon project completion. The qualification package must be submitted electronically only to kaitlin.lucas@state.co.us by July 27th. A participant list for the project is attached to the addendum. Contractor solicitation is anticipated in early Q1 2027, with construction anticipated to begin in early Q2 2027.

The project involves coordination with the State Historic Preservation Office (SHPO) due to the building's designation under the Colorado State Register Act, requiring SHPO review if walls require removal and relocation. A full building HazMat survey was completed in 2015, with additional analysis to be contracted by the State prior to demolition and construction commencement. The selected A/E firm will be responsible for compliance with historic preservation guidelines and submission of plans to SHPO as required. No pricing information, set-asides, or specific funding amounts are detailed in this addendum.

View the file

Other files

File Type Posted
2027-017M26 SOB RR RFQ_AE.pdf PDF
SOB RR RFQ_AE_sched R1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1525 Sherman St.

Denver, CO. 80203

1525 Sherman St. Denver, CO 80203 www.dca.colorado.gov Jared Polis, Governor |Jane Locke, Executive Director | Richard Lee, Division Director

2027-017M26 | Modernize SOB Restrooms

Addendum #1 – Consultant Request for Clarifications

1. Will a list of all participants be available?

Yes, attached to this addendum.

2. Can you please confirm if there are As-Built or Record drawings for the building or for the specific areas of work?

Yes, as-builts and Revit model are available. Per contractual requirements, selected A/E group will be required to update as-builts and Revit model and provide to the State upon project completion.

3. Have there been recent HazMat surveys completed in the areas of work?

Full building HazMat survey as last completed in 2015. Additional analysis will be contracted by the State prior to start of demolition and construction.

4. What is the extent of the historic preservation of the building should walls need to be removed and relocated , and will the A/E be required to submit plans to SHPO?

This project falls under the guidelines of the Colorado State Register Act. A SHPO review will be required.

5. Section VIII describes formatting requirements for a bound qualification package (e.g., stapled, spiral bound, or plastic bound), while Section VIII(f) references submitting an electronic copy of the qualification package. Could you please clarify the required method of submission?

Specifically:

a. Is an electronic submission only required?

Only electronic submission is required. Please provide via email to kaitlin.lucas@state.co.us by the date and time listed in the schedule

b. If hard copies are also required, please confirm the number of copies, delivery location, and whether an electronic copy must accompany the hard-copy submission.

Hard copies are not required.

6. If known, when is this project expected to go to bid for contractors and what is the expected start date for construction?

Solicitation for contractors is anticipated in early Q1 2027 with construction to begin in early Q2

2027.

7. Section 2.f. on page 4 of the RFQ appears to state July 16th as the due date. Can you confirm this is a typo and we should still be shooting for July 27th?

Correct – qualifications are due July 27th.