Site Visit Notes_Attendance 26 August 2021.docx
DOCX document 14 KB Posted
- Attached to
- F16 Flight Simulator Security System Refresh
- Solicitation number
- W50S6W-21-Q-6005
- Issued by
-
Department of the Army National Guard
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW Revised 30 August 2021 Alarm Security Refresh.docx | DOCX document | |
| 6. Price List (Attch 2).docx | DOCX document | |
| 3. Statement of Work F16 Flight Simulator Security System Refresh (Attch 1).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Site Visit Notes (26 August 2021) Alarm Security Refresh
The following information was discovered during the site visit. The technical experts described the needed equipment installations as follows:
· Work will be performed in the R76 Building across from Building 3029.
· All specifications for installed equipment shall be in accordance and compliance with the ICD 705. Specifications and characteristics shall meet the minimum requirements of the ICD 705.
· 2 Magnetic Locks are required. One 1 on the front door of the building and one 1 on the entrapment door
· 4 Balanced Magnetic Switch (BMS) mechanisms are required. 1 on each door of the building.
· 1 Regular Proximity reader on Exterior Door
· 1 Proximity pin on entrapment door
· 1 Audible sounder on rear door
· 5 motion detectors. 1 for each ceiling corner of the building and 1 in the center of the ceiling.
· 1 CCTV camera at outside door entrance. 1 corresponding monitor to the CCTV shall be installed in the inner door of the building entrance.
· 1 Intrusion Detection Vindicator panel to be installed inside National Electrical Manufacturers Association (NEMA) enclosure
· 5 Blue strobe lights. Installed throughout the walls of the building. Lights should be controlled by a corresponding switch.
· 2 Request to Exit (Rex) Motions. 1 for each entrance. 2 corresponding “Push to exit” buttons (1 for each Rex motion).
· Programming of Vindicator and test for compatibility.
· Training to indicate full operational compliance of hardware installed
· Program into Vindicator head end and test for burn in and test for turnover.
Meeting Attendance
1. TSgt McKenzie (CCZ Office)
2. SSgt Mazepa (CCZ Office)
3. MSgt McGee (CCZ Office)
4. MSgt Im (Contracting Office)
5. Captain McDowell (Contracting Office)
6. Tyler Holt (SETEC)