Slurry Seal 2025 Project Manual.pdf

PDF 2 MB Posted

Attached to
2025 Slurry Seal Project
Solicitation number
PN 2025-06
Issued by
Utah

About this file

This is a Project Manual issued by the City of South Salt Lake Engineering Department for the 2025 Slurry Seal project. The project involves providing slurry seal coating to multiple streets in South Salt Lake City, including traffic control, mobilization, and pavement marking work. Bids must be submitted through the Utah Public Procurement Place website (SciQuest) by 2:00 PM on March 24, 2025, with public bid opening at 2:30 PM in the City Council Chambers. The apparent low bidder will be notified by 5 PM on March 25, 2025. The contractor must begin work after execution of the contract and complete all work by June 30, 2025. No pre-bid conference will be held for this project.

The project requires a 5% bid security and performance/payment bonds equal to 100% of the contract price. The contractor must maintain various insurance coverages including workers' compensation, general liability ($2M per occurrence/$3M aggregate), and automobile liability ($3M). The work includes Type II and Type III slurry seal application on approximately 45 street segments throughout South Salt Lake City, with detailed specifications for materials, execution, and traffic control requirements. The City will waive permit fees for building permits and right-of-way permits required for the project. The bid schedule includes 53 line items covering traffic control, mobilization, coordination, and slurry seal application at various locations.

View the file

Other files

File Type Posted
Slurry Seal 2025 Public Notice.pdf PDF
1297091-event.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Title Page

00 00 10 - 1

CITY OF SOUTH SALT LAKE

South Salt Lake City, Utah

PROJECT MANUAL

FOR

2025 Slurry Seal

PREPARED BY

The City of South Salt Lake

Engineering Department

February 2025

Table of Contents

00 00 30 - 1

DOCUMENT 00 00 30

T A B L E O F C O N T E N T S

2025 Slurry Seal

Reference No. of

Number Title Pages

PART I. INTRODUCTORY INFORMATION

00 00 10 Title Page

00 00 30 Table of Contents

00 00 40 List of Drawings

00 10 00 Invitation to Bid

00 20 00 Instructions to Bidders

00 20 01 Modifications to Instructions to Bidders

00 20 02 Bid Submittal Checklist

PART II. BIDDING REQUIREMENTS

BID FORM DOCUMENTS

00 40 00 Bid

00 41 00 Bid Schedule

00 42 00 Bid Security

BID ATTACHMENTS

00 45 20 Bidder Status Report

00 45 30 Subcontractor and Supplier Report

PART III. CONTRACTING REQUIREMENTS

AGREEMENT FORMS

00 50 00 Agreement Template

AGREEMENT ATTACHMENTS

00 60 50 E Verify Form

00 61 00 Performance Bond

Reference No. of

Number Title Pages

Table of Contents

00 00 30 - 2

00 62 00 Payment Bond

00 65 00 Certificate(s) of Insurance

SUPPLEMENTARY CONDITIONS

00 81 00 Modifications to the General Conditions

ADDENDA AND MODIFICATIONS

00 90 00 Addenda and Modifications

PART IV. TECHNICAL SPECIFICATIONS

1. All work and materials shall conform to the latest editions of the Manual of Standard Plans and

Manual of Standard Specifications prepared by the Utah Chapter of the American Public Works

Association unless noted otherwise. All divisions and sections refer to the latest edition of the

Manual of Standard Plans and Manual of Standard Specifications except where specified or noted.

2. Supplementary specifications supersede APWA plans and specifications where noted.

3. Specifications and notes on the drawings replace APWA plans and specifications.

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work

01 26 00 Contract Modification Procedures

01 31 13 Coordination

01 33 00 Submittal Procedures

DIVISION 02 � EXISTING CONDITIONS

DIVISION 03 - CONCRETE

DIVISION 04 - MASONRY

DIVISION 05 - METALS

DIVISION 06 � WOOD, PLASTICS AND COMPOSITES

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

Reference No. of

Number Title Pages

Table of Contents

00 00 30 - 3

DIVISION 09 - FINISHES

DIVISION 13 - SPECIAL CONSTRUCTION

DIVISION 22 � PLUMBING

DIVISION 26 � ELECTRICAL

DIVISION 31 � EARTH WORK

DIVISION 32 � EXTERIOR IMPROVEMENTS

32 17 23 Pavement Marking

DIVISION 33 � UTILITIES

DIVISION 34 � TRANSPORTATION

END OF TABLE OF CONTENTS

List of Drawings

00 00 40 - 1

DOCUMENT 00 00 40

LIST OF DRAWINGS

2025 Slurry Seal

DRAWINGS

1 See attached Slurry Seal Project Map.

REFERENCE DRAWINGS

1. Manual of Standard Plans published by the Utah Chapter of the American Public Works

Association. (2017 Edition)

END OF DRAWING LIST

Invitation to Bid

00 10 00 - 1

DOCUMENT 00 10 00

INVITATION TO BID

PART 1 GENERAL

1.1 CONSTRUCTION CONTRACT

A. Bidders are invited to bid on Construction Contract known as

2025 Slurry Seal

B. The location of the work is:

Bid Schedule A � covers work on multiple streets in South Salt Lake City. (See

Project Map and Bid Schedule Form 00 41 01 for details), end at Point of Curve.

C. The work to be performed consists of furnishing and installing the equipment, facilities, services and appurtenances thereto as included in the Contract Documents.

The Work generally includes, but is not limited to, the following:

Providing slurry seal coating to several locations in South Salt Lake City

D. For information about the award of this Construction Contract, contact

Isaac Gomez at 801-483-6040 .

1.2 BID LOCATION AND OPENING

A. Bids must be submitted through the Utah Public Procurement Place website

(SciQuest) by 2:00 PM on 03/24/2025. Bids received after 2:00 PM. will not be accepted. Bids will be publicly opened at 2:30 PM and read by the OWNER at the

City Council Chambers located on the second floor of 220 East Morris Ave. South

Salt Lake City, Utah 84115 The apparent low bidder will be notified by 5 p.m. on

3/25/2025.

1.3 BID SECURITY

A. Bid security in the amount of 5.0 percent of the Bid must accompany each Bid in accordance with the Instructions to Bidders. Bid Security will be returned to each unsuccessful Bidder after tabulation and award of the Construction Contract.

1.4 PRE-BID CONFERENCE

There will NOT be a Pre-Bid Conference for this project.

00 10 00 - 2

1.5 BASIS OF BIDS

A. Bids shall be on a unit price basis. Unsealed or segregated Bids will not be accepted.

B. The CONTRACTOR shall combine all required bidding documents to ONE document in PDF format. Bids that come with more than one document or not in the format of

PDF will not be accepted.

1.6 CONTRACT TIME

A. The CONTRACTOR shall begin work on a date mutually agreed upon by the

CONTRACTOR, and the Owner, but no later than the dates shown below for each bid schedule. One construction work is started on a bid schedule/segment, the

CONTRACTOR shall complete all work related to that bid schedule within the number of calendar days shown.

B. Bid Schedule A � covers work on multiple streets in South Salt Lake City. (See

Project Map and Bid Schedule Form 00 41 01 for details).

1. Begin work after the execution of Construction Contract, and complete work by the end of business hour (5 pm) on 06/30/2025.

1.7 EXAMINATION AND PROCUREMENT OF DOCUMENTS

A. Complete sets of Contract Documents may be available at Sciquest.

B. Complete sets of Contract Documents may also be examined and obtained from the

ENGINEER by email at igomez@sslc.gov after 9:00 A.M., on 03/03/2025.

1.8 RIGHT TO REJECT BIDS

A. The OWNER reserves the right to reject any or all bids or to waive any informality or technicality in any bid if deemed to be in the best interest of the OWNER.

1.9 VALIDITY PERIOD FOR BIDS

A. Bids shall remain valid for 45 days after the day of Bid opening. Bidders, who withdraw their bid after Bid opening, but before expiration of said period, shall forfeit their bid security if Notice of Intent to Award to the successful Bidder is made by

OWNER.

1.10 GOVERNING LAWS AND REGULATIONS

A. This project is not federally funded and does not require the payment of specific wage rates. Payroll submittal will not be required.

B. Bidders on this Work will be subject to the applicable provisions of all federal rules, 00 10 00 - 3 laws and regulations or orders.

C. In compliance with Americans with Disabilities Act, (ADA) the following information is provided: FAX Number 801-483-6060 , TDD Number 801-467-1147 , Contact person: Chris Merket .

END OF DOCUMENT

Instructions to Bidders

00 20 00 - 1

DOCUMENT 00 20 00

INSTRUCTIONS TO BIDDERS

PART 1 GENERAL

1.1 DESCRIPTION OF THE WORK

A. The Work to be performed consists of furnishing and installing the equipment, facilities, services, and appurtenances thereto as included in the Contract Documents. A general description of the Work is set forth in the Invitation to Bid (Document 00 10 00).

1.2 COPIES OF BID DOCUMENTS

A. Bidders must use complete sets of Bid Documents in preparing Bids. OWNER maintains a complete set on file at the address set forth in the Notice to Bidders, and bidders may review the file copy upon request during regular business hours. Bidders are solely responsible to verify whether their sets of Bid Documents are complete.

B. Bid Documents are made available to bidders only for the purpose of obtaining Bids on the Work. No license or grant for any other use is given.

C. Bidding Document copyrights shall remain with the OWNER.

1.3 PRE-BID CONFERENCE

A. If a pre-bid conference is held, the time, place and nature of the conference will be stated in the Invitation to Bid (Document 00 10 00). Representatives of OWNER and

ENGINEER will be present to discuss the Project. The OWNER shall not be bound by any statements, representations, conclusions, or assumptions made by any party, whether oral or written, except for written statements that are issued in an Addendum or through

SciQuest by the ENGINEER to all prospective bidders.

1.4 PHYSICAL CONDITIONS

A. In General: Prior to submitting a Bid, each Bidder is responsible to review all available explorations, tests and data concerning surface conditions, subsurface conditions and

Underground Facilities at or contiguous to the site, or otherwise, which may affect cost, progress, performance or furnishing of the Work in accordance with the time, price and other terms and conditions of the Contract Documents.

B. Surface and Subsurface Conditions: Provisions concerning surface and subsurface conditions, if any, are set forth in a document titled Geotechnical Data (Document 00 32

00). The document provides the identification of:

00 20 00 - 2

1. those reports of explorations and tests of subsurface conditions at the site which have been utilized in preparing the Contract Documents; and

2. those drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) which are at or contiguous to the site which have been utilized in preparing the Contract Documents.

C. Underground Facilities: Information and data indicated in the Contract Documents regarding Underground Facilities at or contiguous to the site is based upon information and data furnished to OWNER and ENGINEER by owners of such Underground

Facilities. The OWNER does not assume responsibility for the accuracy or completeness thereof other than as provided in paragraph 4.3A.2 of the General Conditions or unless expressly provided in the Modifications to General Conditions (Document 00 81 00).

D. Additional Explorations and Tests: If feasible as determined by OWNER, the OWNER will provide each Bidder access to the site to conduct any explorations and tests as each

Bidder deems necessary for submission of a Bid. Bidder shall obtain all required permits, fill all holes, clean up and restore the site to its former condition upon completion of such explorations. By requesting such an exploration or test, Bidder agrees to release, indemnify, defend, and save the OWNER harmless from all costs damages and liabilities of any kind whatsoever, including reasonable attorneys' fees, which may arise in connection with or as a result of the performance of such explorations or tests.

1.5 COMPENSATION AND QUANTITIES

A. In General: The bid price for any lump sum or unit price contract includes all labor, materials, and incidental work to fully complete the Work in a satisfactory manner under the terms of the Contract Documents. Bidders are responsible to inform themselves of the character of the Work to be performed.

B Lump Sum Work: If the Work is to be paid for on a lump sum basis, the lump sum will be the only sum paid.

C. Unit Price Work: If any portion of the Work is to be paid for on a unit price basis, payment will cover only work actually performed and materials actually supplied at the unit prices bid and on the terms set forth in the Contract Documents, irrespective of any quantity approximations in the Bid Documents. Any quantity approximations in the Bid

Documents are stated as a basis for determining bids, and do not fix the amount of Work to be done or materials to be furnished. Stated quantities are estimates for the purpose of doing the class of work required. Actual quantities will vary. The OWNER may deviate in either direction from any indicated quantities. The Bidder shall have no claim for any variation in quantity, except to the extent permitted in the General Conditions.

00 20 00 - 3

1.6 EXAMINATION OF SITE AND CONTRACT DOCUMENTS

A. In General: The OWNER shall not be bound by any statements, representations, conclusions, or assumptions made by any party, whether oral or written, except for written statements that are issued in an Addendum.

B. Access: The Contract Documents designate the site for performance of the Work. Bidder is responsible to investigate the site and understand all access requirements. All additional off site lands and access thereto required for temporary construction facilities or storage of materials and equipment are to be provided by Bidder.

C. Bidder's Obligations: In addition to Bidder's other responsibilities and obligations in connection with submitting a Bid, it is the responsibility of the Bidder before submitting a

Bid, to:

1. Examine the Contract Documents thoroughly;

2. Visit the site to become familiar with local conditions that may affect cost, progress, performance or furnishing of the Work;

3. Investigate all applicable construction and labor conditions, quantities, and the character of the Work as they affect cost, progress, performance, or furnishing of the

Work;

4. Consider federal, state and local Laws and Regulations that may affect cost, progress, performance or furnishing of the Work;

5. Study and carefully correlate Bidder's observations with the Contract Documents;

6. Attend any pre-bid conference, which shall be mandatory if so designated in the

Notice to Bidders;

7. Review all available explorations and data concerning surface and subsurface conditions as set forth in Section 1.4 above; and

8. Identify and notify ENGINEER in writing in the manner set forth in article 2.1 below of all specific conflicts, omissions, errors, or discrepancies in the Contract Documents, or if Bidder doubts their meanings.

The failure or omission of any Bidder to take any of the foregoing actions shall not in any way relieve Bidder of its Bid, or its obligation to furnish all material, equipment, labor and services necessary to carry out the provisions of the Contract Documents and to complete the contemplated Work for the consideration set forth in its Bid. Submission of a Bid shall constitute prima facie evidence of compliance with these instructions.

00 20 00 - 4

D. Deviations from the Terms of the Contract Documents: OWNER will not accept any deviations whatsoever from the printed terms of the Agreement and the Contract

Documents, except by Addendum or Change Order.

1.7 EFFECT OF SUBMITTING A BID.

A. Bidders are responsible to carefully examine the Contract Documents, visit the site, and fully inform themselves so as to include in the Bid a sum to cover the cost of all items.

Bidder�s failure or omission to receive or examine any form, instrument, addendum or other document, visit the site and become acquainted with existing conditions, or attend any pre-Bid Conference, shall in no way relieve Bidder from any obligations with respect to Bidder�s Bid or the Construction Contract.

B. By submitting a Bid, Bidder represents that Bidder has complied with all requirements of the Bid Documents; that the Bid is premised on properly performing and furnishing the Work required by the Contract Documents within the times specified; that the

Bidder is informed of the conditions to be encountered and the character, quality and quantities of the Work; and that the Bidder believes the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.

C. Submission of a Bid constitutes a promise that the Bidder will enter the Contract

Documents in the form presented in the Contract Documents. Bidders should carefully examine all Contract Documents, including the required Bonds and insurance to be provided by the Bidder.

1. The Performance Bond is a guarantee of faithful performance of the requirements of the Contract Documents, including all applicable warranties. The Payment Bond is a guarantee of payment of all labor, materials, or supplies used directly or indirectly in the prosecution of the Work provided in the Construction Documents.

2. The sum of the Performance Bond and the Payment Bond shall be increased or decreased during the course of the Work in the event that Contract Modifications, Change Orders or Addenda increase or decrease the total contract price. The sum of each bond shall be in an amount equal to the completed contract price at the completion of the Work.

3. OWNER does not provide any release of Performance Bonds or Payment Bonds.

The bonds are in effect throughout all periods during which a suit may be brought under the provisions of applicable law.

D. By submitting a Bid, Bidder represents that the matters stated therein are true and correct.

00 20 00 - 5

PART 2 BIDDING PROCEDURES

2.1 INTERPRETATIONS AND ADDENDA

A. All requests for interpretation of the Contract Documents shall be made in writing and delivered to the ENGINEER no later than 48 hours prior to opening of Bids. In the

ENGINEER's discretion, ENGINEER will send the written interpretation to all persons receiving a set of Bid Documents in the form of an Addendum. If the ENGINEER does not respond to a Bidder's request for interpretation the Bidder shall comply with the intent and terms of the Contract Documents.

B. No oral interpretations shall be made to any Bidder. The OWNER shall not be responsible for or bound by any statements, interpretations, explanations, representations, conclusions or assumptions made by any party, whether oral or written, except for written statements that are issued in an Addendum by the ENGINEER to all prospective bidders.

C. Each statement made in an Addendum is part of the Contract Documents at the location designated in the Addendum. A statement issued in an Addendum shall have the effect of modifying a portion of the Bid Documents when the statement in the Addendum specifies a particular section, paragraph or text and states that it is to be so modified. Only the specified section, paragraph or text shall be so modified, and all other portions of the Bid

Documents shall remain in effect.

D. Bidders shall sign to acknowledge their receipt of all Addenda issued. Bidders shall also acknowledge receipt of all Addenda in the space provided in the Bid (Document 00 40

00).

E. Except to postpone the Bid opening, no Addenda shall be issued within 48 hours of the

Bid opening.

2.2 EQUIPMENT AND MATERIAL OPTIONS PRIOR TO BID OPENING

A. If a Bidder or Supplier wishes to supply a product other than that identified in the Contract

Documents, said Bidder or Supplier shall submit a written request for approval to the

ENGINEER at least ten (10) calendar days prior to the date set for opening of bids.

B. The procedure for submission of any such product option shall be as set forth in Article

6.4 of the General Conditions. It is the sole responsibility of the Bidder or Supplier to submit complete descriptive and technical information so that ENGINEER can make a proper appraisal.

C. ENGINEER's failure to act upon such a request within five (5) days after receipt shall be deemed a denial thereof.

D. Any such approval is at the sole discretion of the ENGINEER and will be in the form of

00 20 00 - 6 an Addendum issued to all Bidder's holding Bid Documents indicating that the additional equipment or materials are approved as equal to those specified for the Project.

E. The Construction Contract, if awarded, will be on the basis of materials and equipment specified in the Drawings and Specifications and any changes permitted in any Addenda.

2.3 BID SECURITY

A. Amount of Bid Security: A Bid Security must accompany each Bid. The total amount of the Bid on which Bid security is to be based shall be the sum of all items of the Bid constituting the maximum amount of the possible award to the Bidder. The Bid Security amount must equal at least five (5) percent of the total amount of the Bid.

B. Form of Bid Security: The Bid Security may be in the form of a certified check, cashier�s check, cash, or Bid Bond. No other form of Bid Security will be accepted. A

Bid Bond must be issued by a licensed Utah agency on behalf of a surety company licensed to do business in the State of Utah. A cashier�s check must be drawn on a bank doing business in the State of Utah and made payable to OWNER. If a cashier�s check is used in lieu of a Bid Bond, or if the Bid Bond does not specifically so provide, a certificate from an approved surety company guaranteeing execution of performance and payment bonds in the full amount of the bid must accompany the bid.

C. Purpose of Submission. By submitting a Bid Security Bidder assures OWNER it will take all steps necessary to properly execute the Contract Documents.

D. Return of Bid Security: OWNER will return Bid securities to Bidder after award of the Construction Contract. Bid Bonds of all Bidders will be held until the Construction

Contract is awarded or all bids have been rejected. The liability of OWNER in regards to the checks shall be limited only to the return of the checks.

E. Default: In the event of failure or refusal of the Bidder to enter into the Construction

Contract and the delivery to the OWNER a Performance Bond, Payment Bond and any other Bonds or documents required by the Contract Documents after Notice of Intent to

Award by the OWNER, the Bidder forfeits the sum of the Bid Bond or cashier�s check as liquidated damages to the OWNER.

2.4 COMPLETING BID DOCUMENTS

A. The General Conditions identify all forms comprising the Bid Documents. Additional copies may be obtained from the ENGINEER. The Bidder shall make no stipulations or alterations on the Bid forms. The Bidder must use and execute only the Bid form and

Bid Schedules bound in the Contract Documents. Bidder shall complete and submit all forms included in the Bid Form Documents as the Bidder�s Bid.

B. The Bidder must fill in all items in the Bid Form Documents in ink or print. Furnish both the unit and total costs for each item in Bid Schedule (Document 00 41 00). The total Bid price is the full price for the performance of all work under the Contract

00 20 00 - 7

Documents. Bidder shall initial in ink any corrections, interlineations, alterations, or erasures made by the Bidder on Bidder�s entries in the Bid Documents.

C. Any work or material which is specified in the Contract Documents or which is necessary because of the nature of the Work, but which is not listed separately in the Bid Schedule shall not be measured or paid for separately. The cost of such work or material shall be considered as included in the Contract Price.

D. Bids by corporations must be executed in the corporate name by a corporate officer authorized to sign, and must be properly attested to as an official act of the corporation.

At the OWNER's request, authority to sign shall be submitted.

E. Bids by partnerships or joint ventures must be executed in the partnership or joint venture name and signed by a partner or joint venture whose title and official address must be shown. If a partnership or joint venture is the low bidder, the partnership or joint venture must also submit evidence to the OWNER of the responsibility of the partnership or joint venture as a bidder in the manner directed by the ENGINEER.

F. Where the Bidder is wholly owned subsidiary of another company, the Bid must so state, and the owner or parent corporation also must agree to sign and be bound with the Bidder.

G. All names must be typed or printed under or near the signature. Signatures shall be in longhand.

H. The Bid shall contain an acknowledgment of receipt of all Addenda. The Addenda numbers must be filled in on the Bid form.

I. The Bidder's address, telephone number, facsimile number, and email address for communications regarding the Bid must be shown on the first page of the Bid form.

J. The divisions and sections of the specifications, and the identifications of any

Drawings, shall not control Bidder in dividing the Work among subcontractors or suppliers, or delineating the Work to be performed by any specific trade.

K. The base Bid and alternates shall include all Work required to be performed by the

Contract Documents.

2.5 CONFLICT OF INTEREST, SUBCONTRACTORS

A. Conflict of interest pertaining to Subcontractors is described in paragraph 6.5H of the

General Conditions.

B. Bidder shall not subcontract more than 75 percent of the dollar value of the total contemplated Work (exclusive of the supply of materials and equipment to be incorporated in the Work) without OWNER's prior written approval.

00 20 00 - 8

2.6 SUBMISSION OF BIDS

A. Bids shall be submitted at the time and place indicated in the Invitation to Bid. It is the sole responsibility of the Bidder to deliver the Bid before the scheduled time.

B. Bidder will make no recapitulations, stipulations, alterations, alternate submissions, or modifications in any manner to any of the Contract Documents.

C. Bidder must submit a Bid by completing all of the Bid Form Documents and Bid

Attachments, which are:

1. Bid Security amount and Bidder�s information in Bid (Document 00 40 00)

2. The Bid portion of the Bid Schedule which is included in these Contract Documents, which shall be in the form of a lump sum, or in the form of unit pricing pursuant to the

Bid Schedule (Document 00 41 00).

3. The Bid Security (Document 00 42 00).

4. Bidder Status Report (Document 00 45 20)

5. Subcontractor and Supplier Report (Document 00 45 30)

6. Preference System Checklist (Form 00 22 01) when required

D. Alternate bids, other than those called for in the Bid Schedule, will not be considered.

E. No oral, telegraphic, telephonic, facsimile or modified bids will be considered.

F. Bids may be submitted directly to the City Recorder via email when indicated in the

Invitation to Bid. Bidder shall combine all Bid submittal documents to ONE PDF document when required to do so.

2.7 MODIFICATION AND WITHDRAWAL OF BIDS

A. At any time prior to the opening of Bids, Bids may be modified or withdrawn if a written notice of modification or withdrawal is signed by Bidder and delivered to the place where

Bids are to be submitted. Bid Security will be returned upon proper withdrawal of a Bid prior to the time for Bid opening.

B. Within 24 hours after Bids are opened, any Bidder may file written notice with OWNER that there was a substantial mistake made in the preparation of its Bid. Bidder must thereafter promptly demonstrate Bidder's mistake. The OWNER has sole discretion to determine whether to permit any modification or withdrawal or the return of any Bid

Security.

00 20 00 - 9

C. When it appears a mistake has been made, or when the OWNER desires an assurance of any matter, the OWNER may request a Bidder to confirm the Bid in writing.

2.8 OPENING OF BIDS

A. Bids will be opened and read aloud publicly unless obviously non-responsive. An abstract of the amounts of the base schedule of prices and any alternate schedules will be made available for review after the opening of Bids.

B. Any Bids received after the time specified in the Invitation to Bid will be returned unopened.

C. Bids may be opened internally when indicated in the Invitation to Bid.

2.9 BIDS SUBJECT TO ACCEPTANCE FOR 45 DAYS

A. All bids remain subject to acceptance for 45 days after the day of the Bid opening.

OWNER may, in its sole discretion, release any Bid and return the Bid security prior to that date.

PART 3 EVALUATION AND AWARD

3.1 EVALUATION OF BIDDER'S QUALIFICATIONS

A. Within seven (7) calendar days of ENGINEER's request, a Bidder, whose Bid is under consideration for award shall submit to the ENGINEER the following information for the

Bidder. ENGINEER may request like information on Bidder's Subcontractors, Bidder's

Suppliers or any other information the ENGINEER may require.

1. A current financial statement for the Work (as provided to bonding company);

2. A chronological list of "in progress" and "completed" construction work done by

Bidder during the last 3 years; including project name, address, owner, contract name, and current telephone number;

3. Present construction commitments other than items listed in paragraph 2 above;

4. Proposed organizational structure such as firm ownership, project manager, progress scheduler, and superintendent for the Work of this Project;

5. Owned and rented equipment which is to be used to do the Work;

6. Investigations, arbitration, litigation or claims which are pending, threatened, settled or otherwise disposed of within the last three (3) years;

00 20 00 - 10

7. Evidence of ability to perform and complete the Work in a manner and within the time limit specified. As a minimum, identify specific experience on projects similar to the Work in physical size, cost, and commercial nature. If the work experiences of the project manager and superintendent designated to construct this project are different than that of the company, provide resumes of their work history. Include their actual project titles and indicate their actual responsibilities on each given project;

8. All matters consistent with federal, state and local Laws and Regulations; and

9. Such other data as may be called by the ENGINEER.

B. If Bidder believes any information should be held confidential for business reasons, Bidder must submit a written claim of business confidentiality for that particular information and include a specific statement of the reasons supporting the claim pursuant to Utah Code Ann. 63-2-308.

C. Untimely response or failure to provide the requested information by Bidder will release

OWNER of any obligation to further consider the Bidder's Bid.

3.2 EVALUATION OF BIDS

A. OWNER reserves the right: to reject any and all Bids or any part thereof; to waive any informalities in the Bid Schedule and elsewhere; to negotiate and agree to contract terms with the successful Bidder; to disregard non-conforming, non-responsive, unbalanced or conditional Bids; and to withhold the award for any reason deemed in the best interests of the OWNER.

B. OWNER reserves the right to reject any Bid if OWNER believes that it would not be in the best interest of the Project or the OWNER. Without limitation, such rejection may be because the Bid is not responsive, or the Bidder is unqualified or of doubtful ability or the

Bid or Bidder fails to meet any other pertinent standard or criteria established by

OWNER.

C. If the OWNER intends to make an award to a Bidder, a Notice of Intent to Award will be issued.

D. OWNER may consider all information which OWNER believes is relevant when evaluating a Bid, including, without limitation:

1. The qualifications and experience of the Bidder and of the Subcontractors, Suppliers, and other persons and organizations proposed (whether or not the Bid otherwise complies with the prescribed requirements).

00 20 00 - 11

2. Such alternates, unit prices and other data, as may be requested in the Bid Form, Bid

Schedule, or written requests issued prior to OWNER's Notice of Intent to Award the

Construction Contract.

3. Operating costs, maintenance requirements, performance data, and guarantees of ability to provide the required materials and equipment.

4. Corporate organization and capacity for any party.

5. Ability to perform and complete the Work in the manner and within the time specified.

6. Pending litigation.

7. The amount of the Bid.

8. Proper licensing to do the Work in compliance with licensing laws of the State of

Utah for contractors and subcontractors.

9. All other relevant matters, consistent with OWNER's procurement code and administrative rules, OWNER's ordinances and program policies.

E. To establish qualifications of Bidder, OWNER may request such data indicated in the Bid

Documents, conduct such investigations as OWNER deems appropriate, and consider any other information (whether obtained from the Bid, the Bidder, or any other source).

F. If the Construction Contract is to be awarded, it will be awarded to the lowest bid, most responsive qualified, and responsible Bidder as determined by the OWNER. Alternates may be accepted depending upon availability of OWNER's funds and as determined by the OWNER. Accepted alternates will be considered in determining the most responsive, qualified, and responsible Bidder.

G. Bid Schedules will be evaluated as follows:

1. Discrepancies in the multiplication of quantities of Work items and unit prices will be resolved in favor of the unit prices. OWNER may correct Bid Schedule calculation errors accordingly.

2. Prices written out in words shall govern over prices written out in numbers.

3. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.

4. Bids shall not contain any recapitulations of or changes in the work to be done.

H. The OWNER, in the OWNER�s sole discretion, shall make determinations as to

00 20 00 - 12 disqualification of Bidders or rejection of Bids. Such matters may include, without limitation, submission of more than one Bid by the Bidder (whether under the same or different names); evidence of collusion among Bidders; other commitments of Bidder which, in the OWNER�s sole judgment, might hinder the Work; previous defaults, Bid irregularities when not waived in the best interests of the OWNER, delays or poor performance by Bidder on any project; official action against Bidder; and any other cause which, in the OWNER�s sole discretion and judgment, is sufficient to justify disqualification of a Bidder or rejection of a Bid.

3.3 ADJUSTMENTS TO THE COST OF THE WORK AFTER OPENING OF BIDS

A. The Contract Price identified in the Agreement represents the cost of the work which is to be paid by the OWNER to the CONTRACTOR.

B. Adjustments to the Contract Price which are agreed to between the OWNER and the successful Bidder shall be effected by signing an Agreement Supplement.

3.4 SUBSTITUTIONS

A. The Construction Contract, if awarded, will be on the basis of materials and equipment described in the Drawings, Specifications and any Addenda.

B. After the Effective Date of the Construction Contract, the procedure for submitting an application for substitution is set forth in Article 6.4 of the General Conditions.

3.5 SUBMITTALS REQUIRED FOR AWARD OF CONTRACT

A. Agreement Attachments: The Agreement Attachments shall be submitted within 7 days after OWNER gives Notice of Intent to Award the Construction Contract, or Agreement

(Document 00 50 00)

1. The Attachments include: E Verify Form (Document 00 60 50), Performance Bond

(Document 00 61 00), Payment Bond (Document 00 62 00), and Certificate(s) of

Insurance (Document 00 65 00).

2. The Attachments shall be carefully examined by the Bidder.

3. The successful Bidder shall deliver the required Agreement Attachments prior to the execution of the Construction Contract to OWNER.

4. Refer to Certificate(s) of Insurance (Document 00 50 00) for requirements.

B. Other Information: When a determination has been made to award the Construction

Contract, Bidder is required, prior to the award or after the award, or both, to furnish such other information as the ENGINEER requests.

00 20 00 - 13

3.6 SIGNING OF AGREEMENT

A. OWNER furnishes the Construction Contract within 14 days after receiving the required

Agreement Attachments. The Bidder shall pick up, sign and return to OWNER within 3 days the required number of copies of the Construction Contract. A minimum of three (3) originals will be signed and returned to the OWNER. One executed original will be returned to the Bidder. Bidder shall comply with all execution requirements.

B. All of Bidder�s executions and submittals must be delivered to the OWNER before

OWNER will furnish the Construction Contract. The Construction Contract will not be deemed awarded and shall not be binding on the OWNER until it has been approved and executed by the OWNER, and a fully executed copy is formally delivered to the

CONTRACTOR. The OWNER reserves the right to rescind its Notice of Intent to

Award without liability, except for the return of Bidder�s Bid Security, at any time before the Construction Contract has been fully executed by all parties and delivered to the CONTRACTOR.

C. Transfers, delegations or assignments of interests in the Contract Documents are prohibited, unless prior written authorization is received from the OWNER.

D. At the time of Bidding, and the signing of the Agreement, and at all times during the

Work, Bidder shall be properly licensed to do the Work and shall be in compliance with the license laws of the State of Utah, South Salt Lake City, and Salt Lake County. The

Bidder shall also require all Subcontractors to do the same.

E. If a Bidder fails to fully and properly execute the Construction Contract and provide all submittals required therewith within five (5) days after the date of the Construction

Contract, the OWNER may elect to rescind the Notice of Intent to Award, and the

OWNER shall be entitled to the full amount of Bidder�s Bid Security, not as a penalty, but in liquidation of and compensation for damages sustained. In the OWNER�s sole discretion, a Notice of Intent to Award may then be provided to another bidder whose

Bid is most advantageous to the OWNER, price and other factors considered.

Modifications to Instructions to Bidders

00 22 01 - 1

DOCUMENT 00 20 01

MODIFICATIONS TO INSTRUCTIONS TO BIDDERS

This document changes provisions in the Instructions to Bidders. All other provisions of the

Instructions to Bidders document remain in full force and effect.

Add the following paragraph to article 1.1

1.1 DESCRIPTION OF WORK

B. General Conditions: as published in Document 00 72 00 in the 2017 Edition of the

Manual of Standard Specifications by the Utah Chapter of the American Public

Works Association.

Add the following paragraph to article 1.2

1.2 COPIES OF BID DOCUMENTS

D. All provisions of the 2017 Edition of the Manual of Standard Specifications and

Manual of Standard Plans published by the Utah Chapter of the American Public

Works Association that are applicable to the Work are hereby made a part of the

Contract Documents by reference. The publications may be purchased separately from the Utah technology Transfer Center, Utah State University 8205 Old Main Hill, Logan UT 84322-8205.

Remove paragraph A. of article 2.2 and replace with the following.

2.2 EQUIPMENT AND MATERIAL OPTIONS PRIOR TO BID OPENING

A. If a Bidder or Supplier wishes to supply a product other than that identified in the

Contract Documents, said Bidder or Supplier shall submit a written request for approval to the ENGINEER at least five (5) calendar days prior to the date set for opening of bids.

Remove paragraph C. of article 2.2 and replace with the following.

2.2 EQUIPMENT AND MATERIAL OPTIONS PRIOR TO BID OPENING

C. ENGINEER�s failure to act upon such a request within three (3) days after receipt shall be deemed ad denial thereof.

00 22 01 - 2

Remove paragraph A. of article 3.1 and replace with the following.

3.1 EVALUATION OF BIDDER'S QUALIFICATIONS

A. Within five (5) calendar days of ENGINEER's request, a Bidder, whose Bid is under consideration for award shall submit to the ENGINEER the following information for the Bidder. ENGINEER may request like information on Bidder's Subcontractors, Bidder's Suppliers or any other information the ENGINEER may require.

1. A current financial statement for the Work (as provided to bonding company);

2. A chronological list of "in progress" and "completed" construction work done by

Bidder during the last 3 years; including project name, address, owner, contract name, and current telephone number;

3. Present construction commitments other than items listed in paragraph 2 above;

4. Proposed organizational structure such as firm ownership, project manager, progress scheduler, and superintendent for the Work of this Project;

5. Owned and rented equipment that is to be used to do the Work;

6. Investigations, arbitration, litigation or claims which are pending, threatened, settled or otherwise disposed of within the last three (3) years;

7. Evidence of ability to perform and complete the Work in a manner and within the time limit specified. As a minimum, identify specific experience on projects similar to the Work in physical size, cost, and commercial nature. If the work experiences of the project manager and superintendent designated to construct this project are different than that of the company, provide resumes of their work history. Include their actual project titles and indicate their actual responsibilities on each given project;

8. All matters consistent with federal, state and local Laws and Regulations; and

9. Such other data as may be called by the ENGINEER.

Add the following paragraph to article 3.2.

3.2 EVALUATION OF BIDS

I. The following firms have been under contract to the OWNER in the design phase of the Work. They shall not be used as subcontractors by the CONTRACTOR.

00 22 01 - 3

1. Design Consultant: None .

2. Geotechnical Consultant: None .

3. Surveying Consultant: None .

4. Other: None .

5. Other: None .

J. The contractor and every subcontractor, if any, shall certify to the Purchasing Agent and provide appropriate documentation whether they have and will maintain the following preference criteria:

1. An offer of qualified health insurance available to a contractor's and subcontractor's covered employees and the employee's dependents;

2. A drug and alcohol testing policy during the period of the contract that:

i. Applies to all covered employees of the contractor and any subcontractor; and

ii. Requires covered employees to submit to random testing under the drug and alcohol testing policy;

3. A program to actively recruit and employ veterans;

4. A federal or state recognized job training program or a city-approved job training program;

5. A safety program; and

6. A formal policy of nondiscrimination consistent with federal, state, and local law.

This paragraph refers to South Salt Lake City Ordinances section 3.12.130, and the

�Preference System Checklist� (Form 00 22 01) shall be used for OWNER�s evaluation.

Remove paragraph A. of article 3.6 and replace with the following.

3.6 SIGNING OF AGREEMENT

A. After OWNER gives Notice of Intent to Award the Construction Contract to the successful Bidder, the Bidder shall pick up, sign and return to OWNER, the required number of copies of the Construction Contract, bonds and insurance. A minimum of three (3) originals will be signed and returned to the OWNER. One executed original will be returned to the Bidder. Bidder shall comply with all execution requirements.

00 22 01 - 4

Remove paragraph E. of article 3.6 and replace with the following.

3.6 SIGNING OF AGREEMENT

E. If a Bidder fails to fully and properly execute the Construction Contract and provide all submittals required therewith within five (5) days after the date of the Notice of Intent to Award, the OWNER may elect to rescind the Notice of Intent to Award, and the

OWNER shall be entitled to the full amount of Bidder�s Bid Security, not as a penalty, but in liquidation of and compensation for damages sustained. In the OWNER�s sole discretion, a Notice of Intent to Award may then be provided to another bidder whose

Bid is most advantageous to the OWNER, price and other factors considered.

Form 00 22 01

00 22 01 - 5

Preference System Checklist

The Contractor and every subcontractor, if any, shall certify and provide appropriate documentation whether they have and will maintain the following preference criteria:

Yes No

___ ___ An offer of qualified health insurance available to the contractor�s and subcontractor�s covered employees and the employee�s dependents

___ ___ A drug and alcohol testing policy during the period of the contract that:

___ ___ applies to all covered employees of the contractor and any subcontractor; and

___ ___ requires covered employees to submit to random testing under the drug and alcohol testing policy

___ ___ A program to actively recruit and employ veterans

___ ___ A federal or state recognized job training program or a city-approved job training program

___ ___ A safety program

___ ___ A formal policy of nondiscrimination consistent with federal, state, and local law

Bid Submittal Checklist

00 20 02 - 1

DOCUMENT 00 20 02

BID SUBMITTAL CHECKLIST

PART 1 BID INFORMATION

1.1 BIDDER

A. Bidder�s Name:

B. Bidder�s Phone Number:

C. Bidder�s Email Address:

PART 2 CHECKLIST

2.1 DISCLAIMER

In an effort to assist the Bidder in properly completing all documentation required for submitting a Bid, the following checklist is provided for the Bidder's convenience. The

Bidder is solely responsible for verifying compliance with Instructions to Bidders

(Document 00 20 00), including those are not specifically stated below.

2.2 CHECKLIST

A. Complete and sign Bid (Document 00 40 00);

B. Bid Schedule (Document 00 41 00) is attached;

C. Bid Security (Document 00 42 00) is attached;

D. Bidder Status Report (Document 00 45 20) is attached;

E. Subcontractor and Supplier Report (Document 00 45 30) is attached.

F. Preference System Checklist (Form 00 22 01) is attached.

Bid 00 40 00 - 1

DOCUMENT 00 40 00

BID

PART 1 GENERAL

1.1 BID PROPOSAL

A. After having personally and carefully examined all conditions surrounding the Work and the Contract Documents, the undersigned proposes to furnish all labor, equipment, tools and machinery and to furnish and deliver all materials not specifically mentioned as being furnished by the OWNER, which is required in and about the construction of the Construction Contract known as

2025 Slurry Seal

B. The undersigned proposes to complete the Work for the price or prices listed in the Bid Schedule (Document 00 41 00) and understands that quantities for Unit Price Work are not guaranteed.

C. The undersigned proposes to furnish bonds with the Contract, signed by a surety company satisfactory to the OWNER, in an amount equal to the Contract amount conditioned to insure compliance with all requirements of the Contract Documents.

D. The undersigned encloses a certified check, cashier's check, cash, or a Bid Bond for

________________________________________________ Dollars ($ ____________) which is (five (5) percent of the Bid amount) payable to the OWNER, as a guarantee of good faith, and which it is agreed will be forfeited to the OWNER as liquidated damages in the event of the failure of the undersigned to enter into a contract and furnish satisfactory bonds to the OWNER.

E. The undersigned proposes to execute the attached contract within five (5) days after the Notice of Intention to Award, and to begin work within ten (10) days after being notified to do so by the OWNER.

F. If OWNER finds it necessary to further define the Work, Contract Price, Contract Time or some other portion of the Construction Contract, after Bid opening, the Bidder promises to execute an Agreement Supplement prior to or concurrent with the execution of the Agreement, if the Agreement Supplement is acceptable to the Bidder.

G. It is understood that the OWNER has the right to reject this proposal or to accept it at the prices listed in the Bid Schedule.

Bid 00 40 00 - 2

PART 2 EXECUTION

2.1 BIDDER

A. The Bidder is as follows

Name:

Address:

Telephone number:

Facsimile number:

Tax identification number:

B. Bidder holds license number _______________________________________, issued on the _____ day of ________________________, ________, by the Utah State Department of Commerce, Division of Occupational and Professional Licensing.

Bidder is licensed to practice as a ___________________________ Contractor.

License renewal date is the ___________ day of ________________, _______.

C. The undersigned hereby acknowledges receipt of the following Addenda.

(list Addenda numbers here)

2.2 BIDDER'S SUBSCRIPTION

A. Date: _________________________

B. Bidder's Signature:

C. Please print Bidder's name here:

D. Title:

Bid Schedule

00 41 00 � 1

DOCUMENT 00 41 00

BID SCHEDULE

PART 1 GENERAL

1.1 DOCUMENT INCLUDES

A. Price schedules.

B. Measurement and payment provisions.

1.2 CONSTRUCTION CONTRACT

A. The Construction Contract is known as

2025 Slurry Seal

1.3 REFERENCES

A. APWA 01 29 00: Payment Procedures.

B. Document 00 50 00: Agreement.

1.4 SCHEDULE TO BE ADDED TO THE AGREEMENT

A. This document will be added to the Agreement by reference.

PART 2 PRICE SCHEDULES

2.1 BASE BID and ADDITIVE ALTERNATES

A. Location: The Base Bid covers work on the following streets.

Bid Schedule A � Covers work on multiple streets in South Salt Lake City. (See

Project Map and Bid Schedule Form 00 41 01 for details), end at Point of Curve.

B. Additive Alternates: NONE.

2.2 Bid Schedule (Form 00 41 01)

00 41 00 � 2

Bid Schedule:

Item

No Spec. No

Approx

Quantity

Item

Unit

Item Description (with Unit Bid Price written in words)

Unit Bid Price

Amount Amount

1 01 55 26 1 LS Traffic Control

2 01 71 13 1 LS Mobilization

3 01 31 13 1 LS Coordination

4.1 32 01 13.61 22,840 SF

Blair St (345 E) from 2100-2175 South

(Type II)

4.2 32 01 13.61 19,526 SF

Utopia Ave (2185 S) from 300-400 East

4.3 32 01 13.61 20,944 SF

Wentworth Ave (2205 S) from 400-500

East (Type II)

4.4 32 01 13.61 56,906 SF

Haven Ave (2290 S) from 300-500 East

4.5 32 01 13.61 63,058 SF

Truman Ave (2335 S) from 300-500 East

4.6 32 01 13.61 52,292 SF

Burton Ave (2360 S) from 300-500 East

4.7 32 01 13.61 44,370 SF 2400 South from 300-500 East (Type II)

4.8 32 01 13.61 34,238 SF 400 East from 2290-2400 South (Type II)

4.9 32 01 13.61 22,066 SF

Warnock Ave (2470 S) from 400-500 East

4.10 32 01 13.61 19,500 SF

Stephie Marie Ln (2500 S) from 400-500

00 41 00 � 3

4.11 32 01 13.61 26,625 SF

Beryl Ave (2530 S) from 300-400 East

4.12 32 01 13.61 27,000 SF

Vidas Ave (2570 S) from 300-400 East

4.13 32 01 13.61 19,500 SF

Leslie Ave (2600 S) from 300-400 East

4.14 32 01 13.61 12,479 SF

Vidas Ave (2570 S) from 400-430 East

4.15 32 01 13.61 9,928 SF

Leslie Ave (2600 S) from 400-430 East

4.16 32 01 13.61 12,479 SF

Adams St (430 E) from 2570-2600 South

4.17 32 01 13.61 11,102 SF

Roberta St (260 E) from 2100-2155 South

4.18 32 01 13.61 11,743 SF 230 East from 2100-2155 South (Type II)

4.19 32 01 13.61 6,533 SF

Nowell Cir (230 E) from 2155-2190 South

4.20 32 01 13.61 29,315 SF

Commonwealth Ave (2140 S) from 100-

200 East (Type II)

4.21 32 01 13.61 15,645 SF

Commonwealth Ave (2155 S) from 200-

300 East (Type II)

4.22 32 01 13.61 29,315 SF

Utopia Ave (2190 S) from 100-200 East

4.23 32 01 13.61 58,500 SF

Wentworth Ave (2205 S) from 100-300

4.24 32 01 13.61 19,950 SF 200 East from 2335-2400 South (Type II)

00 41 00 � 4

4.25 32 01 13.61 55,860 SF

Burton Ave (2360 S) from 110-300 East

4.26 32 01 13.61 43,890 SF 2400 South from 110-200 East (Type II)

4.27 32 01 13.61 20,213 SF

Oakland Ave (2470 S) from 100-200 East

4.28 32 01 13.61 43,239 SF

Whitlock Ave (2500 S) from 100-300 East

4.29 32 01 13.61 62,622 SF

Beryl Ave (2540 S) from 100-300 East

4.30 32 01 13.61 61,131 SF

Vidas Ave (2580 S) from 100-300 East

4.31 32 01 13.61 34,645 SF 200 East from 2500-2700 South (Type II)

4.32 32 01 13.61 6,804 SF

Major Street (60 E) from 2100-2125 South

4.33 32 01 13.61 6,000 SF

Utopia Ave (2170 S) from 80-100…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .