single_source_justification_ECC Relocation ADVANTOR.pdf
PDF 210 KB Posted
- Solicitation number
- Not on record
About this file
The document is a Single Source Justification (Simplified Acquisition) for the uninstall and reinstall of Advantor Intrusion Detection System (IDS) workstations and servers. The project involves relocating the Emergency Communications Center (ECC) from Building 7073 (Hangar 5) to Building 3400 for the 439th Security Forces Squadron. The estimated contract cost is $88,081.18, and the justification for sole source procurement is based on Air Force Reserve Command's previous standardization of the Advantor IDS system through a competitive process.
The document indicates that because the Advantor IDS is proprietary, the Air Force is required to purchase services directly from Advantor as a sole source vendor. The contracting officer, Alex Arnold (GS-12), has determined that only a single source is reasonably available in accordance with Federal Acquisition Regulation (FAR) 13.106-1(b)(1). The procurement is not considered a bridge action, and no competitive efforts or future prevention steps were deemed necessary for this specific requirement.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Single Source Justification (Simplified Acquisition)
November 2018 Page 1 of 2
Section A: General Contract Information
Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan? Yes No
Contracting Activity: Uninstall/Install of Advantor IDS workstation/server(s)
Project/Program Name: ECC Relocation
Purchase Request / Local ID Number: F5N3SF5121A001
Estimated Contract Cost (including Options): $88,081.18
Section B: Description of the Supplies/Services Required
Advantor technician to uninstall current workstation/server(s) in Building 7073 (Hangar 5), and install same equipment in Building 3400 (new primary ECC). New requirement which will be sole source/brand name purchase. In an effort to standardize Intrusion Detection System (IDS) equipment and to facilitate centralized monitoring of alarms, Air Force Reserve Command (AFRC) adopted the Advantor IDS as the standard system through a previously awarded competitive process. Building 7073 (Hangar 5) is currently the alternate Emergency Communications Center(ECC) for the 439 SFS.
The new primary ECC will be Building 3400. In order to successfully migrate over to the new primary location, an IDS system (workstations and servers) must be installed. Because this system is proprietary in nature, we are required to purchase the services outlined in this requirement directly from Advantor sole source.
Section C: Justification for Soliciting from a Single Source or Brand Name
In an effort to standardize Intrusion Detection System (IDS) equipment and to facilitate centralized monitoring of alarms, Air Force Reserve Command (AFRC) adopted the Advantor IDS as the standard system through a previously awarded competitive process. Because this system is propriety in nature, we are required to purchase the services directly from Advantor sole source.
In order to successfully migrate over to the new primary location, an IDS system (workstations and servers) must be installed. Because this system is proprietary in nature, we are required to purchase the services outlined in this requirement directly from Advantor sole source.
Section D: Efforts to Obtain Competition
N/A
Section E: Steps to Preclude Future Single Source or Brand Name Awards
N/A
November 2018 Page 2 of 2
Section F: Contracting Officer's Determination
I have determined, in accordance with FAR 13.106-1(b)(1), that the circumstances of this contract action deem only a single source is reasonably available.
Date
28-May-2025
Typed Name and Rank/Grade of Contracting Officer
Alex Arnold GS-12 Contracting Officer
Signature of Contracting Officer
November 2018 Page of Section A: General Contract Information Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan?
Section B: Description of the Supplies/Services Required Section C: Justification for Soliciting from a Single Source or Brand Name Section D: Efforts to Obtain Competition Section E: Steps to Preclude Future Single Source or Brand Name Awards Section F: Contracting Officer's Determination I have determined, in accordance with FAR 13.106-1(b)(1), that the circumstances of this contract action deem only a single source is reasonably available.
9.0.0.2.20120627.2.874785
| security_markings: |
| CurrentPage: |
| PageCount: |
| Yes: |
| No: |
| Contract_Activity: Uninstall/Install of Advantor IDS workstation/server(s) |
| Project_Name: ECC Relocation |
| PR-ID_Number: F5N3SF5121A001 |
| Estimated_Cost: $88,081.18 |
| Text: |
| Date: 28-May-2025 |
| Name: Alex Arnold GS-12 Contracting Officer |
| Signature: |